ANALISA HARGA PEKERJAAN

Yayasan Perguruan Islam Maros

##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)

1 1 m2 Pembersian Lapangan dan Perataan


Upah
Mandor 0,0100 oh 126.551,7 1.265,52
Pekerja 0,1000 oh 077.337,1 7.733,72
5JUMLAH 8.999,23
1 PEMBULATA 8.999,00
2 1 m1 Pek. Bowplank N
Alat
Kayu Bengkirai 5/7 0,0040 m3 3.834.900, 15.339,6
Kayu Papan 3/20 0,2800 lbr 0061.358,4 0
17.180,3
Paku 0,2900 kg 0
20.133,2 5
5.838,64
3
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0019 oh 126.551,7 241,05
Kepala Tukang Kayu 0,0095 oh 0
105.459,7 1.004,38
Tukang Kayu 0,0476 oh 5
105.459,7 5.021,89
Pekerja 0,0952 oh 577.337,1 7.365,44
5JUMLAH 52.630,5
2 PEMBULATA 0
52.629,0
3 1 m3 Pek. Galian Tanah Manual 1 M N 0
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0333 oh 126.551,7 4.218,39
Tukang Gali 0,0952 oh 098.429,1 9.374,20
Pekerja 0,3333 oh 0
77.337,1 25.779,0
5JUMLAH 5
40.649,9
3 PEMBULATA 4
40.649,0
4 1 m3 Pek. Galian Tanah Manual 2 M N 0
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0400 oh 126.551,7 5.062,07
Tukang Gali 0,1143 oh 098.429,1 11.249,0
Pekerja 0,4000 oh 0
77.337,1 4
30.934,8
5JUMLAH 6
48.524,2
4 PEMBULATA 7
48.524,0
5 1 m3 Pek. Galian Tanah Manual 3 M N 0
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0500 oh 126.551,7 6.327,59
Tukang Gali 0,1429 oh 098.429,1 14.061,3
Pekerja 0,5000 oh 0
77.337,1 0
38.668,5
5JUMLAH 8
60.335,7
5 PEMBULATA 6
60.335,0
6 1 m3 Pek. Galian Tanah Mekanik N 0
Alat
Excavator 0,0036 hr/unit 4.800.564, 17.144,8
Bahan bakar solar 0,5000 ltr 3412.783,0 7
6.391,50
Alat Bantu 1,0000 ls 0639,15 639,15

Upah
Operator 0,0071 oh 210.919,5 1.506,57
Mandor 0,0089 oh 0
126.551,7 1.129,93
Pekerja 0,0357 oh 077.337,1 2.762,04
5
JUMLAH 29.574,0
6 PEMBULATA 6
29.574,0
N 0

Analisa Harga Satuan - 1 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
7 1 m3 Pek. Pemadatan Tanah
Alat
Stamper 0,0057 unit 435.717,6 2.489,82
Bahan bakar solar 0,8000 ltr 912.783,0 10.226,4
Alat Bantu 1,0000 ls 0639,15 0 639,15

Upah
Operator 0,0114 oh 210.919,5 2.410,51
Mandor 0,0143 oh 0
126.551,7 1.807,88
Pekerja 0,0571 oh 077.337,1 4.419,27
5
JUMLAH 21.993,0
7 PEMBULATA 2
21.993,0
8 1 m3 Pek. Buang Tanah Galian N 0
Alat
Excavator loader 0,0024 hr/unit 4.125.621, 9.822,91
Dumtruck 0,0063 hr/unit 94
1.256.386, 7.852,41
Bahan bakar solar 0,1190 ltr 2912.783,0 1.521,79
Alat Bantu 1,0000 ls 0127,83 127,83

Upah
Operator 0,0048 oh 210.919,5 1.004,38
Mandor 0,0003 oh 0
126.551,7 37,66
Pekerja 0,0024 oh 077.337,1 184,14
5JUMLAH 20.551,1
8 PEMBULATA 2
20.551,0
9 1 m3 Pek. Urugan Tanah Kembali N 0
Alat
Alat Bantu 1,0000 ls 1.597,8 1.597,88
8
Upah
Mandor 0,0192 oh 126.551,7 2.429,79
Pekerja 0,1920 oh 077.337,1 14.848,7
5JUMLAH 3
18.876,4
9 PEMBULATA 0
18.876,0
10 1 m3 Pek. Urugan Tanah N 0
Bahan
Tanah urug 1,0000 m3 51.132,0 51.132,0
0 0
Upah
Mandor 0,0192 oh 126.551,7 2.429,79
Pekerja 0,1920 oh 077.337,1 14.848,7
5JUMLAH 3
68.410,5
10 PEMBULATA 3
68.410,0
11 1 m3 Pek. Urugan Pasir t = 10 cm N 0
Bahan
Pasir urug 1,1000 m3 108.655,5 119.521,0
0 5
Alat
Alat Bantu 1,0000 ls 255,66 255,66

Upah
Mandor 0,0952 oh 126.551,7 12.052,5
Pekerja 0,4762 oh 077.337,1 4
36.827,2
5JUMLAH 1
168.656,4
11 PEMBULATA 7
168.656,0
12 1 m3 Pek. Lantai kerja t = 5 cm N 0
Bahan
Semen @ 50 kg 4,3600 zak 70.306,5 306.536,3
Pasir beton 1,1000 m3 0
153.396,0 4
168.735,6
0 0
Alat
Alat Bantu 1,0000 ls 255,66 255,66

Upah
Mandor 0,0476 oh 126.551,7 6.026,27
Kepala tukang batu 0,0952 oh 0
112.490,4 10.713,3
Tukang batu 0,9524 oh 0
105.459,7 7
100.437,8
Pekerja 1,9048 oh 577.337,1 6
147.308,8
5JUMLAH 6
740.013,9
6

Analisa Harga Satuan - 2 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
12 PEMBULATA 740.013,0
13 1 m2 Pek. Bekisting Pondasi Memakai Bataco N 0
Bahan
Bataco Trass 13,1250 bh 2.556,6 33.555,3
Semen @ 50 kg 0,0374 zak 0
70.306,5 8
2.629,46
Pasir pasang 0,0154 m3 0
153.396,0 2.362,30
Kolom praktis 0,0060 m3 0
5.073.471, 30.440,8
00 3
Alat
Alat Bantu 1,0000 ls 319,58 319,58

Upah
Mandor 0,0030 oh 126.551,7 380,61
Kepala Tukang batu 0,0150 oh 0
112.490,4 1.691,58
Tukang Batu 0,2105 oh 0
105.459,7 22.202,0
Pekerja 0,0902 oh 577.337,1 5
6.977,79
5JUMLAH 100.559,5
13 PEMBULATA 100.558,0
14 1 kg Pek. Besi Beton N 0
Bahan
Besi Beton 1,0300 kg 10.418,1 10.730,6
Kawat Beton 0,0100 kg 5
20.133,2 9 201,33
Decking Beton 1,0000 ls 3 57,52 57,52

Alat
Alat Bantu 1,0000 ls 63,92 63,92

Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang besi 0,0020 oh 0
112.490,4 224,98
Tukang besi 0,0040 oh 0
105.459,7 421,84
Pekerja 0,0080 oh 577.337,1 618,70
5JUMLAH 12.445,5
14 PEMBULATA 3
12.444,0
15 1 kg Pek. Wiremesh N 0
Bahan
Wiremesh M 4 mm 1,1500 kg 13.102,5 15.067,9
Kawat Beton 0,0100 kg 8
20.133,2 6 201,33
Decking Beton 1,0000 ls 3 57,52 57,52

Alat
Alat Bantu 1,0000 ls 63,92 63,92

Upah
Mandor 0,0007 oh 126.551,7 90,39
Kepala Tukang besi 0,0014 oh 0
112.490,4 160,70
Tukang besi 0,0029 oh 0
105.459,7 301,31
Pekerja 0,0057 oh 577.337,1 441,93
5JUMLAH 16.385,0
15 PEMBULATA 7
16.384,0
16 1 kg Pek. Besi Beton Borepile N 0
Bahan
Besi Beton 1,0300 kg 10.418,1 10.730,6
Kawat Beton 0,0100 kg 5
20.133,2 9 201,33
Decking Beton 1,0000 ls 3 57,52 57,52

Alat
Alat Bantu 1,0000 ls 63,92 63,92

Upah
Mandor 0,0013 oh 126.551,7 158,19
Kepala Tukang besi 0,0025 oh 0
112.490,4 281,23
Tukang besi 0,0050 oh 0
105.459,7 527,30
Pekerja 0,0100 oh 577.337,1 773,37
5JUMLAH 12.793,5
16 PEMBULATA 5
12.793,0
17 1 m3 Pek. Beton K-175 N 0
Bahan
Beton Ready Mix K-175 NFA slump 12 ± 2 1,0300 m3 869.244,0 895.321,3
0 2
Alat

Analisa Harga Satuan - 3 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Alat Bantu 1,0000 ls 63.915,0 63.915,0
0 0
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
990.686,8
17 PEMBULATA 990.686,0
18 1 m3 Pek. Beton K-300 Bore Pile N 0
Bahan
Beton Ready mix K-350 NFA slump 12 ± 2 1,0300 m3 1.067.380, 1.099.401,
50 92
Alat
Alat Bantu 1,0000 ls 63.915,0 63.915,0
0 0
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.194.767,
18 PEMBULATA 1.194.766,
19 1 m3 Pek. Beton K-300 Pilecap dan Sloof N 00
Bahan
Beton Ready mix K-250 NFA slump 12 ± 2 1,0300 m3 933.159,0 961.153,7
0 7
Alat
Alat Bantu 1,0000 ls 9.587,2 9.587,25
5
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.002.191,
19 PEMBULATA 1.002.190,
20 1 m3 Pek. Beton K-225 Pilecap dan Sloof N 00
Bahan
Beton Ready mix K-225 NFA slump 12 ± 2 1,0300 m3 907.593,0 934.820,7
0 9
Alat
Alat Bantu 1,0000 ls 9.587,2 9.587,25
5
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
975.858,5
20 PEMBULATA 975.857,0
21 1 m3 Pek. Beton K-300 Kolom & Wall N 0
Bahan
Beton Ready mix K-250 NFA slump 12 ± 2 1,0300 m3 933.159,0 961.153,7
0 7
Alat
Alat Bantu 1,0000 ls 9.587,2 9.587,25
5
Upah
Mandor 0,0032 oh 126.551,7 401,75
Kepala Tukang batu 0,0317 oh 0
112.490,4 3.571,12
Tukang Batu 0,0635 oh 0
105.459,7 6.695,86
Pekerja 0,3175 oh 577.337,1 24.551,4
5JUMLAH 8
1.005.961,
21 PEMBULATA 23
1.005.960,
22 1 m3 Pek. Beton K-225 Pelat dan Balok N 00
Bahan
Beton Ready mix K-225 NFA slump 12 ± 2 1,0300 m3 907.593,0 934.820,7
0 9
Alat
Alat Bantu 1,0000 m3 35.153,2 35.153,2
5 5

