SUMBER DANA :
DETAIL PENULANGAN SLOOF DETAIL PENULANGAN KOLOM DETAIL PENULANGAN KOLOM PRAKTIS DETAIL PENULANGAN BALOK DETAIL PENULANGAN STROUSS APBN TA 2018
KODE KODE
2D16
KODE KODE KODE NAMA PAKET :
30
15 RENCANA SISTEM PENGOLAHAN AIR LIMBAH
15 15
2D16 DAN DED KABUPATEN JEMBER
2Ø12 4Ø10 4Ø10
40
Ø8-150 6D16
NAMA PEKERJAAN :
20
Ø8 - 150
20
S1 25 K1 KP RB/BL ST
2Ø12
2D16 Ø6 - 200 Ø6 - 200 DED IPLT KABUPATEN JEMBER
2Ø12
30 Ø8 - 150
KETERANGAN :
30 15 STROUSS Ø 30 CM - KEDALAMAN 6 M
D16 - 150
12
D16 - 150 Konsultan Perencana
40
D16 - 150
30
ADITYA, ST
40
Team Leader
70
DIGAMBAR
RABAT BETON 1 : 3 : 5
195
115
T = 5 CM Drafter
PASIR URUG T= 5CM
30
STROUSS Ø 30 CM
KEDALAMAN 6 M
M.SHOFWAN DONNY C.
53
MENYETUJUI
40
Direktur
PT. STUDIO CILAKI EMPAT LIMA
40 125 40
142 205
Ir. Dicky Hadrianto, M.Sc,IAP
205
GPR 04 05