AHSP.28-A.4.2.1.20. Pemasangan 1 M² rangka besi hollow 1x40.40.0,6 mm, modul 60 x 120 cm, partisi
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Besi L.03 OH 0.2500 130,000.00 32,500.00
Kepala Tukang L.03 OH 0.0250 145,000.00 3,625.00
Mandor L.04 OH 0.0130 150,000.00 1,950.00
Jumlah Harga Tenaga Kerja 63,075.00
B. BAHAN
Rangka metal hollow 40.40.0,6 mm M1 3.5000 6,250.00 21,875.00
Assesoris (perkuatan, las dll) Ls 100% 6,250.00 6,250.00
Jumlah Harga Bahan 28,125.00
C. PERALATAN
-
Jumlah Harga Peralatan -
AHSP.28-A.4.2.1.21. Pemasangan 1 M² rangka besi hollow 1x40.40. mm, modul 60 x 60 cm, plafon
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Besi L.03 OH 0.1750 130,000.00 22,750.00
Kepala Tukang L.03 OH 0.0350 145,000.00 5,075.00
Mandor L.04 OH 0.0180 150,000.00 2,700.00
Jumlah Harga Tenaga Kerja 65,525.00
B. BAHAN
Rangka metal hollow 40.40. mm M1 4.0000 6,250.00 25,000.00
Assesoris (perkuatan, las dll) Ls 100% 6,250.00 6,250.00
Jumlah Harga Bahan 31,250.00
C. PERALATAN
-
Jumlah Harga Peralatan -
AHSP.28-A.4.4.1.9. Pemasangan 1 M² dinding bata lobang (8x8x16) cm tebal 1/2 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 130,000.00 13,000.00
Kepala Tukang L.03 OH 0.0100 145,000.00 1,450.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 46,700.00
B. BAHAN
Bata merah M³ 66.0000 700.00 46,200.00
Semen Portland Kg 11.5000 1,220.00 14,030.00
Pasir Pasang M³ 0.0430 130,000.00 5,590.00
Jumlah Harga Bahan 65,820.00
C. PERALATAN
-
Jumlah Harga Peralatan -
Jumlah 7.80 m3
2 Pondasi Setempat
Spesifikasi : Beton Bertulang kg
Code : P1
ANALISA VOLUME SATUAN
A. PEMBESIAN
1 FOOTING PLAT
- Jumlah Pondasi 26.00 bh
- Panjang Besi Memanjang 21.60
- Panjang Besi Melintang 21.60 m'
Jc/p Pc/q Bj JP Vol Sat
Vol. Cincin 43.20 0.617 26.00 693.01 kg
2 Pedestal
- Panjang Kolom 39.00 m'
- Jarak cincin (10-15) 0.120 m'
- Jumlah cincin 325.00 bh
- Panjang Cincin 1.26 m'
Jc/p Pc/q Bj Vol Sat
Vol. Cincin 325.00 1.260 0.395 161.75 kg
Jumlah 1,272.22 kg
C BETON-K175 l b h qty
1 Plat 1.00 1.00 0.30 26.00 7.80 m3
2 Pedestal 0.25 0.40 0.90 26.00 2.34 m3
Jumlah 10.14 m3
II. PEKERJAAN PONDASI
1 Work Floor
Spesifikasi : Beton Bertulang
Code : P2
ANALISA VOLUME SATUAN
No Code B H T qty Jumlah sat
1 P1 0.80 0.80 0.30 11.00 2.11 m3
Jumlah 2.11 m3
2 Pondasi Setempat
Spesifikasi : Beton Bertulang kg
Code : P2
ANALISA VOLUME SATUAN
A. PEMBESIAN
1 FOOTING PLAT
- Jumlah Pondasi 11.00 bh
- Panjang Besi Memanjang 14.70
- Panjang Besi Melintang 14.70 m'
Jc/p Pc/q Bj JP Vol Sat
Vol. Cincin 29.40 0.617 11.00 199.54 kg
2 Pedestal
- Panjang Kolom 13.20 m'
- Jarak cincin (10-15) 0.120 m'
- Jumlah cincin 110.00 bh
- Panjang Cincin 0.98 m'
Jc/p Pc/q Bj Vol Sat
Vol. Cincin 110.00 0.980 0.395 42.58 kg
Jumlah kg
C BETON-K175 l b h qty
1 Plat 0.80 0.80 0.20 11.00 1.41 m3
2 Pedestal 0.25 0.25 0.60 11.00 0.41 m3
Jumlah 1.82 m3
IV. PEKERJAAN STRUKTUR BETON
1 Balok Sloof 25/30
Spesifikasi : Beton Bertulang
Code : BS
ANALISA VOLUME SATUAN
A. PEMBESIAN
1 Cincin :
- Panjang Balok 134.00 m'
- Jarak cincin 10-15 cm 0.120 cm
- Jumlah cincin 1,116.67 bh
- Panjang Cincin 0.98 m'
Jc/p Pc/q Bj Vol Sat
Vol. Cincin Besi 8 1,116.67 0.98 0.395 432.26 kg
Jumlah 10.40 m3
2 Kolom Konstruksi 25/25
Spesifikasi : Beton Bertulang
Code : K2
ANALISA VOLUME SATUAN
A. PEMBESIAN
1 Cincin :
- Panjang Kolom 3.70 m'
- Jarak cincin 15 Cm 0.150 m'
- Jumlah cincin 24.67 bh
- Panjang Cincin 0.98 m'
- Jumlah Kolom 11.00 bh
Jc/p Pc/q Bj Vol Vol Sat
Vol. Cincin 24.67 0.98 0.395 11.000 105.03 kg
Jumlah 2.54 m3
3 Kolom Praktis 11/11
Spesifikasi : Beton Bertulang
Code : K1
ANALISA VOLUME SATUAN
No Code L qty Jumlah sat
1 K1 4.00 6.00 24.00 m'
2
Jumlah 24.00 m'
3 Ring Balok
Spesifikasi : Beton Bertulang
Code : RB
ANALISA VOLUME SATUAN
A. PEMBESIAN
1 Cincin :
- Panjang Balok 145.00 m'
- Jarak cincin 0.150 m'
- Jumlah cincin 966.67 bh
- Panjang Cincin 0.70 m'
Jc/p Pc/q Bj Vol Sat
Vol. Cincin 966.67 0.70 0.395 267.28 kg
Volume Pekerjaan
Panjang Lebar/dia Tinggi
No Lokasi & Macam Pekerjaan Luas Volume Unit
Total Vol
m' m' m' m2 m3 bh
1 2 3 4 5 6 7 8 9
