+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
44
45
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1269
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1269
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1269
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
= 3 m2
Luas IX = (2,775 + 3 )/2 x 7,5
= 21,656 m2
Luas X = (2,655 + 2,755)/2 x 2,00
= 5,41 m2
Luas XI = (2,755 x 1)
= 2,755 m2
Luas XII = (2,755 +1,755)/2 x 0,25
= 0,564 m2
Luas XIII = (0,5 x 1,755)
= 0,8775 m2
Luas XIV = (2,755 +1,755)/2 x 0,25
= 0,564 m2
Luas XV = (2,755 x 1,00)
= 2,755 m2
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
= 3 m2
Luas IX = (2,775 + 3 )/2 x 7,5
= 21,656 m2
Luas X = (2,655 + 2,755)/2 x 2,00
= 5,41 m2
Luas XI = (2,755 x 1)
= 2,755 m2
Luas XII = (2,755 +1,755)/2 x 0,25
= 0,564 m2
Luas XIII = (0,5 x 1,755)
= 0,8775 m2
Luas XIV = (2,755 +1,755)/2 x 0,25
= 0,564 m2
Luas XV = (2,755 x 1,00)
= 2,755 m2
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
STA 0+700
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
55
5
5
75
5
5
55
+1274
,75
,75
,65
,77
,65
,75
,75
3,7
3,7
3,7
73
73
73
73
73
73
73
27
27
27
+12
+12
+12
+12
+12
+12
+12
+1
+1
+1
+1278
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
+1280
+1279
+1278
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
= 6 m2
Luas IX = (6,225 + 6 )/2 x 7,5
= 45,844 m2
Luas X = (6,345 + 6,225)/2 x 2,00
= 12,57 m2
Luas XI = (6,245 x 1)
= 6,245 m2
Luas XII = (6,245 +7,245)/2 x 0,25
= 1,686 m2
Luas XIII = (0,5 x 6,245)
= 3,1225 m2
Luas XIV = (6,245 +7,245)/2 x 0,25
= 1,686 m2
Luas XV = (6,245 x 1,00)
= 6,245 m2
+1283
+1282
+1281
+1280
+1279
+1278
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1273,755
+1273,755
+1273,775
+1273,755
+1273,655
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
= 9 m2
Luas IX = (9,225 + 9 )/2 x 7,5
= 68,344 m2
Luas X = (9,345 + 9,225)/2 x 2,00
= 18,57 m2
Luas XI = (9,245 x 1)
= 9,245 m2
Luas XII = (9,245 +10,245)/2 x 0,25
= 2,43625 m2
Luas XIII = (0,5 x 10,245)
= 5,1225 m2
Luas XIV = (9,245 +10,245)/2 x 0,25
= 2,43625 m2
Luas XV = (9,245 x 1,00)
= 9,245 m2
+1281
+1280
+1279
+1278
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
= 53,344 m2
Luas X = (7,345 + 7,225)/2 x 2,00
= 14,57 m2
Luas XI = (7,245 x 1)
= 7,245 m2
Luas XII = (7,245 +8,245)/2 x 0,25
= 1,94 m2
Luas XIII = (0,5 x 8,245)
= 4,1225 m2
Luas XIV = (7,245 +8,245)/2 x 0,25
= 1,94 m2
Luas XV = (7,245 x 1,00)
= 7,245 m2
+1278
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
STA 1+000
+1278
+1277
+1276
+1275
3% 3% 6%
+1274 6%
+1273
100 100 100 200 750 100 750 200 100 100 100
+1272
+1271
+1270
+1273,755
+1273,755
+1273,755
+1273,655
+1273,775
+1273,775
+1273,655
+1273,755
+1273,755
+1273,755
+1274
= 3 m2
Luas IX = (3,225 + 3 )/2 x 7,5
= 23,344 m2
Luas X = (3,345 + 3,225)/2 x 2,00
= 6,57 m2
Luas XI = (3,245 x 1)
= 3,245 m2
Luas XII = (3,245 +4,245)/2 x 0,25
= 0,94 m2
Luas XIII = (0,5 x 4,245)
= 2,1225 m2
Luas XIV = (3,245 +4,245)/2 x 0,25
= 0,94 m2
Luas XV = (3,245 x 1,00)
= 3,245 m2
STA 1+050
85
STA 1+600
= 2,33 m2
