NTS
008 - STRIP MAP PENANGANAN LOKASI DAN LAYOUT PEKERJAAN 015 - 024
1 : 50
1 : 10
013 - DETAIL PEMBESIAN 086 - 087 1 : 20
1 : 50
1 : 20
1 : 25
016 - DETAIL RCP (Reinforced Concrete Pipe) 089 - 092
1 : 50
1 : 100
1 : 20
1 : 25
018 - DETAIL SALURAN DAN BALOK PENYANGGA STA 1+275 094 - 096
1 : 40
1 : 50
SPN
Mojokerto
Puskesmas
Bangsal
SDN
Area Persawahan Puloniti
Area Persawahan
Area Persawahan
Area Persawahan
Area Persawahan
Balai Desa
Peterongan
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju DRAFTER
As Jalan Rencana Jl. Raya Bangsal
As Jalan Existing
Jalan Aspal Existing
Menuju Bahu Jalan Dengan ADITYA BURHANUDIN, ST.
Jl.Peterongan Timbunan Biasa t = 25 cm
BOX Existing TEAM LEADER
Beton Fs - 40, t = 25 cm
PENANGGUNG JAWAB
Rigid Beton Existing
002 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju
Jl. Raya Bangsal
PENANGGUNG JAWAB
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik STA 0+150 STA 0+175 AHMAD SIDIG, ST., MT.
STA 0+100 STA 0+125 Direktur
CATATAN TANGGAL
003 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Tiang Listrik
Tiang Listrik Tiang Listrik
Tiang Listrik
Tiang Listrik
STA 0+350
STA 0+375
STA 0+300 STA 0+325 AHMAD SIDIG, ST., MT.
Direktur
STA 0+250 STA 0+275 CATATAN TANGGAL
004 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
Dia. cm
Pagar Existing STA 1+025
100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)∅
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju
Jl. Raya Bangsal
DRAFTER
As Jalan Rencana
As Jalan Existing
Menuju Jalan Aspal Existing ADITYA BURHANUDIN, ST.
Jl.Peterongan Pintu Masuk
Bahu Jalan Dengan TEAM LEADER
Timbunan Biasa t = 25 cm Pintu Masuk
Beton Fs - 40, t = 25 cm
PENANGGUNG JAWAB
Tiang Listrik
AHMAD SIDIG, ST., MT.
Tiang Listrik
STA 0+500 Direktur
Tiang Listrik STA 0+475 CATATAN TANGGAL
005 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
DRAFTER
Menuju Menuju
Jl.Peterongan Jl. Raya Bangsal
As Jalan Rencana ADITYA BURHANUDIN, ST.
As Jalan Existing TEAM LEADER
Tiang Listrik
AHMAD SIDIG, ST., MT.
Direktur
Tiang Listrik
TANGGAL
STA 0+650 CATATAN
Tiang Listrik
STA 0+600 STA 0+625
STA 0+550 STA 0+575
STA 0+500 STA 0+525
006 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju
Jl. Raya Bangsal
DRAFTER
As Jalan Rencana
Menuju As Jalan Existing ADITYA BURHANUDIN, ST.
Jl.Peterongan Jalan Aspal Existing TEAM LEADER
.cm
Pagar Existing
Dia
) 100
PENANGGUNG JAWAB
∅
(RCP
Pipe
Pintu Masuk
rete
Conc
orced
Reinf
007 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju
Jl. Raya Bangsal
DRAFTER
As Jalan Rencana
As Jalan Existing Jembatan Existing
Menuju P = 11,00 m L = 4,00 m ADITYA BURHANUDIN, ST.
Jl.Peterongan Jalan Aspal Existing
Sungai
TEAM LEADER
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Tiang Listrik
Tiang Listrik AHMAD SIDIG, ST., MT.
Sungai
Direktur
STA 0+900 CATATAN TANGGAL
008 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju
Jl. Raya Bangsal
DRAFTER
As Jalan Rencana
Menuju As Jalan Existing
ADITYA BURHANUDIN, ST.
Jl.Peterongan Jalan Aspal Existing TEAM LEADER
Beton Fs - 40, t = 25 cm
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
009 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
Menuju
Jl. Raya Bangsal
DRAFTER
As Jalan Rencana
Menuju As Jalan Existing ADITYA BURHANUDIN, ST.
Jl.Peterongan
Jalan Aspal Existing TEAM LEADER
Beton Fs - 40, t = 25 cm
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
010 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
DRAFTER
TEAM LEADER
Jalan Aspal Existing
Menuju Bahu Jalan Dengan
Jl.Peterongan Timbunan Biasa t = 25 cm
Pagar Existing
Beton Fs - 40, t = 25 cm Pagar Existing AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
011 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
As Jalan Rencana
As Jalan Existing
As Jalan Rencana
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
PULONITI - SUMBERKARANG
As Jalan Rencana Jalan Aspal Existing
Pagar Existing
As Jalan Existing Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Pagar Existing
Jalan Aspal Existing
As Jalan Rencana
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Existing Jembatan Existing
Timbunan Biasa t = 25 cm
P = 11,00 m L = 4,00 m
Jalan Aspal Existing
Sungai
Bahu Jalan Dengan Beton Fs - 40, t = 25 cm
As Jalan Rencana Pagar Existing Tiang Listrik
Timbunan Biasa t = 25 cm Tiang Listrik
As Jalan Existing Tiang Listrik STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
Jalan Aspal Existing Beton Fs - 40, t = 25 cm Pagar Existing Tiang Listrik BOX Existing
STA 1+375
LOKASI
Tiang Listrik STA 1+350
Bahu Jalan Dengan Pintu Masuk STA 1+325
Timbunan Biasa t = 25 cm Pagar Existing Tiang Listrik STA 1+300
As Jalan Rencana Pintu Masuk Pintu Masuk Pagar Existing Tiang Listrik STA 1+250 STA 1+275
As Jalan Existing STA 1+200 STA 1+225
Beton Fs - 40, t = 25 cm Tiang Listrik STA 1+150 STA 1+175
Jalan Aspal Existing Pintu Masuk Pintu Masuk Tiang Listrik STA 1+100 STA 1+125
As Jalan Rencana STA 1+075
Pintu Masuk Tiang Listrik STA 1+050
cm
Pagar Existing STA 1+025
Dia.
∅100
As Jalan Existing Bahu Jalan Dengan STA 1+000
(RCP)
Pintu Masuk Tiang Listrik
Pipe
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk STA 0+950 STA 0+975
Concrete
Sungai
As Jalan Rencana Jalan Aspal Existing
Reinforced
As Jalan Existing Pintu Masuk Pintu Masuk STA 0+900 STA 0+925
As Jalan Rencana Bahu Jalan Dengan STA 0+870
Jalan Aspal Existing Timbunan Biasa t = 25 cm Pintu Masuk Beton Fs - 40, t = 25 cm
Tiang Listrik STA 0+850
As Jalan Existing Tiang Listrik
As Jalan Rencana Jalan Aspal Existing Bahu Jalan Dengan STA 0+800 STA 0+825 STA 0+856
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm Tiang Listrik RENCANA RCP
∅100cm
As Jalan Existing Bahu Jalan Dengan STA 0+750 STA 0+775
As Jalan Rencana Timbunan Biasa t = 25 cm Tiang Listrik
Jalan Aspal Existing
Beton Fs - 40, t = 25 cm Tiang Listrik STA 0+700 STA 0+725
As Jalan Existing
KABUPATEN MOJOKERTO
Bahu Jalan Dengan Pintu Masuk
Jalan Aspal Existing Timbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm Tiang Listrik
Pintu Masuk STA 0+675
Bahu Jalan Dengan Pintu Masuk
STA 0+650
Warung Tiang Listrik
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm STA 0+600 STA 0+625
BOX Existing
Tiang Listrik STA 0+550 STA 0+575
Beton Fs - 40, t = 25 cm STA 0+500 STA 0+525
Tiang Listrik Tiang Listrik STA 0+475
Tiang Listrik STA 0+425 STA 0+450
Tiang Listrik Tiang Listrik
Tiang Listrik Tiang Listrik STA 0+375 STA 0+400
Tiang Listrik STA 0+350
Rigid Beton Existing Tiang Listrik Tiang Listrik
STA 0+300 STA 0+325
Tiang Listrik Tiang Listrik STA 0+275
Tiang Listrik STA 0+200 STA 0+225 STA 0+250
Tiang Listrik Tiang Listrik STA 0+175
Tiang Listrik STA 0+150
Tiang Listrik STA 0+100 STA 0+125
STA 0+050 STA 0+075
STA 0+000 STA 0+025
SUMBER DANA
KONSULTAN PERENCANA
DRAFTER
Jl. Raya B
Menuju
angsal
As Jalan Rencana ADITYA BURHANUDIN, ST.
Jl.Peterongan TEAM LEADER
As Jalan Existing
Jalan Aspal Existing
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm
AHMAD SIDIG, ST., MT.
Jl. Raya B
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
angsal
Pagar Existing Tiang Listrik
Tiang Listrik
STA 1+442
STA 1+400 STA 1+425 SPN Mojokerto
STA 1+350 STA 1+375
STA 1+325
JUDUL GAMBAR SKALA
012 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
STA 0+000 STA 0+075 STA 0+100 STA 0+120 DAN PENATAAN RUANG
Beton Fs - 40, t = 25 cm STA 0+103 Rencana TPT Pas. Batu Pengarah Sungai KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
LOKASI
Jembatan Existing
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu KABUPATEN MOJOKERTO
STA 0+107
SUMBER DANA
STA 0+200 STA 0+230 Bahu Jalan Dengan STA 0+300 STA 0+350 STA 0+375 APBD KAB. MOJOKERTO TA. 2021
Timbunan Biasa t = 25 cm
Rencana TPT Pas. Batu Beton Fs - 40, t = 25 cm Rencana TPT Pas. Batu STA 0+310 STA 0+365 KONSULTAN PERENCANA
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu
DRAFTER
STA 0+300 STA 0+350 STA 0+375 STA 0+400 STA 0+430
STA 0+310 STA 0+365 Bahu Jalan Dengan
ncana TPT Pas. Batu Beton Fs - 40, t = 25 cm Timbunan Biasa t = 25 cm
PENANGGUNG JAWAB
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu
cm
∅100
Dia.
(RCP)
e Pipe
KODE GAMBAR NOMOR GAMBAR JUMLAH GAMBAR
SKALA : NTS
Concret
forced
Rein
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu 013 109
Rencana Crossing Dengan
RCP 3 Buah
PEMERINTAH KABUPATEN MOJOKERTO
Bahu Jalan Dengan
DINAS PEKERJAAN UMUM
STA 0+800 Timbunan Biasa t = 25 cm
STA 0+856 STA 0+870 STA 0+900 STA 0+950 DAN PENATAAN RUANG
Beton Fs - 40, t = 25 cm
STA 0+850 KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
STA 0+900 STA 0+950 STA 1+000 STA 1+040 Bahu Jalan Dengan LOKASI
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm KABUPATEN MOJOKERTO
SUMBER DANA
STA 1+000 STA 1+040 Bahu Jalan Dengan STA 1+100 STA 1+125 STA 1+150
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
STA 1+132 STA 1+157
DRAFTER
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu
STA 1+100 STA 1+125 STA 1+150 STA 1+200 STA 1+250 STA 1+265 STA 1+275 ADITYA BURHANUDIN, ST.
STA 1+132 STA 1+157 Beton Fs - 40, t = 25 cm Balok Penyangga Rencana Saluran Pas. Batu
80
Lebar 6.0m P x L x T = 100 x 15 x 20cm (2 Buah) Pagar Existing Warga (Dibongkar) TEAM LEADER
Jembatan Existing
Rencana TPT Pas. Batu Rencana TPT Pas. Batu STA 1+275 AHMAD SIDIG, ST., MT.
