I PEKERJAAN PERSIAPAN
1 Pek pengukuran dan pembersihan lahan 1.00 unit 500,000.00 - 0.21% 0.00% 0.0010
II PEKERJAAN TANAH -
1 Pek. Galian Tanah Biasa (max dalam 2 m) 89.42 m3 7,082,064.00 - 2.96% 0.00% 0.0296
2 Pek. Urugan Tanah Kembali 17.88 m3 472,137.60 - 0.20% 0.00%
3 Pek. Urugan Pasir Padat Bawah Lantai 4.99 m3 117,265.00 1,122,750.00 0.05% 0.47%
4 Pek. Urugan Tanah Untuk Peninggian Peil Floor Deck 17.88 m3 472,137.60 - 0.20% 0.00%
5 Pek. Pemadatan Tanah Hasil Galian (per 20 cm) 17.88 m3 836,077.00 - 0.35% 0.00%
V PEKERJAAN BETON
1 Sloof Lantai Pool Deck Dimensi 15x20 cm 1.19 m3 969,028.90 2,740,117.80 0.40% 1.14%
2 Membuat Cor Beton Bertulang Dinding dan Lantai Kolam 20.58 m3 14,775,205.20 71,131,106.76 6.17% 29.69%
3 Rabat Beton Mutu K-100 Bawah Pool Deck 13.90 m3 2,264,449.00 7,566,060.21 0.95% 3.16%
57,628,674.300 181,958,733.432 24.05% 75.95% 3.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%