Total 115.500
Total 33.000
Total 23.400
Total 33.150
Total 16.500
Volume Pekerjaan
Panjang Lebar/dia Tinggi
No Lokasi & Macam Pekerjaan Luas Volume Unit
Total Vol
m' m' m' m2 m3 bh
1 2 3 4 5 6 7 8 9
Tot 35.000
Volume Pekerjaan
Panjang Lebar/dia Tinggi
No Lokasi & Macam Pekerjaan Luas Volume Unit
Total Vol
m' m' m' m2 m3 bh
1 2 3 4 5 6 7 8 9
NO URAIAN PEKERJAAN JML HARGA (Rp) BOBOT (%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26
Jumlah 806,124,271.17 100.00 0.51 0.51 0.51 0.51 0.51 0.51 - 1.33 1.36 7.94 7.94 7.94 7.94 7.94 6.58 6.58 7.90 7.90 8.56 7.23 7.23 0.65 0.65 0.65 0.65 -
Kumulatif 0 0.51 1.01 1.52 2.02 2.53 3.03 3.03 4.36 5.72 13.66 21.60 29.54 37.48 45.42 52.00 58.58 66.48 74.38 82.94 90.17 97.40 98.05 98.70 99.35 100 100
Realisasi 0
EKA PRATAMA, ST
REKAPITULASI ANGGARAN BIAYA
TERBILANG : Satu Milyar Tiga Ratus Delapan Puluh Delapan Ribu Rupiah
1 Pemasangan ACP Rangka Hollow Galvalum 2 x 2 Cm, Type - 1 (Warna Abu-abu Tua)
Pemasangan ACP Rangka Besi Hollow 4 x 4 Cm, Type - 2 (Warna Abu-abu Tua)
0
0
JUMLAH DIVISI - 5 Rp -
Konsultan Perencana :
CV. ARCADE ENGINEERING CONSULTANT
S Y A L D I, ST
Direktur
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b d e f g
I. UMUM
1.1. Pekerjaan Persiapan
1 Sewa Alat Bantu 1.000 Ls 2,000,000.00 2,000,000.00
Halaman - 28
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f g
II. PEKERJAAN STRUKTUR
2.1 Pekerjaan Sloof, Kolom dan Ring Balok
1 Pek. Beton Balok 1:2:3 (20/30)
- Beton K-250 A.4.1.1.7 M3 1,030,908.81 -
- Tulangan Utama, Besi Polos 4 Ø 10 mm A.4.1.1.17.2 Kg 16,228.00 -
- Tulangan Beugel, Besi Polos Ø 8 mm - 15 cm A.4.1.1.17.2 Kg 11,270.99 -
- Bakesting Balok (3 Kali Pakai) A.4.1.1.21 M2 112,820.00 -
2 Pek. Sloof Beton 1:2:3 (20/30)
- Beton K-250 A.4.1.1.5 M3 1,030,908.81 -
- Tulangan Utama, Besi Polos 4 Ø 10 mm A.4.1.1.17.4 Kg 13,594.71 -
- Tulangan Beugel, Besi Polos Ø 8 mm - 15 cm A.4.1.1.17.2 Kg 11,270.99 -
- Bakesting Sloof (3 Kali Pakai) A.4.1.1.21 M2 112,820.00 -
3 Kolom Struktur K1 (20 x 30) cm ###
- Beton K-250 A.4.1.1.5 M3 1,030,908.81 -
- Tulangan Utama, Besi Polos 4 Ø 10 mm A.4.1.1.17.4 Kg 13,594.71 -
- Tulangan Beugel, Besi Polos Ø 8 mm - 15 cm A.4.1.1.17.2 Kg 11,270.99 -
- Bakesting Kolom (3 Kali Pakai) A.4.1.1.21 M2 112,820.00 -
4 Plat Lantai dan Atap 1:2:3 tebal 12 cm
- Beton K-250 A.4.1.1.5 M3 1,030,908.81 -
- Tulangan Utama, Besi Polos 4 Ø 10 mm A.4.1.1.17.4 Kg 13,594.71 -
- Tulangan Beugel, Besi Polos Ø 8 mm - 15 cm A.4.1.1.17.2 Kg 11,270.99 -
- Bakesting Kolom (3 Kali Pakai) A.4.1.1.21 M2 112,820.00 -
Jumlah 2.2 -
Sub Jumlah II -
Halaman - 29
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b d e f g
III. PEKERJAAN ARSITEKTUR
3.1 Pekerjaan Dinding dan Plesteran
1 Pas. Dinding Bata Tebal 1/2 Batu, Camp. 1 SP : 5 PP - M2 104,696.80 -
2 Plesteran Dinding Camp. 1 SP : 5 PP, Tebal 15 mm - M2 61,511.84 -
Jumlah 3.1 -
3.2 Pekerjaan Finishing Lantai Dan Dinding
1 Pek. Timbunan Tanah peninggian lantai 136.000 M2 187,000.00 25,432,000.00
2 Pek. Lantai kerja ad 1:3:5 12.240 M2 796,388.10 9,747,790.29
3 Pas Keramik Lantai Utama 60x60 cm 800.000 M2 291,938.00 233,550,400.00
4 Pas Plin Keramik 10x60 cm 593.600 M1 39,469.90 23,429,332.64
5 Pek. Pas Wallpaper Dinding m² 259,630.00 -
6 Pek. Backdrop Plywood 15mm + finishing HPL glossy (R.kelas) m² 1,100,000.00 -
7 Pek. Pas ACP + Rangka hollow 40.40 mm (Façade) 241.575 m² 982,800.00 237,419,910.00
8 Pek. Pas Cutting ACP motif songket + Rangka hollow 40.40 mm (Façade) 72.600 m² 1,147,800.00 83,330,280.00
9 Pek. Pas Cutting Huruf Stainless timbul 388.500 cm² 60,000.00 23,310,000.00
Jumlah 3.2 636,219,712.93
3.3 Pekerjaan Kusen dan Kaca
1 Kusen Pintu Alumunium (PJ1) 6 buah m' 190,492.00 -
2 Daun Pintu Alumunium (PJ1) 6 buah m² 1,179,110.00 -
3 Kusen Pintu Alumunium (P2) 4 buah m' 190,492.00 -
4 Daun Pintu Alumunium (P2) 4 buah m² 1,179,110.00 -
5 Kusen Jendela Alumunium (J1) 5 buah m' 190,492.00 -
6 Daun Jendela Alumunium (J1) 5 buah m² 1,179,110.00 -
7 Kusen Jendela Alumunium (J2) 6 buah m' 190,492.00 -
8 Daun Jendela Alumunium (J2) 6 buah m² 1,179,110.00 -