P = 1.20m L = 5.5m
PENANGGUNG JAWAB
STA 1+200 STA 1+250 STA 1+265 STA 1+275 STA 1+300 STA 1+325 STA 1+350 STA 1+365 STA 1+375
Beton Fs - 40, t = 25 cm Balok Penyangga Rencana Saluran Pas. Batu Rencana Saluran Pas. Batu Rencana Saluran Pas. Batu Rencana Saluran Pas. Batu Beton Fs - 40, t = 25 cm
40
80
65
50
Lebar 6.0m P x L x T = 100 x 15 x 20cm (2 Buah) Pagar Existing Warga (Dibongkar) Pagar Existing Warga (Dibongkar) Pagar Existing Warga (Dibongkar) Lebar 6m
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jembatan Existing
STA 1+275
P = 1.20m L = 5.5m
STA 1+350 STA 1+365 STA 1+375 STA 1+400 Bahu Jalan Dengan STA 1+442
Rencana Saluran Pas. Batu Beton Fs - 40, t = 25 cm Timbunan Biasa t = 25 cm
Lebar 6m Beton Fs - 40, t = 25 cm
JUDUL GAMBAR SKALA
450
900
600
450
StripMap Penanganan Lokasi NTS
STRIPMAP PENANGANAN LOKASI 1
KODE GAMBAR NOMOR GAMBAR JUMLAH GAMBAR
SKALA : NTS 300
014 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
As Jalan Rencana
KEGIATAN
As Jalan Existing
As Jalan Rencana
Jalan Aspal Existing PENYELENGGARAAN JALAN KABUPATEN / KOTA
As Jalan Existing
Bahu Jalan Dengan SUB KEGIATAN
Jalan Aspal Existing Timbunan Biasa t = 25 cm
PELEBARAN JALAN MENUJU STANDAR
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm Beton Fs - 40, t = 25 cm PEKERJAAN
BOX Existing
BELANJA PERENCANAAN TEKNIS
Beton Fs - 40, t = 25 cm PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
SUMBER DANA
Tiang Listrik
Tiang Listrik Tiang Listrik APBD KAB. MOJOKERTO TA. 2021
Tiang Listrik STA 0+150
Tiang Listrik
Tiang Listrik STA 0+100 STA 0+125 KONSULTAN PERENCANA
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
CATATAN TANGGAL
STA 0+075 Rencana TPT Pas. Batu STA 0+103 STA 0+120 Rencana TPT Pas. Batu
015 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
As Jalan Rencana DAN PENATAAN RUANG
As Jalan Existing KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
Jalan Aspal Existing
KEGIATAN
Bahu Jalan Dengan
an Aspal Existing Timbunan Biasa t = 25 cm PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN
hu Jalan Dengan Pintu Masuk
mbunan Biasa t = 25 cm Warung Pintu Masuk Beton Fs - 40, t = 25 cm
Pintu Masuk PELEBARAN JALAN MENUJU STANDAR
Warung Pintu Masuk
PEKERJAAN
on Fs - 40, t = 25 cm
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
CATATAN TANGGAL
TPT Pas. Batu Rencana TPT Pas. Batu STA 0+230 Rencana TPT Pas. Batu Rencana TPT Pas. Batu STA 0+310
016 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
As Jalan Rencana DAN PENATAAN RUANG
As Jalan Existing KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
As Jalan Rencana Jalan Aspal Existing
KEGIATAN
As Jalan Existing Bahu Jalan Dengan
Jalan Aspal Existing Timbunan Biasa t = 25 cm PENYELENGGARAAN JALAN KABUPATEN / KOTA
LOKASI
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
STA 0+300 STA 0+350 STA 0+400 STA 0+450 PENANGGUNG JAWAB
STA 0+310 Bahu Jalan Dengan
TPT Pas. Batu Beton Fs - 40, t = 25 cm Timbunan Biasa t = 25 cm
CATATAN TANGGAL
ana TPT Pas. Batu STA 0+310 Rencana TPT Pas. Batu STA 0+365 Rencana TPT Pas. Batu STA 0+430 Rencana TPT Pas. Batu
STA 0+375
017 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
As Jalan Rencana
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
As Jalan Existing KEGIATAN
Jalan Aspal Existing
Pintu PENYELENGGARAAN
Masuk JALAN KABUPATEN / KOTA
Bahu Jalan Dengan Pintu Masuk
Timbunan Biasa t = 25 cm Pintu Masuk Pintu Masuk SUB KEGIATAN
LOKASI
Tiang Listrik
KABUPATEN MOJOKERTO
Tiang Listrik
STA 0+575 STA 0+600 SUMBER DANA
STA 0+450
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
PENANGGUNG JAWAB
CATATAN TANGGAL
Rencana TPT Pas. Batu Rencana TPT Pas. Batu Rencana TPT Pas. Batu
018 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
As Jalan Rencana DAN PENATAAN RUANG
As Jalan Existing KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
Jalan Aspal Existing
KEGIATAN
Bahu Jalan Dengan Pintu Masuk
Timbunan Biasa t = 25 cm PENYELENGGARAAN JALAN KABUPATEN / KOTA
Pintu Masuk Pintu Masuk Pagar Existing
SUB KEGIATAN
Beton Fs - 40, t = 25 cm
Pintu Masuk Pintu Masuk PELEBARAN JALAN MENUJU STANDAR
Pintu Masuk
.cm
Pagar Existing
Dia
) 10
∅ 0
(RCP
PEKERJAAN
Pipe
Pintu Masuk
rete
nc
ed Co
orc
Reinf
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
Tiang Listrik Tiang Listrik PULONITI - SUMBERKARANG
∅100cm
RENCANA RCP LOKASI
Tiang Listrik
Tiang Listrik STA 0+750 KABUPATEN MOJOKERTO
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
STA 0+600 STA 0+650 Bahu Jalan Dengan STA 0+700 STA 0+750
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
STA 0+689
cm
∅100
AHMAD SIDIG, ST., MT.
Dia.
(RCP)
Direktur
Pipe
crete
d Con
CATATAN TANGGAL
rce
Reinfo
Rencana TPT Pas. Batu
Rencana Crossing Dengan
Rencana TPT Pas. Batu Rencana TPT Pas. Batu
RCP 3 Buah
STA 0+705 Rencana TPT Pas. Batu
019 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
As Jalan Rencana Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
Sungai
Bahu Jalan Dengan SUB KEGIATAN
Timbunan Biasa t = 25 cm
PELEBARAN JALAN MENUJU STANDAR
LOKASI
Sungai
SUMBER DANA
STA 0+900
STA 0+850 STA 0+870 APBD KAB. MOJOKERTO TA. 2021
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
PENANGGUNG JAWAB
STA 0+750 STA 0+800 Bahu Jalan Dengan STA 0+850 STA 0+900
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
CATATAN TANGGAL
Rencana TPT Pas. Batu Rencana TPT Pas. Batu STA 0+856 STA 0+870
Jembatan Existing
P = 11,00 m L = 4,00 m
JUDUL GAMBAR SKALA
020 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
As Jalan Rencana
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
As Jalan Existing Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
PEKERJAAN
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
STA 0+900 STA 0+950 STA 1+000 STA 1+050 PENANGGUNG JAWAB
CATATAN TANGGAL
Rencana TPT Pas. Batu Rencana TPT Pas. Batu STA 1+040
021 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
As Jalan Rencana KEGIATAN
As Jalan Existing
PENYELENGGARAAN JALAN KABUPATEN / KOTA
Jalan Aspal Existing
SUB KEGIATAN
Bahu Jalan Dengan
Timbunan Biasa t = 25 cm PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
Beton Fs - 40, t = 25 cm
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
PENANGGUNG JAWAB
STA 1+050 Bahu Jalan Dengan STA 1+100 STA 1+150 STA 1+200
Timbunan Biasa t = 25 cm
Beton Fs - 40, t = 25 cm
CATATAN TANGGAL
TA 1+040 Rencana TPT Pas. Batu STA 1+125 Rencana TPT Pas. Batu STA 1+157
STA 1+132
022 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
As Jalan Rencana KABUPATEN MOJOKERTO
As Jalan Existing Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
PEKERJAAN
Pagar Existing
Tiang Listrik LOKASI
LAYOUT PEKERJAAN
DRAFTER
SKALA : NTS
TEAM LEADER
STA 1+200 STA 1+250 STA 1+275 STA 1+300 STA 1+325 STA 1+350 PENANGGUNG JAWAB
Beton Fs - 40, t = 25 cm Balok Penyangga Rencana Saluran Pas. Batu Rencana Saluran Pas. Batu Rencana Saluran Pas. Batu
40
80
65
50
Lebar 6.0m P x L x T = 100 x 15 x 20cm (2 Buah) Pagar Existing Warga (Dibongkar) Pagar Existing Warga (Dibongkar) Pagar Existing Warga (Dibongkar)
CATATAN TANGGAL
Jembatan Existing
STA 1+275
P = 1.20m L = 5.5m
023 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
As Jalan Rencana
PENYELENGGARAAN JALAN KABUPATEN / KOTA
As Jalan Existing
SUB KEGIATAN
Jalan Aspal Existing
Bahu Jalan Dengan PELEBARAN JALAN MENUJU STANDAR
Timbunan Biasa t = 25 cm
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
SUMBER DANA
DRAFTER
LAYOUT PEKERJAAN
SKALA : NTS
TEAM LEADER
450
900
600
450
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
300
024 109
PEMERINTAH KABUPATEN MOJOKERTO
TANGGAL
DINAS PEKERJAAN UMUM
KABUPATEN MOJOKERTO
1:200
SKALA
DAN PENATAAN RUANG
109
PELEBARAN JALAN MENUJU STANDAR
PULONITI - SUMBERKARANG
KONSULTAN PERENCANA
PELEBARAN RUAS JALAN
SUMBER DANA
TEAM LEADER
PEKERJAAN
KEGIATAN
DRAFTER
LOKASI
Direktur
025
JUDUL GAMBAR
Long Section
CATATAN
KODE GAMBAR
Urugan Peninggian Agregat Klas A
STA 0+500
+1.099
+0.749 0.100 m
Jl. Raya Bangsal
Elevasi Rencana
STA 0+500
Elevasi Existing
+1.239
+0.889 0.100 m
231 249 245 244 241
247 246 0.68
0.72 248 0.75 0.70 0.67 0.45 240 239
229 230 J 233 232 AJ 0.73
0.77 0.75 J BJ 0.68 0.63
0.77 0.73 0.74 SW
J 236 234 J 242
J 237 0.02 235 0.63 BJ -0.26
0.41 S 0.04
243 S
238 S
-0.19
0.74 S
250
0.57
TP
0.60
0.30
0.00
0.00
0.30
0.60
0.00
Menuju
0.30
0.60
0.30
0.60
STA 0+475
+1.314
+0.964 0.100 m
261 258 257 255 252
260 259 0.02 254 253
262 0.89 0.89 0.85 0.80 256 0.92
263 0.86 0.89 J BJ 0.62 S 0.10 0.94 251
0.86 AJ S 0.85
267 J
264 BJ SW
268 0.52 0.51
0.70 266 265
0.18 0.09
S S
0.90
0.60
0.90
0.30
276
803
4.06
0.86
TL
269 277
270 0.86
0.04 278
0.17 S 1.22
S 272
271 1.28 275