Luas XIV = (1,15 x 4,6)/2
= 2,66 m2
Luas total galian = 54,79 m2
Luas total timbunan = 2,94 m2
STA 1+700
STA 1+800
= 40,83 m2
Luas VII = (19,5 + 20,3) x 3,75/2
= 74,49 m2
Luas VIII = (16,9 + 19,5) x 3,75/2
= 68,10 m2
Luas IX = (15,3 + 16,9) x 2,00/2
= 32,20 m2
Luas X = (13,4 + 15,3) x 0,50/2
= 7,19 m2
Luas XI = (13,1 + 13,4) x 0,50/2
= 6,63 m2
Luas XII = (13,1 + 14,4) x 0,50/2
= 6,88 m2
Luas XIII = (13,80 + 14,4) x 0,50/2
= 7,05 m2
Luas XIV = (2,98 x 13,8)/2
= 20,53 m2
Luas total galian = 0 m2
Luas total timbunan = 380,27 m2
STA 1+900
90
Koefesien (liter/m2) untuk lapis resap pengikat (prime coat) berkisar antara
0,4 sampai 1,3 liter/m2 umumnya koefesien yang diambil = 0,7 liter/m2
V = Lebar Perkerasan Jalan (m) x Koefesien (Liter/m2) x Panjang Jalan (m)
V = 16 m x 0,7 liter/m2 x 1500 m
= 16800 liter
Jadi, total volume Prime Coat yang dibutuhkan berdasarkan perencanaan yaitu
sebesar 16800 liter.
150
80
50
L . atas+ L .bawah
Luas ¿ x tinggi saluran
2
1m+0,5 m
Luas ¿ x1m
2
Luas = 0,75 m2
Volume galian saluran kanan dan kiri
Volume = (Luas x Panjang Drainase) x 2
Volume = (0,75 x 1500 ) x 2
Volume = 2250 m3
95
150
18 115 18
70
80
10
50
18
60
280
Tabel 4.2 Hasil perhitungan volume galian pondasi dinding penahan tanah
L1 =( L. a+2 L . b ) x T m
0,70 m+ 1,20 m
L1 =( ) x 6,26 m
2
L1 = 5,947 m2
L2 =PxL
= 2,8 x 0,60
= 1,680 m2
Lt = L1 + L2
99
Lt = 5,947 m2 + 1,680 m2
V = Lt x Jarak
= 7.627 x 100
= 762.70 m3
Untuk hasil perhitungan volume pasangan batu talud selanjutnya disajikan
dalam tabel 4.3.
30 0
6
50
Tabel 4.6 Hasil perhitungan volume pasangan batu dinding penahan tanah
Jara
Dimensi (m) Luas m2 Volume
k
Lokasi
Luas Luas
(m) La1 Lb1 T1 P1 L2 m3
I II
0.3 0.5 0.6 0.2
Kiri 100 5.12 0.24 1.02 1.264
Sta 0+200 s/d 0 0 0 0
0+300 0.2 0.2 6.2 1.0
Kanan 100 5.10 1.57 5.10 6.665
5 5 6 0
0.3 0.5 0.6 0.2
Kiri 100 5.12 0.24 1.02 1.264
Sta 0+300 s/d 0 0 0 0
0+400 0.2 0.2 6.2 1.0
Kanan 100 5.10 1.57 5.10 6.665
5 5 6 0
0.3 0.5 0.6 0.2
Kiri 100 5.12 0.24 1.02 1.264
Sta 0+400 s/d 0 0 0 0
0+500 0.2 0.2 6.2 1.0
Kanan 100 5.10 1.57 5.10 6.665
5 5 6 0
0.3 0.5 0.6 0.2
Kiri 100 5.12 0.24 1.02 1.264
Sta 1+200 s/d 0 0 0 0
1+300 0.2 0.2 6.2 1.0
Kanan 100 5.10 1.57 5.10 6.665
5 5 6 0
0.3 0.5 0.6 0.2
Kiri 100 5.12 0.24 1.02 1.264
Sta 1+400 s/d 0 0 0 0
1+500 0.2 0.2 6.2 1.0
Kanan 100 5.10 1.57 5.10 6.665
5 5 6 0
39.645
Sta 1+200 s/d 1+300 Kiri 100 0.20 0.20 0.10 50.00 100
JUMLAH 500
Diketahui :
Model = W 2215
3
Kapasitas bucket = 3,4 m
107
Penyelesaian :
Kapasitas Aktual 3 3 3
= 3,4 m x 0,95 = 3,23 m = 3,23 m
0,35 menit
1
Jumlah siklus perjam = x 60 menit/jam
0,35 menit
= 171,43 perjam
3
= 553,714 m /jam
3
= 459,583 m /jam
108
2. Bulldozer
Diketahui :
Model = D65PX - 16
Tinggi blade = 1,100 m
Lebar blade = 3,970 m
Kecepatan gusur = 7,2 km/jam
Kecepatan kembali = 8,6 km/jam
Jarak gusur / kembali = 100 m = 0,1 km
Faktor koreksi :
a. Operator = 0,75
b. Cuaca = 0,80
c. Eff. Kerja = 0,83
d. Material = 1,20
e. Tanjakan 1% = 0,89
Penyelesaian :
Kapasitas aktual waktu siklus = 0,8 x 3,97m x (1,100)2 m
= 3,843 m3
109
1
Jumlah siklus perjam = x 60 menit/jam