9 Pas. Engsel Pintu Alumunium Bh 49,100.00 -
10 Pas. Engsel Casement Jendela Bh 36,200.00 -
11 Pas. Door Closer Bh 370,000.00 -
12 Pas. Kait / Hak Angin Jendela Bh 38,000.00 -
13 Pas. Kunci Pintu Bh 423,850.00 -
Jumlah 3.3 -
3.4 Pekerjaan Penutup Atap dan Plafond
1 Pasang Plafond PVC + Rangka Hollow Galvalum 400.000 M2 244,350.00 97,740,000.00
2 Pek. List Plafond PVC 296.80 M1 31,250.00 9,275,000.00
Halaman - 30
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f g
IV. PEKERJAAN ELEKTRIKAL DAN PLUMBING
4.1 Pekerjaan Instalasi dan Armatur Lampu
Instalasi penerangan, daya, stop kontak, saklar menggunakan kabel Kabel NYM 2 x 1 x 2,5 mm2
dalam conduit hight impact Ø 20 mm, setiap pencabangan ke armature melalui junction box
dan diletakkan dlm fleksibel konduit jarak minimum 1,5 m dari armature
1 Instalasi Titik Lampu Kabel NYM 2,5mm2 - 42.000 Titik 315,561.25 13,253,572.50
dalam PVC Ø 20 mm Komplit Juction Box & Perlengkapannya -
2 Instalasi Saklar dan Stop Kontak Kabel NYM 2,5 mm2 - 23.000 Titik 186,901.88 4,298,743.13
dalam PVC Ø 20 mm Komplit Juction Box & Perlengkapannya -
3 Lampu Tanam Downlight 14 Watt - 42.000 Set 141,500.00 5,943,000.00
4 Pek. Ceiling LED Strip Plafond - m1 198,000.00 -
5 Stop Kontak 2 Phase, 16 A - 32.000 Bh 83,000.00 2,656,000.00
6 Stop Kontak AC - Titik 1,100,000.00 -
7 AC 1 PK - Unit 4,700,000.00 -
8 Saklar Double - 10.000 Bh 84,400.00 844,000.00
9 Pek. Fire Extinguisher CO2 5Kg + Aksesoris (APAR) - Unit 950,000.00 -
10 Pek. Panel MCB + box - Bh 480,000.00 -
Jumlah 4.1 26,995,315.63
Halaman - 31
RENCANA ANGGARAN BIAYA (RAB)
TOTAL 288,000,000.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
2. Kerikil
Kerikil Sungai Pilihan/ Koral M3 360,000.00
Kerikil Sungai Tersaring M3 360,000.00
Kerikil Sungai Tak Tersaring M3 360,000.00
Batu Pecah 0,5 - 1 Cm (Spilt) M3 480,000.00
Batu Pecah 1 - 2 (Spilt) M3 480,000.00
Batu Pecah 2 - 3 (Spilt) M3 480,000.00
Batu Pecah 3 - 5 (Spilt) M3 480,000.00
Batu Pecah 5 - 7 (Spilt) M3 480,000.00
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 525,000.00
Batu Karang M3 412,000.00
Batu Andesit Bintik 30 x 30 cm M2 320,000.00
Batu Andesit Bintik 20 x 40 cm M2 320,000.00
Batu Sikat Motif Kecil Ktg 90,000.00
Batu Sikat Motif Besar Ktg 90,000.00
4. Batu Cetak :
Batu Bata Ukuran 5 x 11 x 22 cm Bh 650.00
Batu Bata Ukuran 5 x 9 x 22 cm Bh 453.33
Batu Bata Ukuran 5 x 7 x 22 cm Bh 380.00
Batu Bata Ukuran 5 x 11 x 22 cm M3 650,000.00
Batu Bata Ukuran 5 x 9 x 22 cm 1 M3 (700 Buah) M3 602,500.00 Bh
2. Semen
Semen Pc (50 Kg) Zak 63,000.00 /Kg
Semen Warna/ Putih Kg 2,300.00 /Zak
Halaman - 02
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4
3. Bahan Atap
Seng Gelombang BJLS 0.20 Lbr 48,600.00
Seng Gelombang BJLS 0.18 Lbr 42,000.00
Genteng Metal (Multi Roof) T= 0,3 mm, 2 Susun Lbr 71,000.00
Genteng Metal (Sakura Roof) T= 0,3 mm, 2 Susun Lbr 29,000.00
Seng Plat BJLS 0.20 Lbr 350,000.00
Atap Zincalume 80 x 170 cm, T= 0,25 mm Lbr 72,000.00
5. Bahan Kayu
Balok 6/16 x 4 m (Kayu Kelas I), Kayu Lasi M3 10,500,000.00
Balok 6/16 x 4 m (Kayu Kelas II) M3 5,100,000.00
Balok 8/12 x 4 m (Kayu Kelas II) M3 5,100,000.00
Balok 6/10 x 4 m (Kayu Kelas II) M3 5,100,000.00
Balok 5/7 x 4 m (Kayu Kelas II) M3 5,100,000.00
Balok 5/7 x 4 m (Kayu Kelas III) M3 2,850,000.00
Kayu Bakesting (Kayu Kelas III) M3 2,850,000.00
Papan Palapi M3 2,500,000.00
Papan (Kayu Kelas II) M3 5,100,000.00
Papan Mall (Kayu Kelas III) M3 1,600,000.00
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' Btg 13,000.00
6. Bahan Bambu
Bambu Besar 15 - 20 Cm Btg 15,000.00
Bambu Sedang 10 - 15 Cm Btg 10,400.00
Bambu Kecil 5 - 10 Cm Btg 8,000.00
Bahan Alumunium :
Kusen Alumunium 3" x 1,3/4", (Indalex) Coating Putih M1 160,000.00
Kusen Alumunium Open Back 4" x 1,3/4", (Indalex) Coating Putih M1 135,000.00
Kusen Alumunium Kaca Mati 4" x 1,3/4", (Indalex) Coating Putih M1 95,916.67
Kusen Alumunium Tutup Kaca Mati 4" x 1,3/4", (Indalex) Coating Putih M1 47,666.67
Kusen Alumunium Tutup Polos 4" x 1,3/4", (Indalex) Coating Putih M1 35,933.33