0.90
1.38 PM
1.22
0.90
PM PJU
0.30
0.60
STA 0+450
274
1.32
PM
273
1.26
PM
279
1.17
280
0.88
+1.373
+1.023 0.100 m
288 287
0.800.62 284 281
293 291 290 289 286 0.14
292 0.95 0.90 0.88 0.91
0.97 0.46 285 S 283
282
SW
294 0.97 AJ J BJ 0.16 0.93
295 0.66
0.97 0.97 S
296 J
300 299 298 297 0.80 BJ
301 0.48 0.32 0.31 0.71
0.61
S S
303
0.85
TP
0.60
0.30
0.90
0.90
0.60
0.60
0.90
STA 0+400
STA 0+425
302
0.80
PH
+1.540
+1.190 0.100 m
305 304
306307 308
309 0.30 0.19
1.23 1.23
310 1.23 WRG
313 311 0.95 S S
314 312 1.02
319 318 317 315 1.02 1.02
320 1.02 1.02 AJ J
0.73 0.29 0.33 316 1.02
0.98 S 1.17 BJ J
S
329
0.97
J
330
1.14
J
0.60
0.90
0.30
0.30
0.90
0.60
331
1.15
J
1.20
0.90
0.30
0.60
1.20
0.90
0.60
0.30
1.20
332
1.23
J
321
803
1.04
4.06
TL
STA 0+400
+1.550
328
1.39
J
323
1.49
TP
324
1.34
TL
327
1.31
J
325
1.20
PJU
326
1.11
J
+1.200 0.100 m
338 334 335
340 339 336
341 342 1.16 3370.29
1.24 333
0.29
343 1.19 1.19 1.20 1.16 S 1.24
344 BJ 1.24 S
1.12 1.19 AJ J WRG
347 346 345 J 322
BJ 1.18
348 0.30 0.72 0.93
350 0.24 TP
349 S
0.90 0.56 S
STA 0+375
0.60
1.20
0.90
+1.639
1.20
0.90
0.60
0.60
+1.289 0.100 m
382
0.32
S 381
0.95 380 379
1.37
1.26
SW
365 356
370 359
360 364 366 1.20 1.14 1.24 355 353
354
386 385 384 371 1.08 368 1.14 1.20 1.20
J
BJ 1.05 0.84
0.37
372 1.20 J AJ S
1.19 0.72 0.41 0.83
0.44 BJ
S S
351
803
1.24
4.06
TL
0.60
0.90
1.20
0.90
0.60
STA 0+350
352
392
1.47
1.48
PJU
PJU
+1.759
0.90
0.60
0.60
+1.409 0.100 m
397
398 1.20396
0.58 395
1.44 S 0.56 394
374
393 373 369
361 362 363 358 357 383 387 388 390 391
S 0.84 1.29 1.29 367 389
1.18
1.14 1.36 1.29 J 1.29 1.29 1.22 1.22 1.14 0.79 0.45 0.84 1.16
J BJ S 0.45
BJ AJ
S
407
1.32
TP
375
1.26
PK5
409
1.17
408
803 PH
1.30
4.06
TL
410
1.08
PH
1.20
0.90
0.90 0.90
STA 0+300
STA 0+325
1.20
1.20
0.90
0.60
0.60
376
1.33
PK6
+1.907
+1.557 0.100 m
401 400 399
418 417 416 414 412 406 405 404 402 1.56
419 1.41 415 413 1.40 1.26 1.08 0.81 403 0.81 1.31
1.39 1.41 1.41 1.37 0.49 0.53
421 420 1.23 BJ J 1.41
AJ J BJ S
422 0.77 1.00 S
423 0.73
424 S
0.94 S
1.38
1.20
0.90
0.60
0.60
0.90
1.20
1.50
1.20
0.90
0.90
411
1.34
PH
803
426
1.62
4.06
TL
STA 0+275 STA 0+300
+2.071
1.50
1.50
1.50
427
1.59
1.20
0.90
1.20
0.90
PJU
429
+1.727 0.100 m
1.93
432
0.65
431 S
0.63 428
430 S 1.80
425
1.78 1.80
SW
435 433
436 437 434 1.59
438 1.56
439 1.56 1.56 1.50 BJ
442 1.51 AJ J
441 1.48 J
445 444 4430.83 1.03 440 BJ
1.41 1.32 1.18S S 1.23
1.80
0.90
1.20
1.50
1.80
1.80
447
1.63
TP
1.50
1.20
0.90
0.90
1.20
1.50
+2.233
446
1.63
PH
+1.883 0.100 m
449 448
456 455 454 453 452 451 450 1.34 1.61
460 458 457 0.75 1.09
459 1.73 1.63 1.451.14 1.00 0.83 S
466 465 464 463 462 461 1.73 1.73 1.68 BJ S
0.96 AJ J
468 467 1.061.53 1.68 1.68 1.70
1.53 1.27 S S BJ J
469
1.42
1.20
1.50
0.90
470
803
4.06
1.52
TL
1.20
1.50
1.20
1.20
0.90
1.50
472
1.77
TP
471
803
1.70
4.06
TL
473
1.76
PJU
+2.319
+1.969 0.100 m
483 480
485 484 1.20 482 481 1.92 479
491 489 488 487 0.91 1.43 1.78 1.77
490 0.85 SW
492 1.88 1.88 1.82 1.79 486 S S
499 498 497 495 1.89 AJ J BJ
496 493 1.87 1.28
501 500 1.49 1.25 1.24 1.60 494
1.75 1.71 S 1.44 1.84 J
S 1.80 BJ
503
502 2.11
2.09 PM
PM
474
504 1.93
1.97 PH
PH
0.90
1.20
1.50
1.80
1.20
0.90
1.80
1.50
475
1.93
PK7
505
2.09
PH
506 507
509 508
2.07
2.06 1.28
PM1.28 PM
S S
803
510
1.83
4.06
TL
1.50
1.80
1.50
STA 0+200
511
1.90
TP
+2.398
+2.048 0.100 m
Elevasi Rencana
Elevasi Existing
527
528
2.12
540 539 538 537 536 1.01
P
1.96 534 535 530529 S
542 541 1.34 1.58 1.80 1.95 1.97 533 532 531
543 1.61 1.32
544 J 1.97 1.94 1.87 1.84
0.93
1.82 S BJ AJ 1.85 S
2.36 S J BJ
P
476
1.88
513 512 PK8
2.30 2.29
PM PM
514
2.31 517 516 515
PM 1.34 1.48 2.27
S S PM
523
522 2.30
2.30 PM
PM
1.80
1.50
1.50
1.80
803
525
2.04
4.06
TL
+2.561
1.50
1.50
1.80
+2.211 0.100 m
1.80
1.50
564
2.18
PH
568
569 2.00
2.08 PM
PM
803
526
2.15
4.06
TL
561 562
1.53 1.66 563
560
557 1.93
554 553 555 556 1.06
552 2.05 1.98 1.91 S
549 548 547 550 551 2.06 2.05 1.98 558
545 546 1.26 1.26 1.99 1.97 1.97 AJ J BJ 1.40
2.04 559
2.08 S S BJ J 0.94
S
573 572
2.09 1.97
WRG WRG
571 570
1.97 1.97
WRG PM
2.10
2.10
1.50
1.80
2.10
1.80
2.10
1.50
606
2.30 605
P 2.37
TM
1.80
1.20
1.50
2.10
565
1.94
PH
+2.726
Jembatan Existing
567
2.12
TP
+2.376 0.100 m
566
2.02
PH
590 589
591 587 588 586 585 584 582 580 574
2.28 2.16 2.21 5831.86 581
1.71 579
578
2.50 BJ J 2.21 2.13 2.13 2.13 2.04 1.79 1.24 577 576 575 1.91
AJ J BJ 1.15 1.47 1.54 1.80
S S
603 604
6021.44 1.39
2.43 S
P S
1.80
1.50
803
596
2.10
4.06
1.80
1.50
1.50
1.50
1.80
2.10
2.10
1.50
TL
1.50
1.80
2.10
803
597
607 608 4.06
2.01
2.49 2.50 TL
P TM
609
2.45
WRG
610
2.35
WRG
+2.914
612
2.22
WRG 613
1.66
S
614
1.66
S
611
2.25
WRG
598
2.40
PJU
599
2.46
PLGPT
600
2.26
PLGPT
601
2.03
PH
+2.564 0.100 m
654 653
652
656 655
658 657 1.33 1.411.67
1.87 651
659 1.80 1.62 1.44 S
638 635 639 642 S 1.97
631 2.27 2.25 2.04 SW
624625 627 633 2.38 2.31
623 626 630 2.28 J BJ
1.61 1.681.77 2.16 2.28 2.34 AJ
619 620 621 1.99 J
2.04 S S BJ
2.051.84
SW
1.80
1.50
1.50
2.40
2.10
1.80
1.80
2.40
STA 0+100
+3.542
660
2.58
TP
+3.192 0.100 m
615
616 1.71
618 6171.90
1.56 2.69
628 622
S
634 629 2.34 1.65
650 649 2.51 TPT S
1.84 648 647 646
645 2.52 637 636 632
641 640
SW 2.11 1.96 1.73 1.77
2.10 2.46 2.49 2.57 2.54 2.54 BJ
S S 644 643 BJ J AJ J
2.08 2.09
661
803
2.55
4.06
TL
662
2.65
J
667
3.06
GRGR
666
3.05
GRGR
671
3.04
670GRGR
3.05
GRGR
677
3.04
TPT
674
2.82
BJ
2.10
2.70
2.40
3.00
2.10
673
2.40
2.80
J
3.00
592
2.80
PK9
679
3.00
TPT
672
2.81
J 681
2.89
675 BJ
2.80
BJ
689 688
694
2.03
S
690
3.31 3.32
3.02
GRGRGRGR
663
3.08
J
664
685 6843.06
3.30
3.28
GRGRGRGR
GRGR
665
3.07
GRGR
695
1.76
S
668
3.06
GRGR
669
3.06
GRGR
676
3.02
682
2.77
J
+3.649
2.70
693 TPT
3.00
3.30
2.04 696
S 1.80
692 691
S
3.00
3.31 3.32
GRGR GRGR
687 686
3.29 3.28
GRGR GRGR
803
697 683
3.24
4.06 2.77
TL J
680
2.81
BJ
678
3.00
TPT
+3.300 0.100 m
714 715 716 717
711 712 713 718
708 710 3.18 2.48 2.42 2.70 2.78 2.62
705 706 707 709 3.20 3.18
2.98 2.80 S S
3.17 3.14 3.20 3.20 J
BJ
703 701704 AJ
699 700 702 BJ J
2.58 3.40
3.05
3.02 3.34
S 2.52
S 698
3.18
PJU
3.00
2.70
719
803
+3.535 0.100 m
729 730 732 731 733 734 735
3.26 3.26 3.30 3.29 3.30 3.38 3.38736739 738737
723
726 727
725 724 728 BJ 3.56 2.94
3.54
740 2.74
3.52 3.29 J AJ J 2.94 S P
3.34
2.783.56 S
3.35 S S BJ
3.30
3.00
3.00
3.30
3.30
3.30
3.00
3.30
3.00
741
3.38
PH
742
3.32
PH
+4.121
+3.771 0.100 m
: 9170023.865
: 9170022.581
758 759
3.02
745 744 3.02 S
746 3.55 S 743
748 749 747 3.49 3.48
752 750 3.54 3.54 BJ 3.58
751 3.54 J
754 3.47 3.48 3.53 AJ RM
755 753 J
3.52 3.57 757 3.56 BJ
756 2.94
2.94
S S
: 663574.037
: 663563.790
824
803
3.54
4.06
TL
823
803
3.57
4.06
TL
829
3.77
PTK2
825
3.85
PJU
3.60
3.60
3.00
3.30
STA 0+000
: +3.770
: +3.783
828
3.78
786
3.62
J
PTK1
+4.343
Elv. + 6.00
Elv. + 4.00
Elv. + 2.00
Elv. ± 0.00
Elv. - 2.00
785
821
4.01
J
782
4.00
J
783
4.02
J
784
3.94
J
3.72
J
822
3.88
TP
+4.093 0.000 m
771 772
781 761 762 763 764 766 767 769 770 3.82 774773
820 760 3.96 765 768 3.76 3.78
4.01 4.01 775 3.75 3.76 3.78 3.76 3.85
4.00 4.04 776 3.08 3.75 3.77 J BJ 3.213.22
J BJ J AJ S S
J 3.09 S
S
780
3.99
779
J
3.96
J
778
3.74
J
777
3.73
J
593
3.78
PK10
3.60
3.60
3.30
3.30
3.60
3.90
3.90
3.90
BM 1
803
4.06
TL
3.90
798
802 799 801 3.99
800 3.95 3.97
3.88 J
3.60
3.90
3.90
3.60
3.85 J J J
J
793 790 796
791797 3.52 792
795 794
788 789 4.09 4.10 4.013.51 S 4.02
787
3.42 3.41
4.154.04 0AJ JB BJ S P
4.10 S JB
S
Z
E
E
826
4.22
PJU
JENIS PEKERJAAN
Urugan Peninggian
= Elevasi Rencana
= Elevasi Existing
Menuju
Jl.Peterongan
810 807
816 4.45 4.42
812 4.46 BJ
814 JB
4.45 AJB
4.52 JB
RM
= 1:100
=
ELEVASI EXISTING =
ELEVASI RENCANA =
SKALA VERTIKAL
LONG SECTIONS
815 809 808
811 4.74 4.50
813 4.71 4.75
4.55 AJB JB BJ
JB
RM
LEGENDA :
PEKERJAAN
LEVELING
STATION
PEMERINTAH KABUPATEN MOJOKERTO
TANGGAL
DINAS PEKERJAAN UMUM
KABUPATEN MOJOKERTO
1:200
SKALA
DAN PENATAAN RUANG
109
PELEBARAN JALAN MENUJU STANDAR
PULONITI - SUMBERKARANG
KONSULTAN PERENCANA
PELEBARAN RUAS JALAN
SUMBER DANA
TEAM LEADER
PEKERJAAN
KEGIATAN
DRAFTER
LOKASI
Direktur
026
JUDUL GAMBAR
Long Section
CATATAN
KODE GAMBAR
STA 1+000
-2.314
-2.664 0.100 m
Urugan Peninggian Agregat Klas A
Jl. Raya Bangsal
-2.134
STA 1+000
-2.484 0.100 m
Galian Aspal Existing P = 8 m T = 0.25 m
1176 1177
-3.02 -3.12
1175
-2.67
1168 1169 1151 1147
1165 1164 -3.06 1149 1153
-2.84 -3.00 1157 -2.68 1155 -2.65 -2.69 -2.74 1171
-2.84 S S AJ J
-2.75 J -2.68 -2.69
BJ BJ
1161 1159
-2.71 -2.74
-3.00
Elevasi Rencana
-2.70
Elevasi Existing
Menuju
-2.70
-1.899
STA 0+975
-2.249 0.100 m
1141
-2.36
PJU
11321136
1135 1126
-2.54-2.85
-2.74 1110 1122 -2.87
PGR S 1130 1128 1112
S -2.47 -2.59 -2.52 1114 1118 1120 -2.52 1123
