PEKERJAAN
TARGET
LOKASI
SUMBER BIAYA
: GD.A : 4 RKB LT. 1,4 RKB LT. 2, & 4 RKB LT.3 + KM/WC + TANGGA
: APBD 2021
NO URAIAN PEKERJAAN
1 2
A PEKERJAAN PENDAHULUAN
a. Penyiapan RKK
e. Personel K3 Konstruksi
g. Rambu-rambu
GEDUNG A
B PEKERJAAN 4 RKB + KM/WC LT. 1
I PEKERJAAN PERSIAPAN
Sloof Beton
Kolom Beton
1 Pek. Kolom beton type (K1) 30x40 K-225 besi 259,4 kg/m3
2 Pek. Kolom beton type (K2) 25x25 K-225 besi 221,4 kg/m3
Balok Beton
1 Pek. Balok beton type (B1) 30/55 K-225 besi 184,7 kg/m3
2 Pek. Balok beton type (B2) 20/40 K-225 besi 169 kg/m3
3 Pek. Balok beton type (B3) 20/30 K-225 besi 211,4 kg/m3
Plat Beton
Tangga Beton
1 Pek. Lantai, trap anak tangga + pondasi beton K-225 besi 195,1 kg/m3
2 Pek. Balok tangga & Void 20/25 K-225 besi 142,9 kg/m3
NO URAIAN PEKERJAAN
1 2
10 Pek. Pasang jalusi teras depan, besi hollow 4x6 dan 4x4 + finishing cat
4 Pek. Ring balk beton railling tangga type (RB Praktis) 10x15
1 Pek. Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm + rangka hollow galvanis 40.40 & 40.20 (120x60)
3 Pek. Pasang lantai keramik putih polos 40/40 KW 1 (R. Kelas & Selasar)
5 Pek. Pasang lantai keramik 40/40 KW 1 (Tangga dan bordes) + step nosing
- Kaca bening 5 mm
- Kaca bening 5 mm
- Engsel casement
- Handel/grendel
- Kaca bening 5 mm
- Kaca bening 5 mm
IX PEKERJAAN PENGECATAN
XI PEKERJAAN SANITASI
NO URAIAN PEKERJAAN
1 2
Kolom Beton
1 Pek. Kolom beton type (K1) 30x40 K-225 besi 259,4 kg/m3
2 Pek. Kolom beton type (K2) 25x25 K-225 besi 221,4 kg/m3
Balok Beton
1 Pek. Balok beton type (B1) 30/55 K-225 besi 184,7 kg/m3
2 Pek. Balok beton type (B2) 20/40 K-225 besi 169 kg/m3
3 Pek. Balok beton type (B3) 20/30 K-225 besi 211,4 kg/m3
Plat Beton
Tangga Beton
1 Pek. Lantai, trap anak tangga beton K-225 besi 195,1 kg/m3
2 Pek. Balok tangga & Void 20/25 K-225 besi 142,9 kg/m3
10 Pek. Pasang jalusi teras depan, besi hollow 4x6 dan 4x4 + finishing cat
4 Pek. Ring balk beton pagar selasar type (RB Praktis) 10x15
IV PEKERJAAN LANTAI
1 Pek. Pasang lantai keramik putih polos 40/40 KW 1 (R. Kelas & Selasar)
3 Pek. Pasang lantai keramik 40/40 KW 1 (Tangga dan bordes) + step nosing
- Kaca bening 5 mm
- Kaca bening 5 mm
- Engsel casement
- Handel/grendel
- Kaca bening 5 mm
- Kaca bening 5 mm
VI PEKERJAAN PENGECATAN
4 Pek. Pengecatan pagar selasar dan railing tangga dgn cat tembok exterior wheatershield
NO URAIAN PEKERJAAN
1 2
3 Pek. Pasang titik cahaya + lampu PL 8 watt
Kolom Beton
1 Pek. Kolom beton type (K1) 30x40 K-225 besi 187,7 kg/m3
2 Pek. Kolom beton type (K2) 25x25 K-225 besi 192,8 kg/m3
1 Pek. Ring balk beton type (RB1) 20/30 K-225 besi 151,4 kg/m3
2 Pek. Ring balk beton type (RB2) 15/30 K-225 besi 173,4 kg/m3
Plat Beton
1 Pek. Plat beton dudukan tabung air t = 12 cm K-225 besi 141,6 kg/m3
Pagar Selasar
4 Pek. Ring balk beton pagar selasar type (RB Praktis) 10x15
2 Pek. Pas. Penutup atap genteng bitumen 3 mm, monolayer selulosa (gelombang genteng)
IV PEKERJAAN PLAFOND
1 Pek. Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm + rangka hollow galvanis 40.40 & 40.20 (120x60)
2 Pek. Langit-langit GRC board, uk. (120 x 240) tebal 4 mm + rangka hollow galvanis 40.40 & 40.20 (120x60)
V PEKERJAAN LANTAI
1 Pek. Pasang lantai keramik putih polos 40/40 KW 1 (R. Kelas & Selasar)
- Kaca bening 5 mm
- Kaca bening 5 mm
- Engsel casement
- Handel/grendel
- Kaca bening 5 mm
- Kaca bening 5 mm
NO URAIAN PEKERJAAN
1 2
IX PEKERJAAN SANITASI
GEDUNG B
B PEKERJAAN 2 RKB + KM/WC LT. 1
I PEKERJAAN PERSIAPAN
Sloof Beton
Kolom Beton
1 Pek. Kolom beton type (K1) 30x40 K-225 besi 259,4 kg/m3
2 Pek. Kolom beton type (K2) 25x25 K-225 besi 221,4 kg/m3
Balok Beton
1 Pek. Balok beton type (B1) 30/55 K-225 besi 184,7 kg/m3
2 Pek. Balok beton type (B2) 20/40 K-225 besi 169 kg/m3
3 Pek. Balok beton type (B3) 20/30 K-225 besi 211,4 kg/m3
Plat Beton
Tangga Beton
1 Pek. Lantai, trap anak tangga + pondasi beton K-225 besi 195,1 kg/m3
2 Pek. Balok tangga & Void 20/25 K-225 besi 142,9 kg/m3
NO URAIAN PEKERJAAN
1 2
10 Pek. Pasang jalusi teras depan, besi hollow 4x6 dan 4x4 + finishing cat
4 Pek. Ring balk beton railling tangga type (RB Praktis) 10x15
1 Pek. Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm + rangka hollow
3 Pek. Pasang lantai keramik putih polos 40/40 KW 1 (R. Kelas & Selasar)
5 Pek. Pasang lantai keramik 40/40 KW 1 (Tangga dan bordes) + step nosing
- Kaca bening 5 mm
- Kaca bening 5 mm
- Engsel casement
- Handel/grendel
- Kaca bening 5 mm
IX PEKERJAAN PENGECATAN
XI PEKERJAAN SANITASI
NO URAIAN PEKERJAAN
1 2
M PEKERJAAN LAIN-LAIN
I PEKERJAAN HALAMAN
II PEKERJAAN AKHIR
1 Pek. Pembersihan akhir pekerjaan
Bekasi,
Penawar
PT/CV.
2021
NAMA JELAS
Jabatan
A PEKERJAAN PERSIAPAN
A.1. 1 m' Pagar sementara dari kayu tinggi 2 meter
A.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter
A.3. 1 m' Pagar sementara dari kawat duri tinggi 1.8 meter
A.4. 1 m' Pengukuran dan pemasangan bouwplank
A.5. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
A.6. 1 m2 Pembuatan rumah jaga/kontruksi kayu
A.7. 1 m2 Pembuatan gudang semen dan alat-alat
A.8. 1 m2 Pembuatan bedeng buruh
A.9. 1 m2 Membersihkan lapangan dan perataan
A.10. 1 m2 Pembuatan stegger dari bambu. Ukuran (40 x 50 x 20) cm
A.11. 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 25) cm
A.12. 1 m2 Pembuatan jalan sementara
A.13. 1 m3 Bongkaran beton bertulang
A.14. 1 m3 Bongkaran dinding tembok bata merah
A.15. 1 m' Pasang pagar kawat jaring galvanis, panjang 240 cm
A.16. 1 m2 Pasang pagar beton pra cetak (5 x 50 x 240) cm
A.17. 1 bh Pasang papan nama proyek Digital Printing
B. PEKERJAAN TANAH
B.1. 1 m3 Menggali tanah biasa sedalam 1 meter
B.2. 1 m3 Menggali tanah biasa sedalam 2 meter
B.3. 1 m3 Menggali tanah biasa sedalam 3 meter
B.4. 1 m3 Menggali tanah keras sedalam 1 meter
B.5. 1 m3 Menggali tanah cadas sedalam 1 meter
B.6. 1 m3 Menggali tanah lumpur sedalam 1 meter
B.7. 1 m3 Mengerjakan stripping tebing setinggi 1 meter
B.8. 1 m3 Membuang tanah sejauh 30 meter
B.9. 1 m3 Mengurug kembali galian tanah
B.10. 1 m3 Memadatankan tanah (per 20 cm)
B.11. 1 m3 Mengurug pasir urug
B.12. 1 m3 Memasang lapisan pudel campuran 1 KP : 3 PS : 7 TL untuk stabilisasi tanah
B.13. 1 m3 Memasang lapisan ijuk tebal 10 cm, untuk bidang resapan
B.14. 1 m3 Mengurug sirtu padat
B.14.a 1 m3 Mengurug tanah merah
B.15. 1 m2 Penyemprotan anti rayap
B.16. 1 btg Pasang cerucuk dolken dia. 7-10 cm - pj-4 m, jarak 60cm
C. PEKERJAAN PONDASI
C.1. 1 m3 Memasang pondasi batu belah, 1 pc : 3 ps
C.2. 1 m3 Memasang pondasi batu belah, 1 pc : 4 ps
C.3. 1 m3 Memasang pondasi batu belah, 1 pc : 5 ps
C.4. 1 m3 Memasang pondasi batu belah, 1 pc : 6 ps
C.5. 1 m3 Memasang pondasi batu belah, 1 pc : 8 ps
C.6. 1 m3 Memasang pondasi batu belah, 1 kp : 1 sm : 2 ps
C.7. 1 m3 Memasang pondasi batu belah, 1 pc : 3 kp : 10 ps
C.8. 1 m3 Memasang pondasi batu belah, 1/4 pc : 1 kp : 4 ps
C.9. 1 m3 Memasang batu kosong (anstamping)
C.10. 1 m3 Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
C.11. 1 m3 Memasang pondasi sumuran diameter 100 cm
C.12. 1 m' Pekerjaan Tiang Pancang segitiga 32 cm
D. PEKERJAAN BETON
D.1. 1 m3 Membuat beton K-100 (Fc = 7,4 Mpa, slump (12±2) cm, w/c = 0.87)
D.2. 1 m3 Membuat beton K-125 (Fc = 9,8 Mpa, slump (12±2) cm, w/c = 0.78)
D.3. 1 m3 Membuat beton K-150 (Fc = 12,2 Mpa, slump (12±2) cm, w/c = 0.72)
D.4. 1 m3 Membuat lantai kerja beton K-100 (Fc = 7,4 Mpa, slump (3±6) cm, w/c = 0.87)
D.5. 1 m3 Membuat beton K-175 (Fc = 14,5 Mpa, slump (12±2) cm, w/c = 0.66)
D.8. 1 m3 Membuat beton K-250 (Fc = 21,7 Mpa, slump (12±2) cm, w/c = 0.56)
D.9. 1 m3 Membuat beton K-275 (Fc = 24 Mpa (K-275), slump (12±2) cm, w/c = 0.53)
D.10. 1 m3 Membuat beton Fc = 26,4 Mpa (K-300), slump (12±2) cm, w/c = 0.52
D.11. 1 m3 Membuat beton Fc = 28,8 Mpa (K-325), slump (12±2) cm, w/c = 0.49
D.12. 1 m3 Membuat beton Fc = 31,2 Mpa (K-350), slump (12±2) cm, w/c = 0.48
D.13. 1 m3 Membuat beton pracetak (24 jam) Fc = 31,2 Mpa (K-350), slump (12±2) cm, w/c = 0.48 + bahan tambahan kim
D.14. 1 m3 Membuat beton kedap air dengan strotox - 100
D.15. 1 m' Memasang PVC Waterstop lebar 150 mm
D.16. 1 m' Memasang PVC Waterstop lebar 200 mm
D.17. 1 m' Memasang PVC Waterstop lebar 230 mm - 320 mm
D.18. 1 kg Pembesian dengan besi polos
D.18.a 1 kg Pembesian dengan besi ulir
D.19. 1 kg Kabel prestressed polos/strands
D.20. 1 kg Jaring kawat baja / Wire mesh
D.21. 1 m2 Pasang bekisting untuk pondasi (1 x pakai)
D.21.a 1 m2 Pasang bekisting untuk pondasi (2 x pakai)
D.22. 1 m2 Pasang bekisting untuk sloof (1 x pakai)
D.22.a 1 m2 Pasang bekisting untuk sloof (2 x pakai)
D.23. 1 m2 Pasang bekisting untuk kolom (1 x pakai)
D.23.a 1 m2 Pasang bekisting untuk kolom (2 x pakai)
D.24. 1 m2 Pasang bekisting untuk balok (1 x pakai)
D.24.a 1 m2 Pasang bekisting untuk balok (2 x pakai)
D.25. 1 m2 Pasang bekisting untuk plat lantai (1 x pakai)
D.25.a 1 m2 Pasang bekisting untuk plat lantai (2 x pakai)
D.25.b 1 m2 Pasang bekisting untuk plat lantai (3 x pakai)
D.25.c. 1 m2 Pasang bekisting untuk plat lantai dengan bondek
D.26. 1 m2 Pasang bekisting untuk dinding (1 x pakai)
D.27. 1 m2 Pasang bekisting untuk tangga (1 x pakai)
D.27.a 1 m2 Pasang bekisting untuk tangga (2 x pakai)
D.28. 1 m2 Pasang jembatan untuk pengecoran beton
D.29. 1 m' Membuat kolom penguat beton bertulang (11 x 11) cm
D.30. 1 m' Membuat ring balok beton bertulang (10 x 15) cm
MEMBUAT BETON STRUKTUR PONDASI TAPAK
D.31.a 1 m3 Membuat Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,5 cm)
MEMBUAT BETON STRUKTUR SLOOF
D.32.a 1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 196,7 kg
D.32.b 1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg
D.32.c 1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 128,7 kg
D.32.d 1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 147 kg
D.32.e 1 m3 Membuat Beton Struktur SL3 K 225 Sloof 15/25 Besi 167,2 kg
D.32.f 1 m3 Membuat Beton Struktur SL4 K 225 Sloof 15/20 Besi 198,9 kg
MEMBUAT BETON STRUKTUR KOLOM
D.33.a 1 m3 Membuat Beton Struktur K1 Kolom 40/40 Lt. 1 K 225 Besi 232,5 kg
D.33.b 1 m3 Membuat Beton Struktur K1 Kolom 40/40 Lt. 2 K 225 Besi 173,5 kg
D.33.c 1 m3 Membuat Beton Struktur K1 Kolom 30/40 Lt. 1 K 225 Besi 259,4 kg
D.33.d 1 m3 Membuat Beton Struktur K1 Kolom 30/40 Lt. 2 K 225 Besi 187,7 kg
D.33.e 1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 1 K 225 Besi 242 kg
D.33.f 1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 2 K 225 Besi 168,4 kg
D.33.g 1 m3 Membuat Beton Struktur K1.A Kolom 30/35 Lt. 1 K 225 Besi 179 kg
G PEKERJAAN DINDING
G.1. 1 m2 Pasangan bata merah tebal 1 bata, camp. spesi 1 pc : 2 ps
G.2. 1 m2 Pasangan bata merah tebal 1 bata, camp. spesi 1 pc : 3 ps
G.3. 1 m2 Pasangan bata merah tebal 1 bata, camp. spesi 1 pc : 4 ps