Profil Alumunium Curtain Wall 4,5 x 10 cm, Coating Putih M1 134,750.00
Profil Alumunium Curtain Wall 5 x 10 cm, Coating Putih M1 162,250.00
Profil Alumunium (Tutup Curtain Wall) 2 x 5 cm, Coating Putih M1 102,116.67
Daun Pintu Aluminium Rangka Kecil M2 1,500,000.00
Daun Pintu Aluminium Rangka Besar M2 2,100,000.00
Slimar Alumunium 3/8 M1 68,000.00
Slimar Alumunium 3/10 M1 84,000.00
Allumunium Strip M1 35,000.00
Cord - Kanal C Tebal = 1 mm Btg 118,000.00
Reng - Kanal U Tebal = 0,6 mm Btg 113,000.00
Braket L Bh 2,000.00
Alcopanel (Alumunium Composite Panel), Seven Type PPDF M2 650,000.00
Jendela Nako Unit 205,000.00
9. Bahan Kawat
Kawat Ikat Beton/ Bendrat Kg 23,000.00
Kawat Duri (50 m) 4 Kg Roll 160,000.00
Kawat Las Dos 175,000.00
Kawat Las LB (5 Kg) Kg 128,000.00 /5 Kg
Kawat Las Listrik Kg 40,000.00
Kawat Las RB (5 Kg) Kg 92,000.00 /5 Kg
Pipa Gip :
Diameter 1/2" Btg 51,000.00 /M1
Diameter 3/4" Btg 66,607.00 /M1
Diameter 1" Btg 126,000.00 /M1
Knie Gip 1/2" Bh 9,500.00 /M1
Double Niple 1" Bh 8,900.00 /M1
Clame Sadle 1/2"-3" Bh 51,500.00 /M1
Tee Gip 1/2" Bh 5,900.00
Socket Drat Gip 1/2" Bh 4,700.00 /M1
Hanger + Support Pipa GIP 4" Set 120,000.00
Hanger + Support Pipa GIP 3" Set 100,000.00
Hanger + Support Pipa GIP 2" Set 90,000.00
Hanger + Support Pipa GIP 3/4" Set 85,000.00
Hanger + Support Pipa GIP 1/2" Set 65,000.00
Cat Tembok :
Cat Tembok & Plafond (Interior) Kg 30,000.00
Cat Tembok Wathersield (Exterior) Kg 45,000.00
Cat Tembok Metrolait Kg 23,550.00
Cat Tembok Paragon (20 Kg) Kg 17,850.00 Pail
Cat Tembok Cathylac Kg 21,600.00
Plamur Tembok Kg 13,500.00 Klg
Dempul Tembok Kg 23,438.00
Polimer Mortar Kg 25,000.00
EAL Water Proofing Epoxy (02) Kg 160,000.00
Cat Besi :
Meny Seng Kg 27,344.00
Meny Besi Kg 25,500.00
Cat Besi Kg 30,000.00
Cat Coating Clear (Glotex) Kg 56,000.00
Cat Dicco Kg 87,000.00
Cat Atap Seng Kg 24,375.00 Klg
Cat Atap dan Genting Kg 24,375.00 Klg
Cat Vernis Kg 32,000.00
Pipa Listrik :
Pipa listrik 5/8" Btg 4,500.00
Pipa Conduit Hight Impact Ø 20 mm Btg 4,650.00
Fleksible 20 mm M1 6,000.00
Saklar/ Sekring :
Saklar tunggal, 10 A, 250 VAC (Setara Panasonic) Bh 25,000.00
Saklar Seri, 10 A, 250 VAC (Setara Panasonic) Bh 35,000.00
Saklar Triple, 10 A, 250 VAC (Setara Panasonic) Bh 40,000.00
Stop Kontak 2 Phase, 16 A Bh 28,000.00
Stop Kontak 1 Phase, 13 A Bh 22,000.00
Switch Socket AC + Indikator Lamp 16 A Bh 25,000.00
Exhaust Fan Set 250,000.00
Fitting Tempel Kotak Bh 15,000.00
Box Sekring 1 Fase Bh 20,350.00
Box Sekring 2 Fase Bh 27,637.50
Sekring Kas Kosong DN 2 G Bh 87,750.00
Sekring Kas Kosong DN 3 G Bh 90,000.00
Sekring Kas Kosong DN 4 G Bh 94,500.00
T Duss Bh 3,500.00
Elbow Bh 350.00
Las dop Bh 1,000.00
Inbow Does Bh 5,000.00
Mangkok Saklar/ Stop Kontak Bh 1,500.00
Klem Biasa Bh 100.00
Lampu Pijar :
Lampu 25 Watt Bh 5,400.00
10 - 40 Watt Bh 15,000.00
60 - 100 Watt Bh 25,000.00
Lampu SL 23 Watt Bh 36,945.00
Lampu SL 20 Watt Bh 34,000.00
Lampu SL 18 Watt Bh 30,629.00
Lampu SL 15 Watt Bh 30,000.00
Lampu SL 10 Watt Bh 27,714.00
Lampu SL 11 Watt Bh 29,500.00
Lampu SL 8 Watt Bh 24,799.00
Lampu SL 5 Watt Bh 10,000.00
Balon Lampu TL :
TL Biasa 20 Watt Bh 9,900.00
TL Biasa 40 Watt Bh 75,000.00
TL Blok Bambu 20 Watt Set 112,000.00
TL Blok Bambu 40 Watt Set 121,641.67
Lampu TL (Perset) :
10 - 20 Watt (Model keranjang) Set 45,000.00
20 - 40 Watt (Model keranjang) Set 75,000.00
40 - 60 Watt (Model keranjang) Set 125,000.00
Lampu RM (Perset) :
Lampu RMI TL 2 x 18 Watt, Stainlees Grill Set 350,000.00
Lampu RM TL 2 x 20 Watt Komplit, Stainlees Grill Set 395,000.00
Lampu RM TL 2 x 18 Watt Komplit, Glass ALML Set 375,000.00
Kran Air :
Kran Air 1/2 " Bh 40,000.00
Kran Leher Angsa Unit 325,000.00
Kran Shower Panas dan Dingin Bh 437,500.00
Kran Wudhu Unit 275,000.00
2. Kerikil
Kerikil Sungai Pilihan/ Koral M3 242,916.67
Kerikil Sungai Tersaring M3 242,916.67
Kerikil Sungai Tak Tersaring M3 242,916.67
Batu Pecah 0,5 - 1 Cm Spilt M3 250,000.00 185.185
Batu Pecah 1 - 2 M3 250,000.00 185.185
Batu Pecah 2 - 3 M3 250,000.00 185.185
Batu Pecah 3 - 5 M3 250,000.00 185.185
Batu Pecah 5 - 7 M3 250,000.00 185.185
