SATUAN KERJA : 0
HARGA
NO. URAIAN SAT
(Rp)
I UPAH
1 Mandor OH 90,000.00
9 Pekerja OH 80,000.00
10 Kameraman OH 110,000.00
B. ALAT
Dibuat Oleh :
0
0
0
Direktur
DAFTAR HARGA SATUAN BAHAN
SATUAN KERJA : 0
HARGA
NO. URAIAN SAT
(Rp)
A. BAHAN LOKAL
5 Ijuk M2 50,000.00
I SEMEN
II ATAP
III BESI
IV ALUMINIUM
V CAT
6 Dempul Kg 37,500.00
8 Plamur Kg 7,340.00
9 Waterprofing Kg 45,000.00
10 Membran 3 mm M2 85,700.00
VI KERAMIK
13 Isolatip Bh 3,000.00
17 MCB Bh 55,000.00
23 Socket TV M1 67,500.00
28 Attenuator M1 175,000.00
31 Elektroda Kg 75,000.00
VIII KACA
6 Grendel Bh 12,500.00
7 Expanyolet Bh 45,000.00
8 Tarikan Jendela Bh 12,500.00
XI PELUMAS
11 Wastafel Bh 300,000.00
XIV KERTAS
0
Direktur
ANALISA HARGA SATUAN
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Plamir Kg 0.1000 7,340.00 734.00
2 Cat Dasar Kg 0.1000 22,000.00 2,200.00
3 Cat Penutup (Jotun) Kg 0.2600 22,000.00 5,720.00
B. UPAH
1 Mandor OH 0.0030 90,000.00 270.00
2 Kepala Tukang OH 0.0060 125,000.00 750.00
3 Tukang Cat OH 0.0630 110,000.00 6,930.00
4 Pekerja OH 0.2000 80,000.00 16,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
2 Cat Dasar Kg 0.1500 22,000.00 3,300.00
3 Cat Penutup Kg 0.1800 22,000.00 3,960.00
B. UPAH
1 Mandor OH 0.0030 90,000.00 270.00
2 Kepala Tukang OH 0.0060 125,000.00 750.00
3 Tukang Cat OH 0.0630 110,000.00 6,930.00
4 Pekerja OH 0.2000 80,000.00 16,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
4 Cat Meni Kg 0.2000 21,200.00 4,240.00
2 Plamir Kg 0.1500 7,340.00 1,101.00
3 Cat Dasar Kg 0.1700 52,000.00 8,840.00
1 Cat Penutup 3x lapis Kg 0.2600 52,000.00 13,520.00
B. UPAH
1 Mandor OH 0.0025 90,000.00 225.00
2 Kepala Tukang OH 0.0060 125,000.00 750.00
3 Tukang Cat OH 0.0090 110,000.00 990.00
4 Pekerja OH 0.0700 80,000.00 5,600.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Waterproof Kg 2.9000 45,000.00 130,500.00
2 Membran 3 mm M2 1.1000 85,700.00 94,270.00
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Cat OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 MCB 3 Phase Bh 1.0000 55,000.00 55,000.00
2 Panel Box Bh 1.0000 850,000.00 850,000.00
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0375 125,000.00 4,687.50
3 Tukang Listrik OH 0.3750 110,000.00 41,250.00
4 Pekerja OH 0.2500 80,000.00 20,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kabel NYM 3x1 1/2 Mm M1 3.0000 10,930.00 32,790.00
2 Pipa PVC 5/8" M1 1.3000 7,000.00 9,100.00
3 Klem PVC 1/2" Lot 0.4500 4,900.00 2,205.00
4 T. Dos PVC 1/2" Bh 3.0000 1,500.00 4,500.00
5 Bok PVC 1/2" Bh 3.0000 4,900.00 14,700.00
6 Isolatip Bh 1.0000 3,000.00 3,000.00
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Listrik OH 0.5350 110,000.00 58,850.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Saklar Ganda Bh 1.0000 29,000.00 29,000.00
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Listrik OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Saklar Tunggal Bh 1.0000 25,000.00 25,000.00
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Listrik OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Stop Kontak Bh 1.0000 25,000.00 25,000.00
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Listrik OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Armateure 2x18 W Bh 1.0000 475,000.00 475,000.00
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Listrik OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Lampu SL 8 Watt Bh 1.0000 37,500.00 37,500.00
2 Peteng Lampu Bh 1.0000 - -
B. UPAH
1 Mandor OH - 90,000.00 -
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Listrik OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pipa PVC AW Æ 4 inci M' 1.2000 23,250.00 27,900.00
2 Perlengkapan (35% harga pipa) Ls 1.0000 8,137.50 8,137.50
B. UPAH
1 Mandor OH 0.0041 90,000.00 369.00
2 Kepala Tukang OH 0.0135 125,000.00 1,687.50