Analisa Harga Satuan - 4 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)

Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.001.424,
22 PEMBULATA 58
1.001.423,
23 1 m3 Pek. Beton K-250 N 00
Bahan
Beton Ready mix K-250 NFA slump 12 ± 2 1,0300 m3 933.159,0 961.153,7
0 7
Alat
Alat Bantu 1,0000 m3 35.153,2 35.153,2
5 5
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.027.757,
23 PEMBULATA 56
1.027.756,
24 1 m3 Pek. Beton K-350 Pelat dan Balok N 00
Bahan
Beton Ready mix K-350 NFA slump 12 ± 2 1,0300 m3 1.067.380, 1.099.401,
50 92
Alat
Alat Bantu 1,0000 m3 35.153,2 35.153,2
5 5
Upah
Mandor 0,0021 oh 126.551,7 269,83
Kepala Tukang batu 0,0213 oh 0
112.490,4 2.398,52
Tukang Batu 0,0853 oh 0
105.459,7 8.994,43
Pekerja 0,2559 oh 577.337,1 19.787,7
5JUMLAH 6
1.166.005,
24 PEMBULATA 71
1.166.004,
25 1 m3 Pek. Beton K-300 Tangga N 00
Bahan
Beton Ready mix K-250 NFA slump 12 ± 2 1,0300 m3 933.159,0 961.153,7
0 7
Alat
Alat Bantu 1,0000 ls 9.587,2 9.587,25
5
Upah
Mandor 0,0036 oh 126.551,7 451,97
Kepala Tukang batu 0,0357 oh 0
112.490,4 4.017,51
Tukang Batu 0,1429 oh 0
105.459,7 15.065,6
Pekerja 0,3571 oh 577.337,1 8
27.620,4
5JUMLAH 1
1.017.896,
25 PEMBULATA 59
1.017.895,
26 1 m2 Pek. Bekisting Kolom N 00
Bahan
Poly Film 15 mm 1 sisi 0,0911 lbr 294.009,0 26.797,7
Kayu Balok kelas II 5/7 cm 0,0046 m3 0
2.556.600, 0
11.744,3
Kayu Balok kelas II 6/12 cm 0,0057 m3 00
2.556.600, 8
14.495,9
Minyak bekisting 0,2500 ltr 0012.783,0 2
3.195,75
Paku 0,1000 kg 0
20.133,2 2.013,32
3
Alat
Steel support 0,3750 m2 38.349,0 14.380,8
0 8
Upah
Mandor 0,0104 oh 126.551,7 1.314,82
Kepala Tukang Kayu 0,1039 oh 0
105.459,7 10.956,8
Tukang Kayu 0,1039 oh 5
105.459,7 6
10.956,8
Pekerja 0,2597 oh 577.337,1 6
20.087,5
5JUMLAH 7
115.944,0
26 PEMBULATA 5
115.943,0
27 1 m2 Pek. Bekisting Pelat & Balok N 0
Bahan
Poly Film 12 mm 1 sisi 0,1823 lbr 249.268,5 45.439,5
0 7

Analisa Harga Satuan - 5 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Kayu Balok kelas II 5/7 cm 0,0092 m3 2.556.600, 23.488,7
Kayu Balok kelas II 6/12 cm 0,0113 m3 00
2.556.600, 6
28.991,8
Minyak bekisting 0,2500 ltr 0012.783,0 4
3.195,75
Paku 0,1000 kg 0
20.133,2 2.013,32
3
Alat
Scafolding 0,4000 m2 36.431,5 14.572,6
5 2
Upah
Mandor 0,0042 oh 126.551,7 535,67
Kepala Tukang Kayu 0,0423 oh 0
105.459,7 4.463,90
Tukang Kayu 0,1270 oh 5
105.459,7 13.391,7
Pekerja 0,3175 oh 577.337,1 1
24.551,4
5JUMLAH 8
160.644,6
27 PEMBULATA 3
160.644,0
28 1 m2 Pek. Bekisting Tangga N 0
Bahan
Poly Film 12 mm 1 sisi 0,2431 lbr 249.268,5 60.586,0
Kayu Balok kelas II 5/7 cm 0,0123 m3 0
2.556.600, 9
31.318,3
Kayu Balok kelas II 6/12 cm 0,0151 m3 00
2.556.600, 5
38.655,7
Minyak bekisting 0,2500 ltr 0012.783,0 9
3.195,75
Paku 0,1000 kg 0
20.133,2 2.013,32
3
Alat
Scafolding 0,6667 m2 36.431,5 24.287,7
5 0
Upah
Mandor 0,0275 oh 126.551,7 3.476,70
Kepala Tukang Kayu 0,0549 oh 0
105.459,7 5.794,49
Tukang Kayu 0,1099 oh 5
105.459,7 11.588,9
Pekerja 0,3297 oh 577.337,1 8
25.495,7
5JUMLAH 6
206.412,9
28 PEMBULATA 4
206.412,0
29 1 m2 Pek.screeding t= 30 mm N 0
Bahan
Semen @ 50 kg 0,1900 zak 70.306,5 13.358,2
Pasir beton 0,0360 m3 0
153.396,0 4
5.522,26
0
Alat
Alat Bantu 1,0000 ls 575,24 575,24

Upah
Mandor 0,0301 oh 126.551,7 3.806,07
Kepala Tukang Batu 0,0602 oh 0
112.490,4 6.766,34
Tukang Batu 0,0602 oh 0
105.459,7 6.343,44
Pekerja 0,1203 oh 577.337,1 9.303,72
5JUMLAH 45.675,2
29 PEMBULATA 9
45.674,0
30 1 m2 Pek. Rabat Beton t= 100 mm N 0
Bahan
Semen @ 50 kg 0,3400 zak 70.306,5 23.904,2
Pasir beton 0,1100 m3 0
153.396,0 1
16.873,5
0 6
Alat
Alat Bantu 1,0000 ls 575,24 575,24

Upah
Mandor 0,0381 oh 126.551,7 4.821,02
Kepala Tukang Batu 0,0762 oh 0
112.490,4 8.570,70
Tukang Batu 0,0762 oh 0
105.459,7 8.035,03
Pekerja 0,1524 oh 577.337,1 11.784,7
5JUMLAH 1
74.564,4
30 PEMBULATA 6
74.563,0
31 1 m2 Pek. Keramik Lantai 200x200 mm Unpholished N 0
Bahan
Keramik 20 x 20 cm Unpolished 1,0500 m2 64.324,0 67.540,2
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 62.588,5 6
13.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Analisa Harga Satuan - 6 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)

Upah
Tukang Batu 0,1818 oh 105.459,7 19.174,5
Kepala Tukang Batu 0,0455 oh 5
112.490,4 0
5.113,20
Mandor 0,0045 oh 0
126.551,7 575,24
Pekerja 0,0909 oh 077.337,1 7.030,65
5JUMLAH 115.279,1
31 PEMBULATA 7
115.278,0
32 1 m2 Pek. Keramik Lantai 300x300 Pholished N 0
Bahan
Keramik 30 x 30 cm Polished 1,0500 m2 70.715,5 74.251,3
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 62.588,5 3
13.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0045 oh 126.551,7 575,24
Kepala Tukang Batu 0,0455 oh 0
112.490,4 5.113,20
Tukang Batu 0,1818 oh 0
105.459,7 19.174,5
Pekerja 0,0909 oh 577.337,1 0
7.030,65
5JUMLAH 121.990,2
32 PEMBULATA 5
121.989,0
33 1 m2 Pek. Keramik Lantai HT 600x600 mm Polish N 0
Bahan
HT 600x600 mm Polished 1,0500 m2 175.216,5 183.977,4
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 8 2.588,5 113.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 958,73 958,73

Upah
Mandor 0,0050 oh 126.551,7 632,76
Kepala Tukang Batu 0,0500 oh 0
112.490,4 5.624,52
Tukang Batu 0,2000 oh 0
105.459,7 21.091,9
Pekerja 0,1000 oh 577.337,1 5
7.733,72
5JUMLAH 235.225,2
33 PEMBULATA 6
235.224,0
34 1 m2 Pek. Keramik Lantai HT 400x400 mm Polish N 0
Bahan
HT 400x400 mm Polished 1,0500 m2 175.216,5 183.977,4
Perekat Keramik Lantai ex. SmartGrip TA 5,2500 kg 8 2.588,5 113.589,9
Pengisi Nat Keramik ex. SmartGrip TG 0,1750 kg 6
9.235,7 3
1.616,25
2
Alat
Alat Bantu 1,0000 ls 958,73 958,73

Upah
Mandor 0,0050 oh 126.551,7 632,76
Kepala Tukang Batu 0,0500 oh 0
112.490,4 5.624,52
Tukang Batu 0,2000 oh 0
105.459,7 21.091,9
Pekerja 0,1000 oh 577.337,1 5
7.733,72
5JUMLAH 235.225,2
34 PEMBULATA 6
235.224,0
35 1 m2 Pek. Koral Sikat N 0
Bahan
Batu Koral Sikat 1,0500 m2 111.621,1 117.202,2
Semen @ 50 kg 0,1040 zak 670.306,5 17.311,88
Pasir pasang 0,0220 m3 0
153.396,0 3.374,71
Pengisi Nat Keramik ex. SmartGrip TG 0,2000 kg 0 9.235,7 1.847,14
2
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0667 oh 126.551,7 8.436,78
Kepala Tukang Batu 0,1333 oh 0
112.490,4 14.998,7
Tukang Batu 0,2667 oh 0
105.459,7 2
28.122,6
Pekerja 0,2667 oh 577.337,1 0
20.623,2
5 4