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 258,194.17
Batu Karang M3 125,000.00
Batu Paras Alur M2 253,000.00
Batu Alam Palimanan M2 247,500.00
Batu Andesit Susun Sirih 3 x 30 cm M2 247,200.00
Batu Andesit Bintik 20 x 40 cm M2 265,000.00
Batu Marmo Bakar 20 x 40 cm M2 231,750.00
Batu Alur Candi 20 x 40 cm M2 267,800.00
Batu Sikat Motif Kecil Ktg 58,000.00
Batu Sikat Motif Besar Ktg 51,500.00
4. Batu Cetak :
Batu Bata Ukuran 5 x 11 x 22 cm Bh 525.83
Batu Bata Ukuran 5 x 9 x 22 cm Bh 453.33
Batu Bata Ukuran 5 x 7 x 22 cm Bh 380.00
Batako 7 cm Bh 2,947.50
Batako 9 cm Bh 3,433.33
Batako 10 cm Bh 3,919.17
Batako 12 cm Bh 4,890.83
Hebel Bata Ringan (20 x 60 x 10) cm Bh 14,400.58 83.33
Hebel Bata Ringan (20 x 60 x 10) cm M3 1,200,000.00 14,457.83
Hebel Bata Ringan (20 x 60 x 7,5) cm Bh 10,800.11 111.11
Hebel Bata Ringan (20 x 60 x 7,5) cm M3 1,200,000.00 14,457.83
Paving Block Lokal Bh 1,200.00 33.33
Paving Block Segi Enam Tebal 6 cm K-250 M2 136,000.00 27
Batu Bata Ukuran 5 x 11 x 22 cm M3 650,000.00
Batu Bata Ukuran 5 x 9 x 22 cm 1 M3 (700 Buah) M3 602,500.00 700
Halaman - 02
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
1. Kapur
Kapur Pasang (Mil) Kg 3,906.26 195,313
Kapur Bakar Kg 3,000.00 150,000
Kapur M3 195,313.00
2. Semen
Semen Pc (50 Kg) Zak 75,515.00 1,510
Semen Warna/ Putih Kg 1,767.33 88,367
Nat (Mortar Flex) Kg 12,000.00
Perekat Bata Ringan Lemkra LBM - 116 Zak 165,000.00 3,300
Perekat Bata Ringan MU - 380 - 40 Kg/Zak Zak 160,000.00 4,000
3. Bahan Atap
Seng Gelombang BJLS 0.20 Lbr 40,835.83
Seng Gelombang BJLS 0.18 Lbr 39,783.33
Genteng Metal (Multi Roof) T= 0,3 mm, 2 Susun Lbr 74,250.00 0,800 x 0,770
Genteng Metal (Sakura Roof) T= 0,3 mm, 2 Susun Lbr 27,540.00
Seng Plat BJLS 0.20 Lbr 44,641.67
Genteng Zincalume Type USR (Unico Single Rib) M2 125,000.00
Genteng Zincalume 80 x 170 cm Lbr 86,000.00
Atap Asphalt Sheet/ Onduline Lbr 86,125.00
5. Bahan Kayu
Balok 6/16 x 4 m (Kayu Kelas I) M3 2,423,666.67
Balok 6/16 x 4 m (Kayu Kelas II) M3 1,549,166.67
Balok 8/12 x 4 m (Kayu Kelas II) M3 1,549,166.67
Balok 6/10 x 4 m (Kayu Kelas II) M3 1,549,166.67
Balok 5/7 x 4 m (Kayu Kelas II) M3 1,549,166.67
Balok 5/7 x 4 m (Kayu Kelas III) M3 1,516,777.50
Kayu Bakesting (Kayu Kelas III) M3 1,160,500.00
Kayu Bakar M3 150,000.00
Papan Palapi M3 1,646,333.33
Papan (Kayu Kelas II) M3 1,516,777.50
Papan Mall (Kayu Kelas III) M3 1,160,500.00
Papan Lembar Seri 8 Cm Lbr 27,206.67
Papan Lembar Seri 10 Cm Lbr 31,500.00
Papan Kateks M3 2,035,000.00
Papan Flooring Lbr 121,875.00
List Profil Kayu 10 Cm Btg 43,725.00 10,931.25
List Profil Kayu 6 Cm Btg 34,008.33 8,502.08
List Profil Kayu M1 26,900.00
Listplank Ornament Jadi Lbr 68,016.67
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' Btg 6,801.67
Gymfloor M2 250,000.00
Penjaga Jarak Bekisting/ Spacer Buah 10,000.00
6. Bahan Bambu
Bambu Besar 15 - 20 Cm Btg 15,000.00
Bambu Sedang 10 - 15 Cm Btg 10,400.00
Bambu Kecil 5 - 10 Cm Btg 8,000.00
Bilik Bambu M2 50,000.00
Halaman - 03
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Halaman - 04
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Bahan Alumunium :
Kusen Alumunium 3" x 1,3/4" (YKK) M1 150,000.00
Kusen Alumunium 4" x 1,3/4" (YKK) M1 165,262.50
Profil Alumunium Jepitan Kaca M1 85,000.00
Daun Pintu Aluminium Rangka Kecil M2 1,000,000.00
Daun Pintu Aluminium Rangka Besar M2 1,800,000.00
Slimar Alumunium 3/8 M1 58,000.00 untuk jendela
Slimar Alumunium 3/10 M1 74,000.00 untuk pintu
Accesories Kusen Alumunium Ls 20,000.00
Rangka Daun Jendela Allumunium M1 50,000.00
Jendela Nako Unit 185,000.00
Panel Allumunium M2 200,000.00
Profil Allumunium M1 15,000.00
Allumunium Strip M1 25,000.00
Cord - Kanal C Tebal = 1 mm Btg 120,000.00 20,000.00
Reng - Kanal U Tebal = 0,6 mm Btg 115,000.00 19,166.67
Braket L Bh 2,000.00
Pintu Besi Khazanah Treasury Unit 55,000,000.00
Jendela Nako (rangka + kaca 5 mm) M2 150,000.00
Alcopanel (Aluminium Composite Panel) + Rangka M2 1,000,000.00
Alcopanel (Aluminium Composite Panel) M2 975,000.00
Railling Tangga Stainless M2 750,000.00
