TAHUN 2019
Semen PC kg 1,340.00
Floor hardener kg 7,500.00
Semen instan Zak 157,700.00 semen; 1 Zak @ 40 Kg
Semen Beton Hebel Zak 188,000.00 semen Untuk bata hebel; 1 Zak @ 40 Kg
Semen putih kg 6,000.00 setara kingkong
Cornis Zak 75,000.00 setara A+; 1 zak @ 20 kg
Cornis kg 3,750.00
4. BATU BATA Batu bata bh 610.00 uk. 8x8x16 cm; batu bata lubang press mesin
1. SENG BJLS Seng gelombang uk. 5' kpg 31,500.00 uk. 0,8 x 1,50 m
Seng gelombang uk. 7' kpg 43,500.00 uk. 0,8 x 2,1 m
Seng gelombang uk. 10' kpg 62,000.00 uk. 0,8 x 3,0 m
Seng polos m 28,000.00 lebar 88 cm
4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr 38,000.00 setara Sakura Merpati roof; 1 m2 @ 1,62 lbr
Genteng metal uk. 2x4 (0.3mm) lbr 46,000.00 setara Sakura Elang roof; 1 m2 @ 1,62 lbr
Genteng metal berpasir 2x5 (0,45mm) lbr 98,000.00 setara Multiroof; 1m2 @ 1,3 lbr
7. ATAP ZINCALUME Atap Zincalume (t.0,35 mm) m' 64,000.00 uk.lebar 105 cm
Atap Zincalume warna (t. 0,35 mm) m' 72,000.00 uk.lebar 105 cm
Atap Alkan (t.0,35 mm) m' 62,000.00 uk. Lebar 105 cm
Nok Zickcalume 0,30 m' 26,000.00 uk. 300x60
I-1
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
Atap Zincalume warna (t.022mm) lbr 52,000.00 uk. 1600 mm x 740 mm, setara soka
Atap Zincalume warna (t.045mm) m' 97,000.00 setara bluecsoope; uk.lebar 105 cm
8. ATAP BITUMEN Atap bitumen motif gelombang lbr 149,500.00 setara onduline; warna merah/ coklat/hitam;
uk. 200x95x0,3 cm
Atap bitumen motif genteng lbr 45,500.00 setara onduvilla; uk. 105x40x0,3 cm
Nok atap bitumen bh 80,000.00 setara onduline; uk. 90 cm x 50 cm
I-2
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
V BAHAN CETAK
1. BUIS BETON Buis beton dia. 100cm m 975,000.00 d0=100 cm; d1=120cm
Buis beton dia. 80cm m 875,000.00 d0=80 cm; d1=100cm
Buis beton dia. 60cm m 625,000.00 d0=60 cm; d1=75cm
Buis beton dia.40cm m 450,000.00 d0=40 cm; d1=48cm
Buis beton dia. 30cm m 345,000.00 d0=30 cm; d1=38cm
Buis beton dia. 20cm m 250,000.00 d0=20 cm; d1=25cm
I-3
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
8. JENDELA UPVC Jendela kaca dan kusen UPVC (uk. 1 m x bh 1,500,000.00 dua daun jendela
1,2 m)
Jendela kaca dan kusen UPVC (uk. 0.6 m bh 995,000.00 satu daun jendela
x 1,5 m)
3. ALUMINIUM Profil daun pintu kaca m 55,000.00 setara CA; warna silver; panjang 6 m
Profil kusen 3" m 33,500.00 setara CA; warna silver; panjang 6 m
Profil kusen 4" m 47,000.00 setara CA; warna silver; panjang 6 m
Aluminium strip m 33,000.00 setara CA; warna silver; panjang 6 m
4. BAJA RINGAN Profil C channel 100.75 btg 128,000.00 Tegangan leleh minimum 550 MPa;p. 6 m
Profil C channel 80.75 btg 92,000.00 Tegangan leleh minimum 550 MPa;p. 6 m
Profil C channel 75.75 btg 82,000.00 Tegangan leleh minimum 550 Mpa;p. 6 m
Profil C channel 75.65 btg 73,000.00 Tegangan leleh minimum 550 Mpa;p. 6 m
Reng R.40.45 btg 40,000.00 Tegangan leleh minimum 550 Mpa;p. 6 m
Screw truss 12x 3/4 bh 165.00
Dynabolt bh 1,500.00 p. 10 mm
Talang Jurai dalam m 39,000.00 panjang 6 m
5. PINTU BESI Folding Gate t.0,4 mm m2 430,000.00 min. 7 m2; finish cat standar
Folding Gate t.0,6mm m2 505,000.00 min. 7 m2; finish cat standar
Folding Gate t.0,8mm (jumbo) m2 655,000.00 min. 7 m2; finish cat standar
Rolling door aluminum t.0,8 mm m2 600,000.00 min. 6 m2; panjang + 50 cm
Rolling door besi t.± 0,5 mm m2 550,000.00 min. 6 m2; panjang + 50 cm; finish cat
standar
Rolling door galvanum t.± 0,5 mm m2 400,000.00 min. 6 m2; panjang + 50 cm
6. PEGANGAN TANGGA Pegangan tangga stainless kombinasi m' 317,000.00 setara star
STAINLESS acylic (3/4", 1" & 2")
Pegangan tangga stainless (3/4" & 2") m' 673,000.00 setara star
I-4
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
7. LAIN-LAIN Kawat jaring galvanis lbr 194,400.00 uk. 2,4 m x 3 m
Kawat duri roll 135,000.00 1 rol @ 60m
Pintu KM/WC Aluminium warna - frame bh 2,450,000.00 Aluminium 0,75mm ; coating powder 60
louver (incl. kusen, lever handle stainless micron; uk. 80cm x 200cm; setara solidoor-
steel, engsel aluminium) starmas
Pintu Aluminium warna - 5 mm ice glass bh 3,750,000.00 Akuminium 0,75mm ; coating powder 60
(incl. kusen, lever handle stainless steel, micron; uk. 90cm x 215cm; setara solidoor-
engsel aluminium) starmas
bh 3,600,000.00 Aluminium 0,75mm ; coating powder 60
Pintu KM/WC Aluminium warna urat kayu micron; uk. 80cm x 200cm; setara solidoor-
- frame louver (incl. kusen, lever handle starmas
stainless steel, engsel aluminium)
Pintu Aluminium warna urat kayu - 5 mm bh 4,300,000.00 Akuminium 0,75mm ; coating powder 60
ice glass (incl. kusen, lever handle micron; uk. 90cm x 215cm; setara solidoor-
stainless steel, engsel aluminium) starmas
1. PIPA PVC Pipa PVC AW 1/2" btg 23,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3/4" btg 30,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3" btg 178,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 4" btg 294,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 3" btg 96,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 4" btg 151,000.00 setara Wavin; 1 batang @ 4 m
2. SOFT BOARD Gypsum 9 mm uk. 1,2 x 2,4 m kpg 75,000.00 setara Jayaboard
4. PLAFOND PVC Plafond PVC putih + pasang m2 175,000.00 setara Shunda plafond
Plafond PVC warna + pasang m2 250,000.00 setara Shunda plafond
Ornamen PVC unit 5,000,000.00 setara Shunda plafond; uk. 1,2m x 1,6m
I-5
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
3. TEMBOK Cat tembok eksterior liter 95,950.00 setara Dulux Weather Shield; 1 galon @ 2,5 l
X. BAHAN KACA
I-6
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
2. ENGSEL/GRENDEL Engsel 3" stainless steel ktk 60,000.00 setara Unikey; 1 ktk @ 2 pcs
Engsel 3" biasa ktk 48,000.00 1 ktk @ 2 pcs (untuk jendela)
Engsel 4" stainless steel ktk 81,000.00 setara Unikey; 1 ktk @ 2 pcs (untuk pintu)
Engsel 4" biasa ktk 60,000.00 1 ktk @ 2 pcs (untuk pintu)
Engsel tanam set 1,137,500.00 setara Dekson
Grendel 2" stainless steel bh 23,000.00
Grendel 3" stainless steel bh 30,000.00
Grendel 8 " bh 100,000.00 Paloma
Grendel 12 " bh 200,000.00
Grendel tanam bh 70,000.00 Paloma
7. PENAMPUNG AIR Penampung air fiber kap. 250L unit 510,000.00 setara tedmont
Penampung air fiber kap. 550 L unit 926,000.00 setara tedmont
I-7
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
Penampung air fiber kap. 1100 L unit 1,564,000.00 setara tedmont
Penampung air fiber kap. 2000 L unit 2,733,000.00 setara tedmont
Penampung air fiber kap. 3000 L unit 4,183,000.00 setara tedmont
Penampung air stainless kap. 550 L unit 2,370,000.00 setara tedmont
Penampung air stainless kap. 1100 L unit 4,994,000.00 setara tedmont
Penampung air stainless kap. 2000 L unit 8,490,000.00 setara tedmont
2. LEM Lem kayu kg 19,375.00 setara lem fox; 1 bungkus @ 800 gram
Lem aica aibon kg 51,580.00
Sealent tube 28,000.00
XV. LAIN-LAIN
1 Pekerja OH 95,000.00
2 Tukang OH 125,000.00
3 Kepala Tukang OH 140,000.00
4 Mandor OH 165,000.00
I-8
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2019
II - 9
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
10 . Pemasangan 1 m2 terali besi strip (2x3) mm m2 584,143.37
11 . Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm m 123,090.25
12 . Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi m2 97,557.38
13 . Pemasangan 1 m2 rangka besi hollow 1x40.20.2mm, modul 60x60cm, plafon m2 120,600.50
14 Pemasangan 1 bh pintu KM/WC Aluminium warna lengkap (kusen, kunci engsel setara bh 2,917,367.15
. dekson) - frame louver
15 . Pemasangan 1 bh pintu Aluminium warna lengkap (kusen, kunci engsel setara dekson) - ice bh 4,412,367.15
glass
16 . Pemasangan 1 bh pintu KM/WC Aluminium warna urat kayu lengkap (kusen, kunci engsel bh 4,239,867.15
setara dekson) - frame louver
17 . Pemasangan 1 bh pintu Aluminium warna urat kayu lengkap (kusen, kunci engsel setara bh 5,044,867.15
dekson) - ice glass
4 . Pemasangan 1 m2 dinding bata lubang (8x8x16) cm tebal 1/2 batu campuran 1 SP:4PP m2 110,932.25
II - 10
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
6 . Pemasangan 1 m' nok genteng keramik m 227,460.80
7 . Pemasangan 1 m' nok genteng metal m 84,772.25
8 . Pemasangan 1 m2 atap seng gelombang m2 57,326.93
9 . Pemasangan 1 m' nok atap seng m 39,203.50
10 . Pemasangan 1 m2 atap aluminium/alkan m2 116,696.25
11 . Pemasangan 1 m' nok aluminium m 88,055.50
12 . Pemasangan 1 m2 aluminium foil m2 82,046.75
