NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Upah
Mandor 0,0019 oh 126.551,7 241,05
Kepala Tukang Kayu 0,0095 oh 0
105.459,7 1.004,38
Tukang Kayu 0,0476 oh 5
105.459,7 5.021,89
Pekerja 0,0952 oh 577.337,1 7.365,44
5JUMLAH 52.630,5
2 PEMBULATA 0
52.629,0
3 1 m3 Pek. Galian Tanah Manual 1 M N 0
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0333 oh 126.551,7 4.218,39
Tukang Gali 0,0952 oh 098.429,1 9.374,20
Pekerja 0,3333 oh 0
77.337,1 25.779,0
5JUMLAH 5
40.649,9
3 PEMBULATA 4
40.649,0
4 1 m3 Pek. Galian Tanah Manual 2 M N 0
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0400 oh 126.551,7 5.062,07
Tukang Gali 0,1143 oh 098.429,1 11.249,0
Pekerja 0,4000 oh 0
77.337,1 4
30.934,8
5JUMLAH 6
48.524,2
4 PEMBULATA 7
48.524,0
5 1 m3 Pek. Galian Tanah Manual 3 M N 0
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0500 oh 126.551,7 6.327,59
Tukang Gali 0,1429 oh 098.429,1 14.061,3
Pekerja 0,5000 oh 0
77.337,1 0
38.668,5
5JUMLAH 8
60.335,7
5 PEMBULATA 6
60.335,0
6 1 m3 Pek. Galian Tanah Mekanik N 0
Alat
Excavator 0,0036 hr/unit 4.800.564, 17.144,8
Bahan bakar solar 0,5000 ltr 3412.783,0 7
6.391,50
Alat Bantu 1,0000 ls 0639,15 639,15
Upah
Operator 0,0071 oh 210.919,5 1.506,57
Mandor 0,0089 oh 0
126.551,7 1.129,93
Pekerja 0,0357 oh 077.337,1 2.762,04
5
JUMLAH 29.574,0
6 PEMBULATA 6
29.574,0
N 0
Upah
Operator 0,0114 oh 210.919,5 2.410,51
Mandor 0,0143 oh 0
126.551,7 1.807,88
Pekerja 0,0571 oh 077.337,1 4.419,27
5
JUMLAH 21.993,0
7 PEMBULATA 2
21.993,0
8 1 m3 Pek. Buang Tanah Galian N 0
Alat
Excavator loader 0,0024 hr/unit 4.125.621, 9.822,91
Dumtruck 0,0063 hr/unit 94
1.256.386, 7.852,41
Bahan bakar solar 0,1190 ltr 2912.783,0 1.521,79
Alat Bantu 1,0000 ls 0127,83 127,83
Upah
Operator 0,0048 oh 210.919,5 1.004,38
Mandor 0,0003 oh 0
126.551,7 37,66
Pekerja 0,0024 oh 077.337,1 184,14
5JUMLAH 20.551,1
8 PEMBULATA 2
20.551,0
9 1 m3 Pek. Urugan Tanah Kembali N 0
Alat
Alat Bantu 1,0000 ls 1.597,8 1.597,88
8
Upah
Mandor 0,0192 oh 126.551,7 2.429,79
Pekerja 0,1920 oh 077.337,1 14.848,7
5JUMLAH 3
18.876,4
9 PEMBULATA 0
18.876,0
10 1 m3 Pek. Urugan Tanah N 0
Bahan
Tanah urug 1,0000 m3 51.132,0 51.132,0
0 0
Upah
Mandor 0,0192 oh 126.551,7 2.429,79
Pekerja 0,1920 oh 077.337,1 14.848,7
5JUMLAH 3
68.410,5
10 PEMBULATA 3
68.410,0
11 1 m3 Pek. Urugan Pasir t = 10 cm N 0
Bahan
Pasir urug 1,1000 m3 108.655,5 119.521,0
0 5
Alat
Alat Bantu 1,0000 ls 255,66 255,66
Upah
Mandor 0,0952 oh 126.551,7 12.052,5
Pekerja 0,4762 oh 077.337,1 4
36.827,2
5JUMLAH 1
168.656,4
11 PEMBULATA 7
168.656,0
12 1 m3 Pek. Lantai kerja t = 5 cm N 0
Bahan
Semen @ 50 kg 4,3600 zak 70.306,5 306.536,3
Pasir beton 1,1000 m3 0
153.396,0 4
168.735,6
0 0
Alat
Alat Bantu 1,0000 ls 255,66 255,66
Upah
Mandor 0,0476 oh 126.551,7 6.026,27
Kepala tukang batu 0,0952 oh 0
112.490,4 10.713,3
Tukang batu 0,9524 oh 0
105.459,7 7
100.437,8
Pekerja 1,9048 oh 577.337,1 6
147.308,8
5JUMLAH 6
740.013,9
6
Upah
Mandor 0,0030 oh 126.551,7 380,61
Kepala Tukang batu 0,0150 oh 0
112.490,4 1.691,58
Tukang Batu 0,2105 oh 0
105.459,7 22.202,0
Pekerja 0,0902 oh 577.337,1 5
6.977,79
5JUMLAH 100.559,5
13 PEMBULATA 100.558,0
14 1 kg Pek. Besi Beton N 0
Bahan
Besi Beton 1,0300 kg 10.418,1 10.730,6
Kawat Beton 0,0100 kg 5
20.133,2 9 201,33
Decking Beton 1,0000 ls 3 57,52 57,52
Alat
Alat Bantu 1,0000 ls 63,92 63,92
Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang besi 0,0020 oh 0
112.490,4 224,98
Tukang besi 0,0040 oh 0
105.459,7 421,84
Pekerja 0,0080 oh 577.337,1 618,70
5JUMLAH 12.445,5
14 PEMBULATA 3
12.444,0
15 1 kg Pek. Wiremesh N 0
Bahan
Wiremesh M 4 mm 1,1500 kg 13.102,5 15.067,9