J -2.50 -2.73
TPT BJ 1116 -2.47 -2.48 J -2.49
-2.49 BJ S
AJ
1139
1140 -2.06
-2.05 PM1
PM1
-2.70
1096
803
4.06
-2.27
TL
-1.598
STA 0+950
1138
1137 -2.07
-2.12 PM1
PM1
1095
-2.11
TP
-1.948 0.100 m
-2.40
1125
1115 1117 -2.64
-2.26 -2.23 1119
1111 1121
-2.25 -2.22 1124
BJ -2.30
-2.54
1127 1109 1113 J
-2.30 -2.23 S
BJ -2.28 AJ
J
1129
-2.38
1131 TPT
-2.231133 1134
-2.65
PGR -2.65
S
S
-2.40
-2.40
STA 0+900
1097
-2.13
1100 PM
-1.99
PM
-1.327
STA 0+925
1098
-2.13
1099 PM
-2.01
PM
1094
-1.67
PJU
-1.677 0.100 m
1037
-2.06
PK14
-2.10
1075 1069
1074 1073 -1.93 -2.00
1083 1071 -1.93 -1.93 J
-2.02 -1.97 AJ
BJ J 1079
-2.04 1080
BJ -2.12
PGR
1085
1086 -2.05
-2.32
1089 1088 TPT
-2.58 -2.60
S S
1107
1108 -1.87
-1.82 PM1
PM1
-0.875
-2.10
803
1092
4.06
-1.94
TL
STA 0+900
1106
-1.74
PM1
1105
-1.85
PM1
1093
-1.74
TP
-1.225 0.100 m
1081
-1.70
1076 1078
1068 -1.70 PGR
1077 -1.68 -1.70
1087 1084 1082 -1.69 1072 BJ
1091 1070 -1.66 J
-1.80 -1.82 -1.78
PGR1090 -2.04 BJ -1.73 AJ
-2.04 S J
S
Galian Aspal Existing P = 8 m T = 0.25 m
1102
1103 -1.71
-1.65 PM2
PM2
P = 11,00 m L = 4,00 m
-1.80
-0.513
-1.50
1101
1104 -1.57
-1.36 PM2
PM2
STA 0+875
Jembatan Existing
-0.863 0.100 m
1036
-1.50
PK13
1022 1031
-1.34 -1.40
JB BJ 1028
-1.42
BJ
1020
-1.23
PJU
1025
-1.22
JB
1027
-1.23
JB
1019 1018
-1.98-2.04
S S
1015
1017
1016
-1.21
-1.24
1010
-1.24 1014 1013 1011
-1.20
BJ 1055 1012 -1.20
1065
-1.50 -1.21
TPT
1057
TPT
-1.22
J
J
-1.24
J
-1.21 -1.20
AJ
-1.24
J
-1.23
1063 BJ
-1.22
BJ
1061 1059
-1.20
-1.27 -1.27
J J
1060 1058
-1.27 -1.26
J J
1064 1024
-1.29 1056 -1.14
BJ -1.18 JB 1026
1062 1066 J 1023 -1.25
-1.31 -1.26 -1.12 JB
BJ BJ 1054 JB 1029
-1.17
1003 1030 -1.26
1005 J 1021
-1.18 -1.15 -1.12 -1.21 BJ
JBT 803
1009 1006
1067 JBT JB 1004 4.06
-0.99 BJ
-1.16
-1.21 -1.09 TL JBT
TL JBT
1008
-1.08
AJBT
1032
-4.49
DS
1033
-4.59
DS
1035
-4.70
DS
-0.269
STA 0+850
1034
-4.67
DS
1049
-1.08
BJ
1046
-1.13
J
1051
-1.03
BJ
1044
1053
-1.17 1001
BJ
1042
-1.12
JBT
1000
-1.04
1040
JBT
-1.05
J
1007
-0.98
AJBT 999
-0.97
JBT
1002
-1.31
JBT
-0.619 0.100 m
-1.11
-1.09
J J
998
-0.81
TP
997
803
-0.96
4.06
TL
1047
-1.14
J 1045
-1.12
1048
J
-1.13 1043
BJ -1.11
1050 J
-1.11
BJ
1052
-1.09
BJ 1041
-1.05
J
967 966
996 -0.84 972 973
993 -0.96 964 971 -0.84
992 -0.90 -0.89 AJ -0.84 -0.84
BJ -0.87 J BJ 976
-0.85 990 TPT J 978
-0.77 979
P989 -1.47 977 -0.89 -0.90
-1.52 S -0.84
S
985
986 -1.36
-1.40 S
S
-0.90
-0.90
-0.90
-1.20
-0.90
STA 0+800
939
-0.79
-0.158
STA 0+825
PK12
-0.508 0.100 m
962
-0.53
PJU
982
-1.06
975 980 981
-0.70-1.06
974 -0.56
965
970 -0.66
969 -0.60 -0.61 984 983
991 995 963 968 J BJ
-0.56 -0.66 -0.64 -0.60 -1.28 -1.31
-0.66 S
P 988 987 994 BJ J AJ S
-1.25 -1.25-0.62
S S TPT
-0.90
-1.20
-1.20
-0.90
-0.60
961
-0.53
PH
-0.099
-0.60
STA 0+800
-0.60
-1.20
-0.60
-0.90
-0.449 0.100 m
960
-0.51
TP
959
-0.49
PH
924
922
921 -0.98 -1.03
-0.65
914 908
910 -0.51 -0.54 918
906 913 -0.50 916
-0.51 J -0.50 932 -0.58 925
-0.56 AJ
904 BJ -0.51 -1.20
J 926 S
-0.56 TL -1.28
BJ S
896 902
897 898
-0.59 -0.52
-1.27
P -1.18 TPT
S S
-1.20
-0.90
-1.20
-0.90
-0.60
938
-0.56
PK11
-1.20
-1.20
-0.90
-0.60
958
-0.70
PH
+0.057
STA 0+775
952
-0.87
950
BJ
-0.85
J
948
-0.80
J
946
-0.68
J
944
-0.55
J
942
-0.55
J
-0.293 0.100 m
951
-0.89
J
953
-0.80
BJ
945
949 947 -0.53
-0.76 -0.67 J
J J
943
-0.55
J
929
-0.42
PJU
919 920
928 927 -0.56 -0.82
∅100 cm
923
915 -1.22 -1.09 -0.85
-0.50 917 S S
912 BJ -0.44
-0.48 907
911 909 -0.46
895 -0.48 -0.44 J
-0.72 905 AJ
P 901 903 -0.49
899 900
-1.03 -1.09-0.49 -0.50 J
S S TPT BJ
Rencana Crossing
-0.60
-0.90
-0.60
-0.90
-0.90
+0.207
(STA 0+700)
STA 0+750
Dengan RCP
-0.143 0.100 m
930
-0.34
TP
954
-0.28
956 PM
-0.22
PM
880
871 864 873 -0.86
862 870 865
867 -0.30 -0.31 -0.33 874
891 -0.31
-0.28 -0.60
890 -0.33 -0.30 J BJ 875
893 892-0.23 J AJ
AJ -0.55
894 -0.84 -1.01
TPT -0.32
882 881
-0.04 S S BJ -1.05
P -1.02
933 S S
-0.28
PH
4
-0.31
-0.30
PK2
-0.30
-0.90
-0.60
-0.30
803
931
4.06
-0.23
TL
-0.60
-0.30
957 955
-0.09 -0.17
PM PM
934
-0.27
PH
STA 0+700
935
-0.40
PH
937
-0.29
PH
936
-0.25
PH
+0.272
STA 0+725
855
856 -0.37
-0.37 PM
C
L
PM
-0.078 0.100 m
854 853
-0.29 -0.26
PM860 859 PM
-0.96 -0.96
S S
-0.30
-0.60
-0.90
-0.60
-0.90
-0.30
852
-0.06
-0.90
-0.60
-0.90
-0.30
PJU
3
-0.17
PK1
850
-0.19
PM
848
-0.19
PM
+0.427
STA 0+700
851 849
-0.17 -0.21
PM PM
843
-0.36
840
BJ
-0.35
J
845
-0.34
BJ 838
-0.34
J
836
-0.34
J
858
-1.10
S
857
-0.95
846
S -0.21
TPT
834
-0.24
J
832
-0.12
J
+0.077 0.100 m
841
-0.35
J 839
-0.36
842 J 30
-0.38 844 837 -0.26
BJ -0.38 -0.37 835 TP
BJ J -0.28
J
833
847 -0.10
-0.28 J 29
803
4.06
-0.15
TL
6 5
15 12 11 10 8 9 -0.40 -0.72
-0.42 7 -0.91
14 -0.08 13 -0.11 -0.11 -0.56 -0.91 SW
16 -0.08 AJ -0.08 J BJ S S
17 -0.07
19 18 -0.10 J
-0.06 -0.06 BJ
23 20 WRG
22 21 TPT
Elevasi Rencana
-0.60
-0.30
Elevasi Existing
24
-0.03
PM
27
-0.03
PM
-0.30
-0.60
0.00
0.00
35
-0.16
J
28
803
4.06
0.11
TL
34
-0.14
26
-0.02
PM
25
-0.02
PM
38
-0.05
J 37
0.15
J
36
0.18
J
J
+0.555
STA 0+675
33
0.21
32 J
0.20
J
31
-0.03
J
+0.205 0.100 m
0.00
2
-0.03
BM1
40 39
41 54 55 0.22 0.24
43 42 -0.53
46 44 0.20-0.54 S
47 0.03 0.03 S
53 5251 48 45 0.08 0.07 J BJ
-0.01
-0.51 -0.97
-0.19 50 49 -0.02 0.05 AJ
S -1.330.05 BJ J
S TPT
58
56 0.28
0.02 J
J 57
0.13
J
-0.90
-0.60
-0.30
0.00
0.00
0.00
-0.30
59
0.00
0.34
J
1
0.00 60
A1 0.22
-0.60
-0.30
-0.90
-0.30
J
62
63
0.03 0.01
PM PM 61
0.06
J
65
64 67 66 0.01
-0.01 -1.06 -1.14PM
PM S S
68
0.23
PJU
+0.692
STA 0+650
73 71
0.14 0.14
74 PM PH
0.15
PM
75
78
0.16
-1.07
PM
S S
76
770.16
PM
-1.01 803
69
0.15
4.06
TL
70
0.11
PH
+0.342 0.100 m
72
0.15
TP
80
82 81 0.19 79
91 90 89 -0.51 -0.51 -0.07
100 98 99 94 0.12 -0.20
S
103 96 0.19 0.20 S SW
105 0.21 0.21 0.21 BJ
114 0.12 0.17 J
0.13 BJ J AJ
-1.13 TPT
116115 S
-0.35
117 -0.93
S
-0.31
-0.30
-0.30
0.00
-0.60
-0.90
-0.30
-0.90
0.00
-0.90
-0.60
-0.30
STA 0+600
STA 0+625 +0.805
803
121
0.30
4.06
TL
+0.455 0.100 m
-0.30
0.00
108 109
0.54 0.32
PM PM
84
0.21
SW
83
87 0.04
88 86 SW
97 0.15 0.07 85
101 93 92 -0.52 -0.52
95 102 0.35 0.31 0.30 S
0.35 S
104 0.32 0.35 AJ J BJ
0.31 J
118 BJ
119 -0.80 106
-0.74
S S 0.42
TPT
107
0.49
P
-0.30
-0.30
0.00
0.00 0.00
-0.30
0.30
-0.60
-0.60
0.30
-0.30
0.00
0.30
0.00
111
0.49
PM
110
0.41
PM
113
-0.66 112
S -0.77
S
120
0.47
PJU
+0.822
STA 0+600
124 123
0.44
PM
0.44
PM
+0.472 0.100 m
125 126
0.47 0.47
PM PM
128 127
-0.79 -0.88
S S
122
0.44
TP
142
140 141 144
129 130 136 138 139 0.30 -0.42 143 0.25
135 0.40 -0.42 S 0.40
-0.81 -0.73 132 133 134 137 0.46 0.40 S SW
131 S 0.03 0.41 0.41 0.46 J BJ
S 0.46
-0.60 BJ J
AJ
151
0.66
150 PM
0.66
PM
+0.965
-0.30 -0.30
0.30
STA 0+575
0.00
-0.30
0.00
-0.60
-0.60
-0.30
153
155
0.66
-0.66
152
1540.66
-0.61
PM
+0.615 0.100 m
PMS S
803
156
0.45
4.06
TL
162
0.34
163 161 160 159
168 167 165 164 0.47 -0.33 -0.410.33
166 0.47 0.47 0.47 158
169 0.42 0.47 BJ S S 0.26
174 0.38 J AJ J SW
171 170
0.23 173 0.01 BJ
172 -0.62
-0.34 S
-0.57
S
0.30
0.00
0.00
0.00
-0.30
0.30
0.00
+1.018
STA 0+550
157
0.64
TP
+0.668 0.100 m
216
0.84
215 PM
0.91
PM
219
0.55
TP
191
0.37
187 189 190 SW
178 177 180 181 182 185 186 188
179 184 183 0.17 -0.27 -0.40 0.29
176-0.26 0.76
-0.31 0.62 0.62 0.62 0.62 0.55 0.55 S
175 BJ J 0.62 BJ S
0.93S S AJ J
0.94
TK
-0.30
0.30
0.00
0.60
0.60
209
210 0.75
0.91 PM
PM 212
0.90
211 1.06
1.03 PM
PM
-0.30
0.30
0.00
0.60
STA 0+500
213
1.08
218
PM
-0.18
S
214
217 1.03
-0.26PM
S
+1.099
STA 0+525
0.60
0.60
0.30
0.00
Elv. + 4.00
Elv. + 2.00
Elv. ± 0.00
Elv. - 2.00
Elv. - 4.00
146
0.61
PK3
+0.749 0.100 m
192
193 0.57
0.56 SW
194
195 -0.33
206 205 200 201 199 198 197 196 -0.36 S
207 -0.09 202 0.67 0.68 0.33 S
208 0.05 -0.19 204 203 0.67 0.64 0.64
0.22 S 0.65 AJ
S 0.42 0.56 J J BJ
BJ
220
803
0.67
4.06
TL
0.30
0.00
0.00
-0.30
-0.30
0.30
-0.30
0.60
0.30
-0.30
0.60
0.00
0.00
Menuju
Jl.Peterongan
222
0.77 221
P 0.92
P
147
0.65
PK4
145
0.87
PJU
STA 0+500
225
0.70
223 J
0.87
224 PM
0.97
PM
Urugan Peninggian
= Elevasi Rencana
JENIS PEKERJAAN
= Elevasi Existing
= 1:100
=
ELEVASI EXISTING =
ELEVASI RENCANA =
SKALA VERTIKAL
LONG SECTIONS
LEGENDA :
PEKERJAAN
LEVELING
STATION
PEMERINTAH KABUPATEN MOJOKERTO
TANGGAL
DINAS PEKERJAAN UMUM
KABUPATEN MOJOKERTO
1:200
SKALA
DAN PENATAAN RUANG
109
PELEBARAN JALAN MENUJU STANDAR
PULONITI - SUMBERKARANG
KONSULTAN PERENCANA
PELEBARAN RUAS JALAN
SUMBER DANA
TEAM LEADER
PEKERJAAN
KEGIATAN
DRAFTER
LOKASI
Direktur
027
JUDUL GAMBAR
Long Section
CATATAN
KODE GAMBAR
Galian Aspal Existing Untuk "R"
P = 8 m T = 0.25 m
STA 1+442
0.100 m
Bangsal
-3.989
Jl. Raya
1509
-4.29
BJ
1508
-4.29
J
STA 1+442
1511
-4.30
BJ
1514
-4.08
BJ
1504
-4.16
J
1513
-4.08
BJ
1503
-4.19
J
1506
-4.23
J
-4.339 0.100 m
1520
-4.06
BJ
1521
1517 -4.15
-4.10