G.4. 1 m2 Pasangan bata merah tebal 1 bata, camp. spesi 1 pc : 5 ps
G.5. 1 m2 Pasangan bata merah tebal 1 bata, camp. spesi 1 pc : 6 ps
G.6. 1 m2 Pasangan bata merah tebal 1 bata, camp. spesi 1 pc : 3 kp : 10 ps
G.7. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 2 ps
G.8. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 3 ps
G.9. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 4 ps
G.10. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 5 ps
G.11. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 6 ps
G.12. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 8 ps
G.13. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc : 3 kp : 10 ps
G.14. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 kp : 1 sm : 1 ps
G.15. 1 m2 Pasangan bata merah tebal 1/2 bata, camp. spesi 1 kp : 1 sm : 2 ps
G.16. 1 m2 Pasangan dinding conblock/hollowblock (HB. 20), camp. spesi 1 PC : 3 Ps
G.17. 1 m2 Pasangan dinding conblokck/hollowblock (HB. 20), camp. spesi 1 PC : 4 Ps
G.18. 1 m2 Pasangan dinding conblokck/hollowblock (HB. 15), camp. spesi 1 PC : 3 Ps
G.19. 1 m2 Pasangan dinding conblokck/hollowblock (HB. 15) campuran 1 PC : 4 Ps
G.20. 1 m2 Pasangan dinding hollowblock (HB. 10), camp. spesi 1 PC : 3 Ps
KODE ANALIS A URAIAN PEKERJAAN
G.21. 1 m2 Pasangan dinding conblokck/hollowblock (HB. 10), camp. spesi PC : 4 Ps
G.22. 1 m2 Pasang dinding roster/terawang (12 x 11 x 24), camp. spesi 1 PC : 3 Ps
G.23. 1 m2 Pasang dinding roster/terawang (12 x 11 x 24), camp. spesi 1 PC : 4 Ps
G.24. 1 m2 Pasangan bata berongga expose ukuran ( 5 x 11 x 24) cm, camp. spesi 1 PC : 3 Ps
G.25. 1 m2 Pasangan bata ringan tb. 10 cm (20 x 60 cm)
G.25.a 1 m2 Pasangan bata ringan tb. 8 cm (20 x 60 cm)
MEMBUAT DINDING PARTISI + RANGKA
G.26.a 1m2 Partisi gypsum board rangkap, uk. (120 x 240) tebal 9 mm + rangka hollow galvanis 40.40 & 40.40 (120x60)
G.26.b 1m2 Partisi gypsum board rangkap, uk. (120 x 240) tebal 9 mm + rangka baja ringan C-75 (120x60)
G.26.c 1m2 Partisi GRC board rangkap, uk. (120 x 240) tebal 9 mm + rangka hollow galvanis 40.40 & 40.40 (120x60)
G.26.d 1m2 Partisi GRC board rangkap, uk. (120 x 240) tebal 9 mm + rangka baja ringan C-75 (120x60)
H. PEKERJAAN PLESTERAN
H.1. 1 m2 Plesteran 1 pc : 1 ps, tebal 15 mm
H.2. 1 m2 Plesteran 1 pc : 2 ps, tebal 15 mm
H.3. 1 m2 Plesteran 1 pc : 3 ps, tebal 15 mm
H.4. 1 m2 Plesteran 1 pc : 4 ps, tebal 15 mm
H.5. 1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm
H.6. 1 m2 Plesteran 1 pc : 6 ps, tebal 15 mm
H.7. 1 m2 Plesteran 1 pc : 7 ps, tebal 15 mm
H.8. 1 m2 Plesteran 1 pc : 8 ps, tebal 15 mm
H.9. 1 m2 Plesteran 1 pc : 0.5 kp : 3 ps, tebal 15 mm
H.10. 1 m2 Plesteran 1 pc : 2 kp : 8 ps, tebal 15 mm
H.11. 1 m2 Plesteran 1 kp : 1 sm : 1 ps, tebal 15 mm
H.12. 1 m2 Plesteran 1 kp : 1 sm : 2 ps, tebal 15 mm
H.13. 1 m2 Plesteran 1 pc : 2 ps, tebal 20 mm
H.14. 1 m2 Plesteran 1 pc : 3 ps, tebal 20 mm
H.15. 1 m2 Plesteran 1 pc : 4 ps, tebal 20 mm
H.16. 1 m2 Plesteran 1 pc : 5 ps, tebal 20 mm
H.17. 1 m2 Plesteran 1 pc : 6 ps, tebal 20 mm
H.18. 1 m2 Plesteran 1 kp : 1 sm : 2 ps, tebal 20 mm
H.19. 1 m2 Plesteran berapen 1 pc : 5 ps, tebal 15 mm
H.20. 1 m2 Plesteran skoning lebar 10 mm 1 pc : 2 ps
H.21. 1 m2 Plesteran Granit 1 pc : 2 granit, tebal 10 mm
H.22. 1 m2 Plesteran teraso 1 pc : 2 batu teraso, tebal 10 mm
H.23. 1 m2 Plesteran ciprat / kamprot 1 pc : 2 ps
H.24. 1 m2 Finishing siar pasangan dinding bata merah (=20 m')
H.25. 1 m2 Finishing siar pasangan dinding conblok ekpose (=8 m')
H.26. 1 m2 Finishing siar pasangan batu kali adukan 1 PC : 2 Psr
H.27. 1 m2 Acian
H.28. 1 m2 Pekerjaan Plesteran dengan mortar siap pakai
H.29. 1 m2 Pekerjaan Acian dengan mortar siap pakai
L. PEKERJAAN KAYU
L.1. 1 m3
L.1.a 1 m3
L.2. 1 m3
L.2.a 1 m3
L.3. 1 m2
L.3.a 1 m2
L.4. 1 m2
L.5. 1 m2
L.5.a 1 m2
L.6. 1 m2
L.6.a 1 m2
L.7. 1 m2
L.7.a 1 m2
L.8. 1 m2
L.8.a 1 m2
L.8.b 1 m2
L.9. 1 m2
L.9.a 1 m2
L.10. 1 m2
L.10.a 1 m2
L.11. 1 m2
L.11.a 1 m2
L.12. 1 m2
L.12.a 1 m2
L.13. 1 m3
L.13.a. 1 m3
L.13.b. 1 m3
L.14. 1 m3
L.14.a. 1 m3
L.15. 1 m3
L.15.a 1 m3
L.16. 1 m2
L.16.a 1 m2
L.16.b 1 m2
N. PEKERJAAN PENGECATAN
N.1. 1 m2 Mengikis/mengerok permukaan cat tembok lama
N.2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
N.3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
N.4. 1 m2 Pengecatan bidang kayu baru ( 1 lapis lamir), 1 lapis cat dasar, 2 lapis cat penutup
N.5. 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
N.6. 1 m2 Pelaburan bidang kayu dengan teak oil
N.7. 1 m2 Pelaburan bidang kayu dengan politur
N.8. 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
N.9. 1 m2 Pelaburan bidang kayu dengan vernis
N.10. 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) interior
N.10.a. 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) exterior
N.11. 1 m2 Pengecatan tembok lama (2 lapis cat penutup)
N.12. 1 m2 Pengecatan tembok dengan kalkarium
N.13. 1 m2 Melabur tembok dengan kapur sirih
N.14. 1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan)
N.15. 1 m2 Pemasangan wall paper
N.16. 1 m2 Pengecatan permukaan baja dengan meni besi
N.17. 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah
N.18. 1 m2 Pengecatan permukaan baja lapis seng (galvanis) secara manual sistem 4 lapis cat konvensional
N.19. 1 m2 Pengecatan permukaan baja lapis seng (galvanis) secara manual sistem 1 lapis cat mutakhir
N.20. 1 m2 Rp -
N.21. 1 m2 Pengecatan permukaan baja lapis seng (galvanis) secara semprot (airless spray) dengan sistem 2 lapis cat mutak
N.22. 1 m2 Plituran dengan plitur melamic
J. PEKERJAAN SANITASI
O.1. 1 bh Pemasangan kloset duduk/monoblok
O.2. 1 bh Pemasangan kloset jongkok poselen
O.2.a 1 bh Pemasangan kloset jongkok lokal warna
O.3. 1 bh Pemasangan kloset jongkok teraso
O.4. 1 bh Pemasangan urinor
O.5. 1 bh Pemasangan wastafel
O.6. 1 bh Pemasangan bak mandi (bathcuip) porselin
O.7. 1 bh Pemasangan bak mandi fibreglass volume 1 m3
O.8. 1 bh Pemasangan bak mandi batu bata volume 0.3 m3
O.9. 1 bh Pemasangan bak mandi batu bata volume 0.3 m3
O.10. 1 bh Pemasangan bak fibreglass volume 0,3 m3
O.11. 1 bh Pemasangan bak mandi batu bata volume 0.3 m3
O.12. 1 bh Pemasangan bak cuci piring stainless steel
O.13. 1 bh Pemasangan bak cuci piring teraso
O.14. 1 bh Pemasangan Floor drain
O.15. 1 bh Memasang 1 buah bak kontrol pas. Bata ukuran (30x30) cm t 35 cm
O.16. 1 bh Memasang 1 bak kontrol pas. Bata ukuran (45x45) cm tinggi 50 cm
O.17. 1 bh Memasang bak kontrol pas. Bata ukuran (60x60) cm tinggi 65 cm
O.18. 1 m' Memasang pipa galvanize diameter 1/2"
P. PEKERJAAN LISTRIK
Q.1. 1 bh Pasang titik lampu, PL 18 watt (fitting standar)
Q.2. 1 bh Pasang titik lampu, PL 8 watt (fitting standar)
Q.3. 1 bh Pasang titik lampu, PL 18 watt (downlight dia. 5")
Q.4. 1 bh Pasang titik lampu, PL 18 watt (downlight dia. 4")
Q.5. 1 bh Pasang titik lampu, PL 18 watt (downlight dia. 3")
Q.6. 1 bh Pasang titik lampu, TL 36 watt komplit
1 Bahan Batu
1 Batu belah/kali
2 Batu Pecah
1 Batu pecah /mesin : 0 2/3 cm
2 Batu pecah /mesin : 0 1/2 cm
3 Sirtu
4 Abu Batu
5 Batu Kapur
6 Abu Screening
7 Gravel abu merah
8 Batu granit pecah
9 Batu teraso pecah
3 Bahan Pasir
1 Pasang/tras ex. Mundu
2 Beton ex. Cilegon
3 Urug
4 Bata Merah
1 Batu bata
2 Batu bata
3 Batu bata
4 Batu bata berongga
5 Bata Ringan
1 Hebel 20 x 60 cm tb. 10 cm
2 Hebel 20 x 60 cm tb. 7,5 cm
3 Roster beton
4 Hollow Block (HB 20)
7 Bahan Semen
1 Semen PC : 50 kg
2 Semen PC (putih) : 20 kg
3 Semen warna nat lantai
3 Semen Mortar MU 380 : 40 kg
7 Strotox - 100
8 Semen Floor hardener : natural
: hijau
No. URAIAN
8 Bahan Kayu
1 Kamper Samarinda
2 Kayu Singkil
3 Kamper Medan
4 Kayu Meranti
5 Kayu Borneo
6 Kayu Terentang
7 Kayu Jati
8 Kayu Perancah
9 Dolken kayu 4m'
10 Bambu
11 Bilik bambu
9 Bahan Besi
1 Besi Beton U.24 (polos) BJTP - 280
2 Besi Beton U.35 (Ulir) BJTS - 420B
2 Besi Beton U.40 (Ulir) BJTS - S20
3 Baja Profil ex DN SII
4 Kabel presstresed polos/strand : 1860 mpa
5 Besi Wire Mesh
6 Plat Bondex tb. 0,75 mm
7 Jenis Kawat :
- Kawat Pengikat/Kawat beton
- Kawat berduri (dia.2,7 mm)
- Kawat nyamuk Aluminium
- Kawat jaring (30 x 30 mm)
8 Besi plat strip
9 Besi strip 2x3
10 Pipa besi galvanize (medium)
15 Paku :
- Paku biasa : 1/2" - 1"
- Paku biasa : 2" - 5"
- Paku beton : 4" - 5"
- Paku abes (payung) : 7 - 10 cm
- Paku Gypsum/GRC
No. URAIAN
- Paku sekrup
- Ramset/dinabolt : M-12
- Ramset/dinabolt : M- 10
- Fisher
- Screw driver (sekrup baja ringan)
11 Bahan Atap
1 Atap Seng Gelombang
2 Seng plat
9 Atap sirap
10 Bahan atap beton
- Genteng beton Natural 14.5 /m2
- Nok genteng beton Natural 14.5 / m2
11 Bahan atap bitumen monoleyer selulosa
- Atap bitumen monoleyer 3 mm : ex. Onduline
: ex. Ondutile
: ex. Onduvila (shade colour)
- Nok genteng bitumen, tb. 3 mm
- Nok bitumen bergelombang , tb. 3 mm H : 38 mm
- Genteng bitumen penutup samping, tb. 3 mm
- Sekrup atap bitumen
12 Bahan Atap genteng metal
- Atap genteng metal : 0.35 mm (ex. Inti roof)
: 0.3 mm (ex. Inti roof)
: 0.25 mm (ex. Inti roof)
- Atap Aluminium Spandek 0,4 mm
- Nok genteng metal
- Nok Aluminium spandek
13 Bahan Atap genteng morando/plentong
- Genteng Morando Natural 1m2=20Bh /buah
- Genteng Plentong ex Bakar
No. URAIAN
12 Bahan alumunium
1 Besi Hollow aluminium 1,2 mm : 40 x 40 mm
2 Aluminium Foil (single side)
3 Aluminium T (rangka plafond)
4 Sun screen aluminium
5 Bahan Kusen Pintu dan jendela Aluminium
- Aluminium kusen 3" standar
- Aluminium kusen 4" standar
- Aluminium kusen 3" cokelat/hitam
- Aluminium kusen 4" cokelat/hitam
- Aluminium kusen 3" warna powder coating
- Aluminium kusen 4" warna powder coating
- Aluminium Frame Jendela 2" standar
- Aluminium Frame Pintu 3" standar
- Aluminium Frame Jendela 2" cokelat/hitam
- Aluminium Frame Pintu 3" cokelat/hitam
- Aluminium Frame Jendela 2" warna powder coating
- Aluminium Frame Pintu 3" warna powder coating
- Plat strilp Aluminium lebar 8 cm standar
- Plat strilp Aluminium lebar 8 cm cokelat/hitam
- Plat strilp Aluminium lebar 8 cm warna powder coating
- Jalusi Hollow Aluminium standar
- Jalusi Hollow Aluminium cokelat/hitam
- Jalusi Hollow Aluminium warna powder coating
- List Karet kaca pintu/Jendela Aluminium
6 Venetion blinds
7 Verticals blinds
8 Bahan Aluminium Composite Panael (ACP)
- ACP tb. 0,21 mm PE ex. Seven
- ACP tb. 0,3 mm aloy PVDF ex. Seven
- ACP tb. 0,5 mm aloy PVDF ex. Seven
- Bracket ACP
- Brazing ACP
13 Bahan Ijuk
1 Ijuk kg
2 Ijuk ikat
3 Tali ijuk
14 Bahan Lantai
1 Keramik lantai Putih (KW1) : 10 x 20 cm Standard
ex. Asia Tile
: 20 x20 cm Standard
ex. Asia Tile
: 30 x30 cm Standard
ex. Asia Tile
: 33 x33 cm Standard
ex. Asia Tile
: 40 x40 cm Standard
ex. Asia Tile
2 Plint keramik putih (KW1) : 5 x 20 cm
No. URAIAN
: 10 x10 cm
: 10 x30 cm