3 Tukang Batu OH 0.1350 110,000.00 14,850.00
4 Pekerja OH 0.0810 80,000.00 6,480.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pipa PVC AW Æ 2 inci M' 1.2000 9,125.00 10,950.00
2 Perlengkapan (35% harga pipa) Ls 1.0000 3,193.75 3,193.75
B. UPAH
1 Mandor OH 0.0027 90,000.00 243.00
2 Kepala Tukang OH 0.0090 125,000.00 1,125.00
3 Tukang Batu OH 0.0900 110,000.00 9,900.00
4 Pekerja OH 0.0540 80,000.00 4,320.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pipa PE Æ 1/2 inci M' 1.2000 7,000.00 8,400.00
2 Perlengkapan (35% harga pipa) Ls 1.0000 2,450.00 2,450.00
B. UPAH
1 Mandor OH 0.0018 90,000.00 162.00
2 Kepala Tukang OH 0.0060 125,000.00 750.00
3 Tukang Batu OH 0.0600 110,000.00 6,600.00
4 Pekerja OH 0.0360 80,000.00 2,880.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pipa Galv Æ 3/4 inci M' 1.2000 40,000.00 48,000.00
2 Perlengkapan (35% harga pipa) Ls 1.0000 14,000.00 14,000.00
B. UPAH
1 Mandor OH 0.0270 90,000.00 2,430.00
2 Kepala Tukang OH 0.0090 125,000.00 1,125.00
3 Tukang Batu OH 0.0900 110,000.00 9,900.00
4 Pekerja OH 0.0540 80,000.00 4,320.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Mata Kran Æ 4 inci Bh 1.0000 40,000.00 40,000.00
2 Seal Tape Bh 0.0250 5,000.00 125.00
B. UPAH
1 Mandor OH 0.0050 90,000.00 450.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0100 80,000.00 800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Floor Drain Bh 1.0000 33,000.00 33,000.00
B. UPAH
1 Mandor OH 0.0050 90,000.00 450.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0100 80,000.00 800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kloset Duduk / Monoblok Bh 1.0000 1,750,000.00 1,750,000.00
2 Perlengkapan (6 % Harga) Ls 1.0000 105,000.00 105,000.00
B. UPAH
1 Mandor OH 0.1600 90,000.00 14,400.00
2 Kepala Tukang OH 0.1500 125,000.00 18,750.00
3 Tukang Batu OH 1.5000 110,000.00 165,000.00
4 Pekerja OH 1.0000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kloset Jongkok Bh 1.0000 240,000.00 240,000.00
2 Semen @50 Kg Zak 0.1200 75,000.00 9,000.00
3 Pasir Pasang M3 0.0100 175,000.00 1,750.00
B. UPAH
1 Mandor OH 0.1600 90,000.00 14,400.00
2 Kepala Tukang OH 0.1500 125,000.00 18,750.00
3 Tukang Batu OH 1.5000 110,000.00 165,000.00
4 Pekerja OH 1.0000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Wastafel Bh 1.0000 300,000.00 300,000.00
2 Perlengkapan (12 % Harga) Ls 1.0000 36,000.00 36,000.00
3 Semen @50 Kg Zak 0.1200 75,000.00 9,000.00
4 Pasir Pasang M3 0.0100 175,000.00 1,750.00
B. UPAH
1 Mandor OH 0.1600 90,000.00 14,400.00
2 Kepala Tukang OH 0.1500 125,000.00 18,750.00
3 Tukang Batu OH 1.5000 110,000.00 165,000.00
4 Pekerja OH 1.0000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Galian Tanah M3 8.5000 62,250.00 529,125.00
2 Urugan Pasir M3 0.6500 144,900.00 94,185.00
3 Pas. Batu Bata Sp 1:3 M3 12.3000 118,655.00 1,459,456.50
4 Plesteran Sp 1:3 M2 23.0000 59,414.00 1,366,522.00
5 Cor Beton Tumbuk Sp. 1:3:5 M3 0.4200 740,075.00 310,831.50
6 Batu Gunung M3 0.8000 727,825.00 582,260.00
7 Ijuk M2 5.5000 50,000.00 275,000.00
8 Pipa PVC Dia. 4" M1 6.0000 59,424.00 356,544.00
9 Pipa Galv. Dia. 2" M1 2.1500 29,731.75 63,923.26
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pipa PVC AW Æ 2 inci M' 1.2000 9,125.00 10,950.00
2 Perlengkapan (35% harga pipa) Ls 1.0000 3,193.75 3,193.75
B. UPAH
1 Mandor OH 0.0027 90,000.00 243.00
2 Kepala Tukang OH 0.0090 125,000.00 1,125.00
3 Tukang Batu OH 0.0900 110,000.00 9,900.00
4 Pekerja OH 0.0540 80,000.00 4,320.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Roof Drain M' 1.0000 42,500.00 42,500.00
B. UPAH
1 Mandor OH 0.0027 90,000.00 243.00
2 Kepala Tukang OH 0.0090 125,000.00 1,125.00
3 Tukang Batu OH 0.0900 110,000.00 9,900.00
4 Pekerja OH 0.0540 80,000.00 4,320.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 4.3600 75,000.00 327,000.00