Kawat Beton 0,0100 kg 8
20.133,2 6 201,33
Decking Beton 1,0000 ls 3 57,52 57,52
Alat
Alat Bantu 1,0000 ls 63,92 63,92
Upah
Mandor 0,0007 oh 126.551,7 90,39
Kepala Tukang besi 0,0014 oh 0
112.490,4 160,70
Tukang besi 0,0029 oh 0
105.459,7 301,31
Pekerja 0,0057 oh 577.337,1 441,93
5JUMLAH 16.385,0
15 PEMBULATA 7
16.384,0
16 1 kg Pek. Besi Beton Borepile N 0
Bahan
Besi Beton 1,0300 kg 10.418,1 10.730,6
Kawat Beton 0,0100 kg 5
20.133,2 9 201,33
Decking Beton 1,0000 ls 3 57,52 57,52
Alat
Alat Bantu 1,0000 ls 63,92 63,92
Upah
Mandor 0,0013 oh 126.551,7 158,19
Kepala Tukang besi 0,0025 oh 0
112.490,4 281,23
Tukang besi 0,0050 oh 0
105.459,7 527,30
Pekerja 0,0100 oh 577.337,1 773,37
5JUMLAH 12.793,5
16 PEMBULATA 5
12.793,0
17 1 m3 Pek. Beton K-175 N 0
Bahan
Beton Ready Mix K-175 NFA slump 12 ± 2 1,0300 m3 869.244,0 895.321,3
0 2
Alat
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.001.424,
22 PEMBULATA 58
1.001.423,
23 1 m3 Pek. Beton K-250 N 00
Bahan
Beton Ready mix K-250 NFA slump 12 ± 2 1,0300 m3 933.159,0 961.153,7
0 7
Alat
Alat Bantu 1,0000 m3 35.153,2 35.153,2
5 5
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.027.757,
23 PEMBULATA 56
1.027.756,
24 1 m3 Pek. Beton K-350 Pelat dan Balok N 00
Bahan
Beton Ready mix K-350 NFA slump 12 ± 2 1,0300 m3 1.067.380, 1.099.401,
50 92
Alat
Alat Bantu 1,0000 m3 35.153,2 35.153,2
5 5
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.166.005,
24 PEMBULATA 71
1.166.004,
25 1 m3 Pek. Beton K-300 Tangga N 00
Bahan
Beton Ready mix K-250 NFA slump 12 ± 2 1,0300 m3 933.159,0 961.153,7
0 7
Alat
Alat Bantu 1,0000 ls 9.587,2 9.587,25
5
Upah
Mandor 0,0036 oh 126.551,7 451,97
Kepala Tukang batu 0,0357 oh 0
112.490,4 4.017,51
Tukang Batu 0,1429 oh 0
105.459,7 15.065,6
Pekerja 0,3571 oh 577.337,1 8
27.620,4
5JUMLAH 1
1.017.896,
25 PEMBULATA 59
1.017.895,
26 1 m2 Pek. Bekisting Kolom N 00
Bahan
Poly Film 15 mm 1 sisi 0,0911 lbr 294.009,0 26.797,7
Kayu Balok kelas II 5/7 cm 0,0046 m3 0
2.556.600, 0
11.744,3
Kayu Balok kelas II 6/12 cm 0,0057 m3 00
2.556.600, 8
14.495,9
Minyak bekisting 0,2500 ltr 0012.783,0 2
3.195,75
Paku 0,1000 kg 0
20.133,2 2.013,32
3
Alat
Steel support 0,3750 m2 38.349,0 14.380,8
0 8
Upah
Mandor 0,0104 oh 126.551,7 1.314,82
Kepala Tukang Kayu 0,1039 oh 0
105.459,7 10.956,8
Tukang Kayu 0,1039 oh 5
105.459,7 6
10.956,8
Pekerja 0,2597 oh 577.337,1 6
20.087,5
5JUMLAH 7
115.944,0
26 PEMBULATA 5
115.943,0
27 1 m2 Pek. Bekisting Pelat & Balok N 0
Bahan
Poly Film 12 mm 1 sisi 0,1823 lbr 249.268,5 45.439,5
0 7
Upah
Mandor 0,0301 oh 126.551,7 3.806,07
Kepala Tukang Batu 0,0602 oh 0
112.490,4 6.766,34
Tukang Batu 0,0602 oh 0
105.459,7 6.343,44
Pekerja 0,1203 oh 577.337,1 9.303,72
5JUMLAH 45.675,2
29 PEMBULATA 9
45.674,0
30 1 m2 Pek. Rabat Beton t= 100 mm N 0
Bahan
Semen @ 50 kg 0,3400 zak 70.306,5 23.904,2
Pasir beton 0,1100 m3 0
153.396,0 1
16.873,5
0 6
Alat
Alat Bantu 1,0000 ls 575,24 575,24
Upah
Mandor 0,0381 oh 126.551,7 4.821,02
Kepala Tukang Batu 0,0762 oh 0
112.490,4 8.570,70
Tukang Batu 0,0762 oh 0
105.459,7 8.035,03
Pekerja 0,1524 oh 577.337,1 11.784,7
5JUMLAH 1
74.564,4
30 PEMBULATA 6
74.563,0
31 1 m2 Pek. Keramik Lantai 200x200 mm Unpholished N 0
Bahan
Keramik 20 x 20 cm Unpolished 1,0500 m2 64.324,0 67.540,2
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 62.588,5 6
13.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Tukang Batu 0,1818 oh 105.459,7 19.174,5
Kepala Tukang Batu 0,0455 oh 5
112.490,4 0
5.113,20
Mandor 0,0045 oh 0
126.551,7 575,24
Pekerja 0,0909 oh 077.337,1 7.030,65
5JUMLAH 115.279,1
31 PEMBULATA 7
115.278,0
32 1 m2 Pek. Keramik Lantai 300x300 Pholished N 0