2,464 menit
= 24,347 perjam
3
= 49,764 m /jam
3. Motor Grader
Diketahui :
Model alat = Cat C13 ACERT VHP
Lebar blade = 4,2 m
Panjanglintasan = 1000 m
Jumlah lintasan = 4 lintasan
Waktu tetap = 1,50menit
Kecepatan Pada:
a. Lintasan 1 = 4,1 km/jam
b. Lintasan 2 = 5,5 km/jam
c. Lintasan 3 = 10,2 km/jam
d. Lintasan 4 = 15,2 km/jam
Faktor efesiensi = 0,83
Penyelesaian :
Lalu lintas = Panjang lintasan x lebar blade
= 1000 m x 4,2 m
= 4200 m2
Waktu siklus :
1000 m x 60 menit/jam
Waktu lintasan 1 = =14,63 menit
4100 m/jam
1000 m x 60 menit/jam
Waktu lintasan 2 = =10,91 menit
5500 m/jam
1000 m x 60 menit/jam
Waktu lintasan 3 = = 5,88 menit
10200 m/jam
1000 m x 60 menit/jam
Waktu lintasan 4 = = 14,63 menit
15200 m/jam
Waktu tetap = 4 x 1,5 menit = 6 menit
= 41,373 menit
4. Water Tank
Diketahui :
Model = CX160
112
3
Kapasitas tangki air = 5 m = 5000 liter
a. Waktu kosong
2500 m x 60 menit/jam
= = 2,143 menit
70000 m/jam
b. Waktu angkut
2500 m x 60 menit/jam
= = 3 menit
50000 m/jam
c. Waktu supplying = 10 menit
d. Waktu isi = 20 menit +
= 35,143 menit
5. Tandem Roller
Diketahui :
Penyelesaian :
114
Lapisan permukaan :
1. AC-WC :
1,5 x 12000 m/jam x 0,04 m
Produksi Kerja Komulatif =
10 lintasan
= 72,000 m3/jam
2. AC-BC :
1,5 x 12000 m/jam x 0,06 m
Produksi Kerja Komulatif =
10 lintasan
= 108,00 m3/jam
= 448,2 m3/jam
6. Wheel Loader
Diketahui :
Model alat = WA 350
3
Kapasitas bucket =3m
= 3 m3 x 1,0 = 3 m3
Waktu siklus :
a. Waktu siklus dasar = 0,65 menit
b. Koreksi waktu = 0,03 menit
c. Tempat pembuangan kecil = 0,05 menit
d. Operasi tidak konstan = 0,05 menit +
= 0,78 menit
7. Dump Truck
Diketahui :
Model alat = 220 PS
3
Kapasitas bak = 24 m
117
Penyelesaian :
Isi aktual bucket = kapasitas bak x faktor isi
= 24 m3 x 0,86
= 20,64 m3
Waktu siklus :
a. Waktu muat
Kapasitas bak
= x 60 menit/jam
Produksi Kerja Aktual pemuat (wheel loader)
24 m3
= x 60 menit/jam
191,538 m3/jam
= 7,518 menit
b. Waktu angkut
Jarak angkut
= x 60 menit/jam
Kecepatan angkut
4000 m
x 60 menit/jam
25000 m3/jam
= 9,600 menit
c. Waktu kembali
Jarak kembali
= x 60 menit/jam
Kecepatan angkut
4000 m3
x 60 menit/jam
28000 m3/jam
= 8,571 menit
118
8. Asphalt Finisher
Diketahui :
Model alat = HA 60 W
Kecepatan penghamparan = 250 m/jam
Tebal lapisan = 0,06 m
Lebar penghamparan = 3,5 m
Penyelesaian :
Produksi Kerja Aktual =lebar penghamparan x kecepatan penghamparan x
tebal perkerasan
119
Diketahui :
Model alat = BW11RH-5
Lebar efektif pemadatan = 1,5 m
Kecepatan = 6 km/jam = 6000 m/jam
Faktor efesiensi = 0,83
Tebal lapisan = 0,06 m
Lebar jalan = 14 m
Jumlah lintasan = = 9.33 > 10 lintasan
Lebar efektif 1,5 m
Penyelesaian :
Produksi Kerja Komulatif (PKK)
Lebar efektif pemadatan x kecepatan alat x tebal penghamparan
PKK =
Jumlah lintasan
1,5 x 6000 m/jam x 0,06 m
=
10 m
= 54 m3/jam
120
Diketahui :
Model alat = BOMAG
Lebar efektif pemadatan =1,48 m
Kecepatan alat = 4 km/jam = 4000 m/jam
Faktor efisiensi kerja = 0,83
Tebal pemadatan = 18 cm = 0,18 m
Penyelesaian :
Lintasan pemadatan timbunan, Lapisan Pondasi Bawah dan Lapisan
Pondasi Atas.