2 Pasir Pasang M3 0.5200 175,000.00 91,000.00
3 Batu Kerikil M3 0.8700 175,000.00 152,250.00
B. UPAH
1 Mandor OH 0.0800 90,000.00 7,200.00
2 Kepala Tukang OH 0.0250 125,000.00 3,125.00
3 Tukang Batu OH 0.2500 110,000.00 27,500.00
4 Pekerja OH 1.6500 80,000.00 132,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Keramik 25 x 25 cm (Anti slip) Bh 16.0000 4,843.75 77,500.00
2 Semen @50 Kg Zak 0.2080 75,000.00 15,600.00
3 Pasir Pasang M3 0.0450 175,000.00 7,875.00
4 Semen Warna (grout) Zak 0.0405 100,000.00 4,050.00
B. UPAH
1 Mandor OH 0.0140 90,000.00 1,260.00
2 Kepala Tukang OH 0.0140 125,000.00 1,750.00
3 Tukang Batu OH 0.1350 110,000.00 14,850.00
4 Pekerja OH 0.2700 80,000.00 21,600.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Keramik 25x40 cm Bh 10.0000 7,500.00 75,000.00
2 Semen @50 Kg Zak 0.2080 75,000.00 15,600.00
3 Pasir Pasang M3 0.0450 175,000.00 7,875.00
4 Semen Warna (grout) Zak 0.0405 100,000.00 4,050.00
B. UPAH
1 Mandor OH 0.0140 90,000.00 1,260.00
2 Kepala Tukang OH 0.0140 125,000.00 1,750.00
3 Tukang Batu OH 0.1350 110,000.00 14,850.00
4 Pekerja OH 0.2700 80,000.00 21,600.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Keramik 40x40 Cm Setara Kw1 BH 6.6300 11,387.63 75,500.00
2 Semen @50 Kg Zak 0.1960 75,000.00 14,700.00
3 Pasir Pasang M3 0.0450 175,000.00 7,875.00
4 Semen Warna (grout) Zak 0.0325 100,000.00 3,250.00
B. UPAH
1 Mandor OH 0.0130 90,000.00 1,170.00
2 Kepala Tukang OH 0.0130 125,000.00 1,625.00
3 Tukang Batu OH 0.1250 110,000.00 13,750.00
4 Pekerja OH 0.2500 80,000.00 20,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Keramik 10x40 Cm Setara Kw1 Bh 2.6500 11,387.63 30,177.22
2 Semen @50 Kg Zak 0.0228 75,000.00 1,710.00
3 Pasir Pasang M3 0.0030 175,000.00 525.00
0.0025
Sub Total A 32,412.22
B. UPAH
1 Mandor OH 0.0045 90,000.00 405.00
2 Kepala Tukang OH 0.0090 125,000.00 1,125.00
3 Tukang Batu OH 0.0900 110,000.00 9,900.00
4 Pekerja OH 0.0900 80,000.00 7,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls II M3 0.0120 2,800,000.00 33,600.00
2 Paku Kg 0.1000 20,500.00 2,050.00
B. UPAH
1 Mandor OH 0.0750 90,000.00 6,750.00
2 Kepala Tukang OH 0.0250 125,000.00 3,125.00
3 Tukang Kayu OH 0.2500 110,000.00 27,500.00
4 Pekerja OH 0.1500 80,000.00 12,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Tripleks 3 mm Lbr 0.3750 47,000.00 17,625.00
2 Paku Tripleks Kg 0.0300 25,000.00 750.00
B. UPAH
1 Mandor OH 0.0050 90,000.00 450.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Kayu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.1000 80,000.00 8,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Profil SP4 M' 1.0500 2,750.00 2,887.50
2 Paku Kg 0.0100 20,500.00 205.00
B. UPAH
1 Mandor OH 0.0030 90,000.00 270.00
2 Kepala Tukang OH 0.0050 125,000.00 625.00
3 Tukang Kayu OH 0.0500 110,000.00 5,500.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Gyfsum Board 9 mm Lbr 0.3640 75,700.00 27,554.80
2 Paku Sekrup Gyfsum Kg 0.1100 30,000.00 3,300.00
B. UPAH
1 Mandor OH 0.0050 90,000.00 450.00
2 Kepala Tukang OH 0.0050 125,000.00 625.00
3 Tukang Kayu OH 0.0500 110,000.00 5,500.00
4 Pekerja OH 0.1000 80,000.00 8,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 profil Gyfsum 14 Cm M' 1.0500 25,000.00 26,250.00
2 Tepung Gypsum Kg 0.1500 18,000.00 2,700.00
B. UPAH
1 Mandor OH 0.0030 90,000.00 270.00
2 Kepala Tukang OH 0.0060 125,000.00 750.00
3 Tukang Kayu OH 0.0600 110,000.00 6,600.00
4 Pekerja OH 0.0600 80,000.00 4,800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Hollow Aluminium M1 3.6000 11,500.00 41,400.00
2 Mur Baut Kg 0.2000 29,000.00 5,800.00
3 Alat Bantu Ls 1.0000 5,000.00 5,000.00
Sub Total A 52,200.00
B. UPAH
1 Mandor OH 0.0750 60,000.00 4,500.00
2 Kepala Tukang OH 0.0250 75,000.00 1,875.00