: 10 x33 cm
: 10 x40 cm
3 Porselain : 11 x 11 cm putih
: 10 x 20 cm warna
: 20 x 20 cm warna
16 Ubin Warna
17 Plint ubin Pc
14 Tegel teraso
: 30 x 30 cm
15 Bahan Loteng/Plapond
1 Triplek, ex. Palem : uk. 1.2x2.4x3mm
: uk. 1.2x2.4x4mm
: uk. 1.2x2.4x6mm
2 Teak wood : uk. 1,2 x 2,4 x 4 mm
3 Multiplek, ex. Palem : uk. 9 mm 120 x 240
: uk. 12 mm 120 x 240
: uk. 18 mm 120 x 240
4 Bahan Gypsum
- Gypsum 120 x 240 t = 9 mm ex DN
- Compound 40 kg
- List Profil Gypsum
5 Bahan GRC
- GRC Board Uk. 2,4m'x 1.2m'x 4mm
- Lystplank GRC Board Uk. 2,4m'x 0.3m'x 9mm
- Lystplank GRC Board Uk. 2,4m'x 0.10m'x 9mm
6 Asbes
7 Acoustic
16 Bahan Pipa
No. URAIAN
5 PVC Waterstop
6 Buis beton :
No. URAIAN
17 Beton Ready-Mix
1 Beton readymix Fly Ash (FA)
20 Bahan Kaca
1 Kaca polos tebal 3 mm
2 Kaca polos tebal 5 mm
3 Kaca polos tebal 8 mm
4 Kaca Rayband 5 mm
5 Kaca Rayband 8 mm
6 Kaca Rayband 10 mm
7 Kaca Es t=3mm
8 Kaca Es t=5mm
9 Kaca cermin 3 mm
10 Kaca cermin 5 mm
11 Kaca cermin 8 mm
12 Kaca wireglass 5 mm
13 Kaca patri 3 mm
14 Kaca nako polos 5 mm lengkap
- Kaca Nako Ukuran 14x90 x 5 mm
- Kaca Nako Ukuran 14x60 x 5 mm
- Kaca Nako Ukuran 14x50 x 5 mm
16 Kaca Tempered clear tb. 10 mm
17 Kaca Tempered clear tb. 12 mm
No. URAIAN
10 Engsel Jendela casement 10" ex. Dekkson
11 Grendle Pintu 4"
12 Spring knip /Grendel Jendela kayu
13 Door closer ex. Solid
14 Door holder ex. Solid
15 Door stop ex. Solid
16 Rel pintu geser (max. Lebar 1 m)
17 Handel jendela kayu
18 Handle Jendela aluminium ex. Dekkson
19 Hak kait angin Jendela kayu
21 Bahan Finishing
1 Cat Kayu/Besi ex. Avian
2 Cat tembok Interior ex. Vinilex
3 Cat tembok Eksterior ex. Jotashield
4 Meni kayu
5 Meni besi
6 Teak oil
7 Residu
8 Ampelas
9 Dempul
10 Plamur tembok
11 Plamur kayu
12 Politur
13 Politur jadi
14 Vernis
15 Lem kayu
16 Lem Vinyl
17 Sealant
18 Sealant
19 Seal tape
20 Kwas 3 "
21 Alang-alang
22 Kapur sirih
23 Cat Tahan Asam
24 Soda api
25 Sabun cuci
26 Kalkarium
27 Formika
28 HPL motif kayu (uk. 1,2 x 2,4 m) tb. 0,6 mm, ex. Taco
29 Alkali
30 Thiner QS 2000
31 Wood filer ex. Impra
32 Wood stain ex. Impra
33 Sanding Sealer ex. Impra
34 Clear Melamic ex. Impra
35 Wallpaper (lebar 50 cm)
36 Perekat/Lem wallpaper
37 Anti rayap metode spray System
( Basileum 505 EC - formula aktif phoxim )
No. URAIAN
24 Bahan Elektrikal
1 Pipa conduit 20 mm
2 T Dos 20 mm
3 X Dos 20 mm
4 indow Dos
5 Klem 20 mm
6 Fitting lampu
7 Lampu PL 18 watt
8 Lampu PL 8 watt
9 Lampu TL 36 watt (komplit)
10 Lampu TL 2 x 36 watt (komplit)
11 Lampu TKI 1 x 36 watt
12 Lampu TKI 2 x 36 watt
13 Lampu RM 1 x 36 watt
14 Lampu RM 2 x 36 watt
15 Ram Lampu Down Light 0 5 "
16 Ram Lampu Down Light 0 4 "
17 Ram Lampu Down Light 0 3 "
18 Stop kontak AC (3 Phase)
19 Stop kontak
20 Saklar Tunggal
21 Saklar Doble
22 Box Panel MCB (4 group)
23 MCB 6 Ampere /220 V
24 Kabel listrik NYM 3 X 1.5 mm2@50 m
25 Kabel listrik NYM 3 X 2.5 mm2@50 m
25 Sewa Alat
1 Sewa Concrete mixer kapasitas 0.35 m3
2 Sewa Concrete pump kapasitas 8 m3
3 Sewa Concrete Vibrator
4 Sewa Kompresor Sandblasting
5 Sewa Towe crane
6 Sewa pipe suport
7 Sewa alat perakitan baja IWF/profil
8 Sewa alat las
9 Sewa Handle crane 2 T
27 Lain-Lain
1 Tanah Merah
2 Air
3 Banner Digital Printing
4 Bahan kimia/aditif campuran beton
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
A.4. 1 m' Pengukuran dan pemasangan bouwplank
2 Tenaga
Pekerja
Tukang kayu kasar
Tukang batu kasar
Kepala tukang
Mandor
Kode
A.5. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
2 Tenaga
Pekerja
Tukang kayu kasar
A.9. 1 m2 Membersihkan lapangan dan perataan
1 Tenaga
Pekerja
Mandor
KODE
Kode A.9.
DIHITUNG
A.17. 1 bh 1
2
Kode A.17.
KODE
B.
B.1. 1 m3 1
Kode B.1.
B.9. Kode 1 m3 1
Kode B.9.
B.10. 1 m3 1
Kode B.10.
B.11. 1 m3 1
2
Kode B.11.
B.14.a 1 m3 1
2
KODE
Kode B.14.a
ANALISA BIA YA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN
KODE
C.
C.3. 1 m3
1
Kode
C.3.
C.9. 1 m3
1
Kode
C.9.
D.7. 1 m3 Membuat beton K-225 (Fc = 19.3 Mpa, slump (12±2) cm, w/c = 0.58)
1 Bahan
Semen portland
Pasir beton
Kerikil (maksimal 30 mm)
Air
2 Tenaga
Pekerja
Tukang batu kasar
Kepala tukang
Mandor
2 Tenaga
Pekerja
Tukang batu kasar
Kepala tukang
Mandor
3 Peralatan
Molen beton kap. 0,3 m3
Kode
D.7.a. 1 m3 Beton K-225 Site mix dengan molen
2 Tenaga
Pekerja
Tukang batu kasar
Kepala tukang
Mandor
3 Peralatan
Pompa Beton (kapasitas 8 m3)
Kode
2 Tenaga
Pekerja
Tukang batu kasar
Kepala tukang
Mandor
Kode
D.7.c. 1 m3 Beton K-225 Ready mix tanpa pompa beton
2 Tenaga
Pekerja
Tukang besi beton
Kepala tukang
Mandor
Kode
D.18. 1 kg Pembesian dengan besi polos
2 Tenaga
Pekerja
Tukang besi beton
Kepala tukang
Mandor
Kode
D.18.a 1 kg Pembesian dengan besi ulir
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.21. 1 m2 Pasang bekisting untuk pondasi (1 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.21.a 1 m2 Pasang bekisting untuk pondasi (2 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.22. 1 m2 Pasang bekisting untuk sloof (1 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.22.a 1 m2 Pasang bekisting untuk sloof (2 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.23. 1 m2 Pasang bekisting untuk kolom (1 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.23.a 1 m2 Pasang bekisting untuk kolom (2 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.24. 1 m2 Pasang bekisting untuk balok (1 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.24.a 1 m2 Pasang bekisting untuk balok (2 x pakai)
2 Tenaga
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.25.c. 1 m2 Pasang bekisting untuk plat lantai dengan bondek
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.26. 1 m2 Pasang bekisting untuk dinding (1 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.27. 1 m2 Pasang bekisting untuk tangga (1 x pakai)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
D.27.a 1 m2 Pasang bekisting untuk tangga (2 x pakai)
2 Tenaga
Pekerja
Tukang batu kasar
Tukang kayu kasar
Tukang besi beton
Kepala tukang
Mandor
Kode
D.29. 1 m' Membuat kolom penguat beton bertulang (11 x 11) cm
2 Tenaga
Pekerja
Tukang batu kasar
Tukang kayu kasar
Tukang besi beton
Kepala tukang
Mandor
Kode
D.30. 1 m' Membuat ring balok beton bertulang (10 x 15) cm
KODE
Kode D.31.a
1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 1 Pasang bekisting untuk sloof (2 x pakai) D.22.a 2 Beton K-225 Site mix den
D.32.b
D.32.b Kode D.32.b
1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 128,7 1 Pasang bekisting untuk sloof (2 x pakai) D.22.a 2 Beton K-225 Site mix den
D.32.c Kode D.32.c
1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 147 1 Pasang bekisting untuk sloof (2 x pakai) D.22.a 2 Beton K-225 Site mix denga
D.32.d Kode D.32.d
1 m3 Membuat Beton Struktur SL3 K 225 Sloof 15/25 Besi 167,2 1 Pasang bekisting untuk sloof (2 x pakai) D.22.a 2 Beton K-225 Site mix den
D.32.e Kode D.32.e
1 m3 Membuat Beton Struktur SL4 K 225 Sloof 15/20 Besi 198,9 1 Pasang bekisting untuk sloof (2 x pakai) D.22.a 2 Beton K-225 Site mix den
D.32.f Kode D.32.f
KODE
Kode D.33.c
1 m3 Membuat Beton Struktur K1 Kolom 30/40 Lt. 2 K 225 Besi 1 Pasang bekisting untuk kolom (2 x pakai) D.23.a 2 Beton K-225 Site mix deng
D.33.d Kode D.33.d
1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 2 K 225 Besi 1 Pasang bekisting untuk kolom (2 x pakai) D.23.a 2 Beton K-225 Site mix deng
D.33.f Kode D.33.f
1 m3 Membuat Beton Struktur K2 Kolom 30/30 Lt. 1 K 225 Besi 1 Pasang bekisting untuk kolom (2 x pakai) D.23.a 2 Beton K-225 Site mix deng
D.33.1 Kode D.33.1
1 m3 Membuat Beton Struktur K2 Kolom 30/30 Lt. 2 K 225 Besi 1 Pasang bekisting untuk kolom (2 x pakai) D.23.a 2 Beton K-225 Site mix deng
D.33.m Kode D.33.m
1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 1 K 225 Besi 1 Pasang bekisting untuk kolom (2 x pakai) D.23.a 2 Beton K-225 Site mix deng
D.33.n Kode D.33.n
1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 2 K 225 Besi 1 Pasang bekisting untuk kolom (2 x pakai) D.23.a 2 Beton K-225 Site mix deng
D.33.O Kode D.33.o
KODE
D.34. MEMBUAT BETON STRUKTUR BALOK
1 m3 Membuat Beton Struktur B1 Balok 30/60 K 225 Besi 186,5 1 Pasang bekisting untuk balok (1 x pakai) D.24. 2 Beton K-225 Ready mix de
D.34.a Kode D.34.a
D.34.b 1 m3 Membuat Beton Struktur B1 Balok 30/55 K 225 Besi 184,7 1 Pasang bekisting untuk balok (1 x pakai) D.24. 2 Beton K-225 Ready mix de
KODE
3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
Kode D.34.b
1 m3 Membuat Beton Struktur B1 Balok 25/50 K 225 Besi 237,1 1 Pasang bekisting untuk balok (1 x pakai) D.24. 2 Beton K-225 Ready mix de
D.34.c Kode D.34.c
1 m3 Membuat Beton Struktur B2 Balok 20/40 K 225 Besi 169 k 1 Pasang bekisting untuk balok (1 x pakai) D.24. 2 Beton K-225 Ready mix de
D.34.d Kode D.34.d
1 m3 Membuat Beton Struktur B3 Balok 20/30 K 225 Besi 211,4 1 Pasang bekisting untuk balok (1 x pakai) D.24. 2 Beton K-225 Ready mix de
D.34.e Kode D.34.e
1 m3 Membuat Beton Struktur B7 Balok Tangga 20/25 K 225 Be 1 Pasang bekisting untuk balok (1 x pakai) D.24. 2 Beton K-225 Ready mix de
D.34.i Kode D.34.i
1 m3 Membuat Plat Dak tb. 10 cm Beton K 225 Besi 101,9 kg 1 Pasang bekisting untuk plat lantai (1 x pakai) D.25. 2 Beton K-225 Ready mix de
D.35.b Kode D.35.b
1 m3 Membuat Plat Topian tb. 10 cm Beton K 225 Besi 115,1 kc 1 Pasang bekisting untuk plat lantai (2 x pakai) D.25.a 2 Beton K-225 Ready mix
D.35.c Kode
KODE
1 m3 Membuat Plat Tempat Duduk tb. 10 cm Beton K 225 Besi 1 Pasang bekisting untuk plat lantai (3 x pakai) D.25.b 2 Beton K-225 Ready mix
D.35.d Kode D.35.d
1 m3 Membuat Lantai & Trap Tangga Beton K 225 Besi 195,1 kt 1 Pasang bekisting untuk tangga (2 x pakai) D.27.a 2 Beton K-225 Ready mix d
D.36.b Kode D.36.b
1 m3 Membuat Beton Struktur RB2 Ring Balk 15/30 K 225 Besi 1 Pasang bekisting untuk balok (2 x pakai) D.24.a 2 Beton K-225 Site mix denga
D.37.b Kode D.37.b
1 m3 Membuat Beton Struktur RB1 Ring Balk 20/30 K 225 Besi 1 Pasang bekisting untuk balok (2 x pakai) D.24.a 2 Beton K-225 Site mix denga
D.37.c
D.37.c Kode D.37.c
1 m3 Membuat Beton Struktur RB2 Ring Balk 15/30 K 225 Besi 1 Pasang bekisting untuk balok (2 x pakai) D.24.a 2 Beton K-225 Site mix denga
D.37.d Kode D.37.d
D.37.e 1 m3 Membuat Beton Struktur RB3 Ring Balk 15/25 K 225 Besi 167,6 kg
KODE
1 Pasang bekisting untuk balok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir
4 Pembesian dengan besi polos D.18.
Kode D.37.e
1 m3 Membuat Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 1 Pasang bekisting untuk balok (2 x pakai) D.24.a 2 Beton K-225 Site mix denga
D.37.f Kode D.37.f
1 m3 Membuat Beton Struktur RBP Ring Balk 15/15 K 225 Besi 1 Pasang bekisting untuk balok (2 x pakai) D.24.a 2 Beton K-225 Site mix denga
D.37.g Kode D.37.g
KODE
E.