Lebar jalan = 14 m
Jumlah lintasan = = 9,46 > 10 lintasan
Lebar efektif 1.48 m
Jawab :
Produksi Kerja Komulatif (PKK)
Lebar efektif pemadatan x kecepatan alat x tebal penghamparan
PKK =
Jumlah lintasan
121
Diketahui :
Model alat = 800 P-SA
Kapasitas = 50 ton/jam
Efisiensi alat = 0,83
Penyelesaian :
Produksi Kerja Aktual = 50 ton/jam x 0.83
= 105 ton/jam
= 41,50 m3/jam
12. Asphalt Sprayer
122
Diketahui :
Model alat = AHN 1000
Kapasitas = 850 liter
Jarak Angkut /Kembali = 2500 m
Kecepatan pengisian = 4100 liter/jam
Kecepatan spraying = 6600 liter/jam
Kecepatan saat pengangkutan= 25 km/jam =liter/jam
Kecepatan saat kembali = 42 km/jam =liter/jam
Faktor efesiensi kerja = 0,83
Penyelesaian :
Jarak angkut x 60 menit/jam
Waktu angkut =
Kecepatan saat pengangkutan
2500 x 60 menit/jam
= = 6,00 menit
25000 m/jam
kapasitas x 60 menit/jam
Waktu pengisian =
Kecepatan saat pengisi
850 x 60 menit/jam
= = 12,439 menit
4100 m/jam
kapasitasx 60 menit/jam
Waktu spraying =
Kecepatan saat pengangkutan
850 x 60 menit/jam = 2,040 menit
=
25000 m/jam
= 24 menit
Kapasitas x 60 menit/jam
Produksi Kerja Komulatif =
Waktu siklus
123
Diketahui :
Kapasitas alat = 500 liter
Faktor efisiensi = 0,83
Waktu siklus :
- Memuat = 8 menit
- Mengaduk = 4 menit
- Menuang = 2 menit
- Tunggu = 3 menit +
= 17 menit
( Urpil )
6 Wheel Loader 230,769 191,538
7 Dump Truk 41,712 34,621
8 Asphalt Finisher - 52,500
9 Pneumatic Tire Roller 54,000 44,820
10 Vibrator Roller 106,560 88,445
11 AMP - 41,500
12 Asphalt Sprayer 2120,542 1760,050
13 Concrete Mixer 1,465 1,216
14 Air Compressor - -
Jumlah alat 1 =
Dump truck = = 0,0289
Produksi kerja aktual alat 34,006
126
0,028
= x 6= 0,1733
9
4 x 7 jam/hari
4 pekerja =
Produksi kerja aktual dominan x 7 jam/hari
28
= 348,34 = 0,0804
9
=
5055,476
=
1
unit
127
5055,476
Vibrator roller =
Produksi kerja aktual vibrator ruller
=
88,4448
=
0,017
unit
5055,476
b. Koefesien alat
c.
Motor grader =
Jumlah alat
=
1
=
0,0002
5055,476
128
Vibrator roller =
Jumlah alat
=
1
=
0,0113
88,4448
a. Jumlah alat
Excavator =
Produksi kerja aktual Excavator
=
459,583
=
1
unit
459,583
Bulldozer =
Produksi kerja aktual Bulldozer
=
49,764
=
130
0,108
unit
459,583
Dump truck =
Produksi kerja aktual dump truck
=
34,621
=
0,075
unit
459,583
131
b. Koefesien alat
c.