Analisa Harga Satuan - 7 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
JUMLAH 203.195,5
35 PEMBULATA 9
203.194,0
36 1 m2 Pek. Dinding Batu Tempel N 0
Bahan
Batu Tempel 1,0500 m2 303.366,1 318.534,4
Perekat Keramik Dinding ex. SmartGrip TA SI-300 5,2500 kg 6 2.940,0 615.435,4
Pengisi Nat Keramik ex. SmartGrip TG 0,1667 kg 9
9.235,7 7
1.539,29
2
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0050 oh 126.551,7 632,76
Kepala Tukang Batu 0,0500 oh 0
112.490,4 5.624,52
Tukang Batu 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,3000 oh 577.337,1 8
23.201,1
5JUMLAH 5
376.791,9
36 PEMBULATA 2
376.791,0
37 1 m2 Pek. Dinding Roster N 0
Bahan
Batu Tempel 1,0500 m2 303.366,1 318.534,4
Semen Portland 5,2500 kg 6 1.406,1 67.382,18
Pengisi Nat Keramik ex. SmartGrip TG 0,1667 kg 3
9.235,7 1.539,29
2
Alat
Alat Bantu 1,0000 ls 1.278,3 1.278,30
0
Upah
Mandor 0,0040 oh 126.551,7 506,21
Kepala Tukang Batu 0,0400 oh 0
112.490,4 4.499,62
Tukang Batu 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,2400 oh 577.337,1 18.560,9
5JUMLAH 2
360.737,7
37 PEMBULATA 5
360.736,0
38 1 m2 Pek. Keramik Dinding 200x250 mm N 0
Bahan
Keramik Dinding 20 x 25 cm 1,0500 m2 78.385,3 82.304,6
Perekat Keramik Dinding ex. SmartGrip TA SI-300 5,2500 kg 62.940,0 2
15.435,4
Pengisi Nat Keramik ex. SmartGrip TG 0,1667 kg 9
9.235,7 7
1.539,29
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0056 oh 126.551,7 703,07
Kepala Tukang Batu 0,0556 oh 0
112.490,4 6.249,47
Tukang Batu 0,2222 oh 0
105.459,7 23.435,5
Pekerja 0,1111 oh 577.337,1 0
8.593,02
5JUMLAH 138.899,5
38 PEMBULATA 8
138.899,0
39 1 m1 Pek. Border Dinding 100x200 mm N 0
Bahan
Border 100x200 mm 1,0500 m' 19.915,9 20.911,7
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 12.940,0 1
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,1667 kg 9
9.235,7 1.539,29
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0020 oh 126.551,7 258,27
Kepala Tukang Batu 0,0204 oh 0
112.490,4 2.295,72
Tukang Batu 0,0408 oh 0
105.459,7 4.304,48
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 34.648,7
39 PEMBULATA 8
34.648,0
40 1 m1 Pek. Plint Kayu 100 mm N 0
Bahan
Wood deck 0,1100 m2 367.281,1 40.400,9
Lem Perekat 0,0550 kg 632.213,1 3
1.771,72
6

Analisa Harga Satuan - 8 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Alat
Alat Bantu 1,0000 ls 319,58 319,58

Upah
Mandor 0,0007 oh 126.551,7 90,39
Kepala Tukang Batu 0,0014 oh 0
112.490,4 160,70
Tukang Batu 0,0714 oh 0
105.459,7 7.532,84
Pekerja 0,1429 oh 577.337,1 11.048,1
5JUMLAH 6
61.324,3
40 PEMBULATA 2
61.323,0
41 1 m1 Pek. Plint HT 100x400 mm Polished N 0
Bahan
HT 100x400 mm Polished 1,0000 m' 41.327,4 41.327,4
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 42.940,0 4
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0004 oh 126.551,7 51,65
Kepala Tukang Batu 0,0008 oh 0
112.490,4 91,83
Tukang Batu 0,0816 oh 0
105.459,7 8.608,96
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 58.129,7
41 PEMBULATA 3
58.128,0
42 1 m1 Pek. Plint HT 100x600 mm Polished N 0
Bahan
HT 100x600 mm Polished 1,0000 m' 41.327,4 41.327,4
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 42.940,0 4
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0004 oh 126.551,7 51,65
Kepala Tukang Batu 0,0008 oh 0
112.490,4 91,83
Tukang Batu 0,0816 oh 0
105.459,7 8.608,96
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 58.129,7
42 PEMBULATA 3
58.128,0
43 1 m1 Pek. Plint Keramik 100x300 mm Polished N 0
Bahan
KR 100x400 mm 1,0000 m' 11.913,7 11.913,7
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5250 kg 62.940,0 6
1.543,55
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0004 oh 126.551,7 51,65
Kepala Tukang Batu 0,0008 oh 0
112.490,4 91,83
Tukang Batu 0,0816 oh 0
105.459,7 8.608,96
Pekerja 0,0408 oh 577.337,1 3.156,62
5JUMLAH 26.159,4
43 PEMBULATA 4
26.159,0
44 1 m1 Pek. Step Nosing Keramik N 0
Bahan
Step nosing Keramik 1,0300 m1 37.172,9 38.288,1
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5500 kg 62.940,0 5
1.617,05
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0005 oh 126.551,7 60,26
Kepala Tukang Batu 0,0010 oh 0
112.490,4 107,13
Tukang Batu 0,0952 oh 0
105.459,7 10.043,7
5 9

Analisa Harga Satuan - 9 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Pekerja 0,0476 oh 77.337,1 3.682,72
5JUMLAH 54.592,1
44 PEMBULATA 8
54.592,0
45 1 m1 Pek. Step Nosing HT N 0
Bahan
Step nosing HT 1,0300 m1 80.149,4 82.553,8
Perekat Keramik Dinding ex. SmartGrip TA SI-300 0,5500 kg 12.940,0 9
1.617,05
Pengisi Nat Keramik ex. SmartGrip TG 0,0167 kg 9
9.235,7 153,93
2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0005 oh 126.551,7 60,26
Kepala Tukang Batu 0,0010 oh 0
112.490,4 107,13
Tukang Batu 0,0952 oh 0
105.459,7 10.043,7
Pekerja 0,0476 oh 577.337,1 9
3.682,72
5JUMLAH 98.857,9
45 PEMBULATA 2
98.857,0
46 1 m2 Pek. Dinding Lapis Kayu N 0
Bahan
Wood deck 1,1000 m2 367.281,1 404.009,2
Rangka Hollow 5,2500 m' 6 8.308,9 743.621,9
Finishing 1,1000 m2 5
63.915,0 9
70.306,5
0 0
Alat
Alat Bantu 1,0000 ls 319,58 319,58

Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang Batu 0,0020 oh 0
112.490,4 224,98
Tukang Batu 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,2000 oh 577.337,1 8
15.467,4
5JUMLAH 3
544.622,2
46 PEMBULATA 7
544.621,0
47 1 m2 Pek. Pasangan Bata Merah 1PC : 3PS N 0
Bahan
Bata merah 5 x 11 x 22 cm 74,0000 bh 830,90 61.486,2
Semen @ 50 kg 0,2874 zak 70.306,5 3
20.206,0
Pasir pasang 0,0380 m3 0
153.396,0 9
5.829,05
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0115 oh 126.551,7 1.457,97
Kepala Tukang Batu 0,0230 oh 0
112.490,4 2.591,94
Tukang Batu 0,0922 oh 0
105.459,7 9.719,79
Pekerja 0,1843 oh 577.337,1 14.255,7
5JUMLAH 0
116.185,9
47 PEMBULATA 2
116.185,0
48 1 m2 Pek. Pasangan Bata Merah 1PC : 4PS N 0
Bahan
Bata merah 5 x 11 x 22 cm 74,0000 bh 830,90 61.486,2
Semen @ 50 kg 0,2300 zak 70.306,5 3
16.170,5
Pasir pasang 0,0430 m3 0
153.396,0 0
6.596,03
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0115 oh 126.551,7 1.457,97
Kepala Tukang Batu 0,0230 oh 0
112.490,4 2.591,94
Tukang Batu 0,0922 oh 0
105.459,7 9.719,79
Pekerja 0,1843 oh 577.337,1 14.255,7
5JUMLAH 0
112.917,3
48 PEMBULATA 1
112.916,0
49 1 m3 Pek. Kolom Praktis 10x10 cm N 0
Bahan
Semen @ 50 kg 6,0000 zak 70.306,5 421.839,0
0 0