1 m2 (K3) Membuat lahan produksi tebal 8 cm beton f’c 14,5MP< 1 Bahan Semen portland Pasir beton Kerikil (maksimal 30 mm) Air 2 Tenaga Peker
1 m2 (K3) Membuat lahan produksi tebal 10 cm beton f’c 14,5M 1 Bahan Semen portland Pasir beton Kerikil (maksimal 30 mm) Air 2 Tenaga Pekerja
1 m2 (K3) Membuat lahan produksi tebal 12 cm beton f’c 14,5M 1 Bahan Semen portland Pasir beton Kerikil (maksimal 30 mm) Air 2 Tenaga Pekerja
E.4. 1 m2 (K3) Membuat lahan produksi tebal 15 cm beton f’c 14,5MPa, slump (120
1 Bahan
Semen portland
Pasir beton
Kerikil (maksimal 30 mm)
Air
2 Tenaga
Pekerja
Tukang batu kasar
Kepala tukang
Mandor
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
E.6. 1 m2 Membuat bekisting untuk balok beton pracetak (10 s.d 12 x pakai)
1 Bahan
Balok kayu borneo (5/7)
Phenol film 12 mm
Minyak beksisting
Paku biasa 2" - 5"
Dinabolt dia. 12 mm (10 s.d 15 cm)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode 1 m2 Membuat bekisting untuk balok beton pracetak (10 s.d
E.6. 12 x pakai)
E.7. 1 m2 Membuat bekisting untuk kolom beton pracetak (10 s.d 12 x pakai)
1 Bahan
Balok kayu borneo (5/7)
Phenol film 12 mm
Minyak beksisting
Paku biasa 2" - 5"
Dinabolt dia. 12 mm (10 s.d 15 cm)
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
E.8. 1 m2 Memasang dan membuka bekisting 1 buah komponen plat beton pracetak
1 Tenaga
Pekerja
Tukang kayu kasar
Mandor
E.9. 1 m2 Memasang dan membuka bekisting 1 buah komponen balok beton pracetak
1 Tenaga
Pekerja
Tukang kayu kasar
Mandor
E.10. 1 m2 Memasang dan membuka bekisting 1 buah komponen kolom beton pracetak
1 Tenaga
Pekerja
Tukang kayu kasar
Mandor
KODE
1 m3 Menuang/menebar beton komponen untuk balok pracetak 1 Tenaga Pekerja Tukang batu kasar Tukang vibrator Kepala tukang Mandor
1 m3 Menuang/menebar beton komponen untuk kolom pracetak 1 Tenaga Pekerja Tukang batu kasar Tukang vibrator Kepala tukang Mandor
2 Tenaga
Operator crane
Pembantu operator crane
Pekerja
Tukang batu kasar
Tukang ereksi
Kepala tukang
Mandor
3 Peralatan
Sewa Crane
Sewa pipe support
Kode
E.14. 1 bh Ereksi komponen untuk plat pracetak
Lantai indeks
1 1,0000
2 1,0000
3 1,0000
4 1,0000
5 1,0000
6 1,0000
7 1,0000
8 1,0180
9 1,0370
10 1,0550
11 1,0750
12 1,0940
13 1,1140
14 1,1340
15 1,1550
16 1,1760
17 1,1970
18 1,2190
19 1,2410
20 1,2640
21 1,2870
22 1,3100
23 1,3340
24 1,3580
2 Tenaga
Operator crane
Pembantu operator crane
Pekerja
Tukang batu kasar
Tukang ereksi
Kepala tukang
Mandor
3 Peralatan
Sewa Crane
Sewa pipe support
Kode
E.15. 1 bh Ereksi komponen untuk balok pracetak
Lantai indeks
1 1,0000
2 1,0000
3 1,0000
4 1,0000
5 1,0000
6 1,0000
7 1,0000
8 1,0110
9 1,0220
10 1,0340
11 1,0450
12 1,0570
13 1,0680
14 1,0800
15 1,0920
16 1,1040
17 1,1160
18 1,1290
19 1,1410
20 1,1540
21 1,1660
22 1,1790
23 1,1920
24 1,2060
2 Tenaga
Operator crane
Pembantu operator crane
Pekerja
Tukang batu kasar
Tukang ereksi
Kepala tukang
Mandor
3 Peralatan
Sewa Crane
Sewa pipe support
Kode
E.16. 1 bh Ereksi komponen untuk kolom pracetak
Lantai indeks
1 1,0000
2 1,0000
3 1,0000
4 1,0000
5 1,0000
6 1,0000
7 1,0000
8 1,0250
9 1,0510
10 1,0780
11 1,1050
12 1,1330
13 1,1620
14 1,1910
15 1,2210
16 1,2520
17 1,2840
18 1,3170
19 1,3500
20 1,3840
21 1,4190
22 1,4550
23 1,4920
24 1,5300
1 bh lansir komponen untuk plat pracetak (± 20 m) 1 Bahan Solar 2 Tenaga Operator crane Pembantu operator crane Pekerja Tukang batu kasar 3
2 Tenaga
Operator crane
Pembantu operator crane
Pekerja
Tukang batu kasar
3 Peralatan
Sewa Crane
Kode
E.18. 1 bh lansir komponen untuk balok pracetak (± 20 m)
2 Tenaga
Operator crane
Pembantu operator crane
Pekerja
Tukang batu kasar
3 Peralatan
Sewa Crane
Kode
E.19. 1 bh lansir komponen untuk kolom pracetak (± 20 m)
Kode
E.21. 1 m3 Bahan grout ( tanpa campuran)
Kode
E.22. 1 titik Upah pekerjaan grout pada joint beton pracetak
2 Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Kode
E.23. 1 titik Memasang 1 titik bekisting joint pracetak
Kode
E.24. 1 titik Upah joint dengan sling
KODE URAIA
F.
F.8.a 1 m2 1
2
Kode F.8.a
F.11.a 1 m' 1
2
Kode F.11.a
F.11.d 1 m' 1
2
Kode F.11.d
F.11.g 1 m' 1
2
Kode
F.11.g 1 m' Pasang Jalusi Hollow alumunium cokelat/hitam
2 Tenaga
Pekerja
Tukang Aluminum
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang besi konstruksi
Kepala tukang
Mandor
Kode F.24.a
1 bh Pintu Type P1 (Pintu kayu lapis HPL 1 x 0,8 x 2,10 m & Ja Aluminium kusen 4" coklat F.11.a Pintu double teakwood 4 mm + lapis HP
1 bh Pintu KM/WC (Pintu kayu lapis HPL 1 x 0,7 x 2,10 m & Jalu Aluminium kusen 4" coklat F.11.a Pintu double teakwood 4 mm + lapis H
KOGE
G.
G.10. 1 m2 1
2
Kode G.10.
G.25. 1 m2 1
2
3
Kode G.25.
G.25.a 1 m2 1
2
3
Kode G.25.a
KODH
H.
H.3. 1 m2 1
2
Kode H.3.
H.5. 1 m2 1
2
Kode H.5.
H.27. 1 m2 1
2
Kode H.27.
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
Kode
I.35.b 1 m2 Pasang lantai keramik 40 x 40 cm Putih Polos
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
Kode
I.35.c 1 m2 Pasang lantai keramik 40 x 40 cm warna
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
Kode
I.36.a 1 m2 Pasang lantai keramik 20 x 20 cm anti slip
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
Kode
I.36.b 1 m2 Pasang lantai keramik 25 x 25 cm anti slip
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
Kode
I.54.b 1 m2 Pasang dinding keramik 25 x 40 cm
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
3 Peratatan
Alat bantu (10% bahan)
Kode
I.64. 1 m2 Pasang paving blok tebal 6 cm natural
2 Tenaga
Pekerja
Tukang batu Halus
Kepala tukang
Mandor
3 Peratatan
Alat bantu (10% bahan)
KODE
Kode I.65.
KODE
J.
1 m' List langit-langit kayu profil 1 Bahan List kayu profil, lb = 5 cm Paku 2"- 5" 2 Tenaga Pekerja Tukang kayu kasar Kepala tukang Mandor
1 m' List langit langit Profil Gypsum 1 Bahan List Profil Gypsum, lb = 10 cm Tepung gypsum 2 Tenaga Pekerja Tukang kayu kasar Kepala tukang Ma
1m2 Langit-langit GRC board, uk. (120 x 240) tebal 4 mm + rar 1 Langit-langit GRC board tb. 4 mm J.7.a 2 Rangka besi hollow 40.40 &
J.11.b
J.11.b Kode J.11.b
KODE
K.
K.32.b 1 m2
1
Kode
K.32.b
K.37.a 1 m'
1
Kode
K.37.a
1 m' Pasang lisplang GRC double ukuran (0.9 x 30)/(0.9 x 10) c 1 Bahan Lystplank GRC 30x2.4x0.9 Lystplank GRC 10x2.4x0.9 Paku sekrup Alat bantu
KODE
M.
M.6.a 1 psg
1
Kode
M.6.a
M.8.b 1 bh
1
Kode
M.8.b
M.17. 1 bh
1
Kode
M.17.
KODE
N.
1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 1 Bahan Plamir Cat dasar Cat penutup 2 x interior 2 Tenaga Pekerja Tukang cat Kep
1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 1 Bahan alkali Cat dasar Cat penutup 2 x exterior 2 Tenaga Pekerja Tukang cat Kepa
KODE
O.
O.2. 1 bh
1
2
Kode
O.2.
O.14. 1 bh
1
Kode
O.14.
O.19. 1 bh
1
Kode
O.19.
O.25. 1 m'
1
2
Kode
O.25. 1 m' Memasang pipa PVC tipe AW diameter 1/2'
2 Tenaga
Pekerja
Tukang batu halus
Kepala tukang
Mandor
Kode
O.26. 1 m' Memasang pipa PVC tipe AW diameter 3/4'
2 Tenaga
Pekerja
Tukang batu halus
Kepala tukang
Mandor
Kode
O.27. 1 m' Memasang pipa PVC tipe AW diameter 1"
O.37. 1 Unit Membuat septictank dan rembesan 2 X 1,5 X 1.5M
1 Bahan
Pasir urug
Pasir pasang/beton
Koral beton
Batu bata
Semen pc
Pipa PVC 4" AW
Pipa Galvanise 1,5" (medium)
Ijuk
Besi beton polos
2 Tenaga
Pekerja
Tukang batu halus
Kepala tukang
Mandor
Kode
O.37. 1 Unit Membuat septictank dan rembesan 2 X 1,5 X 1.5M
KODE
P.
P.1. 1 m' 1
2
3
Kode P.1.
P.2. 1 m' 1
2
3
Kode P.2.
P.3. 1 m' 1
2
3
Kode P.3.
KODE URAIAN PEKERJAAN
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.4. 1 m' Pemasangan pipa PVC dia. 6"
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.5. 1 m' Pemasangan pipa PVC dia. 8"
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.6. 1 m' Pemasangan pipa PVC dia. 10"
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.7. 1 m' Pemasangan pipa PVC dia. 12"
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.8. 1 m' Pemasangan pipa PVC dia. 16"
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.9. 1 m' Pemasangan pipa PVC dia. 18"
KODE
P.10. 1 m'
1
Kode P.10.
P.11. 1 m'
1
Kode P.11.
P.12. 1 m'
1
3
Kode P.12.
KODE
P.13. 1 m'
1
Kode P.13.
P.14. 1 m'
1
Kode P.14.
P.15. 1 m'
1
Kode P.15.
KODE URAIAN PEKERJAAN
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.16. 1 m' Pemasangan pipa PVC dia. 48"
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.17. 1 m' Pemasangan pipa HDPE dia. 63 mm (2")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.18. 1 m' Pemasangan pipa HDPE dia. 110 mm (4")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.19. 1 m' Pemasangan pipa HDPE dia. 125 mm (5")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.20. 1 m' Pemasangan pipa HDPE dia. 160 mm (6")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.21. 1 m' Pemasangan pipa HDPE dia. 200 mm (8")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.22. 1 m' Pemasangan pipa HDPE dia. 250 mm (10")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.23. 1 m' Pemasangan pipa HDPE dia. 315 mm (12")
P.24. 1 m' Pemasangan pipa HDPE dia. 400 mm (16")
1 Bahan
Pipa PVC HDPE dia. 400 mm (16")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.24. 1 m' Pemasangan pipa HDPE dia. 400 mm (16")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.25. 1 m' Pemasangan pipa HDPE dia. 450 mm (18")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.26. 1 m' Pemasangan pipa HDPE dia. 500 mm (20")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.27. 1 m' Pemasangan pipa HDPE dia. 620 mm (24")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.28. 1 m' Pemasangan pipa HDPE dia. 800 mm (32")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.29. 1 m' Pemasangan pipa HDPE dia. 900 mm (36")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.30. 1 m' Pemasangan pipa HDPE dia. 1000 mm (40")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.31. 1 m' Pemasangan pipa HDPE dia. 1100 mm (44")
P.32. 1 m' Pemasangan pipa HDPE dia. 1200 mm (48")
1 Bahan
Pipa PVC HDPE dia. 1200 mm (48")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
3 Tenaga
Sewa Tripot/tackle & handle crane 2 T
Kode
P.32. 1 m' Pemasangan pipa HDPE dia. 1200 mm (48")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
Kode
P.33. 1 m' Pemasangan pipa GIP dia. 63 mm (2,5")
2 Tenaga
Pekerja
Tukang Pipa
Mandor
Kode
P.34. 1 m' Pemasangan pipa GIP dia. 100 mm (4")
KODE
P.35. 1 m'
1
Kode
P.35.
P.36. 1 m'
1
Kode
P.36.
P.37. 1 m'
1
Kode
P.37.
Q.1.
Q.2.
Q.6.
Q.7.
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
Kode
Q.7. 1 bh Pasang titik lampu, 2 x TL 36 watt komplit
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
Kode
Q.8. 1 bh Pasang titik lampu, TKI 1 x 36 watt komplit
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
Kode
Q.12. 1 bh Pasang titik stop kontak
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
KODE
Kode Q.13.
KODE URAIAN PEKERJAAN
Q.14. 1 bh Pasang titik saklar tunggal
1 Bahan
Kabel listrik NYM 3 x 1.5 mm2 (1 roll = 50 m')
Pipa Conduit 20 mm
Klem 20 mm
T Dos 20 mm
Saklar tunggal
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
Kode
Q.14. 1 bh Pasang titik saklar tunggal
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
Kode
Q.15. 1 bh Pasang titik saklar double
Kode
Q.16. 1 bh Pasang MCB 6 Ampere / 220 V
2 Tenaga
Pekerja
Tukang listrik
Kepala tukang
Mandor
KODE
Kode Q.17.
Q.18. 1 M' 1
2
Kode Q.18.
KODE ANALISA
dihitung
dihitung
dihitung
A.17.
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
A.9.
A.4.
B.1.
B.11.
C.9.
C.3.
B.9.
B.1.
B.1.
B.11.
B.11.
D.4.
D.4.
D.31.a
D.31.a
D.33.c
D.33.n
B.9.
D.32.a
D.32.b
D.32.f
D.33.c
D.33.n
D.34.b
D.34.d
D.34.e
D.35.a
D.35.c
D.35.d
D.35.c
D.36.b
D.34.i
D.36.a
G.10.
H.5.
H.27.
H.29.
H.5.
H.27.
I.54.b
KODE ANALISA
D.30.
D.29.
F.23.a
I.35.c
dihitung
G.10.
H.5.
H.27.
D.30.
F.24.a
J.11.a
J.10.
B.14.a
B.11.
I.35.b
I.35.c
I.35.c
I.36.b
D.1.
G.10.
H.5.
B.1.
D.1.
G.8.
H.3.
H.27.
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
F.13.d
M.17.
M.6.a
M.8.b
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
M.17.
F.8.a
N.10.
