Buku Besar Majoo
Buku Besar Majoo
Powered By
(1-17777) Packaging/Kemasan
Saldo Awal
2021-03-16 Jurnal Umum JU-00052
2021-03-30 Jurnal Umum JU-00077
2021-04-08 Jurnal Umum JU-00086
2021-05-28 Jurnal Umum JU-00134
(1-19999) Furniture dan Interior
Saldo Awal
2021-03-24 Jurnal Umum JU-00070
2021-03-26 Jurnal Umum JU-00074
2021-04-02 Jurnal Umum JU-00080
2021-04-17 Jurnal Umum JU-00116
(6-60217) Listrik
Saldo Awal
2021-03-13 Jurnal Umum JU-00049
2021-03-15 Jurnal Umum JU-00050
2021-03-17 Jurnal Umum JU-00053
(6-68888) Advertising
Saldo Awal
2021-03-18 Jurnal Umum JU-00059
2021-04-03 Jurnal Umum JU-00082
0.00
bahan baku trial 72,200.00 0.00 72,200.00
0.00
dp pembangunan taman 3,000,149.00 0.00 3,000,149.00
pelunasan taman 3,775,050.00 0.00 6,775,199.00
poles lantai 2,506,500.00 0.00 9,281,699.00
MURAL 1,471,500.00 0.00 10,753,199.00
Pelunasan Mural 1,000,000.00 0.00 11,753,199.00
tambahan biaya taman 3,737,500.00 0.00 15,490,699.00
pot kaktus taman 266,500.00 0.00 15,757,199.00
Saldo Akhir 15,757,199.00 0.00 15,757,199.00
0.00
AC dan kursi 10,000,000.00 0.00 10,000,000.00
mesin espresso 25,006,500.00 0.00 35,006,500.00
pelunasan mesin 58,002,900.00 0.00 93,009,400.00
kulkas showcase 3,300,000.00 0.00 96,309,400.00
selang, kran, etc 284,750.00 0.00 96,594,150.00
Mixer 4,206,500.00 0.00 100,800,650.00
CCTV 2,500,000.00 0.00 103,300,650.00
STAVOLT 4,851,500.00 0.00 108,152,150.00
SPEAKER 2,806,500.00 0.00 110,958,650.00
Thermal Printer 850,000.00 0.00 111,808,650.00
cup sealer 800,000.00 0.00 112,608,650.00
wafle pan 200,000.00 0.00 112,808,650.00
TAB SAMSUNG MAJOO KASIR 1,865,000.00 0.00 114,673,650.00
0.00
pel, tempat sampah,
2,771,039.00 0.00 2,771,039.00
keperluan dapur wajan dll
0.00
dari BRI 32,000,000.00 0.00 32,000,000.00
kas 0.00 32,000,000.00 0.00
dari BRI 43,500,000.00 0.00 43,500,000.00
tarik tunai untuk membayar
4,000,000.00 0.00 47,500,000.00
mas Nug
Bayar Material 0.00 1,657,000.00 45,843,000.00
Kas dibayar Yusuf 0.00 4,000,000.00 41,843,000.00
kas operasional 0.00 4,069,200.00 37,773,800.00
kas operasional 0.00 2,050,000.00 35,723,800.00
kas operasional 0.00 1,069,000.00 34,654,800.00
kas operasional 0.00 1,725,000.00 32,929,800.00
kas operasional 0.00 1,040,000.00 31,889,800.00
kas operasional 0.00 685,000.00 31,204,800.00
kas operasional 0.00 6,447,000.00 24,757,800.00
kas operasional 0.00 4,920,000.00 19,837,800.00
kas operasional 0.00 2,036,000.00 17,801,800.00
Kas Operasional 0.00 605,000.00 17,196,800.00
kas operasional 0.00 550,000.00 16,646,800.00
kas operasional 0.00 316,500.00 16,330,300.00
kas operasional 0.00 1,672,000.00 14,658,300.00
kas operasional 0.00 8,549,000.00 6,109,300.00
kas operasional 0.00 615,000.00 5,494,300.00
kas operasional 1,800,000.00 0.00 7,294,300.00
kas operasional 0.00 7,279,000.00 15,300.00
dari BRI 15,500,000.00 0.00 15,515,300.00
membayar gaji tukang 0.00 8,106,500.00 7,408,800.00