Excavator =
Jumlah alat
=
1
=
0,0022
459,583
=
0,0022
x 2
= 0,0044
132
Bulldozer =
Jumlah alat
=
1
=
0,0201
49,764
133
=
0,0201
x 2
= 0,0402
134
Dump truck =
Jumlah alat
=
1
=
0,0289
34,621
=
0,0289
x 7
= 0,2022
135
4. Pekerjaan Timbunan
a. Jumlah alat
Produksi kerja aktual Wheel Loader
Wheel Loader =
Produksi kerja aktual alat dominan
191,538
= = 0,038 unit
5055,476
Produksi kerja aktual dump truck
Dump truck =
Produksi kerja aktual alat dominan
34621
= = 0,007 unit
5055,476
Produksi kerja aktual Motor Grader
Motor Grader =
Produksi kerja aktual alat dominan
5055,476
= = 1 unit
5055,476
Produksi kerja aktual Vibrator roller
Vibrator roller =
Produksi kerja aktual alat dominan
88,445 =
= 0,017 unit
5055,476
Produksi kerja aktual Water Tanker
Water Tanker =
Produksi kerja aktual alat dominan
7,085
= = 0,0014 unit
5055,476
b. Koefesien alat
Jumlah alat 1 =
Wheel Loader = = 0,0052
Produksi kerja aktual alat 191,538
Dump truck = Jumlah alat = 1 = 0,0289
136
0,141
= x 3 = 0,423
1
b. Koefesien alat
Jumlah alat 1
Excavator = = 459,58 = 0,0022
Produksi kerja aktual alat
3
Jumlah alat 1
Dump truck = = = 0,0289
Produksi kerja aktual alat 34,621
c. Koefisien tenaga kerja
1 x 7 jam/hari
1 mandor =
Produksi kerja aktual dominan x 7 jam/hari
7
= = 0,0022
3217,080
4 x 7 jam/hari
4 pekerja =
Produksi kerja aktual dominan x 7 jam/hari
28
= = 0,0087
3217,080
W kurang 2 %
Dari gambar diatas , maka dapat kita ketahui volume sekali hampar
volume sekali hampar =PxLxT
= 150 m x 7 m x 0,30 cm
3
= 315 m
Penghamparan II
Bj
23
- W optimum % Tanah 1,4 gr/cm3
140
17
- W dihampar % 0 Kg/cm3
W kurang 6 %
150 m
7 m
0.30 m
Dari gambar diatas , maka dapat kita ketahui volume sekali hampar
Karna jumlah air yang dibutuhkan tergantung dari kadar air tanah yang
dihampar, maka diasumsikan jumlah water tank yang digunakan untuk pekerjaan
timbunan sebanyan 5 unit.
a. Koefesien alat
Jumlah alat 1
Tandem roller = = = 0,0022
Produksi kerja aktual alat 448,200
Jumlah alat 1
Dump truck = = = 0,00002
Produksi kerja aktual alat 5055,476
Jumlah alat 1
Motor Grader = = = 0,0289
Produksi kerja aktual alat 34,621
Jumlah alat 1
Wheel loader = = = 0,0052
Produksi kerja aktual alat 191,538
Jumlah alat 1
Water Tanker = = = 0,1141
Produksi kerja aktual alat 7,085
b. Koefisien tenaga kerja
1 x 7 jam/hari
1 mandor =
Produksi kerja aktual dominan x 7 jam/hari
7 =
= 0,0002
35388,332
4 x 7 jam/hari
4 pekerja =
Produksi kerja aktual dominan x 7 jam/hari
28
= 35388,33 = 0,0008
2
1 operator = 1 x 7 jam/hari
141
a. Jumlah alat
Produksi kerja aktual Tandem roller
Tandem roller =
Produksi kerja aktual alat dominan
216,630 =
= 0,043 unit
5055,476
Produksi kerja aktual Motor Grader
Motor Grader =
Produksi kerja aktual alat dominan
5055,476 =
= 1 unit
5055,476
Produksi kerja aktual Dump truck
Dump truck =
Produksi kerja aktual alat dominan
34,621 = uni
= 0,007
5055,476 t
Produksi kerja aktual Wheel loader
Wheel loader =
Produksi kerja aktual alat dominan
191,538 =
= 0,038 unit
5055,476
Produksi kerja aktual Water Tanker
Water Tanker =
Produksi kerja aktual alat dominan
7,085 =
= 0,0014 unit
5055,476