N.10.a.
N.10.a.
N.10.a.
N.10.
Q.18.
Q.17.
Q.16.
Q.1.
Q.2.
Q.8.
Q.12.
Q.14.
Q.15.
O.2.a
O.5.
O.14.
O.19.
dihitung
dihitung
dihitung
dihitung
dihitung
KODE ANALISA
dihitung
D.33.c
D.33.n
D.34.b
D.34.d
D.34.e
D.35.a
D.35.c
D.35.c
D.36.b
D.34.i
D.36.a
G.10.
H.5.
H.27.
H.29.
H.5.
H.27.
I.54.b
D.30.
D.29.
F.23.a
I.35.c
dihitung
G.10.
H.5.
H.27.
D.30.
F.24.a
J.11.a
J.10.
I.35.b
I.35.c
I.35.c
I.36.b
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
F.13.d
M.17.
M.6.a
M.8.b
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
M.17.
N.10.
N.10.a.
N.10.a.
N.10.a.
N.10.
Q.18.
Q.1.
KODE ANALISA
3
Q.2.
Q.8.
Q.12.
Q.14.
Q.15.
O.2.a
O.5.
O.4.
O.14.
O.19.
dihitung
dihitung
D.33.d
D.33.n
D.34.b
D.34.d
D.35.a
D.35.c
G.10.
H.5.
H.27.
H.29.
H.5.
H.27.
I.54.b
D.30.
D.29.
I.35.c
dihitung
G.10.
H.5.
H.27.
D.30.
F.24.a
F.22.a
K.32.b
K.37.a
L.21.f
J.11.a
J.11.b
J.10.
J.9.
I.35.b
I.35.c
I.36.b
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
F.13.d
M.17.
M.6.a
M.8.b
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
M.17.
KODE ANALISA
N.10.
N.10.a.
N.10.a.
N.10.a.
N.10.
N.4.
Q.18.
Q.1.
Q.2.
Q.8.
Q.12.
Q.14.
Q.15.
dihitung
O.2.a
O.5.
O.4.
O.14.
O.19.
dihitung
dihitung
A.9.
A.4.
B.1.
B.11.
C.9.
C.3.
B.9.
B.1.
B.1.
B.11.
B.11.
D.4.
D.4.
D.31.a
D.31.a
D.33.c
D.33.n
B.9.
D.32.a
D.32.b
D.32.f
D.33.c
D.33.n
D.34.b
D.34.d
D.34.e
D.35.a
D.35.c
D.35.d
D.35.c
D.36.b
D.34.i
D.36.a
G.10.
H.5.
H.27.
H.29.
H.5.
H.27.
I.54.b
D.30.
KODE ANALISA
D.29.
F.23.a
I.35.c
dihitung
G.10.
H.5.
H.27.
D.30.
F.24.a
J.11.a
J.10.
B.14.a
B.11.
I.35.b
I.35.c
I.35.c
I.36.b
D.1.
G.10.
H.5.
B.1.
D.1.
G.8.
H.3.
H.27.
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
F.13.d
M.17.
M.6.a
M.8.b
F.11.a
L.8.b
M.17.
M.5.
M.2.
F.11.d
M.17.
N.10.
N.10.a.
N.10.a.
N.10.a.
N.10.
Q.18.
Q.17.
Q.16.
Q.1.
Q.2.
Q.8.
Q.12.
Q.14.
Q.15.
O.2.a
O.5.
O.14.
O.19.
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
KODE ANALISA
A.9.
B.14.
I.64.
G.10.
H.5.
dihitung
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Pasang kusen pintu dan jendela, kayu kelas I (kayu kamper samarinda)
Pasang kusen pintu dan jendela, kayu kelas II (kayu singkil)
Pasang kusen pintu dan jendela kayu kelas I (kayu kamper samarinda)
Pasang kusen pintu dan jendela kayu kelas II (kayu singkil)
Pasang pintu klamp standar kayu kelas I (kayu kamper samarinda)
Pasang pintu klamp standar kayu kelas II (kayu singkil)
Pasang pintu klamp standar kayu kelas III untuk gudang sementara (kayu borneo)
Pasang pintu panel kayu kelas I, (kayu kamper samarinda)
Pasang pintu panel kayu kelas II, (kayu singkil)
Pasang pintu dan jendela kaca kayu kelas I (kayu kamper samarinda)
Pasang pintu dan jendela kaca kayu kelas II (kayu singkil)
Pasang pintu dan jendela jalusi kayu kelas I (kayu kamper samarinda)
Pasang pintu dan jendela jalusi kayu kelas II (kayu singkil)
Pasang pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm), kayu singkil
Pasang pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas III (lebar sampai 90 cm), kayu meranti
Pasang pintu plywood rangkap + lapis HPL, rangka expose kayu kelas II (kayu singkil)
Pasang pintu kayu lapis (plywood) rangkap, rangka expose kayu kelas I (Kamper samarinda)
Pasang pintu kayu lapis (plywood) rangkap, rangka expose kayu kelas II (Singkil)
Pasang jalusi kusen, kayu kelas I (Kayu kamper samarinda)
Pasang jalusi kusen, kayu kelas II (Kayu singkil)
Pasang pintu teakwood rangkap, rangka expose kayu kelas I (kayu kamper samarinda)
Pasang pintu teakwood rangkap, rangka expose kayu kelas II (kayu singkil)
Pasang pintu teakwood rangkap lapis formika, rangka expose kayu kelas II (kayu singkil)
Pasang pintu teakwood rangkap lapis formika, rangka expose kayu kelas III (kayu meranti)
Pasang kontruksi kuda-kuda konvesional, kayu kelas I (kayu kamper samarinda)
Pasang kontruksi kuda-kuda konvesional, kayu kelas II (kayu singkil)
Pasang kontruksi kuda-kuda konvesional, kayu kelas III (kayu meranti)
Pasang kontruksi kuda-kuda expose, kayu kelas I (kayu jati)
Pasang kontruksi kuda-kuda expose, kayu kelas I (kayu kamper samarinda)
Pasang kontruksi gordeng, kelas II (kayu kamper medan)
Pasang kontruksi gordeng, kelas III (kayu borneo)
Pasang rangka atap (reng + kaso) genteng keramik kayu kelas II (kayu kamper medan)
Pasang rangka atap (reng + kaso) genteng keramik kayu kelas III (kayu borneo)
Pasang rangka atap (reng + kaso) genteng morando ex jatiwangi kayu kelas III (kayu borneo)
Pasang rangka atap (reng + kaso) genteng beton kayu kelas II (kayu kamper medan)
Pasang rangka atap (reng + kaso) genteng beton kayu kelas III (kayu borneo)
Pasang rangka atap sirap, kayu kelas II (kayu kamper medan)
Pasang rangka atap sirap, kayu kelas II (kayu borneol)
Pasang rangka langit-langit ( 50 x 100) cm, kayu kelas II (kamper medan)
Pasang rangka langit-langit ( 50 x 100) cm, kayu kelas III (kayu borneo)
Pasang rangka langit-langit ( 1.00 x 1.00) m, kayu borneo 5/7
Pasang rangka langit-langit ( 60 x 60) cm, kayu kelas II (kayu kamper medan)
Pasang rangka langit-langit ( 60 x 60) cm, kayu kelas III (kayu borneo)
Pasang rangka langit-langit ( 60 x 120) cm, kayu borneo 5/7
Pasang penggantung plafond kayu borneo
Pasang lisplank ukuran (3 x 20) cm, kayu kelas I (kayu kamper samarinda)
Pasang lisplang ukuran (3 x 20) cm, kayu kelas II (kayu kamper medan)
Pasang lisplang ukuran (3 x 20 & 3 x 10) cm, kayu kelas I (kayu kamper samarinda)
Pasang lisplang ukuran (3 x 20 & 3 x 10) cm, kayu kelas II (kayu kamper medan)
Pasang lisplang ukuran (2 x 20 & 2 x 10) cm, kayu kelas I (kayu kamper samarinda)
Pasang lisplang ukuran (2 x 20 & 2 x 10) cm, kayu kelas II (kayu kamper medan)
Pasang lisplang GRC double ukuran (0.9 x 30)/(0.9 x 10) cm
Pasang lisplang ukuran (3 x 30) cm, kayu kelas I (kayu kamper samarinda)
Pasang lisplang ukuran (3 x 30) cm, kayu kelas II (kamper medan)
Pasang rangka dinding pemisah (60 x 120), kayu kelas II (kayu kamper medan)
Pasang rangka dinding pemisah (60 x 120), kayu kelas III (kayu borneo)
Pasang dinding pemisah teakwood 4 mm rangkap, rangka kayu kelas II (kayu kamper medan)
Pasang dinding pemisah teakwood 4 mm rangkap, rangka kayu kelas III (kayu borneo)
Pasang dinding pemisah plywood 4 mm rangkap, rangka kayu kelas II (kayu kamper medan)
Pasang dinding pemisah plywood 4 mm rangkap, rangka kayu kelas II (kayu borneo)
Pasang dinding pemisah gypsum 9 mm rangkap, rangka kayu kelas III (kayu borneo)
Pasang dinding pemisah GRC 4 mm rangkap, rangka kayu kelas III (kayu borneo)
Pasang dinding lambrizing dari papan kayu kelas I (kayu jati)
Pasang dinding lambrizing dari papan kayu kelas I (kayu kamper samarinda)
Pasang dinding lambriziring plywood 4 mm ukuran 120 x 240 cm
Pasang dinding bilik, rangka kayu kelas III (kayu borneo)
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Upah
: Klas 1 (5 x 10 x 20)
: Klas 2 (4 x 8 x 17)
: Oven ( Klinker )
: 6x10x20
8 x 10 x 20
6x10x20
: 8x10x20
: 20 x 20
HB 20
HB 15
HB 10
: Papan (oven)
: Balok (oven)
: Papan
: Balok
: Papan
: Balok
: Papan
: Balok
: Papan
: Balok
: Papan
: Balok
: Papan
: Balok
10 x 60 Polished
10 x 60 Unpolished
10 x 40 Polished
10 x 40 Unpolished
10 x 30 Polished
10 x 30 Unpolished
: 40 x 40 cm Warna
: 30 x 30 cm Warna
: 20 x 20 cm Warna
: 15 x 20 cm Abu - abu
: 10 x 30 cm Abu - abu
: 10 x 40 cm Abu - abu
: 10 x 20 cm warna
: 10 x 30 cm warna
: 10 x 40 cm warna
: 10 x 30 cm warna
: 10 x 40 cm warna
: 40 x 40 cm
: 10 x 30 cm warna
: 10 x 40 cm warna
: 60 x 60 cm
: 40 x 40 cm
: 30 x 30 cm
: 10 x 60 cm
: 10 x 40 cm
: 10 x 30 cm
: 1 m' x 1 m' 6 mm
: 1 m' x 1 m' 5 mm
: 1 m' x 1 m' 4 mm
: 1 m' x 1 m' 3.5 mm
: 30 x 30 cm
: 30 x 60 cm
: 60 x 120 cm
dia. 1/2"
dia. 3/4"
dia. 1"
dia. 1,5"
dia. 2"
: dia. 2,5"
dia. 3"
dia. 4"
dia. 5"
: dia. 6"
dia. 8"
dia. 10"
dia. 12"
dia. 16"
dia. 2"
: dia. 3"
dia. 4"
dia. 5"
dia. 6"
dia. 8"
dia. 10"
dia. 12"
dia. 16"
dia. 18"
dia. 20"
: dia. 24"
dia. 32"
dia. 36"
: dia. 40"
dia. 44"
: dia. 48"
: dia. 63 mm (2")
dia. 110 mm (4")
dia. 125 mm (5")
dia. 160 mm (6")
dia. 200 mm (8")
dia. 250 mm (10")
dia. 315 mm (12")
dia. 400 mm (16")
dia. 450 mm (18")
dia. 500 mm (20")
dia. 630 mm (24")
dia. 800 mm (32")
dia. 900 mm (36")
dia. 1000 mm (40")
dia. 1100 mm (44")
dia. 1200 mm (48")
dia. 6 " - 100 mm
dia. 8 " - 100 mm
L=150 mm
L=200 mm
L=230 mm
L=250 mm
L=300 mm
L=320 mm
dia. 0 30 cm - 1 m
dia. 0 30 cm - 1 m
dia. 0 40 cm - 1 m
dia. 0 50 cm - 1 m
dia. 0 60 cm - 1 m
dia. 0 80 cm - 1 m
dia. 100 cm - 1m
K-450
K-350
K-300
K-250
K-225
K-175
K-125
K-450
K-350
K-300
K-250
K-225
K-175
K-125
HARGA SATUAN
: ex. Toto FB1700-70
: volume = 1 m3
: volume = 0,3 m3
: volume = 0,3 m3
: ex. Toto U57M
: ex. Toto LW103JT1
: ex. Royal ST 3
: ex. Royal SB 62
: Dia. 1/2 - 3/4 inc
ex. Aqualon
ex. Broco
ex. Broco
ex. Broco
ex. Broco
ex. Broco
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Philips
ex. Broco
ex. Broco
ex. Broco
ex. Broco
ex. Broco
ex. Broco
ex. Supreme/eterna
ex. Supreme/eterna
KOEF.
0,0120
0,0200
0,0070
0,1000
0,1000
0,0100
0,0050
0,0800
1,1000
35,0000
0,1500
0,1000
0,1500
0,0800
0,1500
0,0600
2,0000
2,0000
1,0000
0,3000
0,0500
3,0000
0,2760
0,7000
1,5000
1,0000
1,5000
0,1000
0,0500
URAIAN PEKERJAAN
Pasang papan nama proyek Digital Printing Bahan Kayu kaso Triplek 4 mm Paku biasa 2"-5" Banner Digital Printing 1 x 1 m
Tenaga Pekerja Tukang kayu kasar Kepala Tukang Mandor
URAIAN PEKERJAAN
PEKERJAAN TANAH Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan galian tanah biasa dan tanah keras dalam berbagai kedalaman 2. Pekerjaan stri
URAIAN PEKERJAAN
1 m3 Mengurug tanah merah
URAIAN PEKERJAAN
PEKERJAAN PONDASI
Ruang Lingkup
Jenis pekerjaan yang dicakup meliputi :
1. Pekerjaan pembuatan pondasi batu belah, dalam berbagai komposisi spesi
2. Pemasangan aanstamping/ batu kosong
3. Pembuatan pondasi sumuran
Tenaga
Pekerja
Tukang batu kasar
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang batu kasar
Kepala Tukang
Mandor
KOEF.
an ring balok
371,0000
0,4986
0,7756
215,0000
1,6500
0,2750
0,0280
0,0830
371,0000
0,4986
0,7756
215,0000
1,3200
0,1890
0,0190
0,1320
0,2500
1,0200
1,0000
0,2500
0,0250
0,1000
0,1200
KOEF.
KOEF.
1,0000
1,0000
0,2500
0,0250
0,1000
1,0500
0,0150
0,0070
0,0070
0,0007
0,0004
1,0500
0,0150
0,0070
0,0070
0,0007
0,0004
0,0400
0,3000
0,1000
0,5200
0,2600
0,0260
0,0260
0,0200
KOEF.
0,1500
0,0500
0,5200
0,2600
0,0260
0,0260
0,0450
0,3000
0,1000
0,5200
0,2600
0,0260
0,0260
0,0225
0,1500
0,0500
0,5200
0,2600
0,0260
0,0260
0,0400
0,4000
0,2000
0,0150
0,3500
2,0000
0,6600
0,3300
0,0330
0,0330
KOEF.