3 Tukang Kayu OH 0.2500 70,000.00 17,500.00
4 Pekerja OH 0.1500 50,000.00 7,500.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Rangka Hollow M1 3.6000 11,500.00 41,400.00
2 Mur Baut Kg 0.2000 29,000.00 5,800.00
3 Alat Bantu Ls 1.0000 5,000.00 5,000.00
4 Gyfsum Board 9 mm Lbr 0.7280 75,700.00 55,109.60
5 Paku Sekrup Gyfsum Kg 0.2200 30,000.00 6,600.00
B. UPAH
1 Mandor OH 0.0050 90,000.00 450.00
2 Kepala Tukang OH 0.0050 125,000.00 625.00
3 Tukang Kayu OH 0.0500 110,000.00 5,500.00
4 Pekerja OH 0.1000 80,000.00 8,000.00
A. BAHAN
1 Rangka Atap Baja Ringan M2 1.000 176,700.00 176,700.00
2 Atap Genteng Metal Lbr 1.560 37,500.00 58,500.00
3 Paku skrup Genteng Metal + karet Bh 14.000 500.00 7,000.00
B. UPAH
1 Mandor OH 0.022 90,000.00 2,000.00
2 Kepala Tukang OH 0.022 125,000.00 2,777.78
3 Tukang OH 0.222 110,000.00 24,444.44
4 Pekerja OH 0.444 80,000.00 35,555.56
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Talang Karet M 1.1000 10,000.00 11,000.00
2 Paku Bh 6.0000 500.00 3,000.00
B. UPAH
1 Mandor OH 0.0130 90,000.00 1,170.00
2 Kepala Tukang OH 0.0120 125,000.00 1,500.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.2500 80,000.00 20,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Bubungan Genteng Metal bh 1.1000 28,200.00 31,020.00
2 Paku skrup Genteng Metal + karet bh 6.0000 500.00 3,000.00
B. UPAH
1 Mandor OH 0.0130 90,000.00 1,170.00
2 Kepala Tukang OH 0.0120 125,000.00 1,500.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.2500 80,000.00 20,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 GRC M1 1.1000 55,000.00 60,500.00
2 Paku Sekrup Bh 6.0000 500.00 3,000.00
B. UPAH
1 Mandor OH 0.0010 90,000.00 90.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Kayu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0100 80,000.00 800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Rangka Hollow M1 1.1000 11,500.00 12,650.00
2 Paku Sekrup Kg 6.0000 500.00 3,000.00
3 GRC Board 4 mm Lbr 0.3640 75,700.00 27,554.80
4 Paku Sekrup Gyfsum Kg 0.1100 30,000.00 3,300.00
B. UPAH
1 Mandor OH 0.0050 90,000.00 450.00
2 Kepala Tukang OH 0.0050 125,000.00 625.00
3 Tukang Kayu OH 0.0500 110,000.00 5,500.00
4 Pekerja OH 0.1000 80,000.00 8,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls I M3 1.2000 5,000,000.00 6,000,000.00
2 Paku Kg 0.2000 20,000.00 4,000.00
B. UPAH
1 Mandor OH 0.3000 90,000.00 27,000.00
2 Kepala Tukang OH 2.0000 125,000.00 250,000.00
3 Tukang Kayu OH 18.0000 110,000.00 1,980,000.00
4 Pekerja OH 6.0000 80,000.00 480,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls II M3 0.0400 2,800,000.00 112,000.00
2 Paku Kg 0.1000 20,000.00 2,000.00
B. UPAH
1 Mandor OH 0.0500 90,000.00 4,500.00
2 Kepala Tukang OH 0.2500 125,000.00 31,250.00
3 Tukang Kayu OH 2.5000 110,000.00 275,000.00
4 Pekerja OH 1.0000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls II M3 0.0400 2,800,000.00 112,000.00
2 Paku Kg 0.1000 20,000.00 2,000.00
3 Tripleks Aluminium Lbr 0.4098 105,000.00 43,032.79
B. UPAH
1 Mandor OH 0.0500 90,000.00 4,500.00
2 Kepala Tukang OH 0.2500 125,000.00 31,250.00
3 Tukang Kayu OH 2.5000 110,000.00 275,000.00
4 Pekerja OH 1.0000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls II M3 0.0350 2,800,000.00 98,000.00
2 Kaca Bening 4,5 mm M2 0.6000 93,000.00 55,800.00
B. UPAH
1 Mandor OH 0.0400 90,000.00 3,600.00
2 Kepala Tukang OH 0.2000 125,000.00 25,000.00
3 Tukang Kayu OH 2.0000 110,000.00 220,000.00
4 Pekerja OH 0.8000 80,000.00 64,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Engsel Pintu 4 " Bh 1.0000 27,000.00 27,000.00
B. UPAH
1 Mandor OH 0.0008 90,000.00 67.50
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.0150 80,000.00 1,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Engsel Jendela 3" Bh 1.0000 13,000.00 13,000.00
