Anda di halaman 1dari 6

PEMERINTAH KOTA SURAKARTA

DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN


KOTA SURAKARTA
Alamat: Jl. Jend. Sudirman No.02, Kp. Baru,
Kec. Ps. Kliwon, Kota Surakarta, Jawa Tengah 57133

DETAIL ENGINEERING DESIGN


PEKERJAAN :
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)
DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN
KOTA SURAKARTA

TAHUN ANGGARAN 2021


K_50
11940
B 3050

8400 2150
2000
900
600 150
150 300 100 900 700 150 300 300 150

500
1415

150
KOMUNAL KOMUNAL KOMUNAL
A DIM. P=2355 T=1210
3 DIM. P=2355 T=1210
2 DIM. P=2355 T=1210
1 A

OUTPUT
Ø=1165 Ø=1165 Ø=1165

1000
2300
INPUT
- 1.300

OUTPUT

150
1365

KOMUNAL KOMUNAL KOMUNAL

4 2 1

500
DIM. P=2355 T=1210 DIM. P=2355 T=1210 DIM. P=2355 T=1210
Ø=1165 Ø=1165 Ø=1165

- 1.350 SCOPE USER / KSM


1365

KOMUNAL KOMUNAL KOMUNAL


DIM. P=2355 T=1210
Ø=1165 5 DIM. P=2355 T=1210
Ø=1165 3 DIM. P=2355 T=1210
Ø=1165 4

8290
- 1.400
1365

KOMUNAL KOMUNAL KOMUNAL


DIM. P=2355 T=1210
Ø=1165 6 DIM. P=2355 T=1210
Ø=1165 6 DIM. P=2355 T=1210
Ø=1165 5
- 1.450
1365

KOMUNAL KOMUNAL KOMUNAL


DIM. P=2355 T=1210
Ø=1165 7 DIM. P=2355 T=1210
Ø=1165 7 DIM. P=2355 T=1210
Ø=1165 8
- 1.500
OUTPUT
1415

KOMUNAL
DIM. P=2355 T=1210
Ø=1165 8 PEMERINTAH
KOTA SURAKARTA
STATUS GAMBAR
- 1.550
OUTPUT
B DETAIL ENGINEERING DESIGN

LAYOUT KOMUNAL 50 NAMA GAMBAR

SCALE : 1 : 50

Skala Rev No.Gambar Jlh Hal

A3
Dinding pasangan bata
Pipa PVC Ø 6" ( output )
Pipa PVC Ø 2" ( 9 buah )
Manehole ( plat beton )
Pipa PVC Ø 2" ( 9 buah )
Manehole ( plat beton )
Pipa PVC Ø 6" ( input )
+ 0.300 8400 + 0.300 + 0.300
Beton t 10 cm ( M6 1lapis )
K-125
± 0.000 ± 0.000 ± 0.000

OUTPUT

1000
INPUT
INLET Ø 4"

- 0.721
300 300
- 0.820

200
- 0.970
- 1.020
- 1.140
Lantai Kerja - 1.253
- 1.300 Pasir Urug - 1.190
- 1.350 Tanah Asli - 1.350
- 1.400
7900

POTONGAN A-A - 1.950

SCALE : 1 : 40 - 2.150

400
- 2.350
- 2.500
- 2.550

1300 700

+ 0.300
8390
± 0.000

5
5 16
5 16 Ø1
11
6 Ø1
Ø

- 1.350 - 1.300
- 1.450 - 1.400
- 1.550 - 1.550 - 1.500
- 1.600
- 1.650

1255 1365 1365 1365 1365 1255 PEMERINTAH


KOTA SURAKARTA
7970
STATUS GAMBAR
Tanah Asli

POTONGAN B-B Pasir Urug


Lantai Kerja
DETAIL ENGINEERING DESIGN

SCALE : 1 : 30 NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3
2855

± 0.000

Freeeboard Freeeboard Freeeboard

INLET Ø 6" OUTLET Ø 6"

Lantai Kerja 2855


Pasir Urug Ruang lumpur t=22cm Ruang lumpur t=22cm Ruang lumpur t=22cm - 1.300
Tanah Asli - 1.350
± 0.000
- 1.400
2355 Freeeboard Freeeboard Freeeboard

DETAIL BAK PENGENDAPAN ( TANGKI 1 )


SCALE : 1 : 20
INLET Ø 6" OUTLET Ø 6"

2855

LAMELLA LAMELLA LAMELLA


± 0.000
Lantai Kerja
Freeeboard Freeeboard Freeeboard Pasir Urug - 1.300
Tanah Asli - 1.350

INLET Ø 6" OUTLET Ø 6"


- 1.400
2355

DETAIL BAK LAMELLA ( TANGKI 7 & 8 )


SCALE : 1 : 20

BIOBOLL BIOBOLL BIOBOLL

Lantai Kerja
Pasir Urug - 1.300
Tanah Asli - 1.350
- 1.400
2355

DETAIL BAK BIOBALL ( TANGKI 2 s/d 6 )


SCALE : 1 : 20
PEMERINTAH
KOTA SURAKARTA
STATUS GAMBAR

DETAIL ENGINEERING DESIGN

NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3
Dinding pasangan bata
a
Pipa PVC Ø 6" ( output )
2300
Pipa PVC Ø 2" ( 9 buah )
500 150 1000 150 500
Manehole ( plat beton )
INPUT Pipa PVC Ø 2" ( 9 buah )
Manehole ( plat beton )
150
150

Pipa PVC Ø 6" ( input )


+ 0.300 + 0.300
300
900
600

± 0.000 ± 0.000
300
150

1000
INPUT
700

- 0.721 300 300


- 0.820
OUTPUT
3050

200
- 0.970
- 1.020
- 1.140
- 1.253
- 1.190
2000
2150

- 1.350
900

Balok 150x150
- 1.950
100

- 2.150

400
300

- 2.350
150

- 2.500
OUTPUT OUTPUT
- 2.550
a
LAYOUT BAK SEDIMENTASI 1300 700
SCALE : 1 : 40

POTONGAN a - a
SCALE : 1 : 40
PEMERINTAH
KOTA SURAKARTA
STATUS GAMBAR

DETAIL ENGINEERING DESIGN

NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3
TABEL PENULANGAN KOLOM
NAMA KOLOM K ( 150 x 150 )

150
150

UKURAN 150 x 150


TULANGAN VERTIKAL 4 Ø12
TULANGAN TUMPUAN Ø8 - 150
HORISONTAL LAPANGAN Ø8 - 200
TULANGAN PENGIKAT -

PEMERINTAH
KOTA SURAKARTA
STATUS GAMBAR

DETAIL ENGINEERING DESIGN

NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3

Anda mungkin juga menyukai