0,0200
0,2000
0,1000
0,0075
0,1750
1,0000
0,6600
0,3300
0,0330
0,0330
0,0400
0,4000
0,2000
0,0180
0,3500
2,0000
0,6600
0,3300
0,0330
0,0330
0,0200
0,2000
0,1000
0,0090
0,1750
1,0000
0,6600
0,3300
0,0330
0,0330
0,0400
0,4000
0,2000
0,0150
0,3500
6,0000
KOEF.
0,6600
0,3300
0,0330
0,0330
1,1000
0,2000
0,2000
0,2000
0,0200
0,0020
0,0300
0,4000
0,2000
0,0200
0,3500
3,0000
4,0000
0,6600
0,3300
0,0330
0,0330
0,0300
0,4000
0,1500
0,0150
0,3500
2,0000
0,6600
0,3300
0,0330
0,0330
KOEF.
0,0150
0,2000
0,0750
0,0075
0,1750
1,0000
0,6600
0,3300
0,0330
0,0330
0,0020
0,0100
3,0000
0,4500
4,0000
0,0060
0,0090
0,1800
0,0200
0,0200
0,0200
0,0060
0,0090
0,0030
0,0200
3,6000
0,0500
5,5000
0,0090
0,0150
0,2970
0,0330
0,0330
0,0330
0,0100
0,0150
01,4 kg (tb. 3
1,5000
1,0000
101,4000
URAIAN PEKERJAAN
1 m3 Membuat Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,5 cm)
oof (2 x pakai) D.22.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 196,7 kg
oof (2 x pakai) D.22.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg
oof (2 x pakai) D.22.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 128,7 kg
of (2 x pakai) D.22.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 147 kg
oof (2 x pakai) D.22.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur SL3 K 225 Sloof 15/25 Besi 167,2 kg
oof (2 x pakai) D.22.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur SL4 K 225 Sloof 15/20 Besi 198,9 kg
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
URAIAN PEKERJAAN
1 m3 Membuat Beton Struktur K1 Kolom 30/40 Lt. 1 K 225 Besi 259,4 _______ko__________________________________________________________
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur K1 Kolom 30/40 Lt. 2 K 225 Besi 187,7 _______ko__________________________________________________________
olen D.7.a.
D.18.
1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 1 K 225 Besi 242 kg
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 2 K 225 Besi 168,4 _______ko__________________________________________________________
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur K2 Kolom 30/30 Lt. 1 K 225 Besi 221,9 _______ko__________________________________________________________
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur K2 Kolom 30/30 Lt. 2 K 225 Besi 192,1 _______ko__________________________________________________________
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 1 K 225 Besi 221,4 _______ko__________________________________________________________
lom (2 x pakai) D.23.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 2 K 225 Besi 192,8 _______ko__________________________________________________________
URAIAN PEKERJAAN
lok (1 x pakai) D.24. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur B1 Balok 30/60 K 225 Besi 186,5 kg
lok (1 x pakai) D.24. 2 Beton K-225 Ready mix dengan pompa beton D.7.b.
URAIAN PEKERJAAN
D.18.
1 m3 Membuat Beton Struktur B1 Balok 30/55 K 225 Besi 184,7 kg
lok (1 x pakai) D.24. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur B1 Balok 25/50 K 225 Besi 237,1 kg
lok (1 x pakai) D.24. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur B2 Balok 20/40 K 225 Besi 169 kg
lok (1 x pakai) D.24. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur B3 Balok 20/30 K 225 Besi 211,4 kg
alok (1 x pakai) D.24. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur B7 Balok Tangga 20/25 K 225 Besi _______142,9 kg____________________________________________________
plat lantai (1 x pakai) D.25. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi polos D.18.
1 m3 Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 141,6 kg
lantai (1 x pakai) D.25. 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi polos D.18.
1 m3 Membuat Plat Dak tb. 10 cm Beton K 225 Besi 101,9 kg
lat lantai (2 x pakai) D.25.a 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi polos D.18.
1 m3 Membuat Plat Topian tb. 10 cm Beton K 225 Besi 115,1 kg
KOEF.
URAIAN PEKERJAAN
at lantai (3 x pakai) D.25.b 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi polos D.18.
1 m3 Membuat Plat Tempat Duduk tb. 10 cm Beton K 225 Besi 89,5 kg
plat lantai (2 x pakai) D.25.a 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi polos D.18.
1 m3 Membuat Plat Bordes tb. 12 cm Beton K 225 Besi 155,3 kg
ngga (2 x pakai) D.27.a 2 Beton K-225 Ready mix dengan pompa beton D.7.b. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Lantai & Trap Tangga Beton K 225 Besi 195,1 kg
ok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur RB1 Ring Balk 20/30 K 225 Besi 151,4 _______kg__________________________________________________________
ok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur RB2 Ring Balk 15/30 K 225 Besi 173,4 _______kg__________________________________________________________
ok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur RB1 Ring Balk 20/30 K 225 Besi 129,5 _______kg__________________________________________________________
ok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur RB2 Ring Balk 15/30 K 225 Besi 149,9 _______kg__________________________________________________________
URAIAN PEKERJAAN
len D.7.a. 3 Pembesian dengan besi ulir D.18.a
1 m3 Membuat Beton Struktur RB3 Ring Balk 15/25 K 225 Besi 167,6 _______kg__________________________________________________________
ok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi ulir D.18.a 4 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 204,9 _______kg__________________________________________________________
ok (2 x pakai) D.24.a 2 Beton K-225 Site mix dengan molen D.7.a. 3 Pembesian dengan besi polos D.18.
1 m3 Membuat Beton Struktur RBP Ring Balk 15/15 K 225 Besi 149,4 _______ g__________________________________________________________
k
URAIAN PEKERJAAN
PEKERJAAN BETON PRACETAK Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan pembuatan lahan produksi komponen beton pracetak 2. Pekerja
Pasir beton Kerikil (maksimal 30 mm) Air 2 Tenaga Pekerja Tukang batu kasar Kepala tukang Mandor
1 m2 (K3) Membuat lahan produksi tebal 8 cm beton f'c 14,5 MPa, slump (120 ± 20) mm
sir beton Kerikil (maksimal 30 mm) Air 2 Tenaga Pekerja Tukang batu kasar Kepala tukang Mandor
sir beton Kerikil (maksimal 30 mm) Air 2 Tenaga Pekerja Tukang batu kasar Kepala tukang Mandor
KOEF.
48,9000
0,0814
0,1143
32,2500
0,2480
0,0410
0,0040
0,0130
0,0080
9,3940
0,0050
0,0800
0,2000
3,8820
0,0070
0,0760
0,0080
0,0010
0,0050
0,0430
0,2000
0,0460
0,6930
0,0040
0,0380
0,0040
0,0010
KOEF.
0,0040
0,0480
0,2000
0,0460
0,6930
0,0040
0,0380
0,0040
0,0010
0,0530
0,0180
0,0050
0,0890
0,0300
0,0050
0,0710
0,0240
0,0050
0,0640
0,2440
0,1280
0,0340
0,0730
URAIAN PEKERJAAN
KOEF.
6,6760
0,0670
0,0670
0,0670
0,0670
0,1340
0,0670
0,0670
0,0670
1,1000
KOEF.
6,1100
0,0610
0,0610
0,0610
0,0610
0,1220
0,0610
0,0610
0,0610
1,1000
KOEF.
8,2770
0,0830
0,0830
0,0830
0,0830
0,1660
0,0830
0,0830
0,0830
2,2000
1,8970
0,0190
0,0190
0,0190
0,0380
0,0190
1,8970
0,0190
0,0190
0,0190
0,0380
0,0190
1.200,0000
0,4815
350,0000
1.850,0000
400,0000
KOEF.
0,3670
0,0740
0,0370
0,0120
0,0040
0,2640
0,1470
0,1470
0,0150
0,0050
0,2200
0,0220
0,2200
0,0110
N PEKERJAAN
PEKERJAAN BESI DAN ALUMUNIUM Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan pemasangan rangka atap dan talang 2. Pekerjaan pema
Pasang pintu lipat (folding door) bahan besi Bahan Pintu lipat besi
Tenaga Pekerja Tukang Aluminum Kepala tukang Mandor
Pasang kusen pintu/jendela alumunium 4" cokelat/hitam Bahan Profil Aluminium 4" cokelat/hitam skrup fixer Selant
Tenaga Pekerja Tukang Aluminum Kepala tukang Mandor
Pasang kusen pintu/jendela alumunium 3" cokelat/hitam Bahan Profil Aluminium 3" cokelat/hitam skrup fixer Selant
Tenaga Pekerja Tukang Aluminum Kepala tukang Mandor
KOEF.
0,0021
KOEF.
4,4000
4,5000
0,2700
0,0850
0,0850
0,0090
0,0050
4,4000
4,5000
0,2700
0,0850
0,0850
0,0090
0,0050
atap genteng m
1,4880
2,2320
5,4000
38,0000
1,6000
0,2000
0,4500
0,0200
0,0020
1,1000
5,3969
0,2159
1,0000
_____________1___________________________________________________________________________________________________________________________
F.11.a Pintu double teakwood 4 mm + lapis HPL L.8.b Jalusi Alluminium coklat 2" F.11.g Engsel Pintu 4" Setara Dekson M.5. Kunci Tanam Double Slag
1 bh Pintu Type P1 (Pintu kayu lapis HPL 1 x 0,8 x 2,10 m & Jalusi 0,8 >
F.11.a Pintu double teakwood 4 mm + lapis HPL L.8.b Jalusi Alluminium coklat 2" F.11.g Engsel Pintu 4" Setara Dekson M.5. Kunci Tanam Double Slag
1 bh Pintu KM/WC (Pintu kayu lapis HPL 1 x 0,7 x 2,10 m & Jalusi 0,8 x
URAIAN PEKERJAAN
PEKERJAAN DINDING Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan dinding bata merah dengan berbagai ketebalan dan spesi 2. Pekerjaan dindi
Pasangan bata merah tebal 1/2 bata, camp. spesi 1 Bahan Batu bata 5 x 11 x 22 Semen Portland Pasir pasang
Tenaga Pekerja Tukang batu halus Kepala tukang Mandor
Pasangan bata ringan tb. 10 cm (20 x 60 cm) Bahan Bata ringan tb. 10 cm Mortar MU 380
Tenaga Pekerja Tukang batu halus Kepala tukang Mandor
Peralatan Alat bantu
Pasangan bata ringan tb. 8 cm (20 x 60 cm) Bahan Bata ringan tb. 8 cm Mortar MU 380
Tenaga Pekerja Tukang batu halus Kepala tukang Mandor
Peralatan Alat bantu
1 m2 Pasangan bata ringan tb. 8 cm (20 x 60 cm)
KOEF.
URAIAN PEKERJAAN
PEKERJAAN PLESTERAN Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan plesteran dalam berbagai ketebalan dan campuran 2. Pekerjaan berapen
1 m2 Acian
KOEF.
6,6300
9,8000
0,0450
0,5000
0,7000
0,3500
0,0350
0,0350
6,6300
9,8000
0,0450
0,5000
0,7000
0,3500
0,0350
0,0350
26,5000
10,4000
0,0450
0,5000
0,7000
0,3500
0,0350
0,0350
16,8000
10,4000
KOEF.
0,0450
0,5000
0,7000
0,3500
0,0350
0,0350
10,5000
9,3000
0,0180
1,9400
0,9000
0,4500
0,0450
0,0450
1,0100
0,0500
0,2500
0,5000
0,0500
0,0013
1,0000
1,0100
0,0500
0,5000
0,5000
0,0500
0,0013
1,0000
URAIAN PEKERJAAN
URAIAN PEKERJAAN
PEKERJAAN LANGIT-LANGIT Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan menutup rangka plafond dengan berbagai bahan penutup dan list
rd tb. 9 mm J.7. 2 Rangka besi hollow 40.40 & 40.20 (120x60) F.21.a
1m2 Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm + rangka hollow galvanis 40.40 & 40.20 (120x60)
URAIAN PEKERJAAN
PEKERJAAN PENUTUP ATAP
Ruang Lingkup
Jenis pekerjaan yang dicakup meliputi :
1. Pekerjaan pemasangan bahan atap keramik, genteng beton, asbes gelombang, fiber glass, genteng aspal,
genteng metal, sirap, dan alumunium.
2. Pekerjaan pemasangan sasalation/alumunium foil
Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang kayu kasar
Kepala tukang
Mandor
2.4x0.9 Lystplank GRC 10x2.4x0.9 Paku sekrup Alat bantu (0,5% Bahan) 2 Tenaga Pekerja Tukang kayu halus Kepala tukang Mandor
URAIAN PEKERJAAN
PEKERJAAN KUNCI DAN KACA
Ruang Lingkup
Jenis pekerjaan yang dicakup meliputi :
1. Pekerjaan pemasangan berbagai kunci dan engsel pintu dan jendela
2. Pekerjaan pemasangan rel pintu dorong dan door stop
3. Pekerjaan pemasangan kaca berbagai ketebalan dan jenis
Tenaga
Pekerja
Tukang kayu halus
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang kayu halus
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang kayu halus
Kepala tukang
Mandor
URAIAN PEKERJAAN
PEKERJAAN PENGECATAN Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan mengerok/pembersihan permukaan dinding 2. Pekerjaan mengecat dengan cat
1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) interior
1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) exterior
URAIAN PEKERJAAN
PEKERJAAN SANITASI
Ruang Lingkup
Jenis pekerjaan yang dicakup meliputi :
1. Pekerjaan pasangan kloset duduk, kloset jongkok, badculp, urinoir, bak mandi fibreglass, bak cuci piring,
wastafel dan floor drain/saringan
2. Pekerjaan pembuatan bak air dari pasangan batu bata dan teraso
3. Pekerjaan pemasangan pipa saniter air kotor dan air bersih
Tenaga
Pekerja
Tukang batu halus
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang batu halus
Kepala tukang
Mandor
KOEF.
0,0060
0,0020
1,2000
0,3500
0,0360
0,0600
0,0060
0,0020
1,2000
0,3500
0,0360
0,0600
0,0060
0,0020
0,2250
1,2000
0,3400
910,0000
450,0000
9,0000
2,0000
9,0000
30,0000
15,5000
6,1300
0,6130
4,2200
URAIAN PEKERJAAN
PEKERJAAN PIPA LUAR Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan pemasangan pipa PVC dan GIP
Pemasangan pipa PVC dia. 2" Bahan Pipa PVC type D dia. 2"
Tenaga Pekerja Tukang Pipa Mandor
Tenaga Sewa Tripot/tackle & handle crane 2 T
Pemasangan pipa PVC dia. 3" Bahan Pipa PVC type D dia. 3"
Tenaga Pekerja Tukang Pipa Mandor
Tenaga Sewa Tripot/tackle & handle crane 2 T
Pemasangan pipa PVC dia. 4" Bahan Pipa PVC type D dia. 4"
Tenaga Pekerja Tukang Pipa Mandor
Tenaga Sewa Tripot/tackle & handle crane 2 T
1,0000
0,1180
0,0590
0,0120
0,0120
1,0000
0,1890
0,0950
0,0190
0,0240
1,0000
0,2560
0,1280
0,0260
0,0340
KOEF.
1,0000
0,2940
0,1470
0,0290
0,0400
1,0000
0,5440
0,2720
0,0540
0,0800
1,0000
0,6690
0,3350
0,0670
0,1000
URAIAN PEKERJAAN
Tenaga Pekerja
Tukang Pipa
Mandor
Tenaga Pekerja
Tukang Pipa
Mandor
Tenaga Pekerja
Tukang Pipa
Mandor
URAIAN PEKERJAAN
Tenaga Pekerja
Tukang Pipa
Mandor
Tenaga Pekerja
Tukang Pipa
Mandor
Tenaga Pekerja
Tukang Pipa
Mandor
1,0000
2,3030
1,1520
0,2300
0,3590
1,0000
0,0350
0,0170
0,0030
0,0190
1,0000
0,0400
0,0200
0,0040
0,0190
KOEF.