BJ J
1516
-4.10
J
Bangsal
-4.20
1507
-4.22
J
1510
-4.36
Jl. Raya
BJ
1505
-4.24
J
1512
-4.29
BJ
1491
1490 -4.25
-4.25
1492
AJ 1479
-4.25
-4.31
1481 1480 J
-4.35 1501
-4.35
J J -4.23
1478 LM
1522 -4.35
-4.15 J
J
1515
-4.08 1483
J -4.37
1482 J 1502
STA 1+425
-4.35 -4.44
1495 J P
-4.29 1489
PK22 -4.34
BJ
1488
-4.27
1519 BJ
STA 1+400
-4.06
1518 BJ
-4.08
BJ
1485
-4.35 1487
J -4.41
1500 BJ
-4.19 1484
TP 1499 1486 -4.37
-4.30
TP
-4.29
BJ
J
-4.098
: 9170147.463
1494
-4.38 1524
PK21 -4.28
PTK4
Urugan Peninggian Agregat Klas A
: 664954.349
-4.448 0.100 m
: 9170146.056
: -4.277
STA 1+400
1493
-4.117
-4.05
PJU
-4.542 0.100 m
: -4.260
1451
-4.08
RB
1450
-4.12
TP
1461
-4.46
1466
-4.51 P
1473 1474 1469 BJ
1464 1475 -4.47
-4.52 1471 -4.46 -4.50
1463 -4.47 J
BJ -4.48 AJ
-4.36 J
P
Elevasi Rencana
Elevasi Existing
BM 4
STA 1+375
-4.50
1449
803
-4.49
4.06
TL
-4.111
BM 3
0.100 m
E
-4.511
-4.50
1459
1457 1456 1455 1452 1458 -4.41
1460 1453 1454 -4.54 -4.59 P
-4.60 -4.57 -4.55
-4.55 -4.60 -4.55 BJ
P BJ AJ J
J
N
Z
E
1447
-4.54
TP
1439 1425
-4.64 -4.55
J PK20
1446
-4.54
P
1445
-4.60
P
1441
-4.59
J
1443
-4.64
J
1440
1442 -4.60
-4.55 J
J
1444
-4.61
J
1448
-4.38
BLH
STA 1+350
-4.069
-4.50
1428
-4.419 0.100 m
Jembatan Existing
-4.56
J
1438
-4.53
BJ
1437
1430 -4.42
-4.57
J BJ
1436
-4.52
BJ
1432 1434
-4.59 -4.59
J J
1410 1409
1414
1415 -4.51 -4.55
AJ -4.52 J
1421 1408 -4.52
1419 -4.55 -4.53 1435
-4.50 BJ
J -4.59
P J
1433
-4.55
J
1431
-4.56
J
1422
-4.36 1429
PJU -4.58
J
1424
-4.57
PK19
-4.50
803
1423
-4.55
4.06
TL
STA 1+325
-4.50
STA 1+300
-4.002
-4.352 0.100 m
1416 1417
1406
1413 1412 -4.47 -4.51 -4.51
1411 BJ P
-4.44 -4.41 -4.44 J
1418 1407 AJ
-4.42 1420 -4.47
P -4.45 J
BJ
STA 1+300
-3.934
-4.284 0.100 m
1403 1394
-4.35 1398 1391 1396
P -4.44 1384 1392 1388 -4.36 1386 -4.36 -4.28
-4.37 -4.36 -4.36 BJ P
BJ -4.35
J AJ J
1405
-4.25
PJU
-4.50
STA 1+275
1404
803
-4.35
4.06
TL
-3.832
-5.10
-4.80
-4.182 0.100 m
-4.50
1532 1527
-4.28 -4.35
13801530 ASGR 1389 GR
-4.44
-4.59 -4.30 1385 1393
1379 1534
P GR 1387
1540-4.59 1383 1390 -4.27 -4.33 -4.36 1395
1537 1535 -5.36 -4.30 J BJ
-4.58
P -5.36 S -4.34 AJ -4.35
-5.37
P 1397 P
S J
S -4.36
BJ
1528
1531
1538 1533 -4.27 -4.34
1539
-5.34 1542 GR
-4.5815361401 -5.351529
1545 1399 ASGR
S 1543 1544
-5.21 1402
-4.58
-5.34 S -4.40
P -4.58
-5.11
-5.14
1400 TPT-4.62GR
-5.29
SS S
TPT S TPT
-4.60 S
1547 1541
1546
1548 -4.96 -4.55
-4.59 -4.93
1381
1382S TPT
S -4.43
P
-4.45 PM
PM
-4.50
-5.10
-5.10
-4.80
-4.80
STA 1+250
1377
-4.38
PM
1378
-4.32
PM
-3.731
-4.20
-4.20
1376
-4.28
TP
-4.131 0.100 m
1375
-4.31
TP
1374
-4.09
PJU
1354 1351 1372
1352 1355 1353 -4.22 1371
1368 -4.17 -4.17 -4.27
-4.24
-4.25 -4.20 J
-4.28 AJ BJ P
1370 J
P 1366 1367 -4.29
-4.91 -4.91
1369 BJ
S S -4.29
TPT
-4.20
-4.20
803
1373
4.06
-4.14
TL
STA 1+225
-4.20
-4.20
-4.50
-4.80
STA 1+200
-4.20
-4.20
-4.80
-4.50
-4.20
-3.662
-4.50
-4.80
-4.20
-4.012 0.100 m
1347
-3.89 1348
PM1 -3.89
PM1
1363 1358 1350 1359
1362 -4.15 1360
-3.88
1364 1349 -4.12 1356 -4.14
-3.88 1365 TPT -4.14 1357 BJ -4.07
-4.93 -4.93 -4.12 AJ -4.12 J P
J
1361 S S
-3.88
P
-4.50
-4.80
-4.20
-3.90
1346 1345
-3.89 -3.90
PM1 PM1
STA 1+200
1344
-4.08
TP
-3.483
1297
-4.08
PK18
1331
-4.15
TP
-3.883 0.100 m
1337 1336 1338
1334 1332 -4.08 1339
-4.09 -4.01 -4.00 1335 -4.01
BJ 1333 -4.04 -4.10 BJ
AJ J P
-4.03
1342 13431340 J
1341 -4.82 -4.33
-4.75
-4.40S S TPT
P
-3.90
1330
-3.88
PJU
-4.50
-4.20
STA 1+175
-4.50
-4.20
-4.50
1313
-3.74
PM1
803
1314
-3.91
4.06
TL
1296
-3.93
PK17
-3.336
-3.90
1310
-4.22
PM1
1308
-4.03
PM1
-3.686 0.100 m
1316 1320
1319 1315 -3.87
-3.91 1317
1318 -3.87 -3.87 -3.88 BJ 1329
1321 J J 1327 13261328
1309 -4.00 -3.87 AJ -3.73
1307 -4.89 -4.89-3.68
-4.21 BJ S S P
PM1 1324 1325 -4.10
1323
-4.67-4.651322
-4.44
PM1
P S S -4.18
TPT
1311 1312
-3.75 -3.70
PM1 PM1
1306
-3.82
PH
-4.50
-4.50
-4.20
-4.20
STA 1+150
1295
-3.93
TP
-3.213
-4.50
-4.20
-4.20
-4.20
1294
-3.98
TP
-3.563 0.100 m
1277
-3.87
1303 1301
1265 1275 1304 -4.50 1302
1269 1272 -3.79 1300-4.48 -4.48
1267 1273 -3.67 -3.69 -4.29 S -4.20
1282 -3.69 -3.67 -3.67 J BJ S
-3.67 J AJ
1287
1290 BJ
1292 -3.96
1291 -4.45
-4.10
P -4.42 S TPT
S
1293
-3.48
PJU
-4.20
-3.90
-4.20
-4.20
-4.20
-4.20
-3.90
STA 1+125
STA 1+100
1263
803
4.06
-3.55
1305
-3.54
PM
-3.076
1261
TL -3.46
PM
-3.426 0.100 m
1283
-3.95
1286
1271 1264
-4.301285 -3.54 1268 1270 1274
-4.23 -3.55 -3.54 -3.58
1281 1266 J -3.62
1284 1289 -3.45 AJ BJ 1278
-3.911288 -3.55 1279
-4.21 1259 BJ J 1280 -3.48
-4.21 S -3.40 1276 -4.43 -4.40
P
S TP -3.62 S S
1262
1260 -3.49
-3.60 PM
PM
1257
-3.28 1256
PM
-3.40
PM
STA 1+100
1258
-3.42
TP
-2.923
-3.273 0.100 m
1255 1254
-3.22 -3.29
1250 1251 1210
PM
1249 1248 1247 PM1246 1211
-3.85 -4.05 -4.13 -3.42
-3.85 -3.36 -3.44 1245 -3.42
S S
-3.44
BJ
1209 1207
-3.45 1224
-3.42 -3.47
1208 AJ J
-3.45 BJ 1225 1226 1227
J -3.47 1229 1228
1230 -3.86 -4.20
-4.15
-4.20 -4.13
S
S
1253
-3.08
PJU
1252
-3.36
TP
STA 1+075
1243
-3.19
PM1
1244
-3.23
PM1
-2.764
1239 1240
-3.37 -3.36
PM1 PM1
1242
1238
-3.39
PM1
1237
-3.38
PM1
1241
-3.21
PM1
-3.20
PM1
3.114 0.100 m
1221 1220 1219
1223 12221217 1218
-3.92 -3.62
-3.10 -3.16-3.38-3.89 S-3.63
1233 1231 1212 1214 1206 1216 TL TP S
1232 -3.41 1213 -3.30 -3.37
-3.62 -3.28 1215 -3.26 -3.26
1234 1235 1236 -3.48 BJ J J BJ
-3.51 -3.26 AJ
-3.67 -3.66
S
S
1143
-3.37
PK16
1189 1190
-3.02 -2.96
PM PM
STA 1+050
1191
-3.04
TP
-2.533
-2.883 0.100 m
1202 1201 1200
1199-3.94 -3.94 -2.94
1192 1198 -2.94S S
1193 1194 1195 P
1197 -3.15 1196 -3.10 -3.11 -3.15 -3.12 TPT
-3.20 J -3.11 AJ J BJ
1204 1203 BJ
1205 -3.26 -3.18
-3.35
-3.30
1182
-3.23
TL
1187 1188
-2.93 -2.90
PM
PM
1186
-2.73 1185
PM -2.74 1181
PM -3.03
PRT
STA 1+025
1180
-2.67
PJU
Menuju
Jl.Peterongan
STA 1+000
1142
-3.01
-3.30
-3.30
PK15
-2.314
Elv. ± 0.00
Elv. - 2.00
Elv. - 4.00
Elv. - 6.00
Elv. - 8.00
1183
-2.74
PM
1184
-2.80
PM
-2.664 0.100 m
1158
-2.90 1150
1160 1154 -2.87 1152 1146
1162 -2.96 1166 1156 1148 1170 1172
1163 -3.20 1167 -2.89
-3.10 -3.25 -3.20 -2.95 -2.92 AJ -2.89 -2.92 -2.94
-2.85 1173
J J BJ
S S BJ -3.12
1174
-3.22
1178
803
-2.81
4.06
TL
STA 1+000
-3.00
-3.00
Urugan Peninggian
= Elevasi Rencana
JENIS PEKERJAAN
= Elevasi Existing
= 1:100
=
ELEVASI EXISTING =
ELEVASI RENCANA =
SKALA VERTIKAL
LONG SECTIONS
LEGENDA :
PEKERJAAN
LEVELING
STATION
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
Tiang Listrik Existing DAN PENATAAN RUANG
(Dibongkar) KABUPATEN MOJOKERTO
+ 6.000
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
PEKERJAAN
KABUPATEN MOJOKERTO
+ 3.000
SUMBER DANA
KONSULTAN PERENCANA
+ 2.000
Elevasi Rencana
Elevasi Existing + 4.093
TEAM LEADER
+ 6.000
CATATAN TANGGAL
305 305
+ 3.000 600 50
Saluran Existing
SUB KEGIATAN
+ 4.000 Jalan Aspal Existing Saluran Existing
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
139 300 130
BELANJA PERENCANAAN TEKNIS
+ 3.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
KABUPATEN MOJOKERTO
+ 2.000
SUMBER DANA
KONSULTAN PERENCANA
+ 1.000
Elevasi Rencana
Elevasi Existing + 3.771
TEAM LEADER
+ 5.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
CL 50 Timbunan Biasa t = 25 cm AHMAD SIDIG, ST., MT.
+ 4.000 1.0% 1.0%
Saluran Existing Saluran Existing PENANGGUNG JAWAB
305 305
600 77
+ 3.000
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Aspal Existing
+ 2.000
SUB KEGIATAN
+ 4.000
Saluran Existing Jalan Aspal Existing PELEBARAN JALAN MENUJU STANDAR
Saluran Existing
PEKERJAAN
LOKASI
KONSULTAN PERENCANA
+ 1.000
Elevasi Rencana
Elevasi Existing + 3.535
TEAM LEADER
+ 5.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
+ 4.000
CL 50 Timbunan Biasa t = 25 cm
1.0% 1.0% PENANGGUNG JAWAB
Saluran Existing Saluran Existing
CATATAN TANGGAL
Jalan Aspal Existing
+ 2.000
LOKASI
KABUPATEN MOJOKERTO
+ 2.000
SUMBER DANA
KONSULTAN PERENCANA
+ 1.000
Elevasi Rencana
Elevasi Existing + 3.300
TEAM LEADER
+ 5.000
Beton Fs-40, t = 25 cm
+ 4.000 Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
Sumber Galian + Pemadatan Bahu Jalan Dengan PENANGGUNG JAWAB
CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing Saluran Existing
+ 3.000 Rencana
120
AHMAD SIDIG, ST., MT.
305 305 TPT Pas. Batu Direktur
600
CATATAN TANGGAL
30
+ 2.000
70
Ladang Tebu
Jalan Aspal Existing PEKERJAAN
Saluran Existing
+ 3.000 Rawa - Rawa BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
45 300 90
LOKASI
KABUPATEN MOJOKERTO
+ 2.000
SUMBER DANA
KONSULTAN PERENCANA
+ 1.000
Elevasi Rencana
Elevasi Existing + 3.192
Beton Fs-40, t = 25 cm
+ 4.000 Timbunan Sirtu Dari Plastik Polythene
AHMAD SIDIG, ST., MT.
CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing Saluran Existing
Ladang Tebu Rawa - Rawa
+ 3.000
Rencana
120
AHMAD SIDIG, ST., MT.