Bahan
Keramik 30 x 30 cm Polished 1,0500 m2 70.715,5 74.251,3
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 62.588,5 3
13.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0045 oh 126.551,7 575,24
Kepala Tukang Batu 0,0455 oh 0
112.490,4 5.113,20
Tukang Batu 0,1818 oh 0
105.459,7 19.174,5
Pekerja 0,0909 oh 577.337,1 0
7.030,65
5JUMLAH 121.990,2
32 PEMBULATA 5
121.989,0
33 1 m2 Pek. Keramik Lantai HT 600x600 mm Polish N 0
Bahan
HT 600x600 mm Polished 1,0500 m2 175.216,5 183.977,4
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 8 2.588,5 113.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 958,73 958,73
Upah
Mandor 0,0050 oh 126.551,7 632,76
Kepala Tukang Batu 0,0500 oh 0
112.490,4 5.624,52
Tukang Batu 0,2000 oh 0
105.459,7 21.091,9
Pekerja 0,1000 oh 577.337,1 5
7.733,72
5JUMLAH 235.225,2
33 PEMBULATA 6
235.224,0
34 1 m2 Pek. Keramik Lantai HT 400x400 mm Polish N 0
Bahan
HT 400x400 mm Polished 1,0500 m2 175.216,5 183.977,4
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 8 2.588,5 113.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 958,73 958,73
Upah
Mandor 0,0050 oh 126.551,7 632,76
Kepala Tukang Batu 0,0500 oh 0
112.490,4 5.624,52
Tukang Batu 0,2000 oh 0
105.459,7 21.091,9
Pekerja 0,1000 oh 577.337,1 5
7.733,72
5JUMLAH 235.225,2
34 PEMBULATA 6
235.224,0
35 1 m2 Pek. Koral Sikat N 0
Bahan
Batu Koral Sikat 1,0500 m2 111.621,1 117.202,2
Semen @ 50 kg 0,1040 zak 670.306,5 17.311,88
Pasir pasang 0,0220 m3 0
153.396,0 3.374,71
Pengisi Nat Keramik ex. SmartGrip TG 0,2000 kg 0 9.235,7 1.847,14
2
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0667 oh 126.551,7 8.436,78
Kepala Tukang Batu 0,1333 oh 0
112.490,4 14.998,7
Tukang Batu 0,2667 oh 0
105.459,7 2
28.122,6
Pekerja 0,2667 oh 577.337,1 0
20.623,2
5 4
Upah
Mandor 0,0056 oh 126.551,7 703,07
Kepala Tukang Batu 0,0556 oh 0
112.490,4 6.249,47
Tukang Batu 0,2222 oh 0
105.459,7 23.435,5
Pekerja 0,1111 oh 577.337,1 0
8.593,02
5JUMLAH 138.899,5
38 PEMBULATA 8
138.899,0
39 1 m1 Pek. Border Dinding 100x200 mm N 0
Bahan
Border 100x200 mm 1,0500 m' 19.915,9 20.911,7
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 12.940,0 1
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,1667 kg 9
9.235,7 1.539,29
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0020 oh 126.551,7 258,27
Kepala Tukang Batu 0,0204 oh 0
112.490,4 2.295,72
Tukang Batu 0,0408 oh 0
105.459,7 4.304,48
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 34.648,7
39 PEMBULATA 8
34.648,0
40 1 m1 Pek. Plint Kayu 100 mm N 0
Bahan
Wood deck 0,1100 m2 367.281,1 40.400,9
Lem Perekat 0,0550 kg 632.213,1 3
1.771,72
6
Upah
Mandor 0,0007 oh 126.551,7 90,39
Kepala Tukang Batu 0,0014 oh 0
112.490,4 160,70
Tukang Batu 0,0714 oh 0
105.459,7 7.532,84
Pekerja 0,1429 oh 577.337,1 11.048,1
5JUMLAH 6
61.324,3
40 PEMBULATA 2
61.323,0
41 1 m1 Pek. Plint HT 100x400 mm Polished N 0
Bahan
HT 100x400 mm Polished 1,0000 m' 41.327,4 41.327,4
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 42.940,0 4
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0004 oh 126.551,7 51,65
Kepala Tukang Batu 0,0008 oh 0
112.490,4 91,83
Tukang Batu 0,0816 oh 0
105.459,7 8.608,96
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 58.129,7
41 PEMBULATA 3
58.128,0
42 1 m1 Pek. Plint HT 100x600 mm Polished N 0
Bahan
HT 100x600 mm Polished 1,0000 m' 41.327,4 41.327,4
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 42.940,0 4
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0004 oh 126.551,7 51,65
Kepala Tukang Batu 0,0008 oh 0
112.490,4 91,83
Tukang Batu 0,0816 oh 0
105.459,7 8.608,96