Rangka Besi Holo Embos 20 x 40 mm M2 375,000.00
Halaman - 05
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
9. Bahan Kawat
Kawat Ikat Beton/ Bendrat Kg 26,000.00
Kawat Duri (50 m) 4 Kg Roll 156,250.00 3,125.00
Kawat Jaringan/ Ayakan M1 18,000.00
Kawat Harmonika M2 60,938.00
Kawat Bronjong Roll 875,000.00
Kawat Las Dos 150,000.00
Kawat Las LB (5 Kg) Kg 128,000.00 640,000.00
Kawat Las Listrik Kg 40,000.00
Kawat Las RB (5 Kg) Kg 92,000.00 460,000.00
Pipa Gip :
Diameter 1/2" Btg 44,365.00 7,394.17
Diameter 3/4" Btg 66,607.00 10,633.33
Diameter 1" Btg 126,000.00 15,491.67
Diameter 1-1/4" Btg 151,000.00 25,166.67
Diameter 1-1/2" Btg 181,000.00 30,166.67
Diameter 1,5" Btg 1,299,000.00 216,500.00
Halaman - 06
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Cat Tembok :
Cat Tembok & Plafond (Interior) Kg 30,000.00
Cat Tembok Wathersield (Exterior) Kg 45,000.00
Cat Tembok Metrolait Kg 23,550.00 102,500.00
Cat Tembok Paragon (20 Kg) Kg 17,850.00 357,000.00
Cat Tembok Cathylac Kg 21,600.00
Cat Tembok Bel Mas Kg 13,000.00
Cat Marka (Non Thermoplas) Kg 54,688.00
Halaman - 07
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Cat Besi :
Meny Seng Kg 27,344.00
Meny Besi Kg 25,500.00
Meny Kayu Kg 23,438.00
Cat Besi Kg 33,000.00
Cat Coating Clear (Glotex) Kg 56,000.00
Cat Dicco Kg 87,000.00
Cat Atap Seng Kg 24,375.00 87,500.00
Cat Atap dan Genting Kg 24,375.00 87,500.00
Halaman - 08
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Pipa Listrik :
Pipa listrik 5/8" Btg 4,500.00 1,125.00
Saklar/ Sekring :
Saklar Double (Setara Broco) Bh 19,455.00
Saklar Tunggal (Setara Broco) Bh 12,815.00
Stop Kontak (Setara Broco) Bh 13,948.33
Saklar + Stop Kontak (Setara Broco) Bh 19,860.00
Saklar Double Bh 8,000.00
Halaman - 09
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Lampu Pijar :
Lampu 25 Watt Bh 6,013.33
10 - 40 Watt Bh 15,000.00
60 - 100 Watt Bh 25,000.00
Lampu Philips SL 23 Watt Bh 36,945.00
Lampu Philips SL 24 Watt Bh 43,908.33
Lampu Philips SL 18 Watt Bh 30,629.17
Lampu Philips SL 15 Watt Bh 30,000.00
Lampu Philips SL 11 Watt Bh 29,500.00
Lampu Philips SL 10 Watt Bh 27,714.17
Lampu Philips SL 8 Watt Bh 24,799.17
Lampu Philips SL 5 Watt Bh 10,000.00
Lampu Philips SL 20 Watt Type Down Light Ø 4" + Box Set 105,000.00
Lampu Philips SL 18 Watt Type Down Light Ø 4" + Box Set 95,000.00
Lampu Philips SL 15 Watt Type Down Light Ø 4" + Box Set 85,000.00
Lampu Philips Pijar 11 Watt Down Light Ø 4"+ Box Set 80,000.00
Lampu Philips Pijar 8 Watt Down Light Ø 3"+ Box Set 65,000.00
Lampu Philips Pijar 5 Watt Down Light Ø 4"+ Box Set 60,000.00
Lampu Taman Philips + Box Set 350,000.00
Lampu Spot Light 500 Watt Set 200,000.00
Armatur Down Light Bh 55,000.00
Lampu Mercury 400 Watt + Stavolt Set 481,250.00
Balon Lampu TL :
TL Biasa 20 Watt Bh 9,900.00
TL Biasa 40 Watt Bh 75,000.00
TL Blok Bambu 20 Watt Set 100,000.00
TL Blok Bambu 40 Watt Set 121,641.67
Lampu TL (Perset) :
10 - 20 Watt (Model keranjang) Set 45,000.00
20 - 40 Watt (Model keranjang) Set 75,000.00
40 - 60 Watt (Model keranjang) Set 125,000.00
Lampu RM (Perset) :
Lampu RM TL 2 x 20 Watt Komplit Set 250,000.00
Halaman - 10
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Instalasi :
Instalasi Titik Lampu Titik 55,000.00
Instalasi Titik Saklar dan Stop Kontak Titik 40,000.00
Instalasi AC Titik 60,000.00
Soket Antene TV + Instalasi Kabel Tanam Titik 35,000.00
Soket Monitor CCTV + Instalasi Kabel Tanam Titik 35,000.00
Soket Telepon + Instalasi Kabel Tanam Titik 35,000.00
Instalasi Kabel CCTV Titik 35,000.00
Halaman - 11
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Kloset Jongkok Standar Ex. INA Buah 186,875.00
Kloset Jongkok Biasa Ex. INA Buah 203,125.00
Urinoir Dinding Standart Buah 500,000.00
Urinoir Biasa Buah 7,500.00
Jet Shower (Shower Closet) Komplit Unit 318,750.00
Kran Air :
Kran Air 1/2 " Bh 40,625.00
Kran Leher Angsa Unit 325,000.00
Kran Shower Panas dan Dingin Bh 437,500.00
Kran Wudhu Unit 275,000.00
Pompa Air :
Sanyo 150 Watt Set 487,500.00
National 125 Watt Set 475,000.00