Analisa Harga Satuan - 10 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Pasir beton 0,5880 m3 153.396,0 90.196,8
Batu pecah 1 - 2 cm 0,7750 m3 0
383.490,0 5
297.204,7
Bekesting Kolom Praktis 15,0000 m2 044.740,5 5
671.107,5
Besi Beton 192,498 kg 0
10.418,1 0
2.005.475,
4 5 80
Alat
Alat Bantu 1,0000 ls 2.556,6 2.556,60
0
Upah
Mandor 1,8182 oh 126.551,7 230.094,0
Kepala Tukang Batu 3,6364 oh 0
112.490,4 0
409.056,0
Tukang Batu 3,6364 oh 0
105.459,7 0
383.490,0
Pekerja 7,2727 oh 577.337,1 0
562.452,0
5JUMLAH 0
5.073.472,
49 PEMBULATA 49
5.073.471,
50 1 m3 Pek. Balok Praktis 10x20 cm N 00
Bahan
Semen @ 50 kg 6,0000 zak 70.306,5 421.839,0
Pasir beton 0,5880 m3 0
153.396,0 090.196,8
Batu pecah 1 - 2 cm 0,7750 m3 0
383.490,0 5
297.204,7
Bekesting Kolom Praktis 15,0000 m2 044.740,5 5
671.107,5
Besi Beton 192,498 kg 0
10.418,1 0
2.005.475,
4 5 80
Alat
Alat Bantu 1,0000 ls 2.556,6 2.556,60
0
Upah
Mandor 1,8182 oh 126.551,7 230.094,0
Kepala Tukang Batu 3,6364 oh 0
112.490,4 0
409.056,0
Tukang Batu 3,6364 oh 0
105.459,7 0
383.490,0
Pekerja 7,2727 oh 577.337,1 0
562.452,0
5JUMLAH 0
5.073.472,
50 PEMBULATA 49
5.073.471,
51 1 m2 Pekerjaan Plesteran & Acian 1PC : 3PS - 15mm N 00
Bahan
Semen @ 50 kg 0,1700 zak 70.306,5 11.952,1
Semen Acian 2,7500 kg 01.406,1 1
3.866,86
Pasir pasang 0,0200 m3 3
153.396,0 3.067,92
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0033 oh 126.551,7 420,44
Kepala Tukang Batu 0,0332 oh 0
112.490,4 3.737,22
Tukang Batu 0,0664 oh 0
105.459,7 7.007,29
Pekerja 0,2658 oh 577.337,1 20.554,7
5JUMLAH 2
51.245,7
51 PEMBULATA 1
51.244,0
52 1 m2 Pekerjaan Plesteran & Acian 1PC : 4PS - 15mm N 0
Bahan
Semen @ 50 kg 0,1248 zak 70.306,5 8.774,25
Semen Acian 2,7500 kg 01.406,1 3.866,86
Pasir pasang 0,0240 m3 3
153.396,0 3.681,50
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0033 oh 126.551,7 420,44
Kepala Tukang Batu 0,0332 oh 0
112.490,4 3.737,22
Tukang Batu 0,0664 oh 0
105.459,7 7.007,29
Pekerja 0,2658 oh 577.337,1 20.554,7
5JUMLAH 2
48.681,4
52 PEMBULATA 4
48.680,0
53 1 m2 Pek. Plafond Expose Beton N 0
Bahan
Acian Expose Beton ex. SmartCote 50 2,7500 kg 2.332,9 6.415,47
0
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5

Analisa Harga Satuan - 11 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)

Upah
Mandor 0,0005 oh 126.551,7 60,26
Kepala Tukang Kayu 0,0048 oh 0
105.459,7 502,19
Tukang Kayu 0,0476 oh 5
105.459,7 5.021,89
Pekerja 0,0952 oh 577.337,1 7.365,44
5JUMLAH 21.282,7
53 PEMBULATA 1
21.282,0
54 1 bh Closet Jongkok CE 6 N 0
Bahan
Closet Jongkok CE 6 1,0000 bh 374.286,2 374.286,2
Material Bantu 1,0000 ls 431.957,5 431.957,5
0 0
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,1250 oh 126.551,7 15.818,9
Kepala Tukang Pasang Pipa 0,2500 oh 0
112.490,4 6
28.122,6
Tukang Pasang Pipa 0,5000 oh 0
105.459,7 0
52.729,8
Pekerja 1,5000 oh 577.337,1 8
116.005,7
5JUMLAH 3
619.623,9
54 PEMBULATA 7
619.623,0
55 1 bh Closet Duduk CW 826 J N 0
Bahan
Closet Duduk CW 826 J 1,0000 bh 4.817.912, 4.817.912,
Material Bantu 1,0000 ls 70 9.587,2 709.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
4.969.987,
55 PEMBULATA 79
4.969.987,
56 1 bh Closet Duduk CW704J/SW784 JP N 00
Bahan
Closet Duduk CW704J/SW784 JP 1,0000 bh 2.599.423, 2.599.423,
Material Bantu 1,0000 ls 05 9.587,2 059.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
2.751.498,
56 PEMBULATA 14
2.751.498,
57 1 bh Closet Duduk CW421J N 00
Bahan
Closet Duduk CW421J 1,0000 bh 1.901.471, 1.901.471,
Material Bantu 1,0000 ls 25 9.587,2 259.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
2.053.546,
57 PEMBULATA 34
2.053.546,
58 1 bh Wastafel LW 211CJW/F N 00
Bahan
Wastafel LW 211CJW/F 1,0000 bh 1.336.462, 1.336.462,
65 65

Analisa Harga Satuan - 12 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Material Bantu 1,0000 ls 9.587,2 9.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,1250 oh 126.551,7 15.818,9
Kepala Tukang Pasang Pipa 0,2500 oh 0
112.490,4 6
28.122,6
Tukang Pasang Pipa 0,5000 oh 0
105.459,7 0
52.729,8
Pekerja 1,5000 oh 577.337,1 8
116.005,7
5JUMLAH 3
1.559.430,
58 PEMBULATA 13
1.559.430,
59 1 bh Faucet TX 109 LJ N 00
Bahan
Faucet TX 109 LJ 1,0000 bh 885.222,7 885.222,7
5 5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0333 oh 126.551,7 4.218,39
Kepala Tukang Pasang Pipa 0,0667 oh 0
112.490,4 7.499,36
Tukang Pasang Pipa 0,1333 oh 0
105.459,7 14.061,3
Pekerja 0,4000 oh 577.337,1 0
30.934,8
5JUMLAH 6
942.639,7
59 PEMBULATA 3
942.639,0
60 1 bh Wastafel L 548 N 0
Bahan
Wastafel L 548 1,0000 bh 1.079.716, 1.079.716,
Material Bantu 1,0000 ls 10 9.587,2 109.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
1.231.791,
60 PEMBULATA 19
1.231.791,
61 1 bh Wastafel Cerabo LW 523 J, TX116LE N 00
Bahan
Wastafel Cerabo LW 523 J, TX116LE 1,0000 bh 2.908.515, 2.908.515,
Material Bantu 1,0000 ls 99 9.587,2 999.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
3.060.591,
61 PEMBULATA 08
3.060.591,
62 1 bh Wastafel Cerabo LW 711 B, TX119LI N 00
Bahan
Wastafel Cerabo LW 711 B, TX119LI 1,0000 bh 3.523.378, 3.523.378,
Material Bantu 1,0000 ls 29 9.587,2 299.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
3.675.453,
62 PEMBULATA 38
3.675.453,
N 00

Analisa Harga Satuan - 13 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
63 1 bh Urinal U 57 M
Bahan
Urinal U 57 M 1,0000 bh 1.793.454, 1.793.454,
Material Bantu 1,0000 ls 90 9.587,2 909.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0714 oh 126.551,7 9.039,41
Kepala Tukang Pasang Pipa 0,1429 oh 0
112.490,4 16.070,0
Tukang Pasang Pipa 0,2857 oh 0
105.459,7 6
30.131,3
Pekerja 0,8571 oh 577.337,1 6
66.288,9
5JUMLAH 9
1.925.275,
63 PEMBULATA 02
1.925.275,
64 1 bh Urinal U 447 HJT1M N 00
Bahan
Urinal U 447 HJT1M 1,0000 bh 3.139.504, 3.139.504,
Material Bantu 1,0000 ls 80 9.587,2 809.587,25
5
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0714 oh 126.551,7 9.039,41
Kepala Tukang Pasang Pipa 0,1429 oh 0
112.490,4 16.070,0
Tukang Pasang Pipa 0,2857 oh 0
105.459,7 6
30.131,3
Pekerja 0,8571 oh 577.337,1 6
66.288,9
5JUMLAH 9
3.271.324,
64 PEMBULATA 92
3.271.324,
65 1 bh Kitchen Zink Royal N 00
Bahan
Fee Management 1,0000 ls 70.000,0 70.000,0
Material Bantu 1,0000 ls 0
44.740,5 0
44.740,5
0 0
Alat
Alat Bantu 1,0000 ls 703,07 703,07

Upah
Mandor 0,0833 oh 126.551,7 10.545,9
Kepala Tukang Pasang Pipa 0,1667 oh 0
112.490,4 8
18.748,4
Tukang Pasang Pipa 0,3333 oh 0
105.459,7 0
35.153,2
Pekerja 1,0000 oh 577.337,1 5
77.337,1
5JUMLAH 5
257.228,3
65 PEMBULATA 4
257.228,0
66 1 bh Floor Drain TX 1 BV 1 N 0
Bahan
Floor Drain TX 1 BV 1 1,0000 bh 291.388,4 291.388,4
Material Bantu 1,0000 ls 9 9.587,2 99.587,25
5
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0016 oh 126.551,7 202,48
Kepala Tukang Pasang Pipa 0,0160 oh 0
112.490,4 1.799,85
Tukang Pasang Pipa 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,2000 oh 577.337,1 15.467,4
5JUMLAH 3
330.078,0
66 PEMBULATA 2
330.078,0
67 1 bh Floor Drain TX 1 C N 0
Bahan
Floor Drain TX 1 C 1,0000 bh 234.056,7 234.056,7
Material Bantu 1,0000 ls 3 9.587,2 39.587,25
5
Alat
Alat Bantu 1,0000 ls 3.195,7 3.195,75
5
Upah
Mandor 0,0016 oh 126.551,7 202,48
Kepala Tukang Pasang Pipa 0,0160 oh 0
112.490,4 1.799,85
0