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 58.129,7
42 PEMBULATA 3
58.128,0
43 1 m1 Pek. Plint Keramik 100x300 mm Polished N 0
Bahan
KR 100x400 mm 1,0000 m' 11.913,7 11.913,7
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 62.940,0 6
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0004 oh 126.551,7 51,65
Kepala Tukang Batu 0,0008 oh 0
112.490,4 91,83
Tukang Batu 0,0816 oh 0
105.459,7 8.608,96
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 26.159,4
43 PEMBULATA 4
26.159,0
44 1 m1 Pek. Step Nosing Keramik N 0
Bahan
Step nosing Keramik 1,0300 m1 37.172,9 38.288,1
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5500 kg 62.940,0 5
1.617,05
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0005 oh 126.551,7 60,26
Kepala Tukang Batu 0,0010 oh 0
112.490,4 107,13
Tukang Batu 0,0952 oh 0
105.459,7 10.043,7
5 9
Upah
Mandor 0,0005 oh 126.551,7 60,26
Kepala Tukang Batu 0,0010 oh 0
112.490,4 107,13
Tukang Batu 0,0952 oh 0
105.459,7 10.043,7
Pekerja 0,0476 oh 577.337,1 9
3.682,72
5JUMLAH 98.857,9
45 PEMBULATA 2
98.857,0
46 1 m2 Pek. Dinding Lapis Kayu N 0
Bahan
Wood deck 1,1000 m2 367.281,1 404.009,2
Rangka Hollow 5,2500 m' 6 8.308,9 743.621,9
Finishing 1,1000 m2 5
63.915,0 9
70.306,5
0 0
Alat
Alat Bantu 1,0000 ls 319,58 319,58
Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang Batu 0,0020 oh 0
112.490,4 224,98
Tukang Batu 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,2000 oh 577.337,1 8
15.467,4
5JUMLAH 3
544.622,2
46 PEMBULATA 7
544.621,0
47 1 m2 Pek. Pasangan Bata Merah 1PC : 3PS N 0
Bahan
Bata merah 5 x 11 x 22 cm 74,0000 bh 830,90 61.486,2
Semen @ 50 kg 0,2874 zak 70.306,5 3
20.206,0
Pasir pasang 0,0380 m3 0
153.396,0 9
5.829,05
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0115 oh 126.551,7 1.457,97
Kepala Tukang Batu 0,0230 oh 0
112.490,4 2.591,94
Tukang Batu 0,0922 oh 0
105.459,7 9.719,79
Pekerja 0,1843 oh 577.337,1 14.255,7
5JUMLAH 0
116.185,9
47 PEMBULATA 2
116.185,0
48 1 m2 Pek. Pasangan Bata Merah 1PC : 4PS N 0
Bahan
Bata merah 5 x 11 x 22 cm 74,0000 bh 830,90 61.486,2
Semen @ 50 kg 0,2300 zak 70.306,5 3
16.170,5
Pasir pasang 0,0430 m3 0
153.396,0 0
6.596,03
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0115 oh 126.551,7 1.457,97
Kepala Tukang Batu 0,0230 oh 0
112.490,4 2.591,94
Tukang Batu 0,0922 oh 0
105.459,7 9.719,79
Pekerja 0,1843 oh 577.337,1 14.255,7
5JUMLAH 0
112.917,3
48 PEMBULATA 1
112.916,0
49 1 m3 Pek. Kolom Praktis 10x10 cm N 0
Bahan
Semen @ 50 kg 6,0000 zak 70.306,5 421.839,0
0 0
Upah
Mandor 0,0033 oh 126.551,7 420,44
Kepala Tukang Batu 0,0332 oh 0
112.490,4 3.737,22
Tukang Batu 0,0664 oh 0
105.459,7 7.007,29
Pekerja 0,2658 oh 577.337,1 20.554,7
5JUMLAH 2
51.245,7
51 PEMBULATA 1
51.244,0
52 1 m2 Pekerjaan Plesteran & Acian 1PC : 4PS - 15mm N 0
Bahan
Semen @ 50 kg 0,1248 zak 70.306,5 8.774,25
Semen Acian 2,7500 kg 01.406,1 3.866,86
Pasir pasang 0,0240 m3 3
153.396,0 3.681,50
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0033 oh 126.551,7 420,44
Kepala Tukang Batu 0,0332 oh 0
112.490,4 3.737,22
Tukang Batu 0,0664 oh 0
105.459,7 7.007,29
Pekerja 0,2658 oh 577.337,1 20.554,7
5JUMLAH 2
48.681,4
52 PEMBULATA 4
48.680,0
53 1 m2 Pek. Plafond Expose Beton N 0
Bahan
Acian Expose Beton ex. SmartCote 50 2,7500 kg 2.332,9 6.415,47
0
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0005 oh 126.551,7 60,26
Kepala Tukang Kayu 0,0048 oh 0
105.459,7 502,19
Tukang Kayu 0,0476 oh 5
105.459,7 5.021,89
Pekerja 0,0952 oh 577.337,1 7.365,44
5JUMLAH 21.282,7
53 PEMBULATA 1
21.282,0
54 1 bh Closet Jongkok CE 6 N 0
Bahan
Closet Jongkok CE 6 1,0000 bh 374.286,2 374.286,2