305 305 Direktur
TPT Pas. Batu
600 CATATAN TANGGAL
30
+ 2.000 Jalan Aspal Existing
70
Sawah
BELANJA PERENCANAAN TEKNIS
+ 2.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
+ 1.000 412 300 110
SUMBER DANA
KONSULTAN PERENCANA
± 0.000
Elevasi Rencana
Elevasi Existing + 2.564
TEAM LEADER
+ 4.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
+ 3.000 50 75
1.0% CL 1.0% Timbunan Biasa t = 25 cm PENANGGUNG JAWAB
Saluran Existing
Saluran Existing
Rencana Sawah
120
305 305 TPT Pas. Batu
+ 2.000
600 AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
70
+ 1.000
LOKASI
KABUPATEN MOJOKERTO
+ 1.000 200 330 130
SUMBER DANA
KONSULTAN PERENCANA
± 0.000
Elevasi Rencana
Elevasi Existing + 2.376
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
+ 3.000 Sumber Galian + Pemadatan
AHMAD SIDIG, ST., MT.
Bahu Jalan Dengan
PENANGGUNG JAWAB
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing Saluran Existing
+ 2.000 Rencana
120
305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
600 Direktur
CATATAN TANGGAL
30
+ 1.000 70
LOKASI
KABUPATEN MOJOKERTO
267 330 100
+ 1.000
SUMBER DANA
KONSULTAN PERENCANA
± 0.000
Elevasi Rencana
Elevasi Existing + 2.211
Beton Fs-40, t = 25 cm
+ 3.000 Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
Saluran Existing
+ 2.000
Rencana
120
AHMAD SIDIG, ST., MT.
305 305 TPT Pas. Batu Direktur
600 CATATAN TANGGAL
30
+ 1.000
70
SUB KEGIATAN
+ 3.000
PELEBARAN JALAN MENUJU STANDAR
Saluran Existing
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
+ 1.000
SUMBER DANA
170 330 90
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
± 0.000
Elevasi Rencana
Elevasi Existing + 2.048
TEAM LEADER
+ 4.000
120
TPT Pas. Batu 305 305 TPT Pas. Batu CATATAN TANGGAL
600
30
70 70 Saluran Existing
SUB KEGIATAN
+ 3.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
+ 1.000
SUMBER DANA
KONSULTAN PERENCANA
± 0.000
Elevasi Rencana
Elevasi Existing + 1.969
TEAM LEADER
+ 4.000
CATATAN TANGGAL
TPT Pas. Batu 305 305
600
70
PEKERJAAN
KABUPATEN MOJOKERTO
± 0.000
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.883
TEAM LEADER
+ 3.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
75 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0% AHMAD SIDIG, ST., MT.
+ 2.000 Saluran Existing Saluran Existing PENANGGUNG JAWAB
Rencana Rencana
120
120
TPT Pas. Batu 305 305 TPT Pas. Batu
600
+ 1.000 Jalan Aspal Existing AHMAD SIDIG, ST., MT.
30
30
Direktur
CATATAN TANGGAL
70 70
± 0.000
PEKERJAAN
LOKASI
256 300 100
KABUPATEN MOJOKERTO
± 0.000
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.727
TEAM LEADER
+ 3.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
75 CL 75 Timbunan Biasa t = 25 cm AHMAD SIDIG, ST., MT.
+ 2.000 1.0% 1.0%
Saluran Existing Saluran Existing PENANGGUNG JAWAB
Rencana Rencana
120
120
TPT Pas. Batu 305 305 TPT Pas. Batu
+ 1.000 600
AHMAD SIDIG, ST., MT.
Direktur
Jalan Aspal Existing
30
30
CATATAN TANGGAL
70 70
± 0.000
PEKERJAAN
LOKASI
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.557
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan Saluran Existing
+ 2.000 75 75
AHMAD SIDIG, ST., MT.
Rencana Rencana
120
120
+ 1.000 TPT Pas. Batu 305 305 TPT Pas. Batu
600 AHMAD SIDIG, ST., MT.
Direktur
30
70 70
± 0.000
LOKASI
KABUPATEN MOJOKERTO
± 0.000 172 300 100
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.409
TEAM LEADER
+ 3.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
+ 2.000 AHMAD SIDIG, ST., MT.
Sumber Galian + Pemadatan Bahu Jalan Dengan
50 75 PENANGGUNG JAWAB
1.0% CL 1.0% Timbunan Biasa t = 25 cm
Saluran Existing
Saluran Existing
Rencana
120
+ 1.000
305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
600 Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
± 0.000 70
LOKASI
KABUPATEN MOJOKERTO
± 0.000
180 300 100
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.289
Beton Fs-40, t = 25 cm
+ 2.000 Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
Sumber Galian + Pemadatan Bahu Jalan Dengan PENANGGUNG JAWAB
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
+ 1.000 Rencana
120
AHMAD SIDIG, ST., MT.
305 305 TPT Pas. Batu Direktur
600
CATATAN TANGGAL
30
± 0.000
70
LOKASI
KABUPATEN MOJOKERTO
± 0.000
159 330 100 SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.200
Beton Fs-40, t = 25 cm
+ 2.000 Timbunan Sirtu Dari Plastik Polythene
AHMAD SIDIG, ST., MT.
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing Saluran Existing
+ 1.000
Rencana
120
AHMAD SIDIG, ST., MT.
305 305 TPT Pas. Batu Direktur
600 CATATAN TANGGAL
30
± 0.000
70
SUB KEGIATAN
+ 2.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
Jalan Aspal Existing
Saluran Existing Saluran Existing
BELANJA PERENCANAAN TEKNIS
+ 1.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
± 0.000
SUMBER DANA
180 330 130
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.190
TEAM LEADER
+ 3.000
Beton Fs-40, t = 25 cm
AHMAD SIDIG, ST., MT.
+ 2.000 Timbunan Sirtu Dari Plastik Polythene
PENANGGUNG JAWAB
Sumber Galian + Pemadatan Bahu Jalan Dengan
50 CL 50 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing Saluran Existing
+ 1.000
AHMAD SIDIG, ST., MT.
Direktur
305 305
CATATAN TANGGAL
600
SUB KEGIATAN
+ 2.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
± 0.000
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 1.023
TEAM LEADER
+ 3.000
600
PEKERJAAN
Saluran Existing
Jalan Aspal Existing BELANJA PERENCANAAN TEKNIS
+ 1.000 Saluran Existing
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
± 0.000
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 0.964
PENANGGUNG JAWAB
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
+ 1.000 Saluran Existing Saluran Existing
AHMAD SIDIG, ST., MT.
Direktur
Rencana
120
305 305 CATATAN TANGGAL
TPT Pas. Batu
600
30
70
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
± 0.000
SUMBER DANA
KONSULTAN PERENCANA
- 1.000
Elevasi Rencana
Elevasi Existing + 0.889
TEAM LEADER
+ 3.000
Rencana
120
CATATAN TANGGAL
305 305 TPT Pas. Batu
600
± 0.000
Jalan Aspal Existing
30
70
SUB KEGIATAN
+ 1.000 Jalan Aspal Existing
Saluran Existing Saluran Existing PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
180 320 130
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.749
TEAM LEADER
+ 2.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
50 CL 75 Timbunan Biasa t = 25 cm AHMAD SIDIG, ST., MT.
+ 1.000 1.0% 1.0%
Saluran Existing Saluran Existing PENANGGUNG JAWAB
Rencana
120
305 305 TPT Pas. Batu
± 0.000 600
AHMAD SIDIG, ST., MT.
Direktur
Jalan Aspal Existing
30
CATATAN TANGGAL
70
- 1.000
PEKERJAAN
LOKASI
103 300 80
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.668
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
+ 1.000 50 CL 75 Timbunan Biasa t = 25 cm AHMAD SIDIG, ST., MT.
1.0% 1.0%
PENANGGUNG JAWAB
Saluran Existing
Rencana
120
305 305 TPT Pas. Batu
± 0.000 600
AHMAD SIDIG, ST., MT.
Direktur
Jalan Aspal Existing
30
CATATAN TANGGAL
70
- 1.000
LOKASI
200 300 80
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.615
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
+ 1.000 50 CL 75 Timbunan Biasa t = 25 cm
AHMAD SIDIG, ST., MT.
1.0% 1.0%
PENANGGUNG JAWAB
Saluran Existing Saluran Existing
Rencana
120
305 305 TPT Pas. Batu
± 0.000 600
AHMAD SIDIG, ST., MT.
Direktur
Jalan Aspal Existing CATATAN TANGGAL
30
70
- 1.000
LOKASI
KABUPATEN MOJOKERTO
59 330 80
- 1.000
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.472
TEAM LEADER
+ 2.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
+ 1.000 Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
Rencana
120
± 0.000 305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
600 Direktur
30
70
- 1.000
LOKASI
KABUPATEN MOJOKERTO
120 330 80
- 1.000
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.455
TEAM LEADER
+ 2.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan AHMAD SIDIG, ST., MT.
+ 1.000 Bahu Jalan Dengan
50 CL 75 Timbunan Biasa t = 25 cm PENANGGUNG JAWAB
1.0% 1.0%
Saluran Existing Saluran Existing
Rencana
120
± 0.000 305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
600 Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
- 1.000 70
LOKASI
KABUPATEN MOJOKERTO
- 1.000 194 310 100
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.342
TEAM LEADER
+ 2.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
+ 1.000
Sumber Galian + Pemadatan Bahu Jalan Dengan PENANGGUNG JAWAB
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
Saluran Existing
± 0.000 Rencana
120
305 305 TPT Pas. Batu
AHMAD SIDIG, ST., MT.
Direktur
600
CATATAN TANGGAL
30
- 1.000 70
PEKERJAAN
Jalan Aspal Existing
Saluran Existing Saluran Existing
BELANJA PERENCANAAN TEKNIS
± 0.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
- 1.000
170 310 100 SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.205
TEAM LEADER
+ 2.000
Beton Fs-40, t = 25 cm
AHMAD SIDIG, ST., MT.
+ 1.000 Timbunan Sirtu Dari Plastik Polythene
PENANGGUNG JAWAB
Sumber Galian + Pemadatan Bahu Jalan Dengan
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
Saluran Existing
± 0.000
Rencana AHMAD SIDIG, ST., MT.
120
305 305 Direktur
TPT Pas. Batu
600 CATATAN TANGGAL
30
- 1.000 Jalan Aspal Existing
70
PEKERJAAN
Jalan Aspal Existing
Saluran Existing Saluran Existing BELANJA PERENCANAAN TEKNIS
± 0.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
202 300 100
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing + 0.077
TEAM LEADER
+ 2.000
SUB KEGIATAN
+ 1.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
Saluran Existing
Jalan Aspal Existing BELANJA PERENCANAAN TEKNIS
± 0.000 Saluran Existing PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
KONSULTAN PERENCANA
- 2.000
Elevasi Rencana
Elevasi Existing - 0.078
SKALA 1 : 50
TEAM LEADER
+ 2.000
CATATAN TANGGAL
305 305
600
- 1.000
Jalan Aspal Existing
SUB KEGIATAN
+ 1.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
- 2.000
Elevasi Rencana
Elevasi Existing - 0.143
TEAM LEADER
+ 2.000
CATATAN TANGGAL
Rencana
120
Saluran Existing 305 305 TPT Pas. Batu
600
- 1.000
Jalan Aspal Existing
30
70
SUB KEGIATAN
+ 1.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
KABUPATEN MOJOKERTO
- 1.000
SUMBER DANA
- 2.000
Elevasi Rencana
Elevasi Existing - 0.293
TEAM LEADER
+ 2.000
CATATAN TANGGAL
Saluran Existing Rencana
120
305 305 TPT Pas. Batu
- 1.000 600
Jalan Aspal Existing
30
70
LOKASI
KONSULTAN PERENCANA
- 3.000
Elevasi Rencana
Elevasi Existing - 0.449
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
± 0.000 50 75
AHMAD SIDIG, ST., MT.
Saluran Existing
Saluran Existing
Rencana
120
- 1.000 305 305 TPT Pas. Batu
600 AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
70
- 2.000
LOKASI
KONSULTAN PERENCANA
- 3.000
Elevasi Rencana
Elevasi Existing - 0.508
TEAM LEADER
+ 1.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
± 0.000 Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
Rencana
120
Saluran Existing
- 1.000 305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
600 Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
70
- 2.000
LOKASI
KABUPATEN MOJOKERTO
- 2.000 150 330 80
SUMBER DANA
KONSULTAN PERENCANA
- 3.000
Elevasi Rencana
Elevasi Existing - 0.619
TEAM LEADER
+ 1.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
± 0.000 Sumber Galian + Pemadatan Bahu Jalan Dengan PENANGGUNG JAWAB
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
120
- 1.000
305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
Direktur
600
CATATAN TANGGAL
30
- 2.000 70
SUB KEGIATAN
± 0.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
Jalan Aspal Existing
BELANJA PERENCANAAN TEKNIS
- 1.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
- 2.000
SUMBER DANA
281 330 100
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 3.000
Elevasi Rencana
Elevasi Existing - 0.863
TEAM LEADER
+ 1.000
- 1.000
AHMAD SIDIG, ST., MT.
Rencana
120
Direktur
305 305 TPT Pas. Batu CATATAN TANGGAL
600
30
70
SUB KEGIATAN
± 0.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 2.000
SUMBER DANA
- 3.000
Elevasi Rencana
Elevasi Existing - 1.225
TEAM LEADER
+ 1.000
CATATAN TANGGAL
305 305
600
- 2.000
Jalan Aspal Existing
SUB KEGIATAN
- 1.000
PELEBARAN JALAN MENUJU STANDAR
LOKASI
KABUPATEN MOJOKERTO
- 3.000 222 300 100
SUMBER DANA
KONSULTAN PERENCANA
- 4.000
Elevasi Rencana
Elevasi Existing - 1.677
TEAM LEADER
± 0.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
- 1.000
Sumber Galian + Pemadatan Bahu Jalan Dengan PENANGGUNG JAWAB
50 CL 50 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
- 2.000
AHMAD SIDIG, ST., MT.