B. UPAH
1 Mandor OH 0.0008 90,000.00 67.50
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.0150 80,000.00 1,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kunci 2 Slaag Bh 1.0000 115,000.00 115,000.00
B. UPAH
1 Mandor OH 0.0003 90,000.00 22.50
2 Kepala Tukang OH 0.0050 125,000.00 625.00
3 Tukang Kayu OH 0.5000 110,000.00 55,000.00
4 Pekerja OH 0.0050 80,000.00 400.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Grendel Bh 1.0000 5,000.00 5,000.00
B. UPAH
1 Mandor OH 0.0008 90,000.00 67.50
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.0150 80,000.00 1,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kait Angin Bh 1.0000 7,000.00 7,000.00
B. UPAH
1 Mandor OH 0.0008 90,000.00 67.50
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.0150 80,000.00 1,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Tarikan Bh 1.0000 7,000.00 7,000.00
B. UPAH
1 Mandor OH 0.0008 90,000.00 67.50
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.0150 80,000.00 1,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Expanyolet Tanam Bh 1.0000 40,500.00 40,500.00
B. UPAH
1 Mandor OH 0.0008 90,000.00 67.50
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Kayu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.0150 80,000.00 1,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Papan Kayu Kls I M3 0.0252 2,800,000.00 70,560.00
2 Paku Kg 0.0600 20,000.00 1,200.00
3 Pengecatan M2 2.52 35,266.00 88,870.32
B. UPAH
1 Mandor OH 0.0500 90,000.00 4,500.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Kayu OH 0.7200 110,000.00 79,200.00
4 Pekerja OH 0.1000 80,000.00 8,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pintu Harmonika M2 1.0000 750,000.00 750,000.00
B. UPAH
1 Mandor OH 0.0320 90,000.00 2,880.00
2 Kepala Tukang OH 0.0650 125,000.00 8,125.00
3 Tukang Batu OH 0.6500 110,000.00 71,500.00
4 Pekerja OH 0.2000 80,000.00 16,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Besi Dia. 19 mm Kg 11.8500 10,400.00 123,240.00
B. UPAH
Sub Total B -
C. Jumlah Harga Satuan ( A + B ) 123,240.00
ANALISA HARGA SATUAN
A. BAHAN
1 Silmar Aluminium 5x10 M' 1.100 85,000.00 93,500.00
2 Baut Fisher 8mm Bh 2.000 400.00 800.00
B. UPAH
1 Mandor OH 0.002 90,000.00 189.00
2 Kepala Tukang OH 0.004 125,000.00 537.50
3 Tukang Aluminium OH 0.043 110,000.00 4,730.00
4 Pekerja OH 0.043 80,000.00 3,440.00
A. BAHAN
Silmar Aluminium 3x10 M' 1.100 80,000.00 88,000.00
Baut Fisher Bh 2.000 400.00 800.00
B. UPAH
1 Mandor OH 0.002 90,000.00 189.00
2 Kepala Tukang OH 0.004 125,000.00 537.50
3 Tukang Aluminium OH 0.043 110,000.00 4,730.00
4 Pekerja OH 0.043 80,000.00 3,440.00
A. BAHAN
Karet Kosen M' 1.100 3,750.00 4,125.00
B. UPAH
1 Mandor OH 0.002 90,000.00 189.00
2 Kepala Tukang OH 0.004 125,000.00 537.50
3 Tukang Aluminium OH 0.043 110,000.00 4,730.00
4 Pekerja OH 0.043 80,000.00 3,440.00
A. BAHAN
1 Handel Stenless Bh 1.000 370,000.00 370,000.00
B. UPAH
1 Mandor OH 0.003 90,000.00 270.00
2 Kepala Tukang OH 0.050 125,000.00 6,250.00
3 Tukang Aluminium OH 0.500 110,000.00 55,000.00
4 Pekerja OH 0.050 80,000.00 4,000.00
A. BAHAN
Handle Pintu Bh 1.000 325,000.00 325,000.00
B. UPAH
1 Mandor OH 0.003 90,000.00 270.00
2 Kepala Tukang OH 0.050 125,000.00 6,250.00
3 Tukang Aluminium OH 0.500 110,000.00 55,000.00
4 Pekerja OH 0.050 80,000.00 4,000.00
A. BAHAN
Engsel Pintu 4 " Bh 1.000 22,500.00 22,500.00
B. UPAH
1 Mandor OH 0.008 90,000.00 720.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
Engsel Pintu 3 " Bh 1.000 17,500.00 17,500.00
B. UPAH
1 Mandor OH 0.008 90,000.00 720.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
Hak Angin Bh 1.000 15,000.00 15,000.00
B. UPAH
1 Mandor OH 0.008 90,000.00 720.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
Grendel Bh 1.000 12,500.00 12,500.00