bayar ke mapan jaya 0.00 2,261,500.00 5,147,300.00
beli cat 0.00 1,751,200.00 3,396,100.00
Bayar ke Mitra 0.00 2,475,280.00 920,820.00
bayar kost tukang 0.00 1,000,000.00 (79,180.00)
Modal mba Atika 6 20,000,000.00 0.00 19,920,820.00
0.00
DP packaging 1,650,000.00 0.00 1,650,000.00
Paper Cup 2,225,000.00 0.00 3,875,000.00
cup oki 1,786,000.00 0.00 5,661,000.00
packaging box 165,000.00 0.00 5,826,000.00
Saldo Akhir 5,826,000.00 0.00 5,826,000.00
0.00
sofa informa 7,325,998.00 0.00 7,325,998.00
Lampu Gantung 1,500,000.00 0.00 8,825,998.00
Bench&Stool Informa 2,898,000.00 0.00 11,723,998.00
Hiasan dinding 1,300,000.00 0.00 13,023,998.00
Saldo Akhir 13,023,998.00 0.00 13,023,998.00
0.00
50,000,000.00 0.00 50,000,000.00
tarik ke cash 0.00 32,000,000.00 18,000,000.00
BRI 50,000,000.00 0.00 68,000,000.00
0.00 43,500,000.00 24,500,000.00
0.00
trabsfer mas johan 0.00 10,000,000.00 (10,000,000.00)
Bayar gaji tukang 0.00 6,042,000.00 (16,042,000.00)
tambahan modal masuk 25,000,000.00 0.00 8,958,000.00
transfer untuk dp taman 0.00 3,000,149.00 5,957,851.00
bayar paid promote 0.00 90,000.00 5,867,851.00
bayar catering syukuran 0.00 1,600,000.00 4,267,851.00
bayar nasi box 0.00 201,000.00 4,066,851.00
tambahan modal mba may 23,000,000.00 0.00 27,066,851.00
bayar pelunasan taman 0.00 3,775,050.00 23,291,801.00
bayar kabel 0.00 316,500.00 22,975,301.00
beli token listrik 0.00 203,000.00 22,772,301.00
bayar poles lantai 0.00 2,506,500.00 20,265,801.00
bayar instalasi listrik 0.00 667,000.00 19,598,801.00
beli sofa 0.00 7,325,998.00 12,272,803.00
Bayar DP Mural 0.00 1,471,500.00 10,801,303.00
Beli lampu gantung 0.00 1,500,000.00 9,301,303.00
Transfer mas Nug 0.00 5,000,000.00 4,301,303.00
Beli freon 0.00 450,000.00 3,851,303.00
beli paper cup 0.00 2,225,000.00 1,626,303.00
transfer mapan jaya 0.00 624,000.00 1,002,303.00
beli cup packaging 0.00 1,786,000.00 (783,697.00)
beli snack untuk interview 0.00 500,000.00 (1,283,697.00)
bayar DLH 0.00 1,200,000.00 (2,483,697.00)
PELUNASAN PLAT
SUHARTANTO 0.00 4,000,000.00 (6,483,697.00)
0.00
0.00 50,000,000.00 (50,000,000.00)
modal kedua 0.00 50,000,000.00 (100,000,000.00)
Modal Ketiga Mab Atika 0.00 25,000,000.00 (125,000,000.00)
Modal dari mba Atika 0.00 30,000,000.00 (155,000,000.00)
modal mba atika 5 0.00 25,000,000.00 (180,000,000.00)
modal 6 0.00 20,000,000.00 (200,000,000.00)
mba atika 0.00 25,000,000.00 (225,000,000.00)
modal mb atika 0.00 10,000,000.00 (235,000,000.00)
Saldo Akhir 0.00 235,000,000.00 (235,000,000.00)
0.00
modal 0.00 23,000,000.00 (23,000,000.00)
modal mb may 0.00 50,000,000.00 (73,000,000.00)
modal mb may 0.00 50,000,000.00 (123,000,000.00)
modal dari mba may 0.00 36,420,000.00 (163,420,000.00)
setor modal ke bca untuk 0.00 15,570,000.00 (178,990,000.00)
operasional
Saldo Akhir 0.00 17,459,000.00 (178,990,000.00)
0.00
Langganan Majoo 1,548,000.00 0.00 1,548,000.00
