Mencari Kapasitas Dukung Ijin Tiang Tunggal, Efisiensi Grup, dan Kapasitas Ijin Kelompok

Data tanah
Yb1 = 15.2 kN/m3 Yb2 = 17.4 kN/m3
Cu1 = 20 kN/m3 Cu2 = 60 kN/m3
Dimensi dan lain2
h1 = 5m Berat tiang = 3.5 Kn/m
h2 = 10 m
Kedalaman = 15 m
Diameter(d) = 0.3 m

Luas selimut (AS1) = π . D. H1 = 4.712 m2 Luas alas (Ab) = 1/4.π.d^2


Luas selimut (AS2) = π . D. H2 = 9.425 m2 Ab = 0.071 m2

Metode Alpha (α )
FS1 = α . Cu1 = 20 kN/m2 α=1 nilai α dari grafik hal 138 buku
FS2 = α . Cu2 = 33 kN/m2 α = 0.55 Teknik Pondasi II, Hary Christady
Hardiyatmo
QS1 = AS1 . FS1 = 94.248 Kn
QS2 = AS2 . FS2 = 311.018 Kn +
QS = 405.265 Kn

Wp = Berat tiang . Kedalaman = 52.5 Kn

QB = Ab . Fb Cb =Cu2 = 60 kN/m3
QB = 55.842 Kn Tek.overbuden di ujung tiang (Pb) = Y1.h1 + Y2.h2
Pb = 250 kN/m2
Fb = 9.Cb + Pb = 790

QU = QB + QS -WP = 408.607 Kn
Kapasitas dukung ijin tunggal
QA = Qb/3 + QS/1,5 -Wp = 236.291 Kn

Efisiensi Grup
d= 0.3 m
s= 0.75 m
θ =arc tg.d/s = 21.801
Jumlah baris tiang (m) = 3 baris
Jumlah tiang dalam satu baris (n')= 3 tiang
Jumlah tiang (N) = m . N' = 9 tiang
Efisiensi grup (Eg) = 1-θ. (n'-1).m + (m-1).n'/90.m.n'= 0.677 67.70 % yang efektif
Kapasitas ijin kelompok tiang yang dipakai = Eg . N . Qa 1439.7548 KN
grafik hal 138 buku
"Analisis dan Perancangan Fondasi II", Hary Christady Hardiyatmo