Analisa Harga Satuan - 14 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Tukang Pasang Pipa 0,0800 oh 105.459,7 8.436,78
Pekerja 0,2000 oh 577.337,1 15.467,4
5JUMLAH 3
272.746,2
67 PEMBULATA 7
272.746,0
68 1 bh Kran TX 606 KEZ N 0
Bahan
Kran TX 606 KEZ 1,0000 bh 853.904,4 853.904,4
Material Bantu 1,0000 ls 0 1.406,1 01.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
873.934,5
68 PEMBULATA 1
873.934,0
69 1 bh Shower TX 432 SD2 + TX 423 SZ N 0
Bahan
Shower TX 432 SD2 + TX 423 SZ 1,0000 bh 1.007.619, 1.007.619,
Material Bantu 1,0000 ls 98 1.406,1 981.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang Pasang Pipa 0,0100 oh 0
112.490,4 1.124,90
Tukang Pasang Pipa 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,2000 oh 577.337,1 8
15.467,4
5JUMLAH 3
1.036.738,
69 PEMBULATA 37
1.036.738,
70 1 bh Jet Shower, SO 212 CCS N 00
Bahan
Jet Shower, SO 212 CCS 1,0000 bh 350.382,0 350.382,0
Material Bantu 1,0000 ls 3 1.406,1 31.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0013 oh 126.551,7 158,19
Kepala Tukang Pasang Pipa 0,0125 oh 0
112.490,4 1.406,13
Tukang Pasang Pipa 0,1250 oh 0
105.459,7 13.182,4
Pekerja 0,2500 oh 577.337,1 7
19.334,2
5JUMLAH 9
386.316,6
70 PEMBULATA 4
386.316,0
71 1 bh Stop Kran TGB 9 RYRN N 0
Bahan
Stop Kran TGB 9 RYRN 1,0000 bh 497.450,4 497.450,4
Material Bantu 1,0000 ls 5 1.406,1 51.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0011 oh 126.551,7 144,63
Kepala Tukang Pasang Pipa 0,0114 oh 0
112.490,4 1.285,60
Tukang Pasang Pipa 0,1143 oh 0
105.459,7 12.052,5
Pekerja 0,2286 oh 577.337,1 4
17.677,0
5JUMLAH 6
530.463,8
71 PEMBULATA 2
1.061.308,
72 1 bh Kran T23 BQ 13 N 00
Bahan
Kran T23 BQ 13 1,0000 bh 172.570,5 172.570,5
Material Bantu 1,0000 ls 0 1.406,1 01.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Analisa Harga Satuan - 15 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)

Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
192.600,6
72 PEMBULATA 1
192.600,0
73 1 bh Kran Wastafel TEN40AWV500 N 0
Bahan
Kran Wastafel TEN40AWV500 1,0000 bh 4.534.769, 4.534.769,
Material Bantu 1,0000 ls 25 1.406,1 251.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0010 oh 126.551,7 126,55
Kepala Tukang Pasang Pipa 0,0100 oh 0
112.490,4 1.124,90
Tukang Pasang Pipa 0,1000 oh 0
105.459,7 10.545,9
Pekerja 0,2000 oh 577.337,1 8
15.467,4
5JUMLAH 3
4.563.887,
73 PEMBULATA 65
4.563.887,
74 1 bh Hand dryer H3100R N 00
Bahan
Hand dryer H3100R 1,0000 bh 3.080.703, 3.080.703,
Material Bantu 1,0000 ls 00 1.406,1 001.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0011 oh 126.551,7 144,63
Kepala Tukang Pasang Pipa 0,0114 oh 0
112.490,4 1.285,60
Tukang Pasang Pipa 0,1143 oh 0
105.459,7 12.052,5
Pekerja 0,2286 oh 577.337,1 4
17.677,0
5JUMLAH 6
3.113.716,
74 PEMBULATA 38
3.113.716,
75 1 bh Head Shower TX 465SEN + TX 452 SES N 00
Bahan
Head Shower TX 465SEN + TX 452 SES 1,0000 bh 1.445.501, 1.445.501,
Material Bantu 1,0000 ls 64 1.406,1 641.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0011 oh 126.551,7 144,63
Kepala Tukang Pasang Pipa 0,0114 oh 0
112.490,4 1.285,60
Tukang Pasang Pipa 0,1143 oh 0
105.459,7 12.052,5
Pekerja 0,2286 oh 577.337,1 4
17.677,0
5JUMLAH 6
1.478.515,
75 PEMBULATA 02
1.478.515,
76 1 bh Jet Washer THX 20 NB N 00
Bahan
Jet Washer THX 20 NB 1,0000 bh 359.521,8 359.521,8
Material Bantu 1,0000 ls 8 1.406,1 81.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
379.551,9
76 PEMBULATA 8
379.551,0
77 1 bh Tissue holder TX703AES N 0
Bahan
Tissue holder TX703AES 1,0000 bh 249.843,7 249.843,7
4 4

Analisa Harga Satuan - 16 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Material Bantu 1,0000 ls 1.406,1 1.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0010 oh 126.551,7 120,53
Kepala Tukang Pasang Pipa 0,0095 oh 0
112.490,4 1.071,34
Tukang Pasang Pipa 0,0952 oh 0
105.459,7 10.043,7
Pekerja 0,0952 oh 577.337,1 9
7.365,44
5JUMLAH 270.298,3
77 PEMBULATA 6
270.298,0
78 1 bh Paper Holder TS116R N 0
Bahan
Paper Holder TS116R 1,0000 bh 322.131,6 322.131,6
Material Bantu 1,0000 ls 0 1.406,1 01.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
342.161,7
78 PEMBULATA 1
342.161,0
79 1 bh Hand soap S6N N 0
Bahan
Hand soap S6N 1,0000 bh 62.061,4 62.061,4
Material Bantu 1,0000 ls 71.406,1 7
1.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
82.091,5
79 PEMBULATA 7
82.091,0
80 1 bh Robe Hook TX 704 AEZ N 0
Bahan
Robe Hook TX 704 AEZ 1,0000 bh 118.562,3 118.562,3
Material Bantu 1,0000 ls 3 1.406,1 31.406,13
3
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0007 oh 126.551,7 84,37
Kepala Tukang Pasang Pipa 0,0067 oh 0
112.490,4 749,94
Tukang Pasang Pipa 0,0667 oh 0
105.459,7 7.030,65
Pekerja 0,1333 oh 577.337,1 10.311,6
5JUMLAH 2
138.592,4
80 PEMBULATA 3
138.592,0
81 1 bh Partition Urinoir N 0
Bahan
Partion Plate A 100 1,0000 bh 804.881,6 804.881,6
Material Bantu 1,0000 ls 0 3.195,7 03.195,75
5
Alat
Alat Bantu 1,0000 ls 191,75 191,75

Upah
Mandor 0,0013 oh 126.551,7 158,19
Kepala Tukang Pasang Pipa 0,0125 oh 0
112.490,4 1.406,13
Tukang Pasang Pipa 0,2500 oh 0
105.459,7 26.364,9
Pekerja 0,5000 oh 577.337,1 4
38.668,5
5JUMLAH 8
874.866,9
2

Analisa Harga Satuan - 17 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
81 PEMBULATA 874.866,0
82 1 bh Cermin uk. 1000x1000 mm N 0
Bahan
Cermin 1,1000 m2 453.796,5 499.176,1
Material Bantu 1,0000 ls 0
127.830,0 5
127.830,0
0 0
Alat
Alat Bantu 1,0000 ls 447,41 447,41

Upah
Mandor 0,0029 oh 126.551,7 361,58
Kepala Tukang Pasang Pipa 0,0286 oh 0
112.490,4 3.214,01
Tukang Pasang Pipa 0,1429 oh 0
105.459,7 15.065,6
Pekerja 0,5714 oh 577.337,1 8
44.192,6
5JUMLAH 6
690.287,4
82 PEMBULATA 8
690.287,0
83 1 m2 Pek.Meja Wastafel Lapis Granite N 0
Bahan
Beton Bertulang 0,1800 m3 4.474.050, 805.329,0
Granite Tile 1,1500 m2 00
1.038.746, 0
1.194.558,
Perekat Keramik Lantai ex. SmartGrip TA 6,8250 kg 58 2.588,5 5717.666,9
Pengisi Nat Keramik ex. SmartGrip TG 0,2275 kg 6
9.235,7 0
2.101,13
2
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0500 oh 126.551,7 6.327,59
Kepala Tukang Batu 0,2500 oh 0
112.490,4 28.122,6
Tukang Batu 1,0000 oh 0
105.459,7 0
105.459,7
Pekerja 2,0000 oh 577.337,1 5
154.674,3
5JUMLAH 0
2.316.157,
83 PEMBULATA 28
2.316.156,
84 1 m1 Pek.Meja Wastafel Lapis Keramik 200 x 200 N 00
mm Bahan
Beton Bertulang 0,1800 m3 4.474.050, 805.329,0
Keramik 20 x 20 cm Polished 1,0500 m2 0064.324,0 067.540,2
Perekat Keramik Lantai ex. SmartGrip TA 6,8250 kg 62.588,5 6
17.666,9
Pengisi Nat Keramik ex. SmartGrip TG 0,2275 kg 6
9.235,7 0
2.101,13
2
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0500 oh 126.551,7 6.327,59
Kepala Tukang Batu 0,2500 oh 0
112.490,4 28.122,6
Tukang Batu 1,0000 oh 0
105.459,7 0
105.459,7
Pekerja 2,0000 oh 577.337,1 5
154.674,3
5JUMLAH 0
1.189.138,
84 PEMBULATA 97
1.189.138,
85 1 m1 Pek.Meja Wastafel Lapis Homogenous Tile 400 N 00
x 400Bmm
ahan
Beton Bertulang 0,1800 m3 4.474.050, 805.329,0
HT 400x400 mm Polished 1,0500 m2 00
175.216,5 0
183.977,4
Perekat Keramik Lantai ex. SmartGrip TA 6,8250 kg 8 2.588,5 117.666,9
Pengisi Nat Keramik ex. SmartGrip TG 0,2275 kg 6
9.235,7 0
2.101,13
2
Alat
Alat Bantu 1,0000 ls 1.917,4 1.917,45
5
Upah
Mandor 0,0235 oh 126.551,7 2.977,69
Kepala Tukang Batu 0,1176 oh 0
112.490,4 13.234,1
Tukang Batu 0,4706 oh 0
105.459,7 6
49.628,1
Pekerja 0,9412 oh 577.337,1 2
72.787,9
5JUMLAH 1
1.149.619,
85 PEMBULATA 77
1.149.619,
86 1 m2 Pek. Paving block 8 cm N 00
Bahan
Paving block 8 cm 1,0500 m2 133.352,2 140.019,8
6 7