Material Bantu 1,0000 ls 431.957,5 431.957,5
0 0
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,1250 oh 126.551,7 15.818,9
Kepala Tukang Pasang Pipa 0,2500 oh 0
112.490,4 6
28.122,6
Tukang Pasang Pipa 0,5000 oh 0
105.459,7 0
52.729,8
Pekerja 1,5000 oh 577.337,1 8
116.005,7
5JUMLAH 3
619.623,9
54 PEMBULATA 7
619.623,0
55 1 bh Closet Duduk CW 826 J N 0
Bahan
Closet Duduk CW 826 J 1,0000 bh 4.817.912, 4.817.912,
Material Bantu 1,0000 ls 70 9.587,2 709.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
4.969.987,
55 PEMBULATA 79
4.969.987,
56 1 bh Closet Duduk CW704J/SW784 JP N 00
Bahan
Closet Duduk CW704J/SW784 JP 1,0000 bh 2.599.423, 2.599.423,
Material Bantu 1,0000 ls 05 9.587,2 059.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
2.751.498,
56 PEMBULATA 14
2.751.498,
57 1 bh Closet Duduk CW421J N 00
Bahan
Closet Duduk CW421J 1,0000 bh 1.901.471, 1.901.471,
Material Bantu 1,0000 ls 25 9.587,2 259.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
2.053.546,
57 PEMBULATA 34
2.053.546,
58 1 bh Wastafel LW 211CJW/F N 00
Bahan
Wastafel LW 211CJW/F 1,0000 bh 1.336.462, 1.336.462,
65 65
Upah
Mandor 0,1250 oh 126.551,7 15.818,9
Kepala Tukang Pasang Pipa 0,2500 oh 0
112.490,4 6
28.122,6
Tukang Pasang Pipa 0,5000 oh 0
105.459,7 0
52.729,8
Pekerja 1,5000 oh 577.337,1 8
116.005,7
5JUMLAH 3
1.559.430,
58 PEMBULATA 13
1.559.430,
59 1 bh Faucet TX 109 LJ N 00
Bahan
Faucet TX 109 LJ 1,0000 bh 885.222,7 885.222,7
5 5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0333 oh 126.551,7 4.218,39
Kepala Tukang Pasang Pipa 0,0667 oh 0
112.490,4 7.499,36
Tukang Pasang Pipa 0,1333 oh 0
105.459,7 14.061,3
Pekerja 0,4000 oh 577.337,1 0
30.934,8
5JUMLAH 6
942.639,7
59 PEMBULATA 3
942.639,0
60 1 bh Wastafel L 548 N 0
Bahan
Wastafel L 548 1,0000 bh 1.079.716, 1.079.716,
Material Bantu 1,0000 ls 10 9.587,2 109.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
1.231.791,
60 PEMBULATA 19
1.231.791,
61 1 bh Wastafel Cerabo LW 523 J, TX116LE N 00
Bahan
Wastafel Cerabo LW 523 J, TX116LE 1,0000 bh 2.908.515, 2.908.515,
Material Bantu 1,0000 ls 99 9.587,2 999.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
3.060.591,
61 PEMBULATA 08
3.060.591,
62 1 bh Wastafel Cerabo LW 711 B, TX119LI N 00
Bahan
Wastafel Cerabo LW 711 B, TX119LI 1,0000 bh 3.523.378, 3.523.378,
Material Bantu 1,0000 ls 29 9.587,2 299.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
3.675.453,
62 PEMBULATA 38
3.675.453,
N 00
Upah
Mandor 0,0714 oh 126.551,7 9.039,41
Kepala Tukang Pasang Pipa 0,1429 oh 0
112.490,4 16.070,0
Tukang Pasang Pipa 0,2857 oh 0
105.459,7 6
30.131,3
Pekerja 0,8571 oh 577.337,1 6
66.288,9
5JUMLAH 9
1.925.275,
63 PEMBULATA 02
1.925.275,
64 1 bh Urinal U 447 HJT1M N 00
Bahan
Urinal U 447 HJT1M 1,0000 bh 3.139.504, 3.139.504,
Material Bantu 1,0000 ls 80 9.587,2 809.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0714 oh 126.551,7 9.039,41
Kepala Tukang Pasang Pipa 0,1429 oh 0
112.490,4 16.070,0
Tukang Pasang Pipa 0,2857 oh 0
105.459,7 6
30.131,3
Pekerja 0,8571 oh 577.337,1 6
66.288,9
5JUMLAH 9
3.271.324,
64 PEMBULATA 92
3.271.324,
65 1 bh Kitchen Zink Royal N 00
Bahan
Fee Management 1,0000 ls 70.000,0 70.000,0
Material Bantu 1,0000 ls 0
44.740,5 0
44.740,5
0 0
Alat
Alat Bantu 1,0000 ls 703,07 703,07
Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
257.228,3
65 PEMBULATA 4
257.228,0
66 1 bh Floor Drain TX 1 BV 1 N 0
Bahan
Floor Drain TX 1 BV 1 1,0000 bh 291.388,4 291.388,4
Material Bantu 1,0000 ls 9 9.587,2 99.587,25
5
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0016 oh 126.551,7 202,48
Kepala Tukang Pasang Pipa 0,0160 oh 0