305 305
Direktur
600
CATATAN TANGGAL
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 3.000
SUMBER DANA
270 300 100
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 4.000
Elevasi Rencana
Elevasi Existing - 1.948
TEAM LEADER
± 0.000
SUB KEGIATAN
- 1.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
Saluran Existing
KABUPATEN MOJOKERTO
- 3.000
SUMBER DANA
- 4.000
Elevasi Rencana
Elevasi Existing - 2.249
TEAM LEADER
± 0.000
CATATAN TANGGAL
Saluran Existing Rencana
120
305 305 TPT Pas. Batu
- 3.000 600
30
70
LOKASI
KONSULTAN PERENCANA
- 5.000
Elevasi Rencana
Elevasi Existing - 2.484
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
- 2.000 Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0% PENANGGUNG JAWAB
Saluran Existing
Rencana
120
- 3.000 305 305 TPT Pas. Batu
600 AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
70
- 4.000
SUB KEGIATAN
- 2.000
PELEBARAN JALAN MENUJU STANDAR
LOKASI
KABUPATEN MOJOKERTO
- 4.000 339 300 100
SUMBER DANA
KONSULTAN PERENCANA
- 5.000
Elevasi Rencana
Elevasi Existing - 2.664
TEAM LEADER
- 1.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene AHMAD SIDIG, ST., MT.
- 2.000
Sumber Galian + Pemadatan Bahu Jalan Dengan PENANGGUNG JAWAB
50 CL 75 Timbunan Biasa t = 25 cm
1.0% 1.0%
Saluran Existing
- 3.000 Rencana
120
AHMAD SIDIG, ST., MT.
305 305 TPT Pas. Batu Direktur
600
CATATAN TANGGAL
30
- 4.000 70
SUB KEGIATAN
- 2.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
Jalan Aspal Existing
Saluran Existing BELANJA PERENCANAAN TEKNIS
- 3.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
- 4.000
SUMBER DANA
330 330 100
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 5.000
Elevasi Rencana
Elevasi Existing - 2.883
TEAM LEADER
- 1.000
120
Direktur
305 305 TPT Pas. Batu CATATAN TANGGAL
600
30
70
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 4.000
SUMBER DANA
- 5.000
Elevasi Rencana
Elevasi Existing - 3.114
TEAM LEADER
- 1.000
CATATAN TANGGAL
305 305
600
- 4.000
Jalan Aspal Existing
Saluran Existing
- 5.000 JUDUL GAMBAR SKALA
SUB KEGIATAN
- 2.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 4.000
SUMBER DANA
- 5.000
Elevasi Rencana
Elevasi Existing - 3.273
TEAM LEADER
- 1.000
CATATAN TANGGAL
305 305
- 4.000 600
LOKASI
KONSULTAN PERENCANA
- 6.000
Elevasi Rencana
Elevasi Existing - 3.426
TEAM LEADER
- 2.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
- 3.000 50 75
1.0% CL 1.0% Timbunan Biasa t = 25 cm
PENANGGUNG JAWAB
Saluran Existing Saluran Existing
Rencana
120
305 305 TPT Pas. Batu
- 4.000
600 AHMAD SIDIG, ST., MT.
Direktur
Jalan Aspal Existing CATATAN TANGGAL
30
70
- 5.000
LOKASI
KABUPATEN MOJOKERTO
- 5.000 143 310 180
SUMBER DANA
KONSULTAN PERENCANA
- 6.000
Elevasi Rencana
Elevasi Existing - 3.563
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
- 3.000 Sumber Galian + Pemadatan Bahu Jalan Dengan
AHMAD SIDIG, ST., MT.
Rencana
120
- 4.000 305 305 TPT Pas. Batu AHMAD SIDIG, ST., MT.
600 Direktur
CATATAN TANGGAL
Jalan Aspal Existing
30
- 5.000 70
LOKASI
KABUPATEN MOJOKERTO
- 5.000 110 310 180
SUMBER DANA
KONSULTAN PERENCANA
- 6.000
Elevasi Rencana
Elevasi Existing - 3.686
SUB KEGIATAN
- 3.000
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
Jalan Aspal Existing
Saluran Existing BELANJA PERENCANAAN TEKNIS
- 4.000 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
- 5.000
SUMBER DANA
207 310 140
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 6.000
Elevasi Rencana
Elevasi Existing - 3.883
TEAM LEADER
- 2.000
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 5.000
SUMBER DANA
140 310 140
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
- 6.000
Elevasi Rencana
Elevasi Existing - 4.012
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 5.000
SUMBER DANA
KONSULTAN PERENCANA
- 6.000
Elevasi Rencana
Elevasi Existing - 2.883
PENANGGUNG JAWAB
Timbunan Sirtu Dari
50 50 Sumber Galian + Pemadatan
Beton Fs-40, t = 25 cm 1.0% CL 1.0% Plastik Polythene
- 4.000 Saluran Existing
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
305 305 Bahu Jalan Dengan
600 Timbunan Biasa t = 25 cm
- 5.000
Jalan Aspal Existing
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 5.000
SUMBER DANA
- 6.000
Elevasi Rencana
Elevasi Existing - 4.182
TEAM LEADER
- 2.000
30 50 30
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
- 5.000
SUMBER DANA
- 6.000
Pagar Existing
- 3.000 AHMAD SIDIG, ST., MT.
(Dibongkar)
PENANGGUNG JAWAB
CATATAN TANGGAL
Rencana Saluran
305 305
Pasangan Batu Bahu Jalan Dengan
- 5.000 600
Timbunan Biasa t = 25 cm
30 50 30 Jalan Aspal Existing
PEKERJAAN
LOKASI
120 330 170
KABUPATEN MOJOKERTO
- 6.000
SUMBER DANA
KONSULTAN PERENCANA
- 7.000
Rencana Saluran
305 305
- 5.000 Pasangan Batu Bahu Jalan Dengan
600
Timbunan Biasa t = 25 cm AHMAD SIDIG, ST., MT.
Direktur
30 50 30 Jalan Aspal Existing CATATAN TANGGAL
- 6.000
SUB KEGIATAN
- 4.000
Jalan Aspal Existing PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KONSULTAN PERENCANA
- 7.000
Rencana Saluran
305 305
- 5.000 Pasangan Batu
600 Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
Direktur
Timbunan Biasa t = 25 cm
Jalan Aspal Existing CATATAN TANGGAL
30 50 30
- 6.000
LOKASI
KABUPATEN MOJOKERTO
230 300 170
- 6.000
SUMBER DANA
KONSULTAN PERENCANA
- 7.000
- 6.000
LOKASI
KABUPATEN MOJOKERTO
230 300 100
- 6.000
SUMBER DANA
KONSULTAN PERENCANA
- 7.000
TEAM LEADER
- 3.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
AHMAD SIDIG, ST., MT.
- 4.000 Sumber Galian + Pemadatan Bahu Jalan Dengan
50 CL 50 Timbunan Biasa t = 25 cm PENANGGUNG JAWAB
1.0% 1.0%
CATATAN TANGGAL
Jalan Aspal Existing
- 6.000
SUB KEGIATAN
- 4.000
Jalan Aspal Existing PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
LOKASI
KONSULTAN PERENCANA
- 7.000
Elevasi Rencana
Elevasi Existing - 4.448
TEAM LEADER
- 3.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan AHMAD SIDIG, ST., MT.
- 4.000
50 CL 50 Timbunan Biasa t = 25 cm
1.0% 1.0% PENANGGUNG JAWAB
CATATAN TANGGAL
Jalan Aspal Existing
- 6.000
SUB KEGIATAN
- 4.000
Jalan Aspal Existing
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
KONSULTAN PERENCANA
- 7.000
Elevasi Rencana
Elevasi Existing - 4.339
TEAM LEADER
- 3.000
Beton Fs-40, t = 25 cm
Timbunan Sirtu Dari Plastik Polythene
Sumber Galian + Pemadatan Bahu Jalan Dengan
AHMAD SIDIG, ST., MT.
- 4.000 50
1.0% CL 1.0%
50 Timbunan Biasa t = 25 cm
PENANGGUNG JAWAB
305 305
- 5.000 600
AHMAD SIDIG, ST., MT.
Direktur
Jalan Aspal Existing
CATATAN TANGGAL
- 6.000
60 60 60 60 60 60 60 60 60 60 60 60 60 60 LOKASI
B B
KABUPATEN MOJOKERTO
KONSULTAN PERENCANA
30 30 30
30 30 30
30 30 30
30 30 30
30 30 30
30 30 30 300
30 30 30
30 30 30
30 30 30
30 30 30
DRAFTER
Saluran Existing 60
305 305 AHMAD SIDIG, ST., MT.
Direktur
50 600 50
CATATAN TANGGAL
Jalan Aspal Existing
POTONGAN A - A
SKALA 1:50
Detail Pembesian
Lebar 6 Meter 1:50
50 50 50
400 400
KODE GAMBAR NOMOR GAMBAR JUMLAH GAMBAR
POTONGAN B - B
SKALA 1:50 086 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
10
Plastik (Polytene)
50
1/2 LD 1/2 LD
Besi Ø8 - 300 Timbunan Sirtu Dari Plastik (Polytene) 60
(Tumpuan Dowel) Sumber Galian DRAFTER
Timbunan Sirtu Dari
Sumber Galian
10 cm PENANGGUNG JAWAB
10 cm
AHMAD SIDIG, ST., MT.
Direktur
10 cm CATATAN TANGGAL
087 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
SUMBER DANA
A A
DRAFTER
TEAM LEADER
SKALA 1:30
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton Rencana
Masuk Gang Beton Rencana
Potongan AA
088 109
SKALA 1:30
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
PEKERJAAN
M
/ T= ayap
LOKASI
1,80
S
KABUPATEN MOJOKERTO
P. 3, ana TPT
M
/ T= ayap
SUMBER DANA
1,80
00 M
S
Renc
P. 3, ana TPT
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
00 M
Renc
50
m
100 c
Dia. ∅
300
CP)
DRAFTER
ipe (R
Beton Fs-40, t = 25 cm Beton Fs-40, t = 25 cm
CL
ete P
Concr
ADITYA BURHANUDIN, ST.
orced
300
TEAM LEADER
Reinf
Rencana TPT Type 2
P. 8,00 M / T= 1,50 M P. 3,00 M / T= 1,80 M
50
PENANGGUNG JAWAB
CATATAN TANGGAL
SUB KEGIATAN
Beton Fc' 30 Mpa, t = 25cm
(Curing Compound) PELEBARAN JALAN MENUJU STANDAR
Timbunan Sirtu
PEKERJAAN
dari Sumber Galian
40
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
648 PULONITI - SUMBERKARANG
50 324 324 50
90
90
LOKASI
CL
1.0% 1.0% Parapet KABUPATEN MOJOKERTO
Pasangan Batu Aanstamping
30
30
Uk. 30 x 50 x 166 cm SUMBER DANA
25
32
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
Reinforced Concrete Pipe (RCP) Reinforced Concrete Pipe (RCP) Reinforced Concrete Pipe (RCP)
113
126
57
50
PENANGGUNG JAWAB
25
25
10
30
20
AHMAD SIDIG, ST., MT.
Direktur
156
Reinforced Concrete Pipe (RCP)
136
CATATAN TANGGAL
Dia.∅100 cm
Timbunan Sirtu
dari Sumber Galian
Timbunan Sirtu, t = 10 cm
20 126 20
35 35 166 30 35
090 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
Parapet
Pasangan Batu Aanstamping PELEBARAN JALAN MENUJU STANDAR
Uk. 30 x 50 x 166 cm
200
Beton Fc' 30 Mpa, t = 25cm PEKERJAAN
C
L (Curing Compound)
Timbunan Sirtu BELANJA PERENCANAAN TEKNIS
dari Sumber Galian PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
25
30
10
SUMBER DANA
20
32
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
146
Timbunan Sirtu
126
dari Sumber Galian
Reinforced Concrete Pipe (RCP)
Dia.∅100 cm
Pasangan Batu 1Pc : 4Psr
50
50
87 126 87
DRAFTER
35 67 166 67 35
PENANGGUNG JAWAB
25
30
10
20
32
146
Timbunan Sirtu CATATAN TANGGAL
126
dari Sumber Galian
Reinforced Concrete Pipe (RCP)
Dia.∅100 cm
Pasangan Batu 1Pc : 4Psr 50
50
87 126 87
35 67 166 67 35
091 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
200 KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
55 190 55 40
KEGIATAN
5
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN
90
90
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
5
PULONITI - SUMBERKARANG
25
LOKASI
KABUPATEN MOJOKERTO
30
30
30
SUMBER DANA
300
5
40
50
DRAFTER
5
200
PENANGGUNG JAWAB
126
6.5 6.5 260 113
6.5 100 6.5 6.5
16 244 6.5
100
6.5
6.5
Direktur
6.5
6.5 6.5
CATATAN TANGGAL
113
113
113
100
126
126
100
100
6.5
JUDUL GAMBAR SKALA
6.5 6.5
6.5
- DETAIL PARAPET 1 : 20
6.5
GORONG - GORONG
- DETAIL GORONG - GORONG 1 : 25
RCP DIA. ∅100
DETAIL GORONG - GORONG RCP DIA. ∅100
KODE GAMBAR NOMOR GAMBAR JUMLAH GAMBAR
SKALA 1:25
092 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Tembok Penahan Tanah Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
Pasangan Batu 1Pc : 4Psr Plesteran Camp. 1:4
KEGIATAN
Plesteran Camp. 1:4 Pipa PVC 2''
Pipa PVC 2'' Tembok Penahan Tanah PENYELENGGARAAN JALAN KABUPATEN / KOTA
300 Pasangan Batu 1Pc : 4Psr
30 SUB KEGIATAN
10
10
PEKERJAAN
LOKASI
150
150
KABUPATEN MOJOKERTO
182
180
180
SUMBER DANA
KONSULTAN PERENCANA
30
30
60 10
DETAIL TEMBOK PENAHAN TANAH TYPE 1 70 DRAFTER
SKALA 1:25
10
TPT TYPE STA TPT PANJANG LOKASI
PENANGGUNG JAWAB
TYPE 1 STA 0+700 3M 3 BUAH
(1 KANAN & 2 KIRI)
2
STA 0+100 (PENGARAH SUNGAI) 5M SISI KIRI
120
AHMAD SIDIG, ST., MT.