B. UPAH
1 Mandor OH 0.008 90,000.00 720.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
Kunci Tanam Bh 1.000 135,000.00 135,000.00
B. UPAH
1 Mandor OH 0.008 90,000.00 720.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
B. UPAH
1 Mandor OH 0.001 90,000.00 90.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
B. UPAH
1 Mandor OH 0.001 90,000.00 90.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.015 80,000.00 1,200.00
A. BAHAN
B. UPAH
1 Mandor OH 0.001 90,000.00 90.00
2 Kepala Tukang OH 0.015 125,000.00 1,875.00
3 Tukang Aluminium OH 0.150 110,000.00 16,500.00
4 Pekerja OH 0.001 80,000.00 80.00
A. BAHAN
A. BAHAN
A. BAHAN
A. BAHAN
A. BAHAN
1 Pintu Aluminium Set 1.000 425,000.00 425,000.00
B. UPAH
1 Mandor OH 0.050 90,000.00 4,500.00
2 Kepala Tukang OH 0.100 125,000.00 12,500.00
3 Tukang Aluminium OH 1.000 110,000.00 110,000.00
4 Pekerja OH 1.000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Batu Bata Bh 70.0000 750.00 52,500.00
2 Semen @50 Kg Zak 0.2874 75,000.00 21,555.00
3 Pasir Pasang M3 0.0400 175,000.00 7,000.00
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Batu Bata Bh 70.0000 750.00 52,500.00
2 Semen @50 Kg Zak 0.1936 75,000.00 14,520.00
3 Pasir Pasang M3 0.0450 175,000.00 7,875.00
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 0.1555 75,000.00 11,664.00
2 Pasir Pasang M3 0.0230 175,000.00 4,025.00
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Batu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 0.1037 75,000.00 7,776.00
2 Pasir Pasang M3 0.0260 175,000.00 4,550.00
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0150 125,000.00 1,875.00
3 Tukang Batu OH 0.1500 110,000.00 16,500.00
4 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 0.0650 75,000.00 4,875.00
B. UPAH
1 Mandor OH 0.0100 90,000.00 900.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.2000 80,000.00 16,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 0.0864 75,000.00 6,480.00
2 Pasir Pasang M3 0.0060 175,000.00 1,050.00
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0020 90,000.00 180.00
2 Kepala Tukang OH 0.0020 125,000.00 250.00
3 Tukang Batu OH 0.0200 110,000.00 2,200.00
4 Pekerja OH 0.1360 80,000.00 10,880.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 7.6800 75,000.00 576,000.00
2 Pasir Beton M3 0.5930 175,000.00 103,775.00
3 Split M3 0.7700 175,000.00 134,750.00
4 Air Ltr 215.0000 25.00 5,375.00
B. UPAH
1 Mandor OH 0.0830 90,000.00 7,470.00
2 Kepala Tukang OH 0.0280 125,000.00 3,500.00
3 Tukang Batu OH 0.2750 110,000.00 30,250.00
4 Pekerja OH 1.6500 80,000.00 132,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Besi Beton Kg 1.1000 10,400.00 11,440.00
2 Kawat Beton Kg 0.0150 25,000.00 375.00
B. UPAH
1 Mandor OH 0.0003 90,000.00 27.00
2 Kepala Tukang OH 0.0007 125,000.00 87.50
3 Tukang Besi OH 0.0070 110,000.00 770.00
4 Pekerja OH 0.0070 80,000.00 560.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls III M3 0.0400 2,000,000.00 80,000.00
2 Paku Kg 0.3000 16,500.00 4,950.00
3 Minyak Bekisting Lt 0.1000 25,000.00 2,500.00
B. UPAH
1 Mandor OH 0.0260 90,000.00 2,340.00
2 Kepala Tukang OH 0.0260 125,000.00 3,250.00
3 Tukang Kayu OH 0.2600 110,000.00 28,600.00
4 Pekerja OH 0.5200 80,000.00 41,600.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls III M3 0.0450 2,000,000.00 90,000.00
2 Paku Kg 0.3000 16,500.00 4,950.00
3 Minyak Bekisting Lt 0.1000 25,000.00 2,500.00
B. UPAH
1 Mandor OH 0.0260 90,000.00 2,340.00
2 Kepala Tukang OH 0.0260 125,000.00 3,250.00
3 Tukang Kayu OH 0.2600 110,000.00 28,600.00
4 Pekerja OH 0.5200 80,000.00 41,600.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Terentang Kls III M3 0.0400 2,000,000.00 80,000.00
2 Kayu Balok Kls III M4 0.0150 2,000,000.00 30,000.00
3 Paku Kg 0.4000 16,500.00 6,600.00