National 250 Watt Set 550,000.00
Yasuka Uk. 4 Inc Set 2,860,000.00
Yasuka Uk. 8 Inc Set 7,800,000.00
Pompa Lip. Pump. Kap.150 Ltr/ Mnt, Set 3,500,000.00
Head 27 Mtr, 2900 RPM
Halaman - 12
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
KETERANGAN
5
/Kg
bh
bh
Bh
Bh
Bh
Halaman - 02
KETERANGAN
5
Zak
/Kg
/Zak
/M1
/M1
/M1
Halaman - 03
KETERANGAN
5
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
Dos
/Btg
/Btg
/Btg
/Btg
/Btg
/Btg
/Btg
/Btg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
M1
M1
M1
M1
M1
M1
Halaman - 04
KETERANGAN
5
M1
M1
M1
M1
M1
M1
226.08
45.216
Btg
Btg
Btg
Btg
Btg
Btg
Btg
44.28
Btg
Halaman - 05
KETERANGAN
5
/5 Kg
/5 Kg
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
Halaman - 06
KETERANGAN
5
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
/M1
Pail
Halaman - 07
KETERANGAN
5
Klg
Klg
Klg
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Psg
/Psg
Halaman - 08
KETERANGAN
5
/Bh
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Halaman - 09
KETERANGAN
5
Halaman - 10
KETERANGAN
5
Halaman - 11
KETERANGAN
5
/Liter
Halaman - 12
KETERANGAN
5
Btg
Btg
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-77
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-78
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-79
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-80
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-81
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-82
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-83
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-84
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-85
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-86
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-87
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-88
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-89
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-90
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
IV.2 AHSP - A.4.1.1 HARGA SATUAN PEKERJAAN BETON (Pembesian dan Bekisting)
Halaman-91
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
B. BAHAN :
a. Besi Beton (Polos/ Ulir) Ǿ 10 mm - Kg 10.500 8,779.04 92,179.90
b. Kawat Beton - Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 95,629.90
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 112,709.90
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 112,709.90
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 10 mm (Harga Satuan Pekerjaan / 10) 11,270.99
4. Besi Beton (Polos/ Ulir) Ǿ 12 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 100,000.00 7,000.00
Tukang Besi L.02 Org/Hari 0.070 130,000.00 9,100.00
Kepala Tukang L.03 Org/Hari 0.007 140,000.00 980.00
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 17,080.00
B. BAHAN :
a. Besi Beton (Polos/ Ulir) Ǿ 12 mm - Kg 10.500 10,992.11 115,417.14
b. Kawat Beton - Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 118,867.14
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 135,947.14
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 135,947.14
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 12 mm (Harga Satuan Pekerjaan / 10) 13,594.71
5. Besi Beton (Polos/ Ulir) Ǿ 16 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 100,000.00 7,000.00
Tukang Besi L.02 Org/Hari 0.070 130,000.00 9,100.00
Kepala Tukang L.03 Org/Hari 0.007 140,000.00 980.00
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 17,080.00
B. BAHAN :
a. Besi Beton (Polos/ Ulir) Ǿ 16 mm - Kg 10.500 13,500.00 141,750.00
b. Kawat Beton - Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 145,200.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 162,280.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 162,280.00
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 12 mm (Harga Satuan Pekerjaan / 10) 16,228.00
Halaman-92
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-93
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-94
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-95
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-96
#NAME?