Saldo Akhir 1,548,000.00 0.00 1,548,000.00
0.00
biaya naik daya listrik 9,500,000.00 0.00 9,500,000.00
Kabel Electrical Wijaya 3,006,500.00 0.00 12,506,500.00
electrical wijaya 3,006,500.00 0.00 15,513,000.00
0.00
sewa bangunan 32,000,000.00 0.00 32,000,000.00
Saldo Akhir 32,000,000.00 0.00 32,000,000.00
0.00
Tunggal Murah ket tidak 1,657,000.00 0.00 1,657,000.00
terbaca notanya
nota tidak terbaca 2,500,000.00 0.00 4,157,000.00
Tunggal Murah 1 nota tidak
4,069,200.00 0.00 8,226,200.00
terbaca
pasir dan bata 2,050,000.00 0.00 10,276,200.00
bata nerah, ayakan pasir,
1,069,000.00 0.00 11,345,200.00
beton
bata merah, dynamix 1,725,000.00 0.00 13,070,200.00
0.00
DP Mas Nug 4,000,000.00 0.00 4,000,000.00
DP furniture dan jasa 5,006,500.00 0.00 9,006,500.00
bayar mas nug 5,006,500.00 0.00 14,013,000.00
bayar ke mas nug 5,006,500.00 0.00 19,019,500.00
bayar mas Nug 5,000,000.00 0.00 24,019,500.00
bayar mas nug 5,006,500.00 0.00 29,026,000.00
bayar mas nug 2,000,000.00 0.00 31,026,000.00
bayar mas nug 10,000,000.00 0.00 41,026,000.00
Saldo Akhir 41,026,000.00 0.00 41,026,000.00
0.00
gaji tukang 6,447,000.00 0.00 6,447,000.00
gajian tukang 8,549,000.00 0.00 14,996,000.00
gajian tukang 7,279,000.00 0.00 22,275,000.00
Gaji Tukang 8,106,500.00 0.00 30,381,500.00
gaji tukang 7,000,000.00 0.00 37,381,500.00
gaji tukang 6,042,000.00 0.00 43,423,500.00
gaji tukang 1,750,000.00 0.00 45,173,500.00
Saldo Akhir 45,173,500.00 0.00 45,173,500.00
0.00
DP Design 2,500,000.00 0.00 2,500,000.00
pelunasan design gomez 2,500,000.00 0.00 5,000,000.00
Saldo Akhir 5,000,000.00 0.00 5,000,000.00
0.00
biaya pemasangan 100,000.00 0.00 100,000.00
indihome 947,500.00 0.00 1,047,500.00
Saldo Akhir 1,047,500.00 0.00 1,047,500.00
0.00
Kost Tukang 1,000,000.00 0.00 1,000,000.00
catering syukuran 1,600,000.00 0.00 2,600,000.00
nasi box 452,000.00 0.00 3,052,000.00
uang bensin dan makan 500,000.00 0.00 3,552,000.00
bensin dan uang makan 100,000.00 0.00 3,652,000.00
snack interview 500,000.00 0.00 4,152,000.00
DLH Potong Pohon 1,200,000.00 0.00 5,352,000.00
bensin dan uang makan 150,000.00 0.00 5,502,000.00
uang makan team 201,000.00 0.00 5,703,000.00
akomodasi dan makan 50,000.00 0.00 5,753,000.00
hotel teknisi 201,981.00 0.00 5,954,981.00
konsumsi photoshoot 201,000.00 0.00 6,155,981.00
bensin APV dan motor 1,175,000.00 0.00 7,330,981.00
bensin dan makan global 2,000,000.00 0.00 9,330,981.00
biaya cleaning service 400,000.00 0.00 9,730,981.00
Saldo Akhir 9,730,981.00 0.00 9,730,981.00
0.00
Ongkir mesin 910,000.00 0.00 910,000.00
Saldo Akhir 910,000.00 0.00 910,000.00
0.00
paid promote loker 90,000.00 0.00 90,000.00
PLAT DAWAI SUHAR 3,000,000.00 0.00 3,090,000.00
Pelunasan Plat dawai
3,600,000.00 0.00 6,690,000.00
suhartanto
plat dawai suhartanto 2,000,000.00 0.00 8,690,000.00
PELUNASAN PLAT
4,000,000.00 0.00 12,690,000.00
SUHARTANTO