112.490,4 1.799,85
Tukang Pasang Pipa 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,2000 oh 577.337,1 15.467,4
5JUMLAH 3
330.078,0
66 PEMBULATA 2
330.078,0
67 1 bh Floor Drain TX 1 C N 0
Bahan
Floor Drain TX 1 C 1,0000 bh 234.056,7 234.056,7
Material Bantu 1,0000 ls 3 9.587,2 39.587,25
5
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0016 oh 126.551,7 202,48
Kepala Tukang Pasang Pipa 0,0160 oh 0
112.490,4 1.799,85
0
Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
873.934,5
68 PEMBULATA 1
873.934,0
69 1 bh Shower TX 432 SD2 + TX 423 SZ N 0
Bahan
Shower TX 432 SD2 + TX 423 SZ 1,0000 bh 1.007.619, 1.007.619,
Material Bantu 1,0000 ls 98 1.406,1 981.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang Pasang Pipa 0,0100 oh 0
112.490,4 1.124,90
Tukang Pasang Pipa 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,2000 oh 577.337,1 8
15.467,4
5JUMLAH 3
1.036.738,
69 PEMBULATA 37
1.036.738,
70 1 bh Jet Shower, SO 212 CCS N 00
Bahan
Jet Shower, SO 212 CCS 1,0000 bh 350.382,0 350.382,0
Material Bantu 1,0000 ls 3 1.406,1 31.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0013 oh 126.551,7 158,19
Kepala Tukang Pasang Pipa 0,0125 oh 0
112.490,4 1.406,13
Tukang Pasang Pipa 0,1250 oh 0
105.459,7 13.182,4
Pekerja 0,2500 oh 577.337,1 7
19.334,2
5JUMLAH 9
386.316,6
70 PEMBULATA 4
386.316,0
71 1 bh Stop Kran TGB 9 RYRN N 0
Bahan
Stop Kran TGB 9 RYRN 1,0000 bh 497.450,4 497.450,4
Material Bantu 1,0000 ls 5 1.406,1 51.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0011 oh 126.551,7 144,63
Kepala Tukang Pasang Pipa 0,0114 oh 0
112.490,4 1.285,60
Tukang Pasang Pipa 0,1143 oh 0
105.459,7 12.052,5
Pekerja 0,2286 oh 577.337,1 4
17.677,0
5JUMLAH 6
530.463,8
71 PEMBULATA 2
1.061.308,
72 1 bh Kran T23 BQ 13 N 00
Bahan
Kran T23 BQ 13 1,0000 bh 172.570,5 172.570,5
Material Bantu 1,0000 ls 0 1.406,1 01.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
192.600,6
72 PEMBULATA 1
192.600,0
73 1 bh Kran Wastafel TEN40AWV500 N 0
Bahan
Kran Wastafel TEN40AWV500 1,0000 bh 4.534.769, 4.534.769,
Material Bantu 1,0000 ls 25 1.406,1 251.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang Pasang Pipa 0,0100 oh 0
112.490,4 1.124,90
Tukang Pasang Pipa 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,2000 oh 577.337,1 8
15.467,4
5JUMLAH 3
4.563.887,
73 PEMBULATA 65
4.563.887,
74 1 bh Hand dryer H3100R N 00
Bahan
Hand dryer H3100R 1,0000 bh 3.080.703, 3.080.703,
Material Bantu 1,0000 ls 00 1.406,1 001.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0011 oh 126.551,7 144,63
Kepala Tukang Pasang Pipa 0,0114 oh 0
112.490,4 1.285,60
Tukang Pasang Pipa 0,1143 oh 0
105.459,7 12.052,5
Pekerja 0,2286 oh 577.337,1 4
17.677,0
5JUMLAH 6
3.113.716,
74 PEMBULATA 38
3.113.716,
75 1 bh Head Shower TX 465SEN + TX 452 SES N 00
Bahan
Head Shower TX 465SEN + TX 452 SES 1,0000 bh 1.445.501, 1.445.501,
Material Bantu 1,0000 ls 64 1.406,1 641.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0011 oh 126.551,7 144,63
Kepala Tukang Pasang Pipa 0,0114 oh 0
112.490,4 1.285,60
Tukang Pasang Pipa 0,1143 oh 0
105.459,7 12.052,5
Pekerja 0,2286 oh 577.337,1 4
17.677,0
5JUMLAH 6
1.478.515,
75 PEMBULATA 02
1.478.515,
76 1 bh Jet Washer THX 20 NB N 00
Bahan
Jet Washer THX 20 NB 1,0000 bh 359.521,8 359.521,8
Material Bantu 1,0000 ls 8 1.406,1 81.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
379.551,9
76 PEMBULATA 8
379.551,0
77 1 bh Tissue holder TX703AES N 0
Bahan
Tissue holder TX703AES 1,0000 bh 249.843,7 249.843,7
4 4
Upah
Mandor 0,0010 oh 126.551,7 120,53
Kepala Tukang Pasang Pipa 0,0095 oh 0
112.490,4 1.071,34