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f g
V. DIVISI 5.0 PEKERJAAN INTERIOR & EXTERIOR
5.1.1 LANTAI SATU (PEIL + 0,00)
Section 5.1.1.1 Section Pekerjaan Railling dan Dinding Shaft
1 Railling Tangga Type - 02 4.000 Unit Err:509 Err:509
2 Railling Tangga Type - 03 2.000 Unit Belum dilaksanakan
3 Dinding Besi Plat + Rangka Besi Hollow 2 x 2 cm (Segmen Lt.1 s/d Lt.3, Tinggi = 9 m) 55.350 M2 Belum dilaksanakan
Jumlah Divisi 5.1.1 Err:509
5.1.2 LANTAI DUA (PEIL + 4,00)
Section 5.1.2.1 Pekerjaan Railling
1 Pas. Handle Tangga Type - 01 2.000 Unit Err:509 Err:509
2 Railling Tangga Type - 02 4.000 Unit Err:509 Err:509
3 Railling Tangga Type - 3 2.000 Unit Belum dilaksanakan
Sub Jumlah Divisi 5.1.2.1 Err:509
Section 5.1.2.2 Pekerjaan Panggung (Stage)
1 Pek. Rangka Panggung Besi Baja WF (Wide Flange)
- Baja WF 150x75x5x7 mm 735.980 Kg Err:509 Err:509
2 Pek. Rangka Panggung Besi CNP
- Canal CNP 150x50x20x3,2 mm 1,408.822 Kg Err:509 Err:509
- Canal CNP 150x50x20x2,3 mm 164.904 Kg Err:509 Err:509
3 Pek. Penutup Lantai Papan 3 x 30 cm, Kayu Kelas I 101.743 M2 Err:509 Err:509
4 Plat Buhul 8 mm 192.000 Kg 28,130.29 5,401,014.76
5 Angker Tanam Baut Ø 16 mm - 45 cm 98.000 Kg Err:509 Err:509
Sub Jumlah Divisi 5.1.2.2 Err:509
Jumlah Divisi 5.1.2 Err:509
5.1.3 LANTAI TIGA (PEIL + 8,00)
Section 5.1.3.1 Pekerjaan Railling
1 Railling Pagar Area Balcone (Railing Type - 1) 10.000 Unit Belum dilaksanakan
2 Railling Pagar Area Balcone (Railing Type - 2) 2.000 Unit Belum dilaksanakan
3 Railling Pagar Area Void (Railing Type - 1) 3.000 Unit Err:509 Err:509
Sub Jumlah Divisi 5.1.3.1 Err:509
Section 5.1.3.2 Pekerjaan Allumunium Composite Panel
1. Pekerjaan ACP Segmen - A, (Lihat Gambar Detail)
1 Pemasangan ACP Rangka Hollow Galvalum 2 x 2 Cm Type - 1 (Warna Orange) 174.250 M2 Err:509 Err:509
2 Pemasangan ACP Rangka Besi Hollow 4 x 4 Cm, Type - 2 (Warna Abu-abu Muda) 128.769 M2 Err:509 Err:509
3 Pemasangan ACP Rangka Besi Hollow 4 x 4 Cm, Type - 2 (Warna Kuning) 77.564 M2 Err:509 Err:509
4 Pemasangan ACP Rangka Besi Hollow 4 x 4 Cm Type - 2 (Warna Orange) 27.495 M2 Err:509 Err:509
Halaman - 97
2 Pemasangan ACP Rangka Besi Hollow 4 x 4 Cm, Type - 2 (Warna Abu-abu Muda) 73.920 M2 Err:509 Err:509
3 Pemasangan ACP Rangka Besi Hollow 4 x 4 Cm, Type - 2 (Warna Abu-abu Tua) 67.140 M2 Err:509 Err:509
Halaman - 98
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-99
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-100
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-102
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-103
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-104
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-105
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-106
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-107
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-108
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-109
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-110
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-111
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-112
JUMLAH TENAGA KERJA 20,810.00
B. BAHAN :
Profil Aluminium - M1 1.100 - -
Skrup/Fixer - bh 2.000 25,887.00 51,774.00
Sealent - Tube 0.060 - -
Halaman-113
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
SATUAN KERJA : DINAS PEKERJAAN UMUM DAN PERHUBUNGAN KABUPATEN BANGGAI LAUT
PEKERJAAN : RE Desain Ruang Praktik Training Center
LOKASI : SMK NEGERI 1 PALEMBANG
TAHUN ANGGARAN : 2021
Halaman-114
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-115
VII. AHSP - A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
Halaman-116
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
VIII. AHSP - A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
Halaman-117
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-118
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-119
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-120
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-121
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-122
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-123
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-124
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-125
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-126
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-127
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-128
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-129
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-130
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-131
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-132
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-133
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-134
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-135
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-136
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-137
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-138
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-139
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-140
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-141
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-142
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-143
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-144
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-145
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-146
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN Memasang 1 m' Pipa PVC tipe AW Ø ¾"
SATUAN PEMBAYARAN : M1
Halaman-147
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Type AW Diameter 3"
SATUAN PEMBAYARAN : M1
Halaman-148
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-149
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-150
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-151
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-152
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-153
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-154
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-155
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-156
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-157
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-158
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-159
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-160
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-161
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-162
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-163
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-164
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-165