Analisa Harga Satuan - 18 / 31


##
NO URAIAN PEKERJAAN VO SAT HARGA SATUAN JUMLAH HARGA TOTAL
L (Rp) (Rp)
Pasir urug 0,1200 m3 108.655,5 13.038,6
Abu batu 0,0240 m3 0
255.660,0 6
6.135,84
Pemadatan 1,0000 ls 0 6.391,5 6.391,50
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0001 oh 126.551,7 10,12
Kepala Tukang Batu 0,0080 oh 0
112.490,4 899,92
Tukang Batu 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,1600 oh 577.337,1 12.373,9
5JUMLAH 4
187.945,7
86 PEMBULATA 9
187.945,0
87 1 m2 Pek. Paving block 6 cm N 0
Bahan
Paving block 6 cm 1,0500 m2 118.012,6 123.913,2
Pasir urug 0,1200 m3 6
108.655,5 913.038,6
Abu batu 0,0240 m3 0
255.660,0 6
6.135,84
Pemadatan 1,0000 ls 0 6.391,5 6.391,50
0
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0001 oh 126.551,7 10,12
Kepala Tukang Batu 0,0080 oh 0
112.490,4 899,92
Tukang Batu 0,0800 oh 0
105.459,7 8.436,78
Pekerja 0,1600 oh 577.337,1 12.373,9
5JUMLAH 4
171.839,2
87 PEMBULATA 1
171.838,0
88 1 m2 Pek. Pagar Retaining Wall N 0
Bahan
Beton 1,0000 m3 1.005.960, 1.005.960,
Besi 140,000 kg 0012.444,0 00
1.742.160,
Bekisting 06,5000 m2 0
115.943,0 00
753.629,5
0 JUMLAH 0
3.501.749,
88 PEMBULATA 50
3.501.749,
89 1 m2 Pek. Batu Kali 1:4 N 00
Bahan
Semen Portland 163,000 kg 1.406,1 229.199,1
Batu kali gunung 01,2000 m3 3
191.745,0 9
230.094,0
Pasir pasang 0,5200 m3 0
153.396,0 079.765,9
0 2
Alat
Alat Bantu 1,0000 ls 639,15 639,15

Upah
Mandor 0,0004 oh 126.551,7 50,62
Kepala Tukang Batu 0,0400 oh 0
112.490,4 4.499,62
Tukang Batu 0,4000 oh 0
105.459,7 42.183,9
Pekerja 0,8000 oh 577.337,1 0
61.869,7
5JUMLAH 2
648.302,1
89 PEMBULATA 2
648.302,0
N 0

Analisa Harga Satuan - 19 / 31


REKAPITULASI HARGA SATUAN PEKERJAAN
PROYEK Yayasan Perguruan Islam Maros
LOKASI
TAHUN 2.014

No Uraian Pekerjaan Satuan Dipakai

I HARGA ANALISA PEKERJAAN


1 Pembersian Lapangan dan Perataan m2 8.999,00
2 Pek. Bowplank m1 52.629,00
3 Pek. Galian Tanah Manual 1 M m3 40.649,00
4 Pek. Galian Tanah Manual 2 M m3 48.524,00
5 Pek. Galian Tanah Manual 3 M m3 60.335,00
6 Pek. Galian Tanah Mekanik m3 29.574,00
7 Pek. Pemadatan Tanah m3 21.993,00
8 Pek. Buang Tanah Galian m3 20.551,00
9 Pek. Urugan Tanah Kembali m3 18.876,00
10 Pek. Urugan Tanah m3 68.410,00
11 Pek. Urugan Pasir t = 10 cm m3 168.656,00
12 Pek. Lantai kerja t = 5 cm m3 740.013,00
13 Pek. Bekisting Pondasi Memakai Bataco m2 100.558,00
14 Pek. Besi Beton kg 12.444,00
15 Pek. Wiremesh kg 16.384,00
16 Pek. Besi Beton Borepile kg 12.793,00
17 Pek. Beton K-175 m3 990.686,00
18 Pek. Beton K-300 Bore Pile m3 1.194.766,00
19 Pek. Beton K-300 Pilecap dan Sloof m3 1.002.190,00
20 Pek. Beton K-225 Pilecap dan Sloof m3 975.857,00
21 Pek. Beton K-300 Kolom & Wall m3 1.005.960,00
22 Pek. Beton K-225 Pelat dan Balok m3 1.001.423,00
23 Pek. Beton K-250 m3 1.027.756,00
24 Pek. Beton K-350 Pelat dan Balok m3 1.166.004,00
25 Pek. Beton K-300 Tangga m3 1.017.895,00
26 Pek. Bekisting Kolom m2 115.943,00
27 Pek. Bekisting Pelat & Balok m2 160.644,00
28 Pek. Bekisting Tangga m2 206.412,00
29 Pek.screeding t= 30 mm m2 45.674,00
30 Pek. Rabat Beton t= 100 mm m2 74.563,00
31 Pek. Keramik Lantai 200x200 mm Unpholished m2 115.278,00
32 Pek. Keramik Lantai 300x300 Pholished m2 121.989,00
33 Pek. Keramik Lantai HT 600x600 mm Polish m2 235.224,00
34 Pek. Keramik Lantai HT 400x400 mm Polish m2 235.224,00
35 Pek. Koral Sikat m2 203.194,00
36 Pek. Dinding Batu Tempel m2 376.791,00
37 Pek. Dinding Roster m2 360.736,00
38 Pek. Keramik Dinding 200x250 mm m2 138.899,00
39 Pek. Border Dinding 100x200 mm m1 34.648,00
40 Pek. Plint Kayu 100 mm m1 61.323,00
41 Pek. Plint HT 100x400 mm Polished m1 58.128,00
42 Pek. Plint HT 100x600 mm Polished m1 58.128,00
43 Pek. Plint Keramik 100x300 mm Polished m1 26.159,00
44 Pek. Step Nosing Keramik m1 54.592,00
45 Pek. Step Nosing HT m1 98.857,00
46 Pek. Dinding Lapis Kayu m2 544.621,00
47 Pek. Pasangan Bata Merah 1PC : 3PS m2 116.185,00
48 Pek. Pasangan Bata Merah 1PC : 4PS m2 112.916,00
49 Pek. Kolom Praktis 10x10 cm m3 5.073.471,00
50 Pek. Balok Praktis 10x20 cm m3 5.073.471,00
51 Pekerjaan Plesteran & Acian 1PC : 3PS - 15mm m2 51.244,00
52 Pekerjaan Plesteran & Acian 1PC : 4PS - 15mm m2 48.680,00