b. Koefesien alat
Jumlah alat 1
Tandem roller = = = 0,00462
Produksi kerja aktual alat 216,630
Jumlah alat 1
Dump truck = = = 0,0020
Produksi kerja aktual alat 5055,47
142
Jumlah alat 1
Motor Grader = = = 0,0289
Produksi kerja aktual alat 34,621
Jumlah alat 1
Wheel loader = = = 0,0052
Produksi kerja aktual alat 191,538
Jumlah alat 1
Water Tanker = = = 0,1141
Produksi kerja aktual alat 7,085
c. Koefisien tenaga kerja
1 x 7 jam/hari
1 mandor =
Produksi kerja aktual dominan x 7 jam/hari
7 =
= 0,0002
35388,332
4 x 7 jam/hari
4 pekerja =
Produksi kerja aktual dominan x 7 jam/hari
28
= 35388,33 = 0,0008
2
1 x 7 jam/hari
1 operator =
Produksi kerja aktual dominan x 7 jam/hari
7 =
= 0,0002
35388,332
d. Koefisien material
Agregat kelas A = Komposisi x faktor gembur x 1 m
= 80% x 1,2 x 1 m
= 0,96 m3
Agregat kelas Halus = Komposisi x faktor gembur x 1 m
= 20% x 1,2 x 1 m
= 0,24 m3
a. Jumlah alat
Produksi kerja ctual Asphallt finisher
Asphallt finisher =
Produksi kerja ctual alat dominan
52,500 =
= 0,274 unit
191,538
Produksi kerja ctual Pneumatic tire roller
Pneumatic tire roller =
Produksi kerja ctual alat dominan
44,820 0,23
= = unit
191,538 4
Produksi kerja ctual Tandem roller
Tandem roller =
Produksi kerja ctual alat dominan
59,760 0,31
= = unit
191,538 2
Produksi kerja ctual Dump truck
Dump truck =
Produksi kerja ctual alat dominan
34,621 =
= 0,181 unit
191,538
Produksi kerja ctual Wheel loader
Wheel loader =
Produksi kerja ctual alat dominan
191,538
= = 1 unit
191,538
Produksi kerja ctual AMP
AMP =
Produksi kerja ctual alat dominan
41,500 =
= 0,217 unit
191,538
2. AC-BC
a. Jumlah alat
Produksi kerja ctual Asphallt finisher
Asphallt finisher =
Produksi kerja ctual alat dominan
52,500 =
= 0,274 unit
191,538
Produksi kerja ctual Pneumatic tire roller
Pneumatic tire roller =
Produksi kerja ctual alat dominan
44,820 uni
= = 0,234
191,538 t
Produksi kerja ctual Tandem roller
Tandem roller =
Produksi kerja ctual alat dominan
89,640 0,46
= = unit
191,538 8
Produksi kerja ctual Dump truck
Dump truck =
Produksi kerja ctual alat dominan
34,621 = uni
= 0,181
191,538 t
Produksi kerja ctual Wheel loader
Wheel loader =
Produksi kerja ctual alat dominan
191,538 = uni
= 1
191,538 t
Produksi kerja ctual AMP
AMP =
Produksi kerja ctual alat dominan
41,500 = uni
= 0,2170
191,538 t
e. Koefesien alat
Jumlah alat 1
Asphallt finisher = = = 0,019
Produksi kerja ctual alat 52,500
Jumlah alat 1
Tandem roller = = = 0,0223
Produksi kerja ctual alat 44,820
Jumlah alat 1
Pneumatic tire roller = = = 0,0112
Produksi kerja ctual alat 89,640
Dump truck = Jumlah alat = 1 = 0,0289
145
Jumlah alat 1
AMP = = = 0,0241
Produksi kerja ctual alat 41,500
a. Jumlah alat
Produksi kerja aktual Tandem roller
Tandem roller =
Produksi kerja aktual alat dominan
298,800 = uni
= 0,059
5055,476 t
Produksi kerja aktual Motor Grader
Motor Grader =
Produksi kerja aktual alat dominan
5055,476 = uni
= 1
5055,476 t
Produksi kerja aktual Dump truck
Dump truck =
Produksi kerja aktual alat dominan
34,621 = uni
= 0,007
5055,476 t
Produksi kerja aktual Wheel loader
Wheel loader =
Produksi kerja aktual alat dominan