1,0000
0,0450
0,0230
0,0050
0,0190
1,0000
0,0620
0,0310
0,0060
0,0190
1,0000
0,1020
0,0510
0,0100
0,0190
KOEF.
1,0000
0,1330
0,0670
0,0130
0,0420
1,0000
0,1700
0,0850
0,0170
0,0650
1,0000
0,2900
0,1450
0,0290
0,1520
KOEF.
1,0000
0,3590
0,1800
0,0360
0,2000
1,0000
0,4330
0,2160
0,0430
0,2510
1,0000
0,5120
0,2560
0,0510
0,3070
KOEF.
1,0000
0,8930
0,4460
0,0890
0,5730
1,0000
1,3530
0,6770
0,1350
0,8830
1,0000
1,6590
0,8300
0,1660
1,0930
KOEF.
1,0000
1,8180
0,9090
0,1820
1,2050
1,0000
2,3700
1,1850
0,2370
1,5840
1,0000
0,0345
0,0172
0,0034
1,0000
0,4000
0,2000
0,0400
URAIAN PEKERJAAN
Pemasangan pipa GIP dia. 125 mm (5")
Bahan
Pipa GIP dia. 125 mm (5")
Tenaga
Pekerja
Tukang Pipa
Mandor
Tenaga
Pekerja
Tukang Pipa
Mandor
Tenaga
Pekerja
Tukang Pipa
Mandor
Kode Q.1.
1 bh 1
2
Kode Q.2.
1 bh 1
2
Kode Q.6.
1 bh 1
KOEF.
1,0000
1,0000
0,1000
1,0000
0,1000
0,0100
0,1600
8,0000
1,0000
1,0000
0,1000
1,0000
0,1000
0,0100
0,1600
8,0000
3,0000
3,0000
1,0000
1,0000
1,0000
0,0800
0,8000
0,0800
0,0080
0,0800
4,0000
2,0000
1,0000
1,0000
0,0800
0,8000
0,0800
0,0080
URAIAN PEKERJAAN
0,0800
4,0000
2,0000
1,0000
1,0000
0,0800
0,8000
0,0800
0,0080
0,1600
8,0000
4,0000
1,0000
1,0000
0,1000
1,0000
0,1000
0,0100
0,0800
4,0000
2,0000
1,0000
1,0000
0,0800
0,8000
0,0800
0,0080
1,0000
0,0800
0,8000
0,0800
0,0080
URAIAN PEKERJAAN
Pasang Kabel induk/group listrik Bahan Kabel listrik NYM 3 x 2.5 mm2 (1 roll = 50 m') X Dos 20 mm
Tenaga Pekerja Tukang listrik Kepala tukang Mandor
4 5 6 7
Rp -
1,00 ls Rp - Rp -
1,00 ls. Rp - Rp -
1,00 ls Rp - Rp -
1,00 bh Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
Rp -
Rp -
480,25 m2 Rp - Rp -
53,80 m' Rp - Rp -
Rp -
136,94 m3 Rp - Rp -
11,41 m3 Rp - Rp -
22,82 m3 Rp - Rp -
51,35 m3 Rp - Rp -
51,35 m3 Rp - Rp -
Rp -
77,40 m3 Rp - Rp -
11,34 m3 Rp - Rp -
4,50 m3 Rp - Rp -
0,81 m3 Rp - Rp -
2,25 m3 Rp - Rp -
0,41 m3 Rp - Rp -
15,75 m3 Rp - Rp -
2,84 m3 Rp - Rp -
4,32 m3 Rp - Rp -
1,13 m3 Rp - Rp -
56,75 m3 Rp - Rp -
Rp -
7,07 m3 Rp - Rp -
2,18 m3 Rp - Rp -
0,68 m3 Rp - Rp -
9,12 m3 Rp - Rp -
2,38 m3 Rp - Rp -
11,63 m3 Rp - Rp -
12,13 m3 Rp - Rp -
1,29 m3 Rp - Rp -
38,51 m3 Rp - Rp -
4,74 m3 Rp - Rp -
0,75 m3 Rp - Rp -
0,26 m3 Rp - Rp -
2,14 m3 Rp - Rp -
0,15 m3 Rp - Rp -
0,43 m3 Rp - Rp -
Rp -
309,82 m2 Rp - Rp -
619,64 m2 Rp - Rp -
590,84 m2 Rp - Rp -
267,44 m2 Rp - Rp -
31,25 m2 Rp - Rp -
31,25 m2 Rp - Rp -
28,80 m2 Rp - Rp -
4 5 6 7
74,70 m' Rp - Rp -
39,00 m' Rp - Rp -
19,62 m' Rp - Rp -
2,24 m2 Rp - Rp -
1,60 m2 Rp - Rp -
8,50 m2 Rp - Rp -
17,00 m2 Rp - Rp -
17,00 m2 Rp - Rp -
8,50 m' Rp - Rp -
8,50 m' Rp - Rp -
Rp -
13,65 m2 Rp - Rp -
16,40 m' Rp - Rp -
Rp -
33,08 m3 Rp - Rp -
18,83 m3 Rp - Rp -
324,46 m2 Rp - Rp -
34,08 m2 Rp - Rp -
16,38 m2 Rp - Rp -
6,75 m2 Rp - Rp -
7,25 m3 Rp - Rp -
32,28 m2 Rp - Rp -
32,28 m2 Rp - Rp -
16,14 m3 Rp - Rp -
1,88 m3 Rp - Rp -
32,28 m2 Rp - Rp -
64,56 m2 Rp - Rp -
32,28 m2 Rp - Rp -
Rp -
35,20 m' Rp - Rp -
11,76 m2 Rp - Rp -
2,50 m2 Rp - Rp -
24,00 bh Rp - Rp -
4,00 bh Rp - Rp -
226,80 m' Rp - Rp -
23,52 m2 Rp - Rp -
40,32 m2 Rp - Rp -
56,00 psg Rp - Rp -
56,00 bh Rp - Rp -
27,20 m' Rp - Rp -
5,88 m2 Rp - Rp -
1,40 m2 Rp - Rp -
12,00 bh Rp - Rp -
4,00 bh Rp - Rp -
9,60 m' Rp - Rp -
0,96 m2 Rp - Rp -
45,83 m2 Rp - Rp -
Rp -
349,05 m2 Rp - Rp -
241,80 m2 Rp - Rp -
131,36 m2 Rp - Rp -
17,00 m2 Rp - Rp -
376,65 m2 Rp - Rp -
Rp -
36,00 m' Rp - Rp -
1,00 Bh Rp - Rp -
3,00 Bh Rp - Rp -
5,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
16,00 ttk Rp - Rp -
8,00 ttk Rp - Rp -
5,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
Rp -
3,00 bh Rp - Rp -
3,00 bh Rp - Rp -
3,00 bh Rp - Rp -
3,00 bh Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 Set Rp - Rp -
1,00 Set Rp - Rp -
1,00 Set Rp - Rp -
4 5 6 7
1,00 Unit Rp - Rp -
Rp -
Rp -
9,12 m3 Rp - Rp -
2,38 m3 Rp - Rp -
11,63 m3 Rp - Rp -
12,13 m3 Rp - Rp -
1,29 m3 Rp - Rp -
38,51 m3 Rp - Rp -
4,74 m3 Rp - Rp -
0,25 m3 Rp - Rp -
1,84 m3 Rp - Rp -
0,15 Rp - Rp -
0,43 m3 m3 Rp - Rp -
Rp -
352,17 m2 Rp - Rp -
704,34 m2 Rp - Rp -
683,94 m2 Rp - Rp -
267,44 m2 Rp - Rp -
29,02 m2 Rp - Rp -
29,02 m2 Rp - Rp -
20,40 m2 Rp - Rp -
73,20 m' Rp - Rp -
39,00 m' Rp - Rp -
19,62 m' Rp - Rp -
1,54 m2 Rp - Rp -
1,60 m2 Rp - Rp -
50,15 m2 Rp - Rp -
100,30 m2 Rp - Rp -
100,30 m2 Rp - Rp -
41,65 m' Rp - Rp -
41,65 m' Rp - Rp -
Rp -
13,65 m2 Rp - Rp -
16,40 m' Rp - Rp -
Rp -
320,65 m2 Rp - Rp -
26,64 m2 Rp - Rp -
16,38 m2 Rp - Rp -
4,50 m2 Rp - Rp -
Rp -
35,20 m' Rp - Rp -
11,76 m2 Rp - Rp -
2,50 m2 Rp - Rp -
24,00 bh Rp - Rp -
4,00 bh Rp - Rp -
226,80 m' Rp - Rp -
23,52 m' Rp - Rp -
40,32 m2 Rp - Rp -
56,00 psg Rp - Rp -
56,00 bh Rp - Rp -
20,40 m' Rp - Rp -
4,41 m2 Rp - Rp -
1,05 m2 Rp - Rp -
9,00 bh Rp - Rp -
3,00 bh Rp - Rp -
7,20 m' Rp - Rp -
0,72 m2 Rp - Rp -
Rp -
441,80 m2 Rp - Rp -
242,15 m2 Rp - Rp -
131,36 m2 Rp - Rp -
100,30 m2 Rp - Rp -
376,65 m2 Rp - Rp -
Rp -
36,00 m' Rp - Rp -
5,00 ttk Rp - Rp -
4 5 6 7
4,00 ttk Rp - Rp -
16,00 ttk Rp - Rp -
8,00 ttk Rp - Rp -
5,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
Rp -
2,00 bh Rp - Rp -
2,00 bh Rp - Rp -
3,00 bh Rp - Rp -
2,00 bh Rp - Rp -
2,00 bh Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
Rp -
Rp -
8,40 m3 Rp - Rp -
2,19 m3 Rp - Rp -
2,54 m3 Rp - Rp -
5,87 m3 Rp - Rp -
0,43 m3 Rp - Rp -
0,25 m3 Rp - Rp -
Rp -
324,38 m2 Rp - Rp -
648,75 m2 Rp - Rp -
628,35 m2 Rp - Rp -
91,20 m2 Rp - Rp -
29,02 m2 Rp - Rp -
29,02 m2 Rp - Rp -
20,40 m2 Rp - Rp -
73,20 m2 Rp - Rp -
364,00 m2 Rp - Rp -
1,54 m2 Rp - Rp -
1,60 m2 Rp - Rp -
41,65 m2 Rp - Rp -
83,30 m2 Rp - Rp -
83,30 m2 Rp - Rp -
39,85 m' Rp - Rp -
39,85 m' Rp - Rp -
Rp -
528,28 m2 Rp - Rp -
528,28 m2 Rp - Rp -
63,16 m' Rp - Rp -
107,60 m' Rp - Rp -
Rp -
365,29 m2 Rp - Rp -
103,60 m2 Rp - Rp -
239,70 m' Rp - Rp -
126,20 m' Rp - Rp -
Rp -
317,95 m2 Rp - Rp -
33,84 m2 Rp - Rp -
4,50 m2 Rp - Rp -
Rp -
35,20 m' Rp - Rp -
11,76 m2 Rp - Rp -
2,50 m2 Rp - Rp -
24,00 bh Rp - Rp -
4,00 bh Rp - Rp -
226,80 m' Rp - Rp -
23,52 m' Rp - Rp -
40,32 m2 Rp - Rp -
56,00 psg Rp - Rp -
56,00 bh Rp - Rp -
20,40 m' Rp - Rp -
4,41 m2 Rp - Rp -
1,05 m2 Rp - Rp -
9,00 bh Rp - Rp -
3,00 bh Rp - Rp -
7,20 m' Rp - Rp -
0,72 m2 Rp - Rp -
4 5 6 7
Rp -
422,49 m2 Rp - Rp -
205,86 m2 Rp - Rp -
91,20 m2 Rp - Rp -
83,30 m2 Rp - Rp -
468,89 m2 Rp - Rp -
32,28 m2 Rp - Rp -
Rp -
36,00 m' Rp - Rp -
5,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
16,00 ttk Rp - Rp -
8,00 ttk Rp - Rp -
5,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
1,00 ls Rp - Rp -
Rp -
2,00 bh Rp - Rp -
2,00 bh Rp - Rp -
3,00 bh Rp - Rp -
2,00 bh Rp - Rp -
2,00 bh Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
Rp -
Rp -
276,85 m2 Rp - Rp -
35,80 m' Rp - Rp -
Rp -
86,98 m3 Rp - Rp -
7,25 m3 Rp - Rp -
14,50 m3 Rp - Rp -
32,62 m3 Rp - Rp -
32,62 m3 Rp - Rp -
Rp -
46,44 m3 Rp - Rp -
6,80 m3 Rp - Rp -
2,70 m3 Rp - Rp -
0,49 m3 Rp - Rp -
1,35 m3 Rp - Rp -
0,24 m3 Rp - Rp -
9,45 m3 Rp - Rp -
1,70 m3 Rp - Rp -
2,59 m3 Rp - Rp -
0,68 m3 Rp - Rp -
34,05 m3 Rp - Rp -
Rp -
4,21 m3 Rp - Rp -
1,26 m3 Rp - Rp -
0,68 m3 Rp - Rp -
5,47 m3 Rp - Rp -
1,43 m3 Rp - Rp -
6,98 m3 Rp - Rp -
6,74 m3 Rp - Rp -
0,88 m3 Rp - Rp -
20,67 m3 Rp - Rp -
2,72 m3 Rp - Rp -
0,38 m3 Rp - Rp -
0,26 m3 Rp - Rp -
2,14 m3 Rp - Rp -
0,15 m3 Rp - Rp -
0,43 m3 Rp - Rp -
Rp -
228,93 m2 Rp - Rp -
457,85 m2 Rp - Rp -
429,05 m2 Rp - Rp -
156,08 m2 Rp - Rp -
17,85 m2 Rp - Rp -
17,85 m2 Rp - Rp -
28,80 m2 Rp - Rp -
41,10 m' Rp - Rp -
4 5 6 7
26,00 m' Rp - Rp -
14,58 m' Rp - Rp -
2,24 m2 Rp - Rp -
1,60 m2 Rp - Rp -
8,50 m2 Rp - Rp -
17,00 m2 Rp - Rp -
17,00 m2 Rp - Rp -
8,50 m' Rp - Rp -
8,50 m' Rp - Rp -
Rp -
13,65 m2 Rp - Rp -
16,40 m' Rp - Rp -
Rp -
31,07 m3 Rp - Rp -
10,46 m3 Rp - Rp -
176,27 m2 Rp - Rp -
19,68 m2 Rp - Rp -
16,38 m2 Rp - Rp -
6,75 m2 Rp - Rp -
4,73 m3 Rp - Rp -
21,48 m2 Rp - Rp -
21,48 m2 Rp - Rp -
10,74 m3 Rp - Rp -
1,25 m3 Rp - Rp -
21,48 m2 Rp - Rp -
42,96 m2 Rp - Rp -
21,48 m2 Rp - Rp -
Rp -
17,60 m' Rp - Rp -
5,88 m2 Rp - Rp -
1,25 m2 Rp - Rp -
12,00 bh Rp - Rp -
2,00 bh Rp - Rp -
113,40 m' Rp - Rp -
11,76 m2 Rp - Rp -
20,16 m2 Rp - Rp -
28,00 psg Rp - Rp -
28,00 bh Rp - Rp -
27,20 m' Rp - Rp -
5,88 m2 Rp - Rp -
1,40 m2 Rp - Rp -
12,00 bh Rp - Rp -
4,00 bh Rp - Rp -
9,60 m' Rp - Rp -
0,96 m2 Rp - Rp -
Rp -
271,66 m2 Rp - Rp -
157,39 m2 Rp - Rp -
80,48 m2 Rp - Rp -
17,00 m2 Rp - Rp -
209,25 m2 Rp - Rp -
Rp -
18,00 m' Rp - Rp -
1,00 Bh Rp - Rp -
1,00 Bh Rp - Rp -
3,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
8,00 ttk Rp - Rp -
4,00 ttk Rp - Rp -
5,00 ttk Rp - Rp -
2,00 ttk Rp - Rp -
Rp -
3,00 bh Rp - Rp -
3,00 bh Rp - Rp -
3,00 bh Rp - Rp -
3,00 bh Rp - Rp -
1,00 ls Rp - Rp -
1,00 ls Rp - Rp -
1,00 Set Rp - Rp -
1,00 Set Rp - Rp -
1,00 Set Rp - Rp -
1,00 Unit Rp - Rp -
Rp -
4 5 6 7
Rp -
180,00 m2 Rp - Rp -
108,00 m3 Rp - Rp -
360,00 m2 Rp - Rp -
10,80 m2 Rp - Rp -
14,40 m2 Rp - Rp -
Rp -
1,00 ls Rp - Rp -
Rp -
Jumlah Total Rp -
PPN 10 % Rp -
Pembulatan Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Orang/hari
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/orang/hari/8 jam
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/kg
/kg
/m3
/m3
/m3
/bh
/bh
/bh
/bh
/bh
/bh
/m2
/m2
/m2
/m2
/bh
/bh
/bh
/bh
/m2
/m2
/bh
/bh
/zak
/kg
/kg
/kg
/zak
/kg
/zak
/kg
/zak
/kg
/zak
/kg
/kg
/kg
/kg
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/btg
/btg
/m2
/kg
/kg
/kg
/kg
/kg
/kg
/m2
/kg
/kg
/m2
/lbr
/kg
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/kg
/kg
/kg
/kg
/kg
/kg
/bh
/bh
/bh
/bh
/m'
/m'
/m'
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/bh
/bh
/bh
/m2
/m2
/m2
/m'
/m'
/m'
/bh
/m2
/m2
/m2
/m2
/m'
/m'
/bh
/bh
SATUAN
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/lbr
/lbr
/bh
/m'
/m2
/btg
/m2
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m2
/m2
/m2
/m2
/m2
bh
bh
/kg
/ikat
/kg
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/bh
/bh
/bh
/bh
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/m2
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
HARGA SATUAN SATUAN
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/m2
/bh
/bh
/bh
/m2
/m2
/m2
/m2
/m2
/m2
/m3
/bh
/bh
/m2
/m2
/m2
/m2
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/zak
/m'
/lbr
/m'
/m'
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/lbr
/m'
/lbr
/lbr
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/bh
/bh
/m'
/m'
/m'
/m'
/m'
/m'
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/lbr
/btg
/m'
/m'
/m'
/m'
/Ttk
joint
joint
joint
/m'
/m'
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/m2
/dn
/dn
/dn
/m2
/m2
/Set
/Set
/Unit
/Unit
/Set
/Set
/bh
/bh
/bh
SATUAN
/Psg
/bh
/bh
/bh
/bh
/bh
/bh
/bh
bh
/bh
/kg
/kg
/kg
/kg
/kg
/ltr
/ltr
/lbr
/kg
/kg
/kg
/kg
/ltr
/ltr
/kg
/kg
/tube
/kg
/bh
/bh
/ikat
/kg
/kg
/kg
/kg
/kg
/lbr
/lbr
/kg
/Lt
/kg
/kg
/kg
/kg
/m2
/m
/kg
/m2
/ltr
/kg
/ltr
/ltr
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/Set
/m'
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/set
/set
/set
/set
/set
/set
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/bh
/roll
/roll
/hari
/jam
/jam
/hari
/hari
/hari
/jam
/jam
/hari
/m2
/m2
/m2
/m2
/m3
/ltr
/m2
/ltr
m3 Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
m2 Rp. - Rp. -
bh Rp. - Rp. -
Lmb Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (1). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Dibulatkan Rp.