13 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap m2 146,125.67
>=15° jarak gording 60 cm
14 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap m2 150,544.14
antara 10°-15° jarak gording 45 cm
15 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap m2 150,544.14
antara 5°-10°memakai decking plywood 12 mm
16 . Pemasangan 1 m2 atap bitumen motif genteng (uk. 106x40x0,3 cm) jarak gording 32 cm m2 225,363.09
II - 11
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
II - 12
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
II - 13
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 24,225.00
B BAHAN
Dolken Kayu Ø 8-10/400
cm Batang 1.250 9,000.00 11,250.00
Semen Portland Kg 2.500 1,340.00 3,350.00
Seng gelombang 7' Lbr 1.200 43,500.00 52,200.00
Pasir beton m2 0.005 125,000.00 625.00
Koral Beton m3 0.009 435,000.00 3,915.00
Paku biasa 2"-5" Kg 0.060 18,000.00 1,080.00
Meni besi Liter 0.450 32,900.00 14,805.00
JUMLAH TENAGA BAHAN 87,225.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 24,225.00
B BAHAN
Kayu Balok 5/7 m3 0.012 1,600,000.00 19,200.00
Paku 2"-3" Kg 0.020 18,000.00 360.00
Kayu papan 3/20 m3 0.007 1,400,000.00 9,800.00
JUMLAH TENAGA BAHAN 29,360.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang Kayu L.02 OH 2.000 125,000.00 250,000.00
Tukang batu L.02 OH 1.000 125,000.00 125,000.00
Kepala Tukang L.03 OH 0.200 140,000.00 28,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 506,250.00
B BAHAN
Dolken Kayu Ø 8-10/400
cm Batang 1.250 9,000.00 11,250.00
Kayu m3 0.180 1,600,000.00 288,000.00
Paku biasa Kg 0.080 18,000.00 1,440.00
Besi strip Kg 1.100 9,750.00 10,725.00
Semen portland Kg 35.000 1,340.00 46,900.00
Pasir pasang m3 0.150 125,000.00 18,750.00
Pasir beton m3 0.100 125,000.00 12,500.00
Koral beton m3 0.150 435,000.00 65,250.00
Bata merah Bh 30.000 610.00 18,300.00
Seng plat Lbr 0.250 28,000.00 7,000.00
Jendela naco Bh 0.200 208,000.00 41,600.00
Kaca polos m2 0.080 115,000.00 9,200.00
Kunci tanam Bh 0.150 65,000.00 9,750.00
Plywood 4 mm Lbr 0.060 70,000.00 4,200.00
Seng gelombang Lbr 1.500 31,500.00 47,250.00
JUMLAH TENAGA BAHAN 592,115.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang Kayu L.02 OH 2.000 125,000.00 250,000.00
Kepala Tukang L.03 OH 0.200 140,000.00 28,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 381,250.00
B BAHAN
Dolken Kayu Ø 8-10/400
cm Batang 1.700 9,000.00 15,300.00
Kayu m3 0.180 1,600,000.00 288,000.00
Paku biasa Kg 0.300 18,000.00 5,400.00
Semen portland Kg 10.500 1,340.00 14,070.00
Pasir beton m3 0.030 125,000.00 3,750.00
Koral beton m3 0.050 435,000.00 21,750.00
Seng gelombang Lbr 1.500 31,500.00 47,250.00
Seng plat Lbr 0.250 28,000.00 7,000.00
JUMLAH TENAGA BAHAN 402,520.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang Kayu L.02 OH 2.000 125,000.00 250,000.00
Kepala Tukang L.03 OH 0.200 140,000.00 28,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 381,250.00
B BAHAN
Dolken Kayu Ø 8-10/400
cm Batang 1.250 9,000.00 11,250.00
Kayu m3 0.186 1,600,000.00 297,600.00
Paku biasa Kg 0.300 18,000.00 5,400.00
Semen portland Kg 18.000 1,340.00 24,120.00
Pasir beton m3 0.030 125,000.00 3,750.00
Koral beton m3 0.050 435,000.00 21,750.00
Seng gelombang Lbr 1.500 31,500.00 47,250.00
Plywood 4mm Lbr 1.350 70,000.00 94,500.00
JUMLAH TENAGA BAHAN 505,620.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 17,750.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Kayu L.02 OH 0.017 125,000.00 2,125.00
Kepala Tukang L.03 OH 0.002 140,000.00 280.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 28,300.00
B BAHAN
Bambu dia.6-8 / 600 cm Batang 1.250 38,000.00 47,500.00
Tali Ijuk kg 0.186 38,000.00 7,068.00
-
JUMLAH TENAGA BAHAN 54,568.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.030 140,000.00 4,200.00
JUMLAH TENAGA KERJA 41,700.00
B BAHAN
Kayu papan kelas III m3 0.036 1,400,000.00 50,400.00
Kayu 5/7 klas III m3 0.014 1,600,000.00 22,400.00
Paku kg 0.080 18,000.00 1,440.00
-
JUMLAH TENAGA BAHAN 74,240.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 95,000.00 1,266,730.00
Mandor L.04 OH 0.666 165,000.00 109,890.00
JUMLAH TENAGA KERJA 1,376,620.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 95,000.00 633,365.00
Mandor L.04 OH 0.333 165,000.00 54,945.00
JUMLAH TENAGA KERJA 688,310.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.042 95,000.00 3,990.00
Tukang Kayu L.02 OH 0.004 125,000.00 500.00
Kepala Tukang L.03 OH 0.002 140,000.00 280.00
Mandor L.04 OH 0.042 165,000.00 6,930.00
JUMLAH TENAGA KERJA 11,700.00
B BAHAN
Kawat jaring Lbr 0.1434 194,400.00 27,876.96
JUMLAH TENAGA BAHAN 27,876.96
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Kayu L.02 OH 0.017 125,000.00 2,125.00
Kepala Tukang L.03 OH 0.002 140,000.00 280.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 28,300.00
B BAHAN
Sewa scafolding unit 1.000 45,000.00 45,000.00
-
JUMLAH TENAGA BAHAN 45,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 95,000.00 71,250.00
Mandor L.04 OH 0.025 165,000.00 4,125.00
JUMLAH TENAGA KERJA 75,375.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 95,000.00 85,500.00
Mandor L.04 OH 0.045 165,000.00 7,425.00
JUMLAH TENAGA KERJA 92,925.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 95,000.00 142,500.00
Tukang Batu L.02 OH 0.750 125,000.00 93,750.00
Kepala Tukang L.03 OH 0.075 140,000.00 10,500.00
Mandor L.04 OH 0.075 165,000.00 12,375.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali m3 1.200 385,000.00 462,000.00
Sement Portland kg 202.000 1,340.00 270,680.00
Pasir Pasang m3 0.485 125,000.00 60,625.00
JUMLAH TENAGA BAHAN 793,305.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 95,000.00 142,500.00
Tukang Batu L.02 OH 0.750 125,000.00 93,750.00
Kepala Tukang L.03 OH 0.075 140,000.00 10,500.00
Mandor L.04 OH 0.075 165,000.00 12,375.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali m3 1.200 385,000.00 462,000.00
Sement Portland kg 163.000 1,340.00 218,420.00
Pasir Pasang m3 0.520 125,000.00 65,000.00
JUMLAH TENAGA BAHAN 745,420.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.025 95,000.00 192,375.00
Tukang Batu L.02 OH 0.675 125,000.00 84,375.00
Kepala Tukang L.03 OH 0.068 140,000.00 9,450.00
Mandor L.04 OH 0.101 165,000.00 16,706.25
JUMLAH TENAGA KERJA 302,906.25
B BAHAN
Batu bata bh 726.000 610.00 442,860.00
Sement Portland kg 170.022 1,340.00 227,829.48
Pasir Pasang m3 0.470 125,000.00 58,695.00
JUMLAH TENAGA BAHAN 729,384.48
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.025 95,000.00 192,375.00
Tukang Batu L.02 OH 0.675 125,000.00 84,375.00
Kepala Tukang L.03 OH 0.068 140,000.00 9,450.00
Mandor L.04 OH 0.101 165,000.00 16,706.25
JUMLAH TENAGA KERJA 302,906.25
B BAHAN
Batu bata bh 726.000 610.00 442,860.00
Sement Portland kg 136.998 1,340.00 183,577.32
Pasir Pasang m3 0.480 125,000.00 59,985.00
JUMLAH TENAGA BAHAN 686,422.32
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1. Membuat 1 m3 beton mutu F'c=9,8 Mpa (K125), slump (12±2) cm, w/c=0,78
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 165,000.00 13,695.00
JUMLAH TENAGA KERJA 208,740.00
B BAHAN
Semen Portland kg 276.000 1,340.00 369,840.00
Pasir Beton kg 828.000 89.29 73,928.57
Kerikil (Maks. 30mm) kg 1012.000 351.85 356,074.07
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 814,161.65
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. Membuat 1 m3 lantai kerja beton mutu F'c=7,4 Mpa (K100) slump (3-6)cm, w/c=0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 95,000.00 114,000.00
Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.060 165,000.00 9,900.00
JUMLAH TENAGA KERJA 151,700.00
B BAHAN
Semen Portland kg 230.000 1,340.00 308,200.00
Pasir Beton kg 893.000 89.29 79,732.14
Kerikil (Maks. 30mm) kg 1027.000 351.85 361,351.85
Air Liter 200.000 66.60 13,320.00
JUMLAH TENAGA BAHAN 762,603.99
C. PERALATAN
-
JUMLAH TENAGA ALAT -
3. Membuat 1 m3 beton mutu F'c=14,5 Mpa (K175), slump (12±2) cm, w/c=0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 165,000.00 13,695.00
JUMLAH TENAGA KERJA 208,740.00
B BAHAN
Semen Portland kg 326.000 1,340.00 436,840.00
Pasir Beton kg 760.000 89.29 67,857.14
Kerikil (Maks. 30mm) kg 1029.000 351.85 362,055.56
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 881,071.70
C. PERALATAN
-
JUMLAH TENAGA ALAT -
5. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (12±2) cm, w/c=0,56
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 165,000.00 13,695.00
JUMLAH TENAGA KERJA 208,740.00
B BAHAN
Semen Portland kg 384.000 1,340.00 514,560.00
Pasir Beton kg 692.000 89.29 61,785.71
Kerikil (Maks. 30mm) kg 1039.000 351.85 365,574.07
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 956,238.79
C. PERALATAN
-
JUMLAH TENAGA ALAT -
6. Membuat 1 m3 beton mutu F'c=26,4 Mpa (K300), slump (12±2) cm, w/c=0,52
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 165,000.00 13,695.00
JUMLAH TENAGA KERJA 208,740.00
B BAHAN
Semen Portland kg 413.000 1,340.00 553,420.00
Pasir Beton kg 681.000 89.29 60,803.57
Kerikil (Maks. 30mm) kg 1021.000 351.85 359,240.74
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 987,783.31
C. PERALATAN
-
JUMLAH TENAGA ALAT -
25. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (12±2) cm, w/c=0,56 menggunakan molen
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.323 95,000.00 125,685.00
Tukang Batu L.02 OH 0.189 125,000.00 23,625.00
Kepala Tukang L.03 OH 0.019 140,000.00 2,660.00
Mandor L.04 OH 0.1320 165,000.00 21,780.00
JUMLAH TENAGA KERJA 173,750.00
B BAHAN
Semen Portland kg 384.00 1,340.00 514,560.00
Pasir beton kg 692.00 89.29 61,785.71
Kerikil (maks. 30mm) kg 1,039.00 351.85 365,574.07
Air Liter 215.00 66.60 14,319.00
JUMLAH TENAGA BAHAN 956,238.79
C. PERALATAN
Molen sewa/hari 0.25 600,000.00 150,000.00
JUMLAH TENAGA ALAT 150,000.00
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 95,000.00 5,700.00
Tukang Las Konstruksi L.03 OH 0.060 125,000.00 7,500.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 14,535.00
B BAHAN
Besi Profil kg 1.150 12,000.00 13,800.00
JUMLAH TENAGA BAHAN 13,800.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 95,000.00 5,700.00
Tukang Las Konstruksi L.03 OH 0.060 125,000.00 7,500.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 14,535.00
B BAHAN
Besi Baja IWF kg 1.150 14,000.00 16,100.00
JUMLAH TENAGA BAHAN 16,100.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.2.1 - 2
7. Pemasangan 1 m kusen pintu aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 95,000.00 4,085.00
Tukang khusus aluminium L.02 OH 0.0430 125,000.00 5,375.00
Kepala Tukang L.03 OH 0.0043 140,000.00 602.00
Mandor L.04 OH 0.0021 165,000.00 346.50
JUMLAH TENAGA KERJA 10,408.50
B BAHAN
Profil alluminium m 1.100 33,500.00 36,850.00
Skrup fixer buah 2.000 165.00 330.00
Sealeant Tube 0.060 28,000.00 1,680.00
JUMLAH TENAGA BAHAN 38,860.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
12. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Besi L.02 OH 0.250 125,000.00 31,250.00
Kepala Tukang L.03 OH 0.025 140,000.00 3,500.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 60,645.00
B BAHAN
Rangka metal hollow 40.40.2 mm m' 3.500 5,375.00 18,812.50
Assesoris (perkuatan, las dll) Ls 100%xrangka 5,375.00
JUMLAH TENAGA BAHAN 24,187.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
14. Pemasangan 1 bh pintu KM/WC Aluminium warna lengkap (kusen, kunci engsel setara dekson) - frame
louver
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang L.03 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 74,745.00
B BAHAN
Pintu Aluminium - frame louver unit 1.000 2,450,000.00 2,450,000.00
Sealent tube 0.432 28,000.00 12,096.00
JUMLAH TENAGA BAHAN 2,462,096.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
15. Pemasangan 1 bh pintu Aluminium warna lengkap (kusen, kunci engsel setara dekson) - ice glass
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang L.03 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 74,745.00
B BAHAN
Pintu Aluminium - ice glass unit 1.000 3,750,000.00 3,750,000.00
Sealent tube 0.432 28,000.00 12,096.00
JUMLAH TENAGA BAHAN 3,762,096.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
17. Pemasangan 1 bh pintu Aluminium warna urat kayu lengkap (kusen, kunci engsel setara dekson) - ice
glass
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang L.03 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 74,745.00
B BAHAN
Pintu Aluminium - ice glass unit 1.000 4,300,000.00 4,300,000.00
Sealent tube 0.432 28,000.00 12,096.00
JUMLAH TENAGA BAHAN 4,312,096.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 95,000.00 57,000.00
Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.030 165,000.00 4,950.00
JUMLAH TENAGA KERJA 89,750.00
B BAHAN
Bata merah bh 121.000 610.00 73,810.00
Semen Portland kg 21.747 1,340.00 29,140.98
Pasir pasang m3 0.060 125,000.00 7,507.50
JUMLAH TENAGA BAHAN 110,458.48
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 95,000.00 57,000.00
Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.030 165,000.00 4,950.00
JUMLAH TENAGA KERJA 89,750.00
B BAHAN
Bata merah bh 121.000 610.00 73,810.00
Semen Portland kg 17.523 1,340.00 23,480.82
Pasir pasang m3 0.061 125,000.00 7,672.50
JUMLAH TENAGA BAHAN 104,963.32
C. PERALATAN
-
JUMLAH TENAGA ALAT -
3. Pemasangan 1 m2 dinding bata lobang (8x8x16) cm tebal 1/2 batu campuran 1 SP:3PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 44,875.00
B BAHAN
Bata merah bh 66.000 610.00 40,260.00
Semen Portland kg 7.832 1,340.00 10,494.41
Pasir pasang m3 0.022 125,000.00 2,725.00
JUMLAH TENAGA BAHAN 53,479.41
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 44,875.00
B BAHAN
Bata merah bh 66.000 610.00 40,260.00
Semen Portland kg 6.268 1,340.00 8,398.45
Pasir pasang m3 0.023 125,000.00 2,929.38
JUMLAH TENAGA BAHAN 51,587.83
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen Portland kg 7.776 1,340.00 10,419.84
Pasir pasang m3 0.023 125,000.00 2,875.00
JUMLAH TENAGA BAHAN 13,294.84
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.260 95,000.00 24,700.00
Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 54,645.00
B BAHAN
Semen Portland kg 10.368 1,340.00 13,893.12
Pasir pasang m3 0.031 125,000.00 3,875.00
JUMLAH TENAGA BAHAN 17,768.12
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen Portland kg 6.240 1,340.00 8,361.60
Pasir pasang m3 0.024 125,000.00 3,000.00
JUMLAH TENAGA BAHAN 11,361.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.260 95,000.00 24,700.00
Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 54,645.00
B BAHAN
Semen Portland kg 8.320 1,340.00 11,148.80
Pasir pasang m3 0.032 125,000.00 4,000.00
JUMLAH TENAGA BAHAN 15,148.80
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Batu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.008 140,000.00 1,120.00
Mandor L.04 OH 0.008 165,000.00 1,320.00
JUMLAH TENAGA KERJA 26,065.00
B BAHAN
Semen Portland kg 5.184 1,340.00 6,946.56
Pasir pasang m3 0.026 125,000.00 3,250.00
JUMLAH TENAGA BAHAN 10,196.56
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 95,000.00 7,600.00
Tukang Batu L.02 OH 0.400 125,000.00 50,000.00
Kepala Tukang L.03 OH 0.040 140,000.00 5,600.00
Mandor L.04 OH 0.004 165,000.00 660.00
JUMLAH TENAGA KERJA 63,860.00
B BAHAN
Semen Portland kg 0.500 1,340.00 670.00
Pasir pasang m3 0.013 125,000.00 1,625.00
JUMLAH TENAGA BAHAN 2,295.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 44,875.00
B BAHAN
Semen Portland kg 4.320 1,340.00 5,788.80
Pasir pasang m3 0.006 125,000.00 750.00
JUMLAH TENAGA BAHAN 6,538.80
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen Portland kg 6.340 1,340.00 8,495.60
Pasir pasang m3 0.012 125,000.00 1,500.00
JUMLAH TENAGA BAHAN 9,995.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
9. Pemasangan 1 m2 acian
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.010 165,000.00 1,650.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
Semen Portland kg 3.250 1,340.00 4,355.00
JUMLAH TENAGA BAHAN 4,355.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 43,340.00
B BAHAN
Granite tile bh 3.050 77,400.00 236,070.00
Semen Portland kg 8.190 1,340.00 10,974.60
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.620 16,500.00 26,730.00
JUMLAH TENAGA BAHAN 279,399.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 43,340.00
B BAHAN
Granite tile bh 1.716 331,680.00 569,162.88
Semen Portland kg 8.190 1,340.00 10,974.60
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.620 16,500.00 26,730.00
JUMLAH TENAGA BAHAN 612,492.48
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 43,340.00
B BAHAN
Keramik 30x30 (putih) bh 11.870 4,545.45 53,954.55
