Lampiran Kesediaan Alat
Lampiran Kesediaan Alat
Lampiran Kesediaan Alat
*belum fix
W
MA = x 100% ...... (3.3)
W +R
Keterangan:
MA = Kesediaan mekanis (%)
W = Waktu kerja (jam)
R = Waktu rawatan (jam)
18,75
MA = x 100%
18,75+ 2,40
MA = 88
W +S
PA = x 100%
T
Keterangan:
S = Waktu siap (jam)
W = Waktu kerja (jam)
T = Waktu total (jam)
18,75 ,+ 2,85
PA = X 100%
24
PA = 90%
Kesediaan pemakaian (UoA)
W
UA = x 100%
W +S
Keterangan:
W = Working kerja (jam)
S = Waktu siap (jam)
W
UA = x 100%
W +S
18,75
UA = X 100%
18,75+ 2,85
= 87 %
W
EU = x 100% .....(3.6)
T
Keterangan:
W = Waktu kerja (jam)
T = Waktu tersedia (jam)
18,75
EU = x 100%
24
EU = 78%
Lampiran Kesediaan Alat Gali Muat Dump Truck Caterpillar 777D
W
MA = x 100%
W +R
Keterangan:
MA = Kesediaan mekanis (%)
W = Waktu kerja (jam)
R = Waktu rawatan (jam)
18 , 20
MA = x 100%
18 ,20+2,40
MA = 88
W +S
PA = x 100%
T
Keterangan:
S = Waktu siap (jam)
W = Waktu kerja (jam)
T = Waktu total (jam)
18,75 ,+ 2,85
PA = X 100%
24
PA = 90%
Kesediaan pemakaian (UoA)
W
UA = x 100%
W +S
Keterangan:
W = Working kerja (jam)
S = Waktu siap (jam)
W
UA = x 100%
W +S
18 , 20
UA = X 100%
18 ,20+3 , 40
= 84 %
W
EU = x 100% .....(3.6)
T
Keterangan:
W = Waktu kerja (jam)
T = Waktu tersedia (jam)
18 ,20
EU = x 100%
24
EU = 76%