191,538 = uni
= 0,038
5055,476 t
Produksi kerja aktual Water Tanker
Water Tanker =
Produksi kerja aktual alat dominan
7,085 uni
= = 0,0014
5055,476 t
b. Koefesien alat
Jumlah alat 1
=
Tandem roller = Produksi kerja aktual = 0,0033
298,800
alat
Jumlah alat 1
=
Dump truck = Produksi kerja aktual = 5055,47 0,0002
alat 6
Jumlah alat 1
=
Motor Grader = Produksi kerja aktual = 0,0288
34,621
alat
Wheel loader = Jumlah alat = 1 = 0,0052
147
d. Koefisien material
= Tanah biasa ( Kondisi semula asli, diolah menjadi gembur)
= Faktor gembur x 1 m3
= 1,25 x 1 m3
= 1,25 m3
Korosene = Komposisi x fh x 1 kg
= 30 % x 1,1 x 1 kg
= 0,33
Tabel 4.9 Daftar harga satuan upah tenaga kerja dan bahan
HARGA SATUAN
KOD
RP. SATUAN
E
A. KEBUTUHAN TENAGA KERJA
0,0043
4
5 jam
1 m2
23,61 m2/ja
= 0,042 ja =
8 m
34 m
Kemampuan produktifitas untuk Water tanker (produktifitas yang paling kecil)
perhari :
= 23,618 m2/jam x 7 jam = 165,325 m2
c. Pekerjaan plesteran
Luas = Total plesteran
= 1872,8 m2
d. Pekerjaan siaran
Luas = Total siaran
= 3310,74 m2
Kemampuan pekerjaan per hari berdasarkan kuantitas kerja untuk Concrate mixer
1
m2 4,60 m2/ja
Ja =
= 0,2170 8 m
m
Kemampuan produktifitas untuk Concrate mixer (produktifitas yang paling kecil )
perhari :
= 4,608 m2/jam x 7 jam = 32,258 m2
Kemampuan produktifitas untuk Concrate mixer perminggu :
= 32,258 m2 x 6 hari = 193,548 m2
Waktu yang dibutuhkan untuk pekerjaan galian tanahadalah :
3310,74 m2
= = 2,850 > 3 minggu
6 x 193,548 m2
Kemampuan pekerjaan per hari berdasarkan kuantitas kerja untuk Concrate mixer
1 m2
= = 192,3 m2/jam
0,5200 jam
Kemampuan produktifitas untuk Concrate mixer (Produktifitas yang paling kecil )
perhari :
= 1,923 m2/jam x 7 jam = 13,462 m2
Kemampuan produktifitas untuk Concrate mixer per minggu :
= 13,462 m2 x 6 hari = 80,769 m2
Waktu yang dibutuhkan untuk pekerjaan pasangan batu dengan mortal
adalah :
1451,152 m2
= = 17,966 > 18 minggu
80,769 m2
c. Pekerjaan plesteran
Luas = Total plesteran
= 558 m2
Kemampuan pekerja perhari berdasarkan kuantitas 10 orang tenaga kerja
1 m2 2, m2/ja
=
= 0,4000 jam 5 m
Kemampuan produktifitas untuk 10 orang tenaga kerja perhari :
= 2,500 m2/jam x 7 jam = 17,500 m2
Kemampuan produktifitas untuk 10 orang tenaga kerja perminggu :
= 17,500 m2 x 6 hari = 105,000 m2
Waktu yang dibutuhkan untuk pekerjaan plesteran adalah :
157
558 m2
= = 5,31428 > 5 minggu
105,000 m2
0,0288 ja
1 m
8 m
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Dump truck
1 m2 5055,47
= = m2/jam
0,00020 jam 6
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Wheel loader
1 m2
= = 191,538 m2/jam
0,00522 jam
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Water tanker
1 m2
= = 7,085 m2/jam
0,1411 jam
Kemampuan produktifitas untuk Water tanker perhari ( Produktifitas alat paling
kecil)
= 7,085 m2/jam x 7 jam = 49,598 m2
Kemampuan produktifitas untuk Water tankerperminggu :
= 49,598 m2 x 6 hari = 297,585 m2
Waktu yang dibutuhkan untuk pekerjaan lapisan pondasi bawah adalah :
4916,10 m3
= = 2,753 > 3 minggu
6 x 297,585 m2
1 m2
= = 191,538 m2/jam
0,00522 jam
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Water tanker