Semen Portland kg 10.000 1,340.00 13,400.00
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.500 16,500.00 24,750.00
JUMLAH TENAGA BAHAN 97,729.55
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 43,340.00
B BAHAN
Keramik 40x40 (putih) bh 6.630 10,883.33 72,156.50
Semen Portland kg 10.000 1,340.00 13,400.00
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.500 16,500.00 24,750.00
JUMLAH TENAGA BAHAN 115,931.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.270 95,000.00 25,650.00
Tukang Batu L.02 OH 0.135 125,000.00 16,875.00
Kepala Tukang L.03 OH 0.014 140,000.00 1,960.00
Mandor L.04 OH 0.014 165,000.00 2,310.00
JUMLAH TENAGA KERJA 46,795.00
B BAHAN
Keramik 20x20 (KM/WC) bh 26.500 3,200.00 84,800.00
Semen Portland kg 10.400 1,340.00 13,936.00
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.620 16,500.00 26,730.00
JUMLAH TENAGA BAHAN 131,091.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 43,340.00
B BAHAN
Keramik 30x30 warna bh 11.870 5,563.64 66,040.36
Semen Portland kg 10.000 1,340.00 13,400.00
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.500 16,500.00 24,750.00
JUMLAH TENAGA BAHAN 109,815.36
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 43,340.00
B BAHAN
Keramik 40x40 warna bh 6.630 11,783.33 78,123.50
Semen Portland kg 10.000 1,340.00 13,400.00
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 1.500 16,500.00 24,750.00
JUMLAH TENAGA BAHAN 121,898.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 95,000.00 8,550.00
Tukang Batu L.02 OH 0.090 125,000.00 11,250.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 25,525.00
B BAHAN
Plint keramik bh 3.530 1,854.55 6,546.55
Semen Portland kg 1.140 1,340.00 1,527.60
Pasir pasang kg 0.003 125,000.00 375.00
Semen warna kg 0.050 16,500.00 825.00
JUMLAH TENAGA BAHAN 9,274.15
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 95,000.00 8,550.00
Tukang Batu L.02 OH 0.090 125,000.00 11,250.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 25,525.00
B BAHAN
Plint keramik bh 2.650 2,945.83 7,806.46
Semen Portland kg 1.140 1,340.00 1,527.60
Pasir pasang kg 0.003 125,000.00 375.00
Semen warna kg 0.050 16,500.00 825.00
JUMLAH TENAGA BAHAN 10,534.06
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 95,000.00 8,550.00
Tukang Batu L.02 OH 0.090 125,000.00 11,250.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 25,525.00
B BAHAN
Plint granite tile bh 1.760 12,900.00 22,704.00
Semen Portland kg 1.140 1,340.00 1,527.60
Pasir pasang kg 0.003 125,000.00 375.00
Semen warna kg 0.050 16,500.00 825.00
JUMLAH TENAGA BAHAN 25,431.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 95,000.00 8,550.00
Tukang Batu L.02 OH 0.090 125,000.00 11,250.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 25,525.00
B BAHAN
Plint granite tile bh 1.325 41,460.00 54,934.50
Semen Portland kg 1.140 1,340.00 1,527.60
Pasir pasang kg 0.003 125,000.00 375.00
Semen warna kg 0.050 16,500.00 825.00
JUMLAH TENAGA BAHAN 57,662.10
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 125,000.00 43,750.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 165,000.00 5,775.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Marmer bh 1.060 1,750,000.00 1,855,000.00
Semen Portland kg 8.190 1,340.00 10,974.60
Pasir pasang kg 0.045 125,000.00 5,625.00
Semen warna kg 0.650 16,500.00 10,725.00
JUMLAH TENAGA BAHAN 1,882,324.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 4
13. Pemasangan 1 m2 lantai lantai karpet t. 4-5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 95,000.00 16,150.00
Tukang Batu L.02 OH 0.170 125,000.00 21,250.00
Kepala Tukang L.03 OH 0.017 140,000.00 2,380.00
Mandor L.04 OH 0.009 165,000.00 1,485.00
JUMLAH TENAGA KERJA 41,265.00
B BAHAN
Karpet m2 1.050 87,500.00 91,875.00
Lem kg 0.350 51,580.00 18,053.00
JUMLAH TENAGA BAHAN 109,928.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 125,000.00 43,750.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 165,000.00 5,775.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Vinyl kayu m2 1.050 243,240.00 255,402.00
Lem kg 0.600 51,580.00 30,948.00
JUMLAH TENAGA BAHAN 286,350.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 95,000.00 17,812.50
Tukang Batu L.02 OH 0.3750 125,000.00 46,875.00
Kepala Tukang L.03 OH 0.0450 140,000.00 6,300.00
Mandor L.04 OH 0.0188 165,000.00 3,102.00
JUMLAH TENAGA KERJA 74,089.50
B BAHAN
Keramik 20x25 warna bh 22.000 2,800.00 61,600.00
Semen Portland kg 9.300 1,340.00 12,462.00
Pasir pasang kg 0.018 125,000.00 2,250.00
Semen warna kg 1.940 16,500.00 32,010.00
JUMLAH TENAGA BAHAN 108,322.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 95,000.00 17,812.50
Tukang Batu L.02 OH 0.3750 125,000.00 46,875.00
Kepala Tukang L.03 OH 0.0450 140,000.00 6,300.00
Mandor L.04 OH 0.0188 165,000.00 3,102.00
JUMLAH TENAGA KERJA 74,089.50
B BAHAN
Keramik 20x25 putih bh 22.000 3,800.00 83,600.00
Semen Portland kg 9.300 1,340.00 12,462.00
Pasir pasang kg 0.018 125,000.00 2,250.00
Semen warna kg 1.940 16,500.00 32,010.00
JUMLAH TENAGA BAHAN 130,322.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.300 95,000.00 123,500.00
Tukang Batu L.02 OH 0.650 125,000.00 81,250.00
Kepala Tukang L.03 OH 0.065 140,000.00 9,100.00
Mandor L.04 OH 0.035 165,000.00 5,775.00
JUMLAH TENAGA KERJA 219,625.00
B BAHAN
Marmer m2 1.060 1,750,000.00 1,855,000.00
Semen Portland kg 12.440 1,340.00 16,669.60
Pasir pasang kg 0.025 125,000.00 3,125.00
Semen warna kg 0.650 16,500.00 10,725.00
Paku 12 cm kg 3.030 18,000.00 54,540.00
JUMLAH TENAGA BAHAN 1,940,059.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 125,000.00 43,750.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 165,000.00 5,775.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu candi / andesit m2 1.100 170,000.00 187,000.00
Semen Portland kg 11.750 1,340.00 15,745.00
Pasir pasang kg 0.035 125,000.00 4,375.00
JUMLAH TENAGA BAHAN 207,120.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 125,000.00 43,750.00
Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
Mandor L.04 OH 0.035 165,000.00 5,775.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel m2 1.100 130,000.00 143,000.00
Semen Portland kg 11.750 1,340.00 15,745.00
Pasir pasang kg 0.035 125,000.00 4,375.00
JUMLAH TENAGA BAHAN 163,120.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang Batu L.02 OH 0.175 125,000.00 21,875.00
Kepala Tukang L.03 OH 0.017 140,000.00 2,380.00
Mandor L.04 OH 0.002 165,000.00 330.00
JUMLAH TENAGA KERJA 57,835.00
B BAHAN
Wallpaper m 2.200 25,000.00 55,000.00
Lem kg 0.250 51,580.00 12,895.00
JUMLAH TENAGA BAHAN 67,895.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 95,000.00 11,400.00
Tukang Batu L.02 OH 0.120 125,000.00 15,000.00
Kepala Tukang L.03 OH 0.012 140,000.00 1,680.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 29,070.00
B BAHAN
Floor harderner kg 3.000 7,500.00 22,500.00
JUMLAH TENAGA BAHAN 22,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 95,000.00 2,850.00
Tukang Kayu L.02 OH 0.070 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 165,000.00 660.00
JUMLAH TENAGA KERJA 13,240.00
B BAHAN
Asbes semen m2 1.100 22,569.44 24,826.39
Paku tripleks kg 0.010 25,000.00 250.00
JUMLAH TENAGA BAHAN 25,076.39
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. Pemasangan 1 m2 langit-langit plywood ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 24,225.00
B BAHAN
Plywood 4mm Lembar 0.375 70,000.00 26,250.00
Paku tripleks kg 0.030 25,000.00 750.00
JUMLAH TENAGA BAHAN 27,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Batu L.02 OH 0.050 125,000.00 6,250.00
Kepala Tukang L.03 OH 0.005 140,000.00 700.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 17,275.00
B BAHAN
Gypsum board Lembar 0.364 75,000.00 27,300.00
Paku skrup kg 0.110 60,000.00 6,600.00
Cornis kg 0.300 3,750.00 1,125.00
Lakban gypsum roll 0.070 15,000.00 1,050.00
JUMLAH TENAGA BAHAN 36,075.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.5.1 - 1
4. Pemasangan 1 m' list langit-langit kayu profil
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang Batu L.02 OH 0.050 125,000.00 6,250.00
Kepala Tukang L.03 OH 0.005 140,000.00 700.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 12,195.00
B BAHAN
List kayu profil m 1.050 4,473.68 4,697.37
Paku kg 0.010 18,000.00 180.00
JUMLAH TENAGA BAHAN 4,877.37