4 Minyak Bekisting Lt 0.2000 25,000.00 5,000.00
5 Plywood T = 9 mm Lbr 0.3500 155,000.00 54,250.00
6 Dolken Kayu Dia. 10-15 Cm Pjg 4 M Btg 2.0000 17,500.00 35,000.00
B. UPAH
1 Mandor OH 0.0330 90,000.00 2,970.00
2 Kepala Tukang OH 0.0330 125,000.00 4,125.00
3 Tukang Kayu OH 0.3300 110,000.00 36,300.00
4 Pekerja OH 0.6600 80,000.00 52,800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Terentang Kls III M3 0.0400 2,000,000.00 80,000.00
2 Kayu Balok Kls III M4 0.0180 2,000,000.00 36,000.00
3 Paku Kg 0.4000 16,500.00 6,600.00
4 Minyak Bekisting Lt 0.2000 25,000.00 5,000.00
5 Plywood T = 9 mm Lbr 0.3500 155,000.00 54,250.00
6 Dolken Kayu Dia. 10-15 Cm Pjg 4 M Btg 2.0000 17,500.00 35,000.00
B. UPAH
1 Mandor OH 0.0330 90,000.00 2,970.00
2 Kepala Tukang OH 0.0330 125,000.00 4,125.00
3 Tukang Kayu OH 0.3300 110,000.00 36,300.00
4 Pekerja OH 0.6600 80,000.00 52,800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Terentang Kls III M3 0.0400 2,000,000.00 80,000.00
2 Kayu Balok Kls III M4 0.0150 2,000,000.00 30,000.00
3 Paku Kg 0.4000 16,500.00 6,600.00
4 Minyak Bekisting Lt 0.2000 25,000.00 5,000.00
5 Plywood T = 9 mm Lbr 0.3500 155,000.00 54,250.00
6 Dolken Kayu Dia. 10-15 Cm Pjg 4 M Btg 6.0000 17,500.00 105,000.00
B. UPAH
1 Mandor OH 0.0330 90,000.00 2,970.00
2 Kepala Tukang OH 0.0330 125,000.00 4,125.00
3 Tukang Kayu OH 0.3300 110,000.00 36,300.00
4 Pekerja OH 0.6600 80,000.00 52,800.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Pekerja OH 4.0000 80,000.00 320,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Batu Kali Belah (15/20 cm) M3 1.2000 175,000.00 210,000.00
B. UPAH
1 Mandor OH 0.0390 90,000.00 3,510.00
2 Kepala Tukang OH 0.0390 125,000.00 4,875.00
3 Tukang Batu OH 0.3900 110,000.00 42,900.00
4 Pekerja OH 0.7800 80,000.00 62,400.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 2.7200 75,000.00 204,000.00
2 Pasir Pasang M3 0.5440 175,000.00 95,200.00
3 Batu Kali Belah (15/20 cm) M3 1.2000 175,000.00 210,000.00
B. UPAH
1 Mandor OH 0.0750 90,000.00 6,750.00
2 Kepala Tukang OH 0.0750 125,000.00 9,375.00
3 Tukang Batu OH 0.7500 110,000.00 82,500.00
4 Pekerja OH 1.5000 80,000.00 120,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0250 90,000.00 2,250.00
2 Pekerja OH 0.7500 80,000.00 60,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0450 90,000.00 4,050.00
2 Pekerja OH 0.9000 80,000.00 72,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0190 90,000.00 1,710.00
2 Pekerja OH 0.1920 80,000.00 15,360.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Domato M3 1.2000 85,000.00 102,000.00
B. UPAH
1 Mandor OH 0.0250 90,000.00 2,250.00
2 Pekerja OH 0.2500 80,000.00 20,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Pasir Urug M3 1.2000 100,000.00 120,000.00
B. UPAH
1 Mandor OH 0.0100 90,000.00 900.00
2 Pekerja OH 0.3000 80,000.00 24,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Dolken Kayu / Bambu 10-15 Cm M1 2.0000 4,375.00 8,750.00
B. UPAH
1 Mandor OH 0.0100 90,000.00 900.00
2 Pekerja OH 0.1000 80,000.00 8,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.2000 80,000.00 16,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0010 90,000.00 90.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.1600 80,000.00 12,800.00
ANALISA HARGA SATUAN
Sub Total B 25,140.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0010 90,000.00 90.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.2500 80,000.00 20,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0750 90,000.00 6,750.00
2 Kepala Tukang OH 0.0600 125,000.00 7,500.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.0500 80,000.00 4,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Mandor OH 0.0150 90,000.00 1,350.00
2 Kepala Tukang OH 0.0100 125,000.00 1,250.00
3 Tukang Batu OH 0.1000 110,000.00 11,000.00