Tukang Pasang Pipa 0,0952 oh 0
105.459,7 10.043,7
Pekerja 0,0952 oh 577.337,1 9
7.365,44
5JUMLAH 270.298,3
77 PEMBULATA 6
270.298,0
78 1 bh Paper Holder TS116R N 0
Bahan
Paper Holder TS116R 1,0000 bh 322.131,6 322.131,6
Material Bantu 1,0000 ls 0 1.406,1 01.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
342.161,7
78 PEMBULATA 1
342.161,0
79 1 bh Hand soap S6N N 0
Bahan
Hand soap S6N 1,0000 bh 62.061,4 62.061,4
Material Bantu 1,0000 ls 71.406,1 7
1.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
82.091,5
79 PEMBULATA 7
82.091,0
80 1 bh Robe Hook TX 704 AEZ N 0
Bahan
Robe Hook TX 704 AEZ 1,0000 bh 118.562,3 118.562,3
Material Bantu 1,0000 ls 3 1.406,1 31.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41
Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
138.592,4
80 PEMBULATA 3
138.592,0
81 1 bh Partition Urinoir N 0
Bahan
Partion Plate A 100 1,0000 bh 804.881,6 804.881,6
Material Bantu 1,0000 ls 0 3.195,7 03.195,75
5
Alat
Alat Bantu 1,0000 ls 191,75 191,75
Upah
Mandor 0,0013 oh 126.551,7 158,19
Kepala Tukang Pasang Pipa 0,0125 oh 0
112.490,4 1.406,13
Tukang Pasang Pipa 0,2500 oh 0
105.459,7 26.364,9
Pekerja 0,5000 oh 577.337,1 4
38.668,5
5JUMLAH 8
874.866,9
2
Upah
Mandor 0,0029 oh 126.551,7 361,58
Kepala Tukang Pasang Pipa 0,0286 oh 0
112.490,4 3.214,01
Tukang Pasang Pipa 0,1429 oh 0
105.459,7 15.065,6
Pekerja 0,5714 oh 577.337,1 8
44.192,6
5JUMLAH 6
690.287,4
82 PEMBULATA 8
690.287,0
83 1 m2 Pek.Meja Wastafel Lapis Granite N 0
Bahan
Beton Bertulang 0,1800 m3 4.474.050, 805.329,0
Granite Tile 1,1500 m2 00
1.038.746, 0
1.194.558,
Perekat Keramik Lantai ex. SmartGrip TA 6,8250 kg 58 2.588,5 5717.666,9
Pengisi Nat Keramik ex. SmartGrip TG 0,2275 kg 6
9.235,7 0
2.101,13
2
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0500 oh 126.551,7 6.327,59
Kepala Tukang Batu 0,2500 oh 0
112.490,4 28.122,6
Tukang Batu 1,0000 oh 0
105.459,7 0
105.459,7
Pekerja 2,0000 oh 577.337,1 5
154.674,3
5JUMLAH 0
2.316.157,
83 PEMBULATA 28
2.316.156,
84 1 m1 Pek.Meja Wastafel Lapis Keramik 200 x 200 N 00
mm Bahan
Beton Bertulang 0,1800 m3 4.474.050, 805.329,0
Keramik 20 x 20 cm Polished 1,0500 m2 0064.324,0 067.540,2
Perekat Keramik Lantai ex. SmartGrip TA 6,8250 kg 62.588,5 6
17.666,9
Pengisi Nat Keramik ex. SmartGrip TG 0,2275 kg 6
9.235,7 0
2.101,13
2
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0500 oh 126.551,7 6.327,59
Kepala Tukang Batu 0,2500 oh 0
112.490,4 28.122,6
Tukang Batu 1,0000 oh 0
105.459,7 0
105.459,7
Pekerja 2,0000 oh 577.337,1 5
154.674,3
5JUMLAH 0
1.189.138,
84 PEMBULATA 97
1.189.138,
85 1 m1 Pek.Meja Wastafel Lapis Homogenous Tile 400 N 00
x 400Bmm
ahan
Beton Bertulang 0,1800 m3 4.474.050, 805.329,0
HT 400x400 mm Polished 1,0500 m2 00
175.216,5 0
183.977,4
Perekat Keramik Lantai ex. SmartGrip TA 6,8250 kg 8 2.588,5 117.666,9
Pengisi Nat Keramik ex. SmartGrip TG 0,2275 kg 6
9.235,7 0
2.101,13
2
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0235 oh 126.551,7 2.977,69
Kepala Tukang Batu 0,1176 oh 0
112.490,4 13.234,1
Tukang Batu 0,4706 oh 0
105.459,7 6
49.628,1
Pekerja 0,9412 oh 577.337,1 2
72.787,9
5JUMLAH 1
1.149.619,
85 PEMBULATA 77
1.149.619,
86 1 m2 Pek. Paving block 8 cm N 00
Bahan
Paving block 8 cm 1,0500 m2 133.352,2 140.019,8
6 7
Upah
Mandor 0,0001 oh 126.551,7 10,12
Kepala Tukang Batu 0,0080 oh 0
112.490,4 899,92
Tukang Batu 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,1600 oh 577.337,1 12.373,9
5JUMLAH 4
187.945,7
86 PEMBULATA 9
187.945,0
87 1 m2 Pek. Paving block 6 cm N 0
Bahan
Paving block 6 cm 1,0500 m2 118.012,6 123.913,2
Pasir urug 0,1200 m3 6
108.655,5 913.038,6
Abu batu 0,0240 m3 0