1 m2
= = 7,085 m2/jam
0,1411 jam
Kemampuan produktifitas untuk Water tanker perhari (Produktifitas alat paling
kecil)
= 7,085 m2/jam x 7 jam = 49,598 m2
16387 Liter
= = 1,17 > 2 minggu
14000,00 m2
983,22 m3
= = 0,676 > 1 minggu
1454,070 m2
Kemampuan produktifitas untuk Dump truck per hari (Produktifitas alat paling
kecil)
= 34,621 m2/jam x 7 jam = 242,345 m2
Kemampuan produktifitas untuk Dump truck perminggu :
= 242,345 m2 x 6 hari = 1454,070 m2
162
m
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Motor grader
1 m2
34,62 m2/ja
= 0,0288 ja =
1 m
8 m
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Dump truck
1 m2 5055,47
= = m2/jam
0,00020 jam 6
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Wheel loader
1 m2
= = 191,538 m2/jam
0,00522 jam
0,0210 jam
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Dump truck
1 m2
= = 81,967 m2/jam
0,0122 jam
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Asphalt finisher
1 m2
= 0,383 = 2,611 m2/jam
0 jam
Kemampuan pekerjaan berdasarkan kuantitas kerja untuk Tandem roller
1 m2
31,545 m2/ja
= 0,0317 ja =
7 m
0 m
1 m2
= = 13,33333 m2/jam
0,07500 jam
0,7500
0 jam
Kemampuan produktifitas untuk Dump truck per hari ( Produktifitas alat paling
kecil)
= 1,333 m2/jam x 7 jam = 9,333 m2
Kemampuan produktifitas untuk Asphalt finisher perminggu :
= 9,333 m2 x 6 hari = 56,000 m2
Waktu yang dibutuhkan untuk pekerjaan lapisan permukaan latasir adalah:
126,850 m3
= = 2,2652 > 2 minggu
56,000 m2
Data perhitungan, hasil Rencana Anggaran Biaya dan time schedule lebih
lengkap disajikan dalam tabel pada lampiran.
= 16.528,09
Wheel loader (jam) ; Koefesien alat 0,0052 ; Harga Rp. 546.166
Biaya = Koefesien alat x Upah
= 0,0052 x 546.166
= 2851,47
Dump truck (jam) ; Koefesien alat 0,1733 ; Harga Rp. 400.684
Biaya = Koefesien alat x Upah
= 0,1733 x 400.684
= 69441,18
Alat bantu (Ls) ; Volume 1 ; Harga Rp. 578,73
Biaya = Volume x 6 % dari Upah
= 1 x (9645,49 x 6 %)
= 578,73
Total biaya tenaga (A) = 9645,49
Total biaya peralatan (B) = 89399,47
Harga satuan pekerjaan (A+B = C) = 99044,96
Pekerjaan Tanah
a. Pembersihan Semak dan Pengupasan Lahan
Bobot Perhitungan = Volume Pekerjaan x Harga Satuan
= 46820 x 99044,96
= 4637285230.841
b. Persiapan Badan Jalan
Bobot Perhitungan = Volume Pekerjaan x Harga Satuan
= 16387 x 5174,69
= 84797657,51
c. Galian Tanah
Bobot Perhitungan = Volume Pekerjaan x Harga Satuan
= 228483 x 119563
= 27318328470
d. Timbunan Tanah
Bobot Perhitungan = Volume Pekerjaan x Harga Satuan
= 202394 x 187714,65
= 37992319028
Total bobot perhitungan untuk pekerjaan tanah adalah:
= 70032730386
= Rp. 70.032.730.386,00
5.000.000,00
= X 100 %
81.561.207.262,9
= 0,006
b. Mobilisasi dan Demobilisasi
Harga Tiap Pekerjaan
Bobot = X 100 %
Jumlah Harga Pekerjaan
20.000.000,00
= X 100 %
81.561.207.262,9
= 0,025
c. Pembuatan Papan Nama Proyek
Harga Tiap Pekerjaan
Bobot = X 100 %
Jumlah Harga Pekerjaan
500.000,00
= X 100 %
81.561.207.262,9
= 0,001
d. Pekerjaan Direksi Keet
Harga Tiap Pekerjaan
Bobot = X 100 %
Jumlah Harga Pekerjaan
1.000.000,00
= X 100 %
81.561.207.262,9
= 0,001