4 Pekerja OH 0.4000 80,000.00 32,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kertas A3 Rim 3.0000 65,000.00 195,000.00
2 Tinta Printer Dos 2.0000 37,500.00 75,000.00
3 foto Copy Dokumen Lbr 35.0000 1,500.00 52,500.00
B. UPAH
1 Operator Komputer Hari 12.0000 80,000.00 960,000.00
C ALAT
1 Komputer Hari 12.0000 45,000.00 540,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Pekerja OH 1.1500 80,000.00 92,000.00
2 Mandor OH 15.0000 90,000.00 1,350,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Papan Bouwplank Kayu Kls III M3 0.3200 2,000,000.00 640,000.00
2 Balok Bouwplank Kayu Kls III M3 0.2500 2,000,000.00 500,000.00
3 Paku Kg 0.9000 16,500.00 14,850.00
B. UPAH
1 Mandor OH 0.1000 90,000.00 9,000.00
2 Kepala Tukang OH 125,000.00 -
3 Tukang Batu OH 1.0000 110,000.00 110,000.00
4 Pekerja OH 1.0000 80,000.00 80,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu bulat Kayu Kls III M3 0.6700 2,000,000.00 1,340,000.00
2 Papan alas Kayu Kls III M3 0.5500 2,000,000.00 1,100,000.00
3 Paku Kg 0.5000 16,500.00 8,250.00
B. UPAH
1 Mandor OH 0.1000 90,000.00 9,000.00
2 Kepala Tukang OH 0.0500 125,000.00 6,250.00
3 Tukang Batu OH 0.5000 110,000.00 55,000.00
4 Pekerja OH 2.0000 80,000.00 160,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Tangki Air Hari 40.0000 50,000.00 2,000,000.00
2 pompa Air Jam 30.0000 15,000.00 450,000.00
B. UPAH
4 Pekerja OH 15.1400 80,000.00 1,211,200.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Dump Truk Hari 3.0000 700,000.00 2,100,000.00
B. UPAH
4 Pekerja OH 2.0000 80,000.00 160,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kertas A4 Rim 3.0000 40,000.00 120,000.00
2 Kertas A3 Rim 1.0000 65,000.00 65,000.00
3 Tinta Printer Dos 2.0000 37,500.00 75,000.00
4 Foto Dokumentasi Lbr 35.0000 1,500.00 52,500.00
5 Foto Copy Laporan Lbr 666.0000 250.00 166,500.00
B. UPAH
1 Kameraman OH 1.0000 110,000.00 110,000.00
2 Pimpinan Teknik OB 1.0000 1,250,000.00 1,250,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Huruf Stenlees Bh 1.0000 325,000.00 325,000.00
B. UPAH
1 Upah Pemasangan 15% dr Harga Ls 1.0000 - 48,750.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Logo Bh 1.0000 4,500,000.00 4,500,000.00
B. UPAH
1 Upah Pemasangan 15% dr Harga Ls 1.0000 - 675,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Klas III M3 0.0900 2,000,000.00 180,000.00
2 Seng Gelombang Lbr 1.0000 39,000.00 39,000.00
3 Paku Seng Kg 0.0400 25,000.00 1,000.00
4 Paku Kg 0.4000 16,500.00 6,600.00
B. UPAH
1 Mandor OH 0.0500 90,000.00 4,500.00
Kepala Tukang OH 0.0800 125,000.00 10,000.00
Tukang OH 0.4500 110,000.00 49,500.00
2 Pekerja OH 0.7500 80,000.00 60,000.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 MultiPleks Lbr 0.2500 300,000.00 75,000.00
2 Kayu Klas II M3 0.0568 2,800,000.00 159,040.00
3 Cat Minyak Kg 0.3400 52,000.00 17,680.00
4 Paku Kg 0.4920 16,500.00 8,118.00
B. UPAH
1 Mandor OH 0.1500 90,000.00 13,500.00
2 Pekerja OH 1.0000 80,000.00 80,000.00
SATUAN KERJA : 0
PEKERJAAN : JALAN RABAT BETON KECAMATAN PINOGU
LOKASI : KABUPATEN BONE BOLANGO
TAHUN ANGGARAN : 2016
HARGA SATUAN
NO URAIAN PEKERJAAN SAT
(Rp)
-
Direktur
ENGINEERING ESTIMATE
(EE)
SATUAN KERJA : 0
PEKERJAAN : JALAN RABAT BETON KECAMATAN PINOGU
LOKASI : KABUPATEN BONE BOLANGO
T. A : 2016
SATUAN KERJA :
PEKERJAAN : JALAN RABAT BETON KECAMATAN PINOGU
LOKASI : KABUPATEN BONE BOLANGO
THN. ANGGARAN : 2016
`
Hitungan Volume gedung Kantor KSOP
Total 91.53
Galian Telapak 0.80 0.80 1.20 12.00 9.22
-
Total Galian 9.22
Total 115.73
Urugan Pasir Bwh Lantai & P 5.70 3.80 0.10 2.00 2.17
5.70 4.80 0.10 1.00 2.74
1.55 1.30 0.10 2.00 0.20
6.00 2.75 0.10 1.00 1.65
3.80 2.75 0.10 2.00 1.05
7.80 5.85 0.10 2.00 4.56
4.80 5.85 0.10 1.00 2.81
Total 468.625
List Plank 154.5
Talang 20
Bumbungan 85.85