Direktur
150
150
150
STA 0+120 S/D STA 0+200 80 M SISI KANAN CATATAN TANGGAL
30
STA 0+950 S/D STA 1+040 90 M SISI KANAN DETAIL TEMBOK PENAHAN TANAH 1 : 25
TYPE 2
STA 1+100 S/D STA 1+125 25 M SISI KANAN
KODE GAMBAR NOMOR GAMBAR JUMLAH GAMBAR
SUB KEGIATAN
275
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
550
LOKASI
KABUPATEN MOJOKERTO
SUMBER DANA
KONSULTAN PERENCANA
275
D I N A S P E K E R J A A N U M U M
D I N A S P E K E R J A A N U M U M
KABUPATEN
KABUPATEN
MOJOKERTO
MOJOKERTO
DRAFTER
155 90 155 400 155
SKALA 1:50 Besi Dowel Ø32 - 300 Dipotong 1/4 H di Isi Sealent A
Besi 2 Ø8 - 300 Lapisan Cat Anti Karat Full Besi Tie Bar D16 - 600
(Tumpuan Dowel) ADITYA BURHANUDIN, ST.
TEAM LEADER
30 30 30
30 30 30
30 30 30
30 30 30
30 30 30 AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
275
60 60 60 60 60 60 60 60 60 60 60 60 60 60
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
550
30 30 30
30 30 30
30 30 30
30 30 30
30 D13 - 100 30 30
D13 - 100 D16 - 100
275
90
D I N A S P E K E R J A A N U M U M
D I N A S P E K E R J A A N U M U M
KABUPATEN
KABUPATEN
TAMPAK ATAS 1 : 50
RIGID BETON DAN SALURAN
MOJOKERTO
MOJOKERTO
SUB KEGIATAN
Beton Fs-40, t = 25 cm D13 - 100 Beton Fs-40, t = 25 cm D13 - 100 Joint Sealent Plastik Polythene PELEBARAN JALAN MENUJU STANDAR
25
LOKASI
50
50
KABUPATEN MOJOKERTO
30
Rencana Saluran Pas. Batu Rencana Saluran Pas. Batu APBD KAB. MOJOKERTO TA. 2021
30 50 30 30 50 30
KONSULTAN PERENCANA
Plesteran Campuran 1:4 Plesteran Campuran 1:4
TEAM LEADER
25
30
D I N A S P E K E R J A A N U M U M
50
50
Direktur
KABUPATEN MOJOKERTO
CATATAN TANGGAL
30
20
20 70 20
Rencana Saluran Pas. Batu
20 70 20 30 50 30
D13-100 Grill Tangkapan Air Tb. 15 mm
Plesteran Campuran 1:4
Angkur D12 Di Las
25
30 50 30
110
PEKERJAAN
Besi Ø13-100
BELANJA PERENCANAAN TEKNIS
Besi 6 Ø16 PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
KABUPATEN MOJOKERTO
SUMBER DANA
STA 1+275
P = 1.20m L = 5.5m
Tampak Atas Rencana Balok Penyangga
SKALA 1:25 ADITYA BURHANUDIN, ST.
A TEAM LEADER
PENANGGUNG JAWAB
Rencana Balok Penyangga Rigid Beton
Beton Fs-40, t = 25 cm
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
25
20
POTONGAN AA 1 : 25
096 109
900 PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
150 300 300 150
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
A Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
SUB KEGIATAN
40
PELEBARAN JALAN MENUJU STANDAR
40
300
40
PEKERJAAN
Bangsal
Jalan Raya 400
40
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
Bangsal
40
Jalan Raya
PULONITI - SUMBERKARANG
40
LOKASI
30
30
30
30
30
30
30
30
30
30
SUMBER DANA
30
30
30
30
30
30
30
30
30
30
KONSULTAN PERENCANA
40
Jl.Petero
40
A
Menuju
40
ngan
400
40
40
40
DRAFTER
30
30
30
30
30
30
30
30
30
30
600 ADITYA BURHANUDIN, ST.
30
30
30
30
30
30
30
30
30
30
TEAM LEADER
40
40
40
400
40
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
40
40
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
600
25
25
800
JUDUL GAMBAR SKALA
60
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
60
Jalan Existing KEGIATAN
Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
PENYELENGGARAAN JALAN KABUPATEN / KOTA
30
30
30
30
30
30
30
30
30
30
25
10 SUB KEGIATAN
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
60
LOKASI
60
SKALA NTS SUMBER DANA
60
KONSULTAN PERENCANA
60
A A
30
30
30
30
30
30
30
30
30
30
300 450
DRAFTER
30
30
30
30
30
30
30
30
30
30
60
ADITYA BURHANUDIN, ST.
TEAM LEADER
60
60
AHMAD SIDIG, ST., MT.
60
AHMAD SIDIG, ST., MT.
30
30
30
30
30
30
30
30
30
30
Direktur
CATATAN TANGGAL
30
30
30
30
30
30
30
30
30
30
60
JUDUL GAMBAR SKALA
60
098 109
PEMERINTAH KABUPATEN MOJOKERTO
DINAS PEKERJAAN UMUM
60
500 DAN PENATAAN RUANG
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
60
KEGIATAN
30
30
30
30
30
30
30
30
30
SUB KEGIATAN
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
60
LOKASI
KABUPATEN MOJOKERTO
60
SUMBER DANA
KONSULTAN PERENCANA
A A
60
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
60
TEAM LEADER
60
60
PENANGGUNG JAWAB
60
30
30
30
30
30
30
30
30
30
Direktur
CATATAN TANGGAL
30
30
30
30
30
30
30
30
30
25
10
500
60
60
KEGIATAN
60
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN
60
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
30
30
30
30
30
30
30
30
30
30
LOKASI
KABUPATEN MOJOKERTO
60
40
SUMBER DANA
40
60
APBD KAB. MOJOKERTO TA. 2021
A A
40
KONSULTAN PERENCANA
60
40
40
60
40
30
30
30
30
30
30
30
30
30
30
750 1200 DRAFTER
30
30
30
30
30
30
30
30
30
30
60
40 ADITYA BURHANUDIN, ST.
TEAM LEADER
40
60
40
60
40
60
PENANGGUNG JAWAB
40
30
30
30
30
30
30
30
30
30
30
AHMAD SIDIG, ST., MT.
Direktur
30
30
30
30
30
30
30
30
30
30
CATATAN TANGGAL
60
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
60
Masuk Gang Beton Rencana Rencana
25
60
10 JUDUL GAMBAR SKALA
500
Detail R STA 0+400
KIRI NTS
60
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
60
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN
60
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
30
30
30
30
30
30
30
30
30
30
LOKASI
400
KABUPATEN MOJOKERTO
60
SUMBER DANA
60
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
60
A A
60
30
30
30
30
30
30
30
30
30
30
300 500 DRAFTER
30
30
30
30
30
30
30
30
30
30
60
ADITYA BURHANUDIN, ST.
TEAM LEADER
60
60
AHMAD SIDIG, ST., MT.
60
PENANGGUNG JAWAB
30
30
30
30
30
30
30
30
30
30
AHMAD SIDIG, ST., MT.
Direktur
30
30
30
30
30
30
30
30
30
30
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
60
25
10
400
60
60
JUDUL GAMBAR SKALA
60
KEGIATAN
60
SUB KEGIATAN
60
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
30
30
30
30
30
30
30
30
30
30
LOKASI
KABUPATEN MOJOKERTO
400
60
SUMBER DANA
60
KONSULTAN PERENCANA
60
A A
60
30
30
30
30
30
30
30
30
30
30
DRAFTER
500 350
30
30
30
30
30
30
30
30
30
30
ADITYA BURHANUDIN, ST.
60
TEAM LEADER
60
60
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
60
30
30
30
30
30
30
30
30
30
30
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
30
30
30
30
30
30
30
30
30
30
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
60
25
10
60
400
60
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
60
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN
30
30
30
30
30
30
30
30
30
30
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
LOKASI
60
KABUPATEN MOJOKERTO
60
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
60
60
A A
30
30
30
30
30
30
30
30
30
30
DRAFTER
250 350
30
30
30
30
30
30
30
30
30
30
ADITYA BURHANUDIN, ST.
TEAM LEADER
60
60
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
60
60
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Existing
30
30
30
30
30
30
30
30
30
30
Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
25
10
30
30
30
30
30
30
30
30
30
30
400
60
Detail R STA 0+705
KIRI NTS
60
KEGIATAN
SUB KEGIATAN
30
30
30
30
30
30
30
30
30
30
PELEBARAN JALAN MENUJU STANDAR
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
60
LOKASI
KABUPATEN MOJOKERTO
60
SUMBER DANA
60
KONSULTAN PERENCANA
60
A A
30
30
30
30
30
30
30
30
30
30
DRAFTER
250 400
30
30
30
30
30
30
30
30
30
30
ADITYA BURHANUDIN, ST.
60
TEAM LEADER
60
AHMAD SIDIG, ST., MT.
400
60
PENANGGUNG JAWAB
60
AHMAD SIDIG, ST., MT.
Direktur
30
30
30
30
30
30
30
30
30
30
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
25
30
30
30
30
30
30
30
30
30
30
10
400
60
JUDUL GAMBAR SKALA
60
KABUPATEN MOJOKERTO
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
30
30
30
30
30
30
30
30
30
30
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN
30
30
30
30
30
30
30
30
30
30
PEKERJAAN
60
PULONITI - SUMBERKARANG
LOKASI
60
KABUPATEN MOJOKERTO
SUMBER DANA
60
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
60
A A
30
30
30
30
30
30
30
30
30
30
200 250
DRAFTER
30
30
30
30
30
30
30
30
30
30
60
ADITYA BURHANUDIN, ST.
TEAM LEADER
60
400
60
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
60
30
30
30
30
30
30
30
30
30
30
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang
30
30
30
30
30
30
30
30
30
30
Beton Rencana Rencana
25
10
400
60
JUDUL GAMBAR SKALA
60
Jl. Raden Wijaya No. 60 Mojokerto Telp/Fak. (0321) 321958
KEGIATAN
30
30
30
30
30
30
30
30
30
30
SUB KEGIATAN
30
30
30
30
30
30
30
30
30
30
PEKERJAAN
60
LOKASI
KABUPATEN MOJOKERTO
60
SUMBER DANA
60
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
60
A A
30
30
30
30
30
30
30
30
30
30
200 350
DRAFTER
30
30
30
30
30
30
30
30
30
30
60
ADITYA BURHANUDIN, ST.
TEAM LEADER
60
400
60
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
60
30
30
30
30
30
30
30
30
30
30
AHMAD SIDIG, ST., MT.
Direktur
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
30
30
30
30
30
30
30
30
30
30
25
10
400
60
JUDUL GAMBAR SKALA
60
KEGIATAN
30
30
30
30
30
30
30
30
30
SUB KEGIATAN
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
60 LOKASI
KABUPATEN MOJOKERTO
60
SUMBER DANA
KONSULTAN PERENCANA
60
A A
30
30
30
30
30
30
30
30
30
30
500 250 DRAFTER
30
30
30
30
30
30
30
30
30
30
60
TEAM LEADER
60
60
PENANGGUNG JAWAB
400
60
30
30
30
30
30
30
30
30
30
Direktur
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
30
30
30
30
30
30
30
30
30
30
25
10
400
60
60
KEGIATAN
30
30
30
30
30
30
30
30
30
30
SUB KEGIATAN
PEKERJAAN
30
30
30
30
30
30
30
30
30
30
BELANJA PERENCANAAN TEKNIS
PELEBARAN RUAS JALAN
PULONITI - SUMBERKARANG
60
LOKASI
KABUPATEN MOJOKERTO
60
SUMBER DANA
60
KONSULTAN PERENCANA
60
A A
30
30
30
30
30
30
30
30
30
30
250 300 DRAFTER
30
30
30
30
30
30
30
30
30
30
60
ADITYA BURHANUDIN, ST.
TEAM LEADER
60
400
60
AHMAD SIDIG, ST., MT.
PENANGGUNG JAWAB
60
AHMAD SIDIG, ST., MT.
30
30
30
30
30
30
30
30
30
30
Direktur
CATATAN TANGGAL
Jalan Existing Nyambung Jalan Existing Nyambung Jalan Jalan Beton
Masuk Gang Beton Rencana Rencana
30
30
30
30
30
30
30
30
30
30
25
10
400
60
JUDUL GAMBAR SKALA
SUB KEGIATAN
PEKERJAAN
LOKASI
KABUPATEN MOJOKERTO
DETAIL OPRITAN JEMBATAN SUMBER DANA
SKALA NTS
APBD KAB. MOJOKERTO TA. 2021
KONSULTAN PERENCANA
25
800
ADITYA BURHANUDIN, ST.
TEAM LEADER
DETAIL A.1
SKALA NTS
PENANGGUNG JAWAB
Jalan Aspal Jalan Aspal Existing
Existing
Galian Aspal Existing
T = 25 cm
AHMAD SIDIG, ST., MT.
25 CATATAN
Direktur
TANGGAL
800
DETAIL A.2
SKALA NTS JUDUL GAMBAR SKALA
109 109