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang Batu L.02 OH 0.050 125,000.00 6,250.00
Kepala Tukang L.03 OH 0.005 140,000.00 700.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 12,195.00
B BAHAN
List gypsum sedang m 1.050 10,000.00 10,500.00
Paku skrup kg 0.010 60,000.00 600.00
Cornis kg 0.100 3,750.00 375.00
JUMLAH TENAGA BAHAN 11,475.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Batu L.02 OH 0.050 125,000.00 6,250.00
Kepala Tukang L.03 OH 0.005 140,000.00 700.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 17,275.00
B BAHAN
Kalsiboard Lembar 0.364 69,000.00 25,116.00
Paku skrup kg 0.110 60,000.00 6,600.00
Cornis kg 0.300 3,750.00 1,125.00
Lakban gypsum roll 0.070 15,000.00 1,050.00
JUMLAH TENAGA BAHAN 33,891.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.5.1 - 1
4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 95,000.00 13,300.00
Tukang Kayu L.02 OH 0.067 125,000.00 8,375.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.007 165,000.00 1,155.00
JUMLAH TENAGA KERJA 23,810.00
B BAHAN
Rooflight 2,1m x 11,8m m2 1.050 90,800.00 95,340.00
Paku kg 0.050 28,000.00 1,400.00
JUMLAH TENAGA BAHAN 96,740.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1400 95,000.00 13,300.00
Tukang Kayu L.02 OH 0.0700 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.0070 140,000.00 980.00
Mandor L.04 OH 0.0070 165,000.00 1,155.00
JUMLAH TENAGA KERJA 24,185.00
B BAHAN
Asbes gelombang Lbr 0.800 55,000.00 44,000.00
Paku pancing 6x23 kg 0.120 28,000.00 3,360.00
JUMLAH TENAGA BAHAN 47,360.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.084 95,000.00 7,980.00
Tukang Kayu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.004 165,000.00 660.00
JUMLAH TENAGA KERJA 26,085.00
B BAHAN
Nok asbes Lbr 1.000 45,000.00 45,000.00
Paku seng kg 0.040 28,000.00 1,120.00
JUMLAH TENAGA BAHAN 46,120.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.010 165,000.00 1,650.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
Genteng keramik Bh 14.000 12,300.00 172,200.00
Paku biasa 2"-5" kg 0.030 18,000.00 540.00
JUMLAH TENAGA BAHAN 172,740.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.001 165,000.00 165.00
JUMLAH TENAGA KERJA 33,065.00
B BAHAN
Genteng metal ex. Sakura Bh 1.620 38,000.00 61,560.00
Paku biasa 1/2"-1" kg 0.200 18,000.00 3,600.00
JUMLAH TENAGA BAHAN 65,160.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 95,000.00 38,000.00
Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.020 165,000.00 3,300.00
JUMLAH TENAGA KERJA 69,100.00
B BAHAN
Nok genteng beton Bh 3.900 23,800.00 92,820.00
Paku biasa 1/2"-1" kg 0.050 18,000.00 900.00
Semen PC kg 10.800 1,340.00 14,472.00
Pasir pasang m3 0.032 125,000.00 4,000.00
Semen warna kg 1.000 16,500.00 16,500.00
JUMLAH TENAGA BAHAN 128,692.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.013 165,000.00 2,145.00
JUMLAH TENAGA KERJA 46,745.00
B BAHAN
Nok genteng metal Bh 1.100 23,700.00 26,070.00
Paku biasa 1/2"-1" kg 0.050 18,000.00 900.00
JUMLAH TENAGA BAHAN 26,970.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 95,000.00 11,400.00
Tukang Kayu L.02 OH 0.060 125,000.00 7,500.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 20,730.00
B BAHAN
Atap seng gelombang Lbr 0.913 31,500.00 28,759.50
Paku biasa 1/2"-1" kg 0.020 18,000.00 360.00
JUMLAH TENAGA BAHAN 29,119.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.070 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 24,970.00
B BAHAN
Seng plat 3"x6" Bh 0.300 28,000.00 8,400.00
Paku biasa 1/2"-1" kg 0.040 18,000.00 720.00
JUMLAH TENAGA BAHAN 9,120.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.5.2 -3
10. Pemasangan 1 m2 atap aluminium/alkan
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.080 140,000.00 11,200.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 35,815.00
B BAHAN
alkan t. 0,35 Lbr 1.050 62,000.00 65,100.00
Paku hak panj.15 cm kg 0.020 28,000.00 560.00
JUMLAH TENAGA BAHAN 65,660.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.100 140,000.00 14,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 44,250.00
B BAHAN
Nok standar 40x18 Bh 1.200 26,000.00 31,200.00
Paku hak panj.15 cm kg 0.040 28,000.00 1,120.00
JUMLAH TENAGA BAHAN 32,320.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.050 125,000.00 6,250.00
Kepala Tukang L.03 OH 0.005 140,000.00 700.00
Mandor L.04 OH 0.008 165,000.00 1,320.00
JUMLAH TENAGA KERJA 22,520.00
B BAHAN
Aluminium foil m2 1.050 46,500.00 48,825.00
JUMLAH TENAGA BAHAN 48,825.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 95,000.00 13,300.00
Tukang Kayu L.02 OH 0.070 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.007 165,000.00 1,155.00
JUMLAH TENAGA KERJA 24,185.00
B BAHAN
Atap bitumen ex. Onduline Lbr 0.641 149,500.00 95,829.50
Paku ex. onduline bh 7.051 1,000.00 7,051.30
JUMLAH TENAGA BAHAN 102,880.80
C. PERALATAN
-
JUMLAH TENAGA ALAT -
14. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap antara 10°-15° jarak
gording 45 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 95,000.00 13,300.00
Tukang Kayu L.02 OH 0.070 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.007 165,000.00 1,155.00
JUMLAH TENAGA KERJA 24,185.00
B BAHAN
Atap bitumen ex. Onduline Lbr 0.667 149,500.00 99,671.65
Paku ex. onduline bh 7.051 1,000.00 7,051.30
JUMLAH TENAGA BAHAN 106,722.95
C. PERALATAN
-
JUMLAH TENAGA ALAT -
15. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap antara 5°-
10°memakai decking plywood 12 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 95,000.00 13,300.00
Tukang Kayu L.02 OH 0.070 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.007 165,000.00 1,155.00
JUMLAH TENAGA KERJA 24,185.00
B BAHAN
Atap bitumen ex. Onduline Lbr 0.667 149,500.00 99,671.65
Paku ex. onduline bh 7.051 1,000.00 7,051.30
JUMLAH TENAGA BAHAN 106,722.95
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.001 165,000.00 165.00
JUMLAH TENAGA KERJA 33,065.00
B BAHAN
Atap bitumen motif genteng Lbr 3.226 45,500.00 146,773.90
Sekrup ex. Onduline bh 16.129 1,000.00 16,129.00
JUMLAH TENAGA BAHAN 162,902.90
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.084 95,000.00 7,980.00
Tukang Kayu L.02 OH 0.125 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.013 140,000.00 1,820.00
Mandor L.04 OH 0.004 165,000.00 660.00
JUMLAH TENAGA KERJA 26,085.00
B BAHAN
Nok bitumen bh 1.280 80,000.00 102,400.00
Paku bh 10.240 1,000.00 10,240.00
JUMLAH TENAGA BAHAN 112,640.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.080 140,000.00 11,200.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 35,815.00
B BAHAN
Zincalujme t.0,35 Lbr 1.050 64,000.00 67,200.00
Paku hak panj.15 cm kg 0.020 28,000.00 560.00
JUMLAH TENAGA BAHAN 67,760.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.080 140,000.00 11,200.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 35,815.00
B BAHAN
Zincalujme warna t.0,35 Lbr 1.050 72,000.00 75,600.00
Paku hak panj.15 cm kg 0.020 28,000.00 560.00
JUMLAH TENAGA BAHAN 76,160.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.080 140,000.00 11,200.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 35,815.00
B BAHAN
Zincalujme warna t.0,45 Lbr 1.050 97,000.00 101,850.00
Paku hak panj.15 cm kg 0.020 28,000.00 560.00
JUMLAH TENAGA BAHAN 102,410.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.100 140,000.00 14,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 44,250.00
B BAHAN
Nok zincalume m 1.200 26,000.00 31,200.00
Paku kg 0.040 28,000.00 1,120.00
JUMLAH TENAGA BAHAN 32,320.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.080 140,000.00 11,200.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 35,815.00
B BAHAN
Zincalujme t.0,22 Lbr 1.050 52,000.00 54,600.00
Paku hak panj.15 cm kg 0.020 28,000.00 560.00
JUMLAH TENAGA BAHAN 55,160.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.010 165,000.00 1,650.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
Genteng ex. Lokal Bh 17.500 1,200.00 21,000.00
Paku biasa 2"-5" kg 0.030 18,000.00 540.00
JUMLAH TENAGA BAHAN 21,540.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 95,000.00 38,000.00
Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.020 165,000.00 3,300.00
JUMLAH TENAGA KERJA 69,100.00
B BAHAN
Nok genteng Bh 3.500 1,800.00 6,300.00
Paku biasa 1/2"-1" kg 0.050 18,000.00 900.00