Dibulatkan Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
liter Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (3). Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (3). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
Jumlah (1). Rp. -
Dibulatkan Rp. -
m2 Rp. - Rp. -
bahan Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
bh Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Lt Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
btg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
7,5 cm)
m2 Rp. - Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
kg 10,0000 1,0000 144,6000 52,1000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
kg 13,3333 1,0000 166,0000 60,5000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
kg 10,0000 1,0000 95,4000 33,3000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
g
13,3333 1,0000 108,3000 38,7000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
kg 13,3333 1,0000 128,2000 39,0000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
kg 13,3333 1,0000 157,4000 41,5000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
259,4 kg 11,6667 1,0000 222,6000 36,8000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
187,7 kg 11,6667 1,0000 148,4000 39,3000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____ko__________________________________________________________ Dibulatkan Rp. -
168,4 kg 12,3810 1,0000 127,2000 41,2000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____ko__________________________________________________________ Dibulatkan Rp. -
221,9 kg 13,3333 1,0000 178,0000 43,9000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____ko__________________________________________________________ Dibulatkan Rp. -
192,1 kg 13,3333 1,0000 148,4000 43,7000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____ko__________________________________________________________ Dibulatkan Rp. -
221,4 kg 16,0000 1,0000 170,9000 50,5000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____ko__________________________________________________________ Dibulatkan Rp. -
192,8 kg 16,0000 1,0000 142,4000 50,4000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____ko__________________________________________________________ Dibulatkan Rp. -
kg 7,0000 1,0000 149,2000 37,3000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
kg 8,0800 1,0000 193,4000 43,7000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
g
9,5000 1,0000 116,7000 52,3000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
kg 9,3333 1,0000 155,6000 55,8000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
si 142,9 kg 9,2000 1,0000 104,2000 38,7000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
_142,9 kg____________________________________________________ Dibulatkan Rp. -
8,3333 1,0000 141,6000 m2 m3 kg Rp. - Rp. Rp. - Rp. - Rp.- Jumlah - Rp. - Rp. -
Dibulatkan Rp. -
10,0000 1,0000 101,9000 m2 m3 kg Rp. - Rp. Rp. - Rp. - Rp.- Jumlah - Rp. - Rp. -
Dibulatkan Rp. -
12,0000 1,0000 115,1000 m2 m3 kg Rp. - Rp. Rp. - Rp. - Rp.- Jumlah - Rp. - Rp. -
9,5 kg 12,0000 1,0000 89,5000 m2 m3 kg Rp. - Rp. Rp. - Rp. - Rp.- Jumlah - Rp. - Rp. -
Dibulatkan Rp. -
8,3333 1,0000 155,3000 m2 m3 kg Rp. - Rp. Rp. - Rp. - Rp.- Jumlah - Rp. - Rp. -
Dibulatkan Rp. -
6,6667 1,0000 104,7000 90,4000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
Dibulatkan Rp. -
51,4 kg 10,0000 1,0000 95,4000 56,0000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____kg__________________________________________________________ Dibulatkan Rp. -
73,4 kg 13,3333 1,0000 108,3000 65,1000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____kg__________________________________________________________ Dibulatkan Rp. -
29,5 kg 10,0000 1,0000 93,8000 35,7000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____kg__________________________________________________________ Dibulatkan Rp. -
49,9 kg 13,3333 1,0000 108,3000 41,6000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____kg__________________________________________________________ Dibulatkan Rp. -
’04,9 kg 13,3333 1,0000 160,3000 44,6000 m2 m3 kg kg Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah - Rp.
____kg__________________________________________________________ Dibulatkan Rp. -
49,4 kg 13,3333 1,0000 149,4000 m2 m3 kg Rp. - Rp. Rp. - Rp. - Rp.- Jumlah - Rp. - Rp. -
____ g__________________________________________________________
k
Dibulatkan Rp. -
± 20) mm
kg Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
liter Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
Lt Rp. - Rp. -
bh Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
Lt Rp. - Rp. -
kg Rp. - Rp. -
bh Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
lbr Rp. - Rp. -
Lt Rp. - Rp. -
kg Rp. - Rp. -
bh Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
0,0690 0,2420 0,1380 0,0370 0,0730 oh oh oh oh oh Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Rp. - Rp.
- Jumlah (2)
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
0,0610 0,2130 0,1220 0,0330 0,0730 oh oh oh oh oh Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Rp. - Rp.
- Jumlah (2)
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (3). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
liter Rp. - Rp. -
Jumlah (1). Rp. -
Jumlah (1) + (2) Rp. -
Keuntungan 10% Rp. -
Jumlah Rp. -
Dibulatkan Rp. -
kg Rp. - Rp. -
liter Rp. - Rp. -
Jumlah (1). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (1). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (1). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
usi 0,8 x 0,5) 7,1600 1,6800 4,0000 3,0000 1,0000 m' m2 m' bh bh Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Rp. - Rp.
-
Jumlah (1) + (2) Keuntungan
Rp. 10%- Rp. -
Jumlah Rp. -
Dibulatkan Rp. -
si 0,8 x 0,5) 6,9600 1,4700 3,5000 3,0000 1,0000 m' m2 m' bh bh Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Rp. - Rp.
-
Jumlah (1) + (2) Keuntungan
Rp. 10%- Rp. -
Jumlah Rp. -
Dibulatkan Rp. -
KOEF. SAT.
puti : 1. Pekerjaan dinding bata merah dengan berbagai ketebalan dan spesi 2. Pekerjaan dinding hollow block dengan berbagai dimensi dan spesi 3. Pekerjaan pemasangan terawangan roster atau b
8,4000 2,5200 bh Kg
0,0671 0,1300 0,0130 0,0003
oh oh oh oh
1,0000 ls
Jumlah Total Overhead & profit (10%)
Jumlah total + 10%
60 cm) Dibulatkan
8,4000 2,5200 bh Kg
0,0671 0,1300 0,0130 0,0003
oh oh oh oh
1,0000 ls
Jumlah Total Overhead & profit (10%)
Jumlah total + 10%
Dibulatkan
bh Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
bh Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
bh Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
bh Rp. - Rp. -
kg Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
bh Rp. - Rp. -
kg Rp. - Rp. -
m3 Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m2 Rp. - Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
ls Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m2 Rp. - Rp. -
m3 Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
ls Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
1,0500 0,0100 0,0500 0,0500 0,0050 0,0030 m' kg oh oh oh oh Rp. - Rp. Rp. - Jumlah (1).
- Rp.
Rp. -- Rp.
Rp. - Rp.
- Rp. --
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
1,0500 0,1500 0,0600 0,0600 0,0060 0,0030 m' kg oh oh oh oh Rp. - Rp. Rp. - Jumlah (1).
- Rp.
Rp. -- Rp.
Rp. - Rp.
- Rp. --
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
rangka hollow 1,0000 1,0000 galvanis 40 m2 m2 .40 & 40.20 (120x60) Rp. Rp. - Rp. - Rp. - Jumlah
- Rp. -
low galvanis 40.40 & 40.20 (120x60) Dibulatkan Rp. -
gka hollow gal 1,0000 1,0000 vanis 40.40 m2 m2 & 40.20 (120x60) Rp. Rp. - Rp. - Rp. - Jumlah - Rp. -
galvanis 40.40 & 40.20 (120x60) Dibulatkan Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
KOEF. SAT. HARGA SATUAN Rp. JUMLAH HARGA Rp.
1. Pekerjaan pembuatan/pemasangan kusen pintu/jendela berbagai jenis kelas kayu 2. Pekerjaan pembuatan pintu panel, pintu klamp, pintu/jendela jalusi, pintu/jendela kaca dan pintu teakwood 3.
m 1,1000 1,1000 0,0600 1,0000 0,1500 0,2500 0,0250 0,0075m' m' kg ls oh oh oh oh Rp. - Rp. Rp. - Rp. - Rp.- Rp. - Rp.
- Jumlah (1).- Rp.
Rp. -
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
1,1000 m2 Rp. - Rp. -
Jumlah (1). Rp. -
Dibulatkan Rp. -
2 lapis cat pen 0,1000 0,1000 0,2600 0,0200 0,0630 0,0063 0,0030
utup) interio kg kg kg ohr oh
Rp.oh oh - Rp. Rp. - Rp. - Rp. - Jumlah (1).
- Rp.Rp. --Rp.
Rp. -
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
penutup) interior Dibulatkan Rp. -
2 lapis cat pen 0,1000 0,1000 0,2600 0,0200 0,0630 0,0063 0,0030
utup) exteri kg kg kg oh or
ohRp.
oh oh - Rp. Rp. - Rp. - Rp. - Jumlah -(1).
Rp. Rp. - Rp.
- Rp. -
Jumlah Total Overhead & profit (10%) Rp. - Rp. -
Jumlah total + 10% Rp. -
penutup) exterior Dibulatkan Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
m3 Rp. - Rp. -
bh Rp. - Rp. -
kg Rp. - Rp. -
m' Rp. - Rp. -
m' Rp. - Rp. -
ikat Rp. - Rp. -
kg Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
m' Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
m' Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah (1) + (2) Rp. -
Keuntungan 10% Rp. -
Jumlah Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah (1) + (2) Rp. -
Keuntungan 10% Rp. -
Jumlah Rp. -
Dibulatkan Rp. -
HARGA
KOEF. SAT. SATUAN
Rp.
Dibulatkan Rp.
Dibulatkan Rp.
Dibulatkan Rp.
URAIAN PEKERJAAN KOEF. SAT. HARGA SATUAN Rp.
PEKERJAAN LISTRIK Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pekerjaan pemasangan berbagai titik listrik 2. Pekerjaan pemasangan instalasi listrik 3. Pekerjaa
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
Jumlah total + 10% Rp. -
Dibulatkan Rp. -
bh Rp. - Rp. -
Jumlah (1). Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
oh Rp. - Rp. -
Jumlah (2). Rp. -
Jumlah Total Rp. -
Overhead & profit (10%) Rp. -
-----
-----
--
-
-
H HARGA Rp.
pembuangan tanah 4. Pekerjaan urugan kembali, urugan pasir, pemadatan tanah, perbaikan tanah sulit dan urugan sirtu
---
--
-
-
--
-
---
---
--
-
-
--
---
--
-
-
--
---
--
-
- Rp. - Rp. - Rp. - Rp. -
- Rp. - Rp. -
- Rp. -
- Rp. - Rp. -
- Rp. - Rp. -
- Rp. -
--
-----
--
-
-
----
-----
--
-
-
----
-----
--
-
-
--
---
- Rp. - Rp. - Rp. - Rp. -
- Rp. -
H HARGA Rp.
Pekerjaan penyelesaiaan akhir / acian
-- -
-----
--
-
-
-- -
-----
--
-
-
--
-----
--
-
-
- Rp. - Rp. - Rp. - Rp. - Rp. - Rp. - Rp. -
- Rp. -
- Rp. - Rp. -
- Rp. - Rp. -
- Rp. - Rp. - Rp. - Rp. - Rp. - Rp. - Rp. - Rp. - Rp. -
- Rp. -
- Rp. - Rp. - Rp. - Rp. - Rp. - Rp. - Rp. - Rp. -
- Rp. -
--
----
--
--
-
-
--
----
--
--
-
-
--
----
--
--
-
-
H HARGA Rp.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
H HARGA Rp.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH
HARGA
Rp.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA Rp.
k listrik 2. Pekerjaan pemasangan instalasi listrik 3. Pekerjaan pemasangan titik stop kontak dan titik saklar
Rp. Rp. --
H HARGA Rp.
-
-
-- -
-----
--
-
-