255.660,0 6
6.135,84
Pemadatan 1,0000 ls 0 6.391,5 6.391,50
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0001 oh 126.551,7 10,12
Kepala Tukang Batu 0,0080 oh 0
112.490,4 899,92
Tukang Batu 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,1600 oh 577.337,1 12.373,9
5JUMLAH 4
171.839,2
87 PEMBULATA 1
171.838,0
88 1 m2 Pek. Pagar Retaining Wall N 0
Bahan
Beton 1,0000 m3 1.005.960, 1.005.960,
Besi 140,000 kg 0012.444,0 00
1.742.160,
Bekisting 06,5000 m2 0
115.943,0 00
753.629,5
0 JUMLAH 0
3.501.749,
88 PEMBULATA 50
3.501.749,
89 1 m2 Pek. Batu Kali 1:4 N 00
Bahan
Semen Portland 163,000 kg 1.406,1 229.199,1
Batu kali gunung 01,2000 m3 3
191.745,0 9
230.094,0
Pasir pasang 0,5200 m3 0
153.396,0 079.765,9
0 2
Alat
Alat Bantu 1,0000 ls 639,15 639,15
Upah
Mandor 0,0004 oh 126.551,7 50,62
Kepala Tukang Batu 0,0400 oh 0
112.490,4 4.499,62
Tukang Batu 0,4000 oh 0
105.459,7 42.183,9
Pekerja 0,8000 oh 577.337,1 0
61.869,7
5JUMLAH 2
648.302,1
89 PEMBULATA 2
648.302,0
N 0
Kabel Feeder
MEB1 NYY 4 x 4 mm2 + NYA 4 mm2 + BC 4 m 48.300,00
MEB2 BC 50 mm2 m 63.800,00
MEB3 NYY 4 x 25 mm2 + NYA 16 mm2 m 184.800,00
MEB4 NYY 4 x 10 mm2 + E-NYA 6 mm2 m 97.400,00
MEB5 NYY 4 x 6 mm2 + NYA 2,5 mm2 m 60.900,00
MEB6 NYY 4 x 10 mm2 m 88.600,00
MEB7 NYY 4 x 4 mm2 m 39.000,00
MEB8 NYM 3 x 2,5 mm2 + PVC 20 mm m 24.200,00
MEB9 Proteksi Kabel dengan Pipa Gip Dia 100 m 268.400,00
KABEL TRAY
MEC1 Kabel tray W = 300 mm, t = 100 mm m 385.900,00
MEC2 Kabel tray W = 200 mm, t = 100 mm m 320.000,00
MEC3 Kabel Tray= 200 mm x 50 mm m 287.200,00
Instalasi
MEF0 Kabel NYA 3 x 1 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF1 Lampu ttk 237.200,00
MEF2 Saklar Tunggal ttk 78.800,00
MEF3 Kabel NYM 3 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF4 Kotak kontak 10A, 1 phasa tipe dinding ttk 308.000,00
MEF5 Kabel NYA 4 x 1 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF6 Lampu + Nicad Battery ttk 1.072.800,00
MEF7 Saklar ganda ttk 90.600,00
MEF8 Saklar hotel ttk 114.200,00
MEF9 Kabel NYA 8 x 1 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF10 Grid switch 6 gang ttk 151.800,00
PEKERJAAN VENTILASI
MEM1 Exhaust fan, tipe axial duct, air flow 300 CFM, unit 1.117.400,00
PEKERJAAN TESTING COMMISSIONING & PENYAMBUNGAN DAYA PLN
MEN1 Biaya penyambungan Daya PLN 10.5 KVA lot 1.300,00
O FIRE ALARM
MEO1 Main Control Panel - Fire Alarm ( MCFA ) 10 Zone bh 20.133.200,00
MEO2 Main Control Panel - Fire Alarm ( MCFA ) 5 Zone bh 13.422.200,00
MEO3 Main Distribution Frame - Fire ( MDF - FA ) Alarm 10 Zone bh 5.368.900,00
MEO4 Terminal Box - Fire Alarm ( TB - FA ) bh 872.400,00
MEO5 Kabel NYA 10x2x1.5 mm2 Dari MCFA ke MDF - FA m 68.100,00
MEO6 Kabel NYA 4x( 1 x 1.5 mm2 ) + Pipa Hi Conduit dia 3/4" : m 29.500,00
MEO61 Kabel twisted sheilded AWG 2 pair + NYM 3 x 2.5 mm2 m 41.300,00
MEO7 Rate of Rise Heat Detector bh 283.900,00
MEO8 Smoke Detector bh 849.000,00
MEO9 Manual Break Glass Switch bh 432.900,00
MEO10 Alarm bell bh 540.200,00
MEO11 Lampu Indikator bh 199.300,00
MEO12 Instalasi Detector titik 327.000,00
MEO13 Installasi Manual Break Glass Switch titik 687.600,00
MEO14 Installasi Alarm Bell titik 793.800,00
MEO15 installasi Lampu Indicator titik 793.800,00
P INSTALLASI TV
MEP1 Coaxial 7C/2V + Pipa Hi Conduit dia 3/4" m' 16.300,00
MEP2 Coaxial 5C/2V + Pipa Hi Conduit dia 3/4" m' 13.400,00
MEP21 Junction box (JB-MATV.1) lengkap dengan tap-off 6 way, UNIT 671.100,00
MEP3 Outlet TV bh 68.700,00
MEP4 Splitter 2 x 3 Port bh 307.600,00
MEP5 Splitter 1 x 6 Port bh 307.600,00
MEP6 TB-Splitter-TV/lt.1 bh 150.000,00
MEP7 Instalasi Outlet TV titik 201.300,00