Semen PC kg 10.800 1,340.00 14,472.00
Pasir pasang m3 0.032 125,000.00 4,000.00
Semen warna kg 1.000 16,500.00 16,500.00
JUMLAH TENAGA BAHAN 42,172.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 95,000.00 570,000.00
Tukang Kayu L.02 OH 18.000 125,000.00 2,250,000.00
Kepala Tukang L.03 OH 1.800 140,000.00 252,000.00
Mandor L.04 OH 0.300 165,000.00 49,500.00
JUMLAH TENAGA KERJA 3,121,500.00
B BAHAN
Balok kayu klas II m3 1.200 5,800,000.00 6,960,000.00
Paku 10 cm kg 1.250 18,000.00 22,500.00
Lem kayu kg 1.000 19,375.00 19,375.00
JUMLAH TENAGA BAHAN 7,001,875.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang Kayu L.02 OH 3.000 125,000.00 375,000.00
Kepala Tukang L.03 OH 0.300 140,000.00 42,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 520,250.00
B BAHAN
Papan kayu klas III m3 0.040 4,800,000.00 192,000.00
Lem kayu kg 0.500 19,375.00 9,687.50
JUMLAH TENAGA BAHAN 201,687.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 95,000.00 76,000.00
Tukang Kayu L.02 OH 2.400 125,000.00 300,000.00
Kepala Tukang L.03 OH 0.240 140,000.00 33,600.00
Mandor L.04 OH 0.040 165,000.00 6,600.00
JUMLAH TENAGA KERJA 416,200.00
B BAHAN
Papan kayu klas III m3 0.024 4,800,000.00 115,200.00
Lem kayu kg 0.300 19,375.00 5,812.50
Kaca polos 5 mm m2 1.000 115,000.00 115,000.00
JUMLAH TENAGA BAHAN 236,012.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Kayu L.02 OH 2.100 125,000.00 262,500.00
Kepala Tukang L.03 OH 0.210 140,000.00 29,400.00
Mandor L.04 OH 0.035 165,000.00 5,775.00
JUMLAH TENAGA KERJA 364,175.00
B BAHAN
Papan kayu klas III m3 0.025 4,800,000.00 120,000.00
Paku 1 cm - 2,5 cm kg 0.030 18,000.00 540.00
Lem kayu kg 0.500 19,375.00 9,687.50
Plywood tebal 4 mm Lembar 1.000 70,000.00 70,000.00
JUMLAH TENAGA BAHAN 200,227.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.670 95,000.00 63,650.00
Tukang Kayu L.02 OH 2.000 125,000.00 250,000.00
Kepala Tukang L.03 OH 0.200 140,000.00 28,000.00
Mandor L.04 OH 0.335 165,000.00 55,275.00
JUMLAH TENAGA KERJA 396,925.00
B BAHAN
Papan kayu klas II m3 0.060 5,500,000.00 330,000.00
Paku 1 cm - 2,5 cm kg 0.150 18,000.00 2,700.00
JUMLAH TENAGA BAHAN 332,700.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 4.000 95,000.00 380,000.00
Tukang Kayu L.02 OH 12.000 125,000.00 1,500,000.00
Kepala Tukang L.03 OH 1.200 140,000.00 168,000.00
Mandor L.04 OH 0.200 165,000.00 33,000.00
JUMLAH TENAGA KERJA 2,081,000.00
B BAHAN
Balok kayu klas II m3 1.100 5,800,000.00 6,380,000.00
Besi strip tebal 5mm kg 15.000 14,000.00 210,000.00
Paku 12 cm kg 5.600 18,000.00 100,800.00
JUMLAH TENAGA BAHAN 6,690,800.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.700 95,000.00 636,500.00
Tukang Kayu L.02 OH 20.100 125,000.00 2,512,500.00
Kepala Tukang L.03 OH 2.010 140,000.00 281,400.00
Mandor L.04 OH 0.335 165,000.00 55,275.00
JUMLAH TENAGA KERJA 3,485,675.00
B BAHAN
Balok kayu klas II m3 1.100 5,800,000.00 636,500.00
Besi strip tebal 5mm kg 15.000 14,000.00 2,512,500.00
Paku 12 cm kg 3.000 18,000.00 281,400.00
JUMLAH TENAGA BAHAN 3,430,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 24,225.00
B BAHAN
Kaso 5x7 cm m3 0.014 4,300,000.00 60,200.00
Reng 2x3 cm m3 0.036 4,300,000.00 154,800.00
Paku 5 dan 10 cm kg 0.250 18,000.00 4,500.00
JUMLAH TENAGA BAHAN 219,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.300 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.030 140,000.00 4,200.00
Mandor L.04 OH 0.075 165,000.00 12,375.00
JUMLAH TENAGA KERJA 68,325.00
B BAHAN
Kaso 5x7 cm m3 0.0154 4,300,000.00 66,220.00
Paku kg 0.200 18,000.00 3,600.00
JUMLAH TENAGA BAHAN 69,820.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Kayu L.02 OH 0.300 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.030 140,000.00 4,200.00
Mandor L.04 OH 0.010 165,000.00 1,650.00
JUMLAH TENAGA KERJA 62,350.00
B BAHAN
Kaso 5x7 cm m3 0.0163 4,300,000.00 70,090.00
Paku kg 0.250 18,000.00 4,500.00
JUMLAH TENAGA BAHAN 74,590.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 38,125.00
B BAHAN
Papan kayu klas II m3 0.0108 5,500,000.00 59,400.00
Paku kg 0.100 18,000.00 1,800.00
JUMLAH TENAGA BAHAN 61,200.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 38,125.00
B BAHAN
Papan kayu klas II m3 0.0110 5,500,000.00 60,500.00
Paku kg 0.050 18,000.00 900.00
JUMLAH TENAGA BAHAN 61,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.450 125,000.00 56,250.00
Kepala Tukang L.03 OH 0.045 140,000.00 6,300.00
Mandor L.04 OH 0.008 165,000.00 1,320.00
JUMLAH TENAGA KERJA 78,120.00
B BAHAN
Balok kayu klas III m3 0.0280 4,300,000.00 120,400.00
Paku kg 0.150 18,000.00 2,700.00
JUMLAH TENAGA BAHAN 123,100.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
14. Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 95,000.00 2,660.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.860 140,000.00 120,400.00
Mandor L.04 OH 0.560 165,000.00 92,400.00
JUMLAH TENAGA KERJA 234,210.00
B BAHAN
Balok kayu klas III, 6x12 m3 0.0280 4,300,000.00 120,400.00
Paku kg 0.1500 18,000.00 2,700.00
Plywood 4 mm, 120x240 Lembar 0.8600 70,000.00 60,200.00
Lem kayu kg 0.560 19,375.00 10,850.00
JUMLAH TENAGA BAHAN 194,150.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 95,000.00 57,000.00
Tukang Kayu L.02 OH 1.800 125,000.00 225,000.00
Kepala Tukang L.03 OH 0.180 140,000.00 25,200.00
Mandor L.04 OH 0.030 165,000.00 4,950.00
JUMLAH TENAGA KERJA 312,150.00
B BAHAN
Papan kayu klas II m3 0.0070 5,500,000.00 38,500.00
Paku kg 0.1000 18,000.00 1,800.00
Paku skrup kg 0.1500 18,000.00 2,700.00
JUMLAH TENAGA BAHAN 43,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 95,000.00 2,375.00
Tukang Kayu L.02 OH 0.075 125,000.00 9,375.00
Kepala Tukang L.03 OH 0.008 140,000.00 1,120.00
Mandor L.04 OH 0.001 165,000.00 165.00
JUMLAH TENAGA KERJA 13,035.00
B BAHAN
Plywod 4 mm m3 0.4000 70,000.00 28,000.00
Paku 1' dan 2,5' kg 0.0500 18,000.00 900.00
JUMLAH TENAGA BAHAN 28,900.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 38,125.00
B BAHAN
Kalsiplank btg 0.3500 48,000.00 16,800.00
Paku kg 0.100 18,000.00 1,800.00
JUMLAH TENAGA BAHAN 18,600.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.1 - 6
4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 95,000.00 950.00
Tukang Kayu L.02 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 71,275.00
B BAHAN
Kunci tanam biasa bh 1.000 159,000.00 159,000.00
JUMLAH TENAGA BAHAN 159,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 95,000.00 950.00
Tukang Kayu L.02 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 71,275.00
B BAHAN
Handle bh 1.000 238,000.00 238,000.00
Isi Silinder bh 1.000 175,000.00 175,000.00
JUMLAH TENAGA BAHAN 413,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 95,000.00 475.00
Tukang Kayu L.02 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 70,470.00
B BAHAN
Kunci bulat ex. SES bh 1.000 150,000.00 150,000.00
JUMLAH TENAGA BAHAN 150,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 1
4. Pemasangan 1 buah engsel pintu biasa
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 95,000.00 1,425.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0008 165,000.00 132.00
JUMLAH TENAGA KERJA 22,407.00
B BAHAN
Engsel 4" biasa bh 1.000 30,000.00 30,000.00
JUMLAH TENAGA BAHAN 30,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 95,000.00 1,425.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0008 165,000.00 132.00
JUMLAH TENAGA KERJA 22,407.00
B BAHAN
Engsel 4" stainless bh 1.000 40,500.00 40,500.00
JUMLAH TENAGA BAHAN 40,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 95,000.00 950.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.0005 165,000.00 82.50
JUMLAH TENAGA KERJA 14,932.50
B BAHAN
Engsel 3" biasa bh 1.000 24,000.00 24,000.00
JUMLAH TENAGA BAHAN 24,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 95,000.00 1,425.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0080 165,000.00 1,320.00
JUMLAH TENAGA KERJA 23,595.00
B BAHAN
Spring knip stainless stell bh 1.000 29,000.00 29,000.00
JUMLAH TENAGA BAHAN 29,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 95,000.00 1,425.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0080 165,000.00 1,320.00
JUMLAH TENAGA KERJA 23,595.00
B BAHAN
Kait angin stainless stell bh 1.000 30,000.00 30,000.00
JUMLAH TENAGA BAHAN 30,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang Kayu L.02 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 74,745.00