53 Pek. Plafond Expose Beton m2 21.282,00


54 Closet Jongkok CE 6 bh 619.623,00
55 Closet Duduk CW 826 J bh 4.969.987,00
56 Closet Duduk CW704J/SW784 JP bh 2.751.498,00
57 Closet Duduk CW421J bh 2.053.546,00
58 Wastafel LW 211CJW/F bh 1.559.430,00
59 Faucet TX 109 LJ bh 942.639,00
60 Wastafel L 548 bh 1.231.791,00
61 Wastafel Cerabo LW 523 J, TX116LE bh 3.060.591,00
62 Wastafel Cerabo LW 711 B, TX119LI bh 3.675.453,00
63 Urinal U 57 M bh 1.925.275,00
64 Urinal U 447 HJT1M bh 3.271.324,00
65 Kitchen Zink Royal bh 257.228,00
66 Floor Drain TX 1 BV 1 bh 330.078,00
67 Floor Drain TX 1 C bh 272.746,00
68 Kran TX 606 KEZ bh 873.934,00
69 Shower TX 432 SD2 + TX 423 SZ bh 1.036.738,00
70 Jet Shower, SO 212 CCS bh 386.316,00
71 Stop Kran TGB 9 RYRN bh 1.061.308,00
72 Kran T23 BQ 13 bh 192.600,00
73 Kran Wastafel TEN40AWV500 bh 4.563.887,00
74 Hand dryer H3100R bh 3.113.716,00
75 Head Shower TX 465SEN + TX 452 SES bh 1.478.515,00
76 Jet Washer THX 20 NB bh 379.551,00
77 Tissue holder TX703AES bh 270.298,00
78 Paper Holder TS116R bh 342.161,00
79 Hand soap S6N bh 82.091,00
80 Robe Hook TX 704 AEZ bh 138.592,00
81 Partition Urinoir bh 874.866,00
82 Cermin uk. 1000x1000 mm bh 690.287,00
83 Pek.Meja Wastafel Lapis Granite m2 2.316.156,00
84 Pek.Meja Wastafel Lapis Keramik 200 x 200 mm m1 1.189.138,00
85 Pek.Meja Wastafel Lapis Homogenous Tile 400 x 400 mm m1 1.149.619,00
86 Pek. Paving block 8 cm m2 187.945,00
87 Pek. Paving block 6 cm m2 171.838,00
88 Pek. Pagar Retaining Wall m2 3.501.749,00
89 Pek. Batu Kali 1:4 m2 648.302,00
90 Pekerjaan Plesteran 1 : 3 PP, 15mm #N/A #N/A
II HARGA SUBKON
1 Bore pile dia 80 cm ttk 422.800,00
2 Bore pile dia 60 cm ttk 355.700,00
3 Bore pile dia 30 cm ttk 308.700,00
4 Potong Bore pile dia 80 cm ttk 201.300,00
5 Potong Bore pile dia 60 cm ttk 174.500,00
6 Potong Bore pile dia 30 cm ttk 134.200,00
7 Buang tanah pengeboran m3 80.500,00
8 Pas. Batu kali m3 771.800,00
9 Pas. Batu kosong m3 241.600,00
10 Pasang cerucuk @ 4bh m2 255.000,00
11 Test PDA (Pile Driving Analyzer) ttk 13.422.200,00
12 Test Beban Lateral ttk 134.221.500,00
13 Anti Rayap m2 16.800,00
14 Waterproofing Integral m3 134.200,00
15 Waterproofing Coating m2 47.000,00
16 Waterproofing Membrane m2 98.000,00
17 Waterproofing Kristalin m3 201.300,00
18 Bar Finish Brushbond flek m2 73.800,00
19 Waterstop m1 124.800,00
20 Fire stop m1 154.400,00
21 Dewatering ls 331.661.300,00
22 Mobilisasi alat ls 67.110.800,00
23 Pemadatan Tanah m2 4.700,00
24 Kerikil m3 308.700,00
25 Sub Base tebal 30 cm, CBR 60 % m3 369.100,00
26 Base Couse tebal 20 cm, CBR 80 % m2 402.700,00
27 Batu pecah tebal 30 cm, CBR 80 % m3 463.100,00
28 Treat Base tebal 15 cm, CBR 80 % m2 64.400,00
29 Aspal tebal 4 cm m2 120.800,00
30 Prime coat 1,5 liter/m2 m2 19.100,00
31 Bahan Pengisi Filler Tambahan kg 67.100,00
32 Sterofoam t = 50 m 2.700,00
33 Aspal m 4.000,00
34 Pengaspalan m2 322.100,00
35 Gutter 240 x 200 mm m1 100.000,00
36 Gutter 300 x 200 mm m1 107.500,00
37 Greting cast iron m1 469.800,00
38 Kitchen Zink 2 Lubang ex. Bianco (pantry) bh 1.812.000,00
39 Kitchen Zink 1 Lubang ex. Bianco (pantry) bh 738.200,00
40 Bak Janitor bh 872.400,00
41 Bak Mandi uk. 600x700 mm bh 1.392.400,00
42 ACP Alucobond m2 1.102.100,00
43 ACP Seven m2
44 ACP Alutile m2 1.024.400,00
45 Ornamen tradisional m2 1.024.400,00
46 Curtain Wall m2 1.101.700,00
47 Aluminium frame 150x125 mm m1 386.900,00
48 Aluminium Caping vertical m1 306.200,00
49 Aluminium Caping horizontal m1 306.200,00
50 Aluminium spandreil m2 164.400,00
51 Hollow 100.50 finish duco m2 664.400,00
52 Toping aluminium m1 462.900,00
53 Parapet aluminium m1 585.100,00
54 Curtain box m1 435.100,00
55 Grill aluminium m2 1.106.400,00
56 Cover kolom stainless steel m2 1.677.800,00
57 Plat stainless steel m2 1.024.400,00
58 Louver steel m2 1.024.400,00
59 Kaca tempered 12 mm m2 1.416.000,00
60 Kaca laminated clear glass 6+6 mm m2 1.543.500,00
61 Kaca tempered clear 8 mm m2 1.373.800,00
62 Kaca tempered panasap blue green 8 mm m2 1.555.400,00
63 Kaca panasap blue green 8 mm m2 989.500,00
64 Kaca tempered panasap blue green 6 mm m2 930.600,00
65 Kaca Bening12 mm m2 1.275.100,00
66 Jendela kaca 8 mm m2 1.140.900,00
67 Kaca clear 6 mm m2 591.400,00
68 Partisi double gypsum tebal 9 mm m2 187.900,00
69 Partisi Gypsum tebal 12 mm (Single) m2 140.900,00
70 Partisi GRC tebal 6 mm m2 120.800,00
71 Partisi lipat antar ruang m2 402.700,00
72 Pas. PVC Board m' 40.300,00
73 Partisi Gypsum tebal 9 mm (Double) m2 154.400,00
74 Insulation rockwool density 48 kg/m3 m2 147.600,00
75 GRC Panel m2 587.900,00
76 Delatasi Bangunan m' 50.300,00
77 Lemari Built In bh 3.355.500,00
78 Meja Resepsionis bh 6.711.100,00
79 Topian Beton diatas jendela m2 476.800,00
80 Cove Plafon Toilet, Acrilic t = 5 bh 181.200,00
81 Skonengan m' 26.800,00
82 Gypsum Board tebal 9 mm + Rangka Metal Euring m2 114.100,00
83 Grid Ceiling System - 150 mm m2 442.900,00
84 Linier Ceiling System m2 416.100,00
85 Calciboard tebal 4 mm + Rangka Metal Furing m2 120.800,00
86 Calciboard tebal 6 mm + Rangka Metal Furing m2 154.400,00
87 Perforated ex, Galaxy m' 738.200,00
88 Plafond metal m2 738.200,00
89 Accoustic Ceiling 600x600 mm m2 174.500,00
90 Drop ceiling t: 300 mm m' 62.300,00
91 Shadow line m' 20.100,00
92 List plafond 50 mm m' 16.800,00
93 List plafond 70 mm m' 20.100,00
94 Up Ceiling Gypsum Finishing Cat m' 32.300,00
95 Curtain Box Multiplex Fin Cat m' 187.900,00
96 PVC Capping t: 2 mm m' 3.288.400,00
97 Floor Hardener 5 Kg/m2 m2 33.600,00
98 Floor Hardener 4 Kg/m2 m2 29.500,00
99 Floor Hardener 5 Kg/m2 + sersan m2 40.300,00
100 Floor Hardener 3 Kg/m2 m2 25.500,00
101 Cubicle kaca tempered 12 mm m2 2.416.000,00
102 Pek. Hand Rail Closet Toliet Difable bh 671.100,00
103 Pek. Hand Rail Washtafel Toliet Difable bh 671.100,00
104 Railing Stainless steel m' 1.006.700,00
105 Pasang Railing Pipa Besi dia. 20 mm m' 805.300,00
106 Railing Hollow Balkon m' 805.300,00
107 Railling kaca tempered 10 mm t: 1955 mm m' 5.368.900,00
108 Tangga Servis Ke Ruang Mesin Lift ls 5.637.300,00
109 Tangga Besi Type 2 ls 6.040.000,00
110 Tangga Stainless Type 1 ls 10.066.600,00
111 Tangga Stainless Kolam ls 10.066.600,00
112 Cat Interior m2 18.100,00
113 Cat weathershield m2 30.900,00
114 Cat Oil base m2 36.900,00
115 Cat enamel m2 60.400,00
116 Cat epoxy m2 37.600,00
117 Cat Duco/m2 m2 134.200,00
118 Cat Parkir 100 mm m1 20.100,00
119 Cat Pulau m2 100.700,00
120 Cat Penunjuk 2 Arah bh 201.300,00
121 Cat Penunjuk 4 Arah bh 402.700,00
122 Car stoper bh 156.600,00
123 Corner guard bh 183.900,00
124 Kanstein tepi jalan m1 127.000,00
125 Kanstein 15/25/40 cm m1 166.900,00
126 Kanstein 20/60 cm m1 204.600,00
127 Manhole bh 254.000,00
128 Sersan Besi Siku ukuran 30.30.3. m1 32.900,00
129 Besi Sinage Rambu - Rambu bh 120.500,00
130 Signage Out bh 268.400,00
131 Signage In bh 268.400,00
132 Planter box bh 201.300,00
133 Grill selokan ramp bh 1.006.700,00
134 Guard rail m' 201.300,00
135 Plastik m' 6.700,00
136 Saluran buis dia 300 mm m' 469.800,00
137 Sumur resapan 1 m3 unit 2.684.400,00
138 Dinding Porous Ø 100 cm, t = 100 cm unit 268.400,00
139 Ijuk (t= 5 cm) m3 201.300,00
140 Koral Ø 3-5 cm m3 268.400,00
141 Holding Tank, kapasitas 2 bh x 2 m3. bh 30.199.800,00
142 Pek. Kusen Pintu Type P U. unit 10.297.000,00
143 Pek. Kusen Pintu Type P 1 unit 5.620.900,00
144 Pek. Kusen Pintu Type P 2 unit 4.231.300,00
145 Pek. Kusen Pintu Type P 3. unit 4.055.100,00
146 Pek. Kusen Pintu Type P V unit 3.399.800,00
147 Pek. Kusen Pintu Double Type PD - 1. unit 895.400,00
148 Pek. Kusen Pintu Double Type PD - 1A. unit 895.400,00
149 Pek. Kusen Pintu Double Type PD - 2. unit 895.400,00
150 Pek. Kusen Pintu Double Type PD - 3. unit 895.400,00
151 Pek. Kusen Pintu Double Type PD - 4. unit 895.400,00
152 Pek. Kusen Pintu Double Type PD - 5. unit 895.400,00
153 Pek. Kusen Pintu Jendela Type PJ - 1. unit 895.400,00
154 Pek. Kusen Pintu Jendela Type PJ - 1A. unit 895.400,00
155 Pek. Kusen Pintu Jendela Type PJ - 2. unit 895.400,00
156 Pek. Kusen Pintu Shaft Type PS - 1. unit 895.400,00
157 Pek. Kusen Jendela Type J - 1. unit 6.949.900,00
158 Pek. Kusen Jendela Type J - 2. unit 5.112.100,00
159 Pek. Kusen Jendela Type J - 2A. unit 895.400,00
160 Pek. Kusen Jendela Type J - 2B. unit 895.400,00
161 Pek. Kusen Jendela Type J - 3. unit 3.560.400,00
162 Pek. Kusen Jendela Type J - 3A. unit 895.400,00
163 Pek. Kusen Jendela Type J - 3B. unit 895.400,00
164 Pek. Kusen Jendela Type J - 4. unit 895.400,00
165 Pek. Kusen Jendela Type J - 4A. unit 895.400,00
166 Pek. Kusen Jendela Type J - 5. unit 895.400,00
167 Pek. Kusen Bovenlight Type BV - 1 unit 895.400,00
168 Pek. Kusen Bovenlight Type BV - 1A. unit 895.400,00
169 Pek. Kusen Bovenlight Type BV - 2. unit 895.400,00
170 Pek. Kusen Bovenlight Type BV - 3. unit 895.400,00
171 Pek. Kusen Bovenlight Type BV - 4. unit 895.400,00
172 Pek. Kusen Bovenlight Type BV - 5. unit 895.400,00
173 Pek. Kusen Partisi Lipat Type PL 1 unit 895.400,00
174 Pek. Kusen Pintu Besi Double Type - 1. unit 895.400,00
175 Pek. Kusen Pintu Besi Double Type - 2. unit 895.400,00
176 Pek. Kusen Pintu Besi Double Type - 3. unit 895.400,00
177 Pek. Louver Besi Type - 1. unit 895.400,00
178 Pek. Louver Besi Type - 2. unit 895.400,00
179 Pek. Louver Besi Type - 3. unit 895.400,00
180 Pek. Louver Besi Type - 4. unit 895.400,00
181 Type W5 unit -
182 W-1 unit -
183 W-1A unit -
184 J-1 unit -
185 Profil H 150.150 kg 21.600,00
186 Profil Kolom WF 150.75 kg 21.600,00
187 Profil Balok WF 150.75 kg 19.100,00
188 Gording C 125x50x20x2.3mm kg 16.900,00
189 Profil UNP 150 x 75 x 6,5 x 10 kg 19.100,00
190 Profil WF 300.150 kg 19.100,00
191 Profil WF 250.125 kg 19.100,00
192 Profil WF 200.100 kg 19.100,00
193 Pek Cquerred plate t = 3 mm kg 22.300,00
194 Besi Siku L. 40x40x4 kg 22.300,00
195 L 100 x 100 x 10 kg 16.900,00
196 Trestang diameter 10mm kg 24.700,00
197 Base Plate no 35.800,00
198 Pelat Tebal 10 mm no 159.200,00
199 Pelat sambung kg 16.900,00
200 Baut M22 mm bh 16.100,00
201 Chemical Angkur Ø22 L: 150 mm bh 53.700,00
202 Chemical Angkur Ø19 L: 400 mm bh 107.400,00
203 Chemical Angkur Ø12 L: 200 mm bh 69.800,00
204 Chemical Angkur Ø16 bh 102.000,00
205 Chemical Angkur Ø10 bh 37.600,00
206 Chemset D13-400 kg 21.500,00
207 Grouting baseplate 25mm m2 265.000,00
208 Chequered Plate, 4mm thick m2 566.800,00
209 Cat finish Duco kg 2.500,00
210 Cat finish Alkyd kg 1.100,00
211 Cat zincromate kg 500,00
212 Shear Conector bh 16.100,00
213 Rangka atap Baja Ringan m2 201.300,00
214 Pasang Genteng Metal m2 133.900,00
215 Pasang Nok Genteng Metal m' 67.100,00
216 Aluminium foil 1 lapis + Glasswool m' 140.900,00
217 Listplank GRC m' 60.400,00
218 Talang GRC Rangka Besi m' 302.000,00
219 Liwatan (Flashing) t: 0,8 mm m' 140.900,00
220 Penutup tepi (Capping) 40 cm lebar pada atap utama m' 140.900,00
221 Isolasi Peredam Panas Spray m2 134.200,00
222 Calsiboard tebal 5 mm rangka baja m2 469.800,00
223 Roof drain Ø 4" Cast iron bh 114.100,00
224 Pipa air hujan dari PVC Ø 4", lengkap klem, Fitting dll m' 134.200,00
225 Pemasangan saluran beton precast U- Ditch 300 x 500 m' 520.400,00
226 Pemasangan Box Culvert beton precast BC 400 x 400 m' 567.800,00
227 Pemasangan Box Culvert beton precast BC 500 x 500 untuk sal m' 946.300,00
228 Pemasangan saluran beton precast U- Ditch 300 x 400 m' 473.100,00
229 Pemasangan saluran beton precast U- Ditch 300 x 400 dengan p m' 662.400,00
230 Pemasangan saluran beton precast U- Ditch 500 x 700 mm m' 804.300,00
231 Pemasangan saluran beton precast U- Ditch 500 x 700 mm deng m' 1.135.500,00
232 Pemasangan saluran beton precast U- Ditch 600 x 700 mm m' 898.900,00
233 Pemasangan saluran beton precast U- Ditch 600 x 700 mm, den m' 1.230.100,00
234 Pemasangan saluran beton precast U- Ditch 600 x 800 mm m' 946.300,00
235 Pemasangan Box Culvert beton precast 800 x 800 mm Type HD m' 1.514.000,00
236 Saluran type U-Ditch U 1500 x 1500 m' 2.129.100,00
237 Box Culvert BC 1500 x 1500 Type HD m' 2.838.800,00
238 Buis Beton dia 400 mm m' 483.200,00
239 Lapisan ijuk kg 134.200,00
240 Penyusunan batu belah secara berongga, tebal 40 cm m3 234.900,00
241 Pipa PVC diameter 4 inch untuk inlet dan outlet m' 20.100,00
242 Bongkar saluran m3 436.200,00
243 Cerucuk dolken dia 10 cm L: 2m bh 20.100,00
244 Logo/Signage no 107.914.100,00
245 Pemasangan Panel beton precast type 50 x 400 x 2400 lbr 221.500,00
246 Pemasangan Kolom Standard type 170 x 170 x 3600 btg 550.300,00
247 Pemasangan Kolom Sudut type 200 x 200 x 3600 btg 861.700,00
248 Pekerjaan Rataing Wall (untuk pondasi pagar) m3 3.355.500,00
249 Pagar Depan Pasangan Batu Bata + Besi (pj. ) m1 1.101.700,00
250 Pintu Gerbang unit 72.479.600,00
251 Sumpit unit 6.711.100,00
252 Palm Raja phn 197.300,00
253 Palem Putri phn 197.300,00
254 Kamboja Merah/Kuning phn 460.400,00
255 Cemara Udang phn 223.600,00
256 Dadap Merah phn 249.900,00
257 Siklok phn 223.600,00
258 Pandan Bali phn 223.600,00
259 Bougenvillae m² 52.600,00
260 Lidah Mertua m² 52.600,00
261 Soka Kuning m² 52.600,00
262 Lantana m² 52.600,00
263 Seruni Jalar m² 52.600,00
264 Pucuk Merah Pohon 223.600,00
265 Bayam - Bayaman m² 67.100,00
266 Bakung Harum m² 39.500,00
267 Steger dolken 2 m @ 3 btg/ pohon phn 65.800,00
268 Rumput jepang m2 26.300,00
269 Tanaman ground cover pot 26.300,00
270 Rumput Paitan m2 38.100,00
271 Grill 2.80 x 12.00 m + cat + Fixing bolt type G1, L1 ~ LA. unit 1,00
272 Stainless steel zink + meja beton + keramik 60/60. bh 1,00
273 Rak handuk bh 1,00
274 Gantungan baju bh 1,00
275 Kran dinding shower head/hand lokal bh 1,00
276 Railing tangga bh 1,00
277 Mobilisasi dan Demobilisasi Alat Pancang ls 1,00
278 Tiang Pancang Segi empat 25X25 p=9 m m' 1,00
279 Penyambungan Tiang Pancang bh 1,00
280 Pemotongan kepala pancang bh 1,00
281 Rumah Blower uk 120 x 120 cm (lengkap terpasang) Unit 7.920.000,00
282 Pas. besi Black Steel railling tangga finish cat anti korosi m' 822.000,00
283 Pek. Railling Teras m' 1,00
284 Pintu Toilet Type PV unit 1,00
285 Pasang kran type double + shower (terpasang) unit 1.111.109,00
286 Penutup plafond Flat Pull system kalsiboard + rangka hollow (pla m2 1,00
287 Pekerjaan Grill besi siku 5 cm diarea entrance, Jalan Masuk Ke m2 1,00
288 Pekerjaan Holding Tank lengkap terpasang sesuai gambar Ls 1,00
289 Pek. Besi Hollow Entrance Bagian Belakang Gedung m2 822.000,00
Pekerjaan Grill besi siku 5 cm diarea entrance, Jalan Mauk Ke B m2 731.900,00
Pintu Type PU unit 1,00
Pek. Façade Rangka Hollow m2 1,00
Bak kontrol pasangan batu bata ukuran 80 x 80 cm, dalam 50 cm bh 1,00
Saluran terbuka lebar 40 cm, pasangan bata, buis setengah ling m 1,00
Pekerjaan plafond gypsum board , termasuk rangka besi hollow m2 1,00
Pekerjaan plafond calsium silicate , termasuk rangka besi hollow m2 1,00
Pintu besi uk. 0.95 x 2.20 m, rangka dan daun pintu besi hollow unit 1,00
Pembersihan dan stripping GROUND TANK 1,00
-
PEKERJAAN ME
PANEL
MEA1 Panel LVMDP lengkap dengan system interlock manual antara P unit 97.821.500,00
MEA2 Panel P-PLN unit 24.780.600,00
MEA3 Panel Penerangan (PP-1) unit 8.070.300,00
MEA4 Panel Penerangan (PP-2) unit 5.109.400,00
MEA5 Panel P-PLN unit 26.190.000,00
MEA6 Panel PUTR unit 27.367.800,00
MEA7 Panel KWH / lantai (DB-UNIT/Lantai ) unit 9.367.000,00
MEA8 Panel Unit Typical (BOX HANGER) unit 2.244.900,00
MEA9 Panel Pompa Air Bersih unit 6.508.600,00

