Anda di halaman 1dari 3

CV.

LAPORAN HARIAN OPERASI UNIT

DATE : 24 Juli s/d 22 Agustus 2021 Periode Customer : 1


S/N UNIT : Excavator PC 300 - 8 New
LOCATE
CUSTOMER
OPERATOR
HOUR METER TOTAL CHARGE
NO DATE REMARK
START AKHIR HM HM
1 24 07.21 5984 5994 10 Kupas 3.33
2 25 07.21 5994 6002 8 Kupas 5.33
3 26 07.21 6002 6008 6 Kupas 7.33
4 27 07.21 6008 6008 0 Stand By No Job 13.33
5 28 07.21 6008 6014 6 Kupas 7.33
6 29 07.21 6014 6024 10 Kupas 4.33
7 30 07.21 6024 6029 5 Kupas,PM 1000 HM 6029
8 31 07.21 6029 6040 11 Kupas 0.33
9 1 08.21 6040 6052 12 Kupas 1.33
10 2 08.21 6052 6066 14 Kupas (0.67)
11 3 08.21 6066 6076 10 Kupas 3.33
12 4 08.21 6076 6087 11 Kupas 2.33
13 5 08.21 6087 6100 13 Kupas 0.33
14 6 08.21 6100 6114 14 Kupas (0.67)
15 7 08.21 6114 6127 13 Kupas 0.33
16 8 08.21 6127 6142 15 Kupas (1.67)
17 9 08.21 6142 6158 16 Kupas (2.67)
18 10 08.21 6158 6164 6 Kupas 7.33
19 11 08.21 6164 6174 10 Kupas 3.33
20 12 08.21 6174 6182 8 Kupas 5.33
21 13 08.21 6182 6182 0 Stand by hujan 6.67
22 14 08.21 6182 6200 18 Kupas (4.67)
23 15 08.21 6200 6211 11 Kupas 2.33
24 16 08.21 6211 6219 8 5.33
25 17 08.21 6219 6220 1 12.33
26 18 08.21 6220 6226 6 Kupas, Adaptor Patah
27 19 08.21 0 13.33
28 20 08.21 0 13.33
29 21 08.21 0 13.33
30 22 08.21 0 13.33
31 23 08.21 0 13.33
32 24 08.21 0 13.33
Total 242.0 Charge HM 161.3
Total Kontrak HM 400

KALKULASI
HM Aktual 242 HM
Charge HM 161 HM
Total HM 403 HM

PINJAMAN BELI SPARE PART DI LAPANGAN

5/21/2021 Rp 5,000,000 Kuku Bucket PC 400 ( Nota Tgl 21 Mei'21 )


5/21/2021 Rp 790,000 Grease Phoenik ( Nota Tgl 21 Mei'21 )
5/21/2021 Rp 1,000,000 Bolt Kuku PC 400 ( Nota Tgl 21 Mei'21 )
5/21/2021 Rp 648,000 Beli Pen bucket 1pc 600rb, Baut 32x20 1pc 48rb
6/10/2021 Rp 1,964,000 Beli Baut 46x20 10pcs 1Jt, Baut 36x20 3pcs 174rb, Grease Phoenix 2pail 790rb
6/25/2021 Rp 5,525,000 Beli Kuku 10pcs 5Jt, Baut 46x20 5pcs 525rb
6/25/2021 Rp 1,500,000 Bayar Helper
Total Rp 16,427,000
6x20 10pcs 1Jt, Baut 36x20 3pcs 174rb, Grease Phoenix 2pail 790rb

Anda mungkin juga menyukai