B BAHAN
Door closer kw 2 bh 1.000 500,000.00 500,000.00
JUMLAH TENAGA BAHAN 500,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 95,000.00 1,900.00
Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.0010 165,000.00 165.00
JUMLAH TENAGA KERJA 29,865.00
B BAHAN
Kunci slot stainless stell bh 1.000 35,000.00 35,000.00
JUMLAH TENAGA BAHAN 35,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 3
10. Pemasangan 1 buah Door handle
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang Kayu L.02 OH 0.500 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 74,745.00
B BAHAN
Door handle bh 1.000 450,000.00 450,000.00
JUMLAH TENAGA BAHAN 450,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 95,000.00 950.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.0050 165,000.00 825.00
JUMLAH TENAGA KERJA 15,675.00
B BAHAN
Door stop bh 1.000 130,000.00 130,000.00
JUMLAH TENAGA BAHAN 130,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 95,000.00 1,425.00
Tukang Kaca L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0008 165,000.00 132.00
JUMLAH TENAGA KERJA 22,407.00
B BAHAN
Kaca tebal 5 mm m2 1.100 115,000.00 126,500.00
Sealent bh 0.050 28,000.00 1,400.00
JUMLAH TENAGA BAHAN 127,900.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 4
13. Pemasangan 1 m2 kaca tebal 8 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.017 95,000.00 1,615.00
Tukang Kayu L.02 OH 0.170 125,000.00 21,250.00
Kepala Tukang L.03 OH 0.017 140,000.00 2,380.00
Mandor L.04 OH 0.0009 165,000.00 148.50
JUMLAH TENAGA KERJA 25,393.50
B BAHAN
Kaca tebal 8 mm m2 1.100 350,000.00 385,000.00
Sealent bh 0.070 28,000.00 1,960.00
JUMLAH TENAGA BAHAN 386,960.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 95,000.00 2,375.00
Tukang Kayu L.02 OH 0.250 125,000.00 31,250.00
Kepala Tukang L.03 OH 0.025 140,000.00 3,500.00
Mandor L.04 OH 0.0013 165,000.00 214.50
JUMLAH TENAGA KERJA 37,339.50
B BAHAN
Kaca tebal 12 mm m2 1.100 550,000.00 605,000.00
Sealent bh 0.070 28,000.00 1,960.00
JUMLAH TENAGA BAHAN 606,960.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 95,000.00 7,125.00
Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0040 165,000.00 660.00
JUMLAH TENAGA KERJA 28,635.00
B BAHAN
Kaca patri 5 mm m2 1.100 2,000,000.00 2,200,000.00
Sealent bh 0.050 28,000.00 1,400.00
JUMLAH TENAGA BAHAN 2,201,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 5
4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 14,745.00
B BAHAN
Soda api bh 0.050 40,000.00 2,000.00
JUMLAH TENAGA BAHAN 2,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 95,000.00 6,650.00
Tukang cat L.02 OH 0.009 125,000.00 1,125.00
Kepala tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 9,110.00
B BAHAN
Cat menie kg 0.200 46,100.00 9,220.00
Plamir kg 0.150 9,300.00 1,395.00
Cat dasar kg 0.170 31,000.00 5,270.00
Cat penutup kg 0.260 52,000.00 13,520.00
Kuas bh 0.010 11,500.00 115.00
Pengencer kg 0.030 31,800.00 954.00
Amplas Lbr 0.200 8,000.00 1,600.00
JUMLAH TENAGA BAHAN 32,074.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 95,000.00 3,800.00
Tukang cat L.02 OH 0.063 125,000.00 7,875.00
Kepala tukang L.03 OH 0.063 140,000.00 8,820.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 20,990.00
B BAHAN
Teak oil L 0.360 57,500.00 20,700.00
JUMLAH TENAGA BAHAN 20,700.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 95,000.00 3,800.00
Tukang cat L.02 OH 0.060 125,000.00 7,500.00
Kepala tukang L.03 OH 0.016 140,000.00 2,240.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 14,035.00
B BAHAN
Politur L 0.150 9,300.00 1,395.00
Politur jadi L 0.372 63,000.00 23,436.00
Amplas Lbr 2.000 8,000.00 16,000.00
JUMLAH TENAGA BAHAN 40,831.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Mandor L.04 OH 0.006 165,000.00 990.00
JUMLAH TENAGA KERJA 10,490.00
B BAHAN
Residu atau ter L 0.350 4,500.00 1,575.00
JUMLAH TENAGA BAHAN 1,575.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.160 95,000.00 15,200.00
Tukang cat L.02 OH 0.160 125,000.00 20,000.00
Kepala tukang L.03 OH 0.016 140,000.00 2,240.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 37,935.00
B BAHAN
Vernis L 0.150 57,500.00 8,625.00
Dempul Kg 0.050 9,300.00 465.00
Ampelas Lbr 0.100 8,000.00 800.00
JUMLAH TENAGA BAHAN 9,890.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 95,000.00 1,900.00
Tukang cat L.02 OH 0.063 125,000.00 7,875.00
Kepala tukang L.03 OH 0.0063 140,000.00 882.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 11,152.00
B BAHAN
Plamir L 0.100 9,300.00 930.00
Cat dasar Kg 0.100 33,025.10 3,302.51
Cat penutup ex. Vinilex kg 0.260 22,240.00 5,782.40
JUMLAH TENAGA BAHAN 10,014.91
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 95,000.00 2,660.00
Tukang cat L.02 OH 0.042 125,000.00 5,250.00
Kepala tukang L.03 OH 0.0042 140,000.00 588.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 8,993.00
B BAHAN
Cat dasar Kg 0.120 33,025.10 3,963.01
Cat penutup ex. Vinilex Lbr 0.180 22,240.00 4,003.20
JUMLAH TENAGA BAHAN 7,966.21
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 95,000.00 5,700.00
Tukang cat L.02 OH 0.060 125,000.00 7,500.00
Kepala tukang L.03 OH 0.0120 140,000.00 1,680.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 15,375.00
B BAHAN
Menie besi kg 0.100 250,000.00 25,000.00
Kuas bh 0.010 25,000.00 250.00
JUMLAH TENAGA BAHAN 25,250.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 95,000.00 5,700.00
Tukang cat L.02 OH 0.060 125,000.00 7,500.00
Kepala tukang L.03 OH 0.0120 140,000.00 1,680.00
Mandor L.04 OH 0.0030 165,000.00 495.00
JUMLAH TENAGA KERJA 15,375.00
B BAHAN
Cat kg 0.300 75,000.00 22,500.00
Kuas bh 0.010 25,000.00 250.00
Pengencer L 0.010 31,800.00 318.00
JUMLAH TENAGA BAHAN 23,068.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
11. Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 95,000.00 1,900.00
Tukang cat L.02 OH 0.063 125,000.00 7,875.00
Kepala tukang L.03 OH 0.0063 140,000.00 882.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 11,152.00
B BAHAN
Plamir L 0.100 9,300.00 930.00
Cat dasar Kg 0.100 33,025.10 3,302.51
Cat penutup ex. Dulux L 0.260 95,950.00 24,947.00
JUMLAH TENAGA BAHAN 29,179.51
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 95,000.00 2,660.00
Tukang cat L.02 OH 0.042 125,000.00 5,250.00
Kepala tukang L.03 OH 0.0042 140,000.00 588.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 8,993.00
B BAHAN
Cat penutup ex. Vinilex Lbr 0.180 22,240.00 4,003.20
JUMLAH TENAGA BAHAN 4,003.20
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 95,000.00 313,500.00
Tukang batu L.02 OH 1.100 125,000.00 137,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.160 165,000.00 26,400.00
JUMLAH TENAGA KERJA 478,800.00
B BAHAN
Closed duduk ex. AmStand unit 1.000 1,490,000.00 1,490,000.00
Perlengkapan Ls 6%xclosed 89,400.00
JUMLAH TENAGA BAHAN 1,579,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang batu L.02 OH 0.300 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.150 140,000.00 21,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 161,750.00
B BAHAN
Closed jongkok unit 1.000 478,000.00 478,000.00
Semen Portland kg 6.000 1,340.00 8,040.00
Pasir pasang m3 0.010 125,000.00 1,250.00
Batu bata bh 7.000 610.00 4,270.00
JUMLAH TENAGA BAHAN 491,560.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang batu L.02 OH 1.000 125,000.00 125,000.00
Kepala Tukang L.03 OH 0.100 140,000.00 14,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 242,250.00
B BAHAN
Urinoir unit 1.000 2,055,000.00 2,055,000.00
Semen Portland kg 6.000 1,340.00 8,040.00
Pasir pasang m3 0.010 125,000.00 1,250.00
Perlengkapan 30%xurinoir 616,500.00
JUMLAH TENAGA BAHAN 2,680,790.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 95,000.00 114,000.00
Tukang batu L.02 OH 1.450 125,000.00 181,250.00
Kepala Tukang L.03 OH 0.150 140,000.00 21,000.00
Mandor L.04 OH 0.060 165,000.00 9,900.00
JUMLAH TENAGA KERJA 326,150.00
B BAHAN
Wastafel unit 1.000 421,000.00 421,000.00
Semen Portland kg 6.000 1,340.00 8,040.00
Pasir pasang m3 0.010 125,000.00 1,250.00
Perlengkapan (siphon, kran, stop kran, flexible) 997,600.00
JUMLAH TENAGA BAHAN 1,427,890.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 95,000.00 7,125.00
Tukang batu L.02 OH 0.750 125,000.00 93,750.00
Kepala Tukang L.03 OH 0.075 140,000.00 10,500.00
Mandor L.04 OH 0.003 165,000.00 495.00
JUMLAH TENAGA KERJA 111,870.00
B BAHAN
Bathube unit 1.000 3,800,000.00 3,800,000.00
Perlengkapan % 20.000 - 760,000.00
JUMLAH TENAGA BAHAN 4,560,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang batu L.02 OH 0.450 125,000.00 56,250.00
Kepala Tukang L.03 OH 0.045 140,000.00 6,300.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 93,525.00
B BAHAN
Bak fibreglass unit 1.000 395,000.00 395,000.00
Perlengkapan Ls 12%xbak 47,400.00
JUMLAH TENAGA BAHAN 442,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 95,000.00 2,850.00
Tukang batu L.02 OH 0.300 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.030 140,000.00 4,200.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
JUMLAH TENAGA KERJA 47,025.00
B BAHAN
Bak cuci piring stainless Steel unit 1.000 1,361,000.00 1,361,000.00
Waterdrain unit 1.000 88,000.00 88,000.00
JUMLAH TENAGA BAHAN 1,449,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 95,000.00 950.00
Tukang batu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 15,675.00
B BAHAN
Floor drain unit 1.000 284,500.00 284,500.00
JUMLAH TENAGA BAHAN 284,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 95,000.00 5,130.00
Tukang batu L.02 OH 0.090 125,000.00 11,250.00
Kepala Tukang L.03 OH 0.009 140,000.00 1,260.00
Mandor L.04 OH 0.027 165,000.00 4,455.00
JUMLAH TENAGA KERJA 22,095.00
B BAHAN
Pipa galvanis 1/2" m 1.200 23,333.33 28,000.00
Perlenglapan Ls 35%xpipa 8,166.67
JUMLAH TENAGA BAHAN 28,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 95,000.00 950.00
Tukang L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.040 140,000.00 5,600.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 19,875.00
B BAHAN
Kran air ex. onda m 1.000 57,500.00 57,500.00
Sealtape Buah 0.025 5,000.00 125.00
JUMLAH TENAGA BAHAN 57,625.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 95,000.00 5,130.00
Tukang batu L.02 OH 0.090 125,000.00 11,250.00
Kepala Tukang L.03 OH 0.009 140,000.00 1,260.00
Mandor L.04 OH 0.027 165,000.00 4,455.00
JUMLAH TENAGA KERJA 22,095.00
B BAHAN
Pipa galvanis 3/4" m 1.200 31,666.67 38,000.00
Perlengkapan Ls 35%xpipa 11,083.33
JUMLAH TENAGA BAHAN 49,083.33
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 95,000.00 3,420.00
Tukang batu L.02 OH 0.060 125,000.00 7,500.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.002 165,000.00 330.00
JUMLAH TENAGA KERJA 12,090.00
B BAHAN
Pipa PVC tipe AW 1/2" m 1.200 5,750.00 6,900.00
Perlengkapan Ls 35%xpipa 2,012.50
JUMLAH TENAGA BAHAN 8,912.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 95,000.00 3,420.00
Tukang batu L.02 OH 0.060 125,000.00 7,500.00
Kepala Tukang L.03 OH 0.006 140,000.00 840.00
Mandor L.04 OH 0.002 165,000.00 330.00
JUMLAH TENAGA KERJA 12,090.00
B BAHAN
Pipa PVC tipe AW 3/4" m 1.200 7,500.00 9,000.00
Perlengkapan Ls 35%xpipa 2,625.00
JUMLAH TENAGA BAHAN 11,625.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 95,000.00 7,695.00
Tukang batu L.02 OH 0.135 125,000.00 16,875.00
Kepala Tukang L.03 OH 0.0135 140,000.00 1,890.00
Mandor L.04 OH 0.004 165,000.00 660.00
JUMLAH TENAGA KERJA 27,120.00
B BAHAN
Pipa PVC tipe DW 3" m 1.200 24,000.00 28,800.00
Perlengkapan Ls 35%xpipa 8,400.00
JUMLAH TENAGA BAHAN 37,200.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 95,000.00 7,695.00
Tukang batu L.02 OH 0.135 125,000.00 16,875.00
Kepala Tukang L.03 OH 0.0135 140,000.00 1,890.00
Mandor L.04 OH 0.004 165,000.00 660.00
JUMLAH TENAGA KERJA 27,120.00
B BAHAN
Pipa PVC tipe DW 4" m 1.200 37,750.00 45,300.00
Perlengkapan Ls 35%xpipa 13,212.50
JUMLAH TENAGA BAHAN 58,512.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 5.1.1 -5
16. Pemasangan 1 m' pipa beton diameter 40 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 95,000.00 36,100.00
Tukang batu L.02 OH 0.190 125,000.00 23,750.00
Kepala Tukang L.03 OH 0.019 140,000.00 2,660.00
Mandor L.04 OH 0.019 165,000.00 3,135.00
JUMLAH TENAGA KERJA 65,645.00
B BAHAN
Buis beton dia. 40 bh 1.100 450,000.00 495,000.00
Batu bata m3 0.550 610.00 335.50
Semen Portland kg 10.300 1,340.00 13,802.00
Pasir pasang m3 0.061 125,000.00 7,625.00
Pasir urug m3 0.069 95,000.00 6,555.00
JUMLAH TENAGA BAHAN 523,317.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang L.02 OH 0.450 125,000.00 56,250.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 84,900.00
B BAHAN
Profil C 75.80/81 m 1.488 15,333.33 22,816.00
Profil C 75.75 m 2.232 13,666.67 30,504.00
Reng AZ 0,55mm x 6m m 5.400 6,666.67 36,000.00
Screw bh 38.000 165.00 6,270.00
Dynabolt bh 1.600 1,500.00 2,400.00
Valery Gutter Talang Jurai m 0.124 39,000.00 4,836.00
JUMLAH TENAGA BAHAN 102,826.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang L.02 OH -
Kepala Tukang L.03 OH -
Mandor L.04 OH 0.018 165,000.00 2,887.50
JUMLAH TENAGA KERJA 36,137.50
B BAHAN
Persegi panjang t. 8 cm bh 44.000 2,102.27 92,499.88
Pasir m3 0.100 95,000.00 9,500.00
JUMLAH TENAGA BAHAN 101,999.88
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang L.02 OH - -
Kepala Tukang L.03 OH - -
Mandor L.04 OH 0.018 165,000.00 2,887.50
JUMLAH TENAGA KERJA 36,137.50
B BAHAN
Persegi panjang t. 8 cm bh 44.000 2,386.36 104,999.84
Pasir m3 0.100 95,000.00 9,500.00
JUMLAH TENAGA BAHAN 114,499.84
C. PERALATAN
-
JUMLAH TENAGA ALAT -
TAKSIR - 1
4. Pemasangan 1 m2 paving blok segienam t. 8 cm mutu K200
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang L.02 OH - -
Kepala Tukang L.03 OH - -
Mandor L.04 OH 0.018 165,000.00 2,887.50
JUMLAH TENAGA KERJA 36,137.50
B BAHAN
Paving blok segienam t. 8 cm bh 37.000 2,500.00 92,500.00
Pasir m3 0.100 95,000.00 9,500.00
JUMLAH TENAGA BAHAN 102,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang L.02 OH - -
Kepala Tukang L.03 OH - -
Mandor L.04 OH 0.018 165,000.00 2,887.50
JUMLAH TENAGA KERJA 36,137.50
B BAHAN
Paving blok segienam t. 8 cm bh 37.000 2,837.84 105,000.08
Pasir m3 0.100 95,000.00 9,500.00
JUMLAH TENAGA BAHAN 114,500.08
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH -
Tukang L.02 OH 0.1350 125,000.00 16,875.00
Kepala Tukang L.03 OH 0.0135 140,000.00 1,890.00
Mandor L.04 OH 0.0050 165,000.00 825.00
JUMLAH TENAGA KERJA 19,590.00
B BAHAN
NYM 2 x 2,5 mm2 m 15.000 13,600.00 204,000.00
Perlengkapan ( 35% harga conduit,klem,isolasi ) 71,400.00
JUMLAH TENAGA BAHAN 275,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
TAKSIR - 3
10. Pemasangan 100 m2 karung goni basah untuk curing beton
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 95,000.00 76,000.00
Tukang Batu L.02 OH 125,000.00 -
Kepala Tukang L.03 OH 140,000.00 -
Mandor L.04 OH 0.0800 165,000.00 13,200.00
JUMLAH TENAGA KERJA 89,200.00
B BAHAN
Karung goni lbr 102.000 9,700.00 989,400.00
Air liter 5000.000 66.60 333,000.00
TAKSIR - 4
13. Pemasangan 1 m2 geotekstil untuk timbunan
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Batu L.02 OH 0.020 125,000.00 2,500.00
Kepala Tukang L.03 OH 140,000.00 -
Mandor L.04 OH 0.0100 165,000.00 1,650.00
JUMLAH TENAGA KERJA 13,650.00
B BAHAN
Geotekstil m2 1.05 22,000.00 23,100.00
10 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, Sekat dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Besi L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.005 135,000.00 675.00
Mandor L.04 OH 0.005 165,000.00 825.00
JUMLAH TENAGA KERJA 66,000.00
B BAHAN
Kaca polos 8mm m2 1.000 300,000.00 300,000.00
Sunblast m2 1.000 270,000.00 270,000.00
HPL (motif kayu ex. Taco) m2 1.000 387,862.06 387,862.06
Rangka metal hollow 40.40.2 mm m' 3.500 5,375.00 18,812.50
Assesoris (perkuatan, las dll) Ls 100%xrangka 5,375.00
JUMLAH TENAGA BAHAN 982,049.56
C. PERALATAN
-
JUMLAH TENAGA ALAT -
-
JUMLAH TENAGA BAHAN 1,398,339.56
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1 m2 meja tv
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang aluminium/kaca L.03 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.100 140,000.00 14,000.00
Mandor L.04 OH 0.050 165,000.00 8,250.00
JUMLAH TENAGA KERJA 44,250.00
B BAHAN
Playwood 12 mm kpg 5.400 75,000.00 405,000.00
Lem Kayu 0.100 19,375.00 1,937.50
amplas 1.000 8,000.00 8,000.00
skrup fiser 0.220 7,000.00 1,540.00
Paku Playwood 1.500 18,000.00 27,000.00
HPL (motif kayu ex. Taco) 1.000 387,862.06 387,862.06
-
JUMLAH TENAGA BAHAN 831,339.56
C. PERALATAN
-
JUMLAH TENAGA ALAT -