Kabel Feeder
MEB1 NYY 4 x 4 mm2 + NYA 4 mm2 + BC 4 m 48.300,00
MEB2 BC 50 mm2 m 63.800,00
MEB3 NYY 4 x 25 mm2 + NYA 16 mm2 m 184.800,00
MEB4 NYY 4 x 10 mm2 + E-NYA 6 mm2 m 97.400,00
MEB5 NYY 4 x 6 mm2 + NYA 2,5 mm2 m 60.900,00
MEB6 NYY 4 x 10 mm2 m 88.600,00
MEB7 NYY 4 x 4 mm2 m 39.000,00
MEB8 NYM 3 x 2,5 mm2 + PVC 20 mm m 24.200,00
MEB9 Proteksi Kabel dengan Pipa Gip Dia 100 m 268.400,00

KABEL TRAY
MEC1 Kabel tray W = 300 mm, t = 100 mm m 385.900,00
MEC2 Kabel tray W = 200 mm, t = 100 mm m 320.000,00
MEC3 Kabel Tray= 200 mm x 50 mm m 287.200,00

Armature lampu, Saklar dan Kotak kontak.


MED1 FL 1 x 36W tipe V-Shape bh 288.300,00
MED2 FL 1 x 36W tipe V-Shape + Nicad Battery bh 1.563.400,00
MED21 Lampu TL 1 x 18 watt v-shafe bh 288.300,00
MED22 Lampu PL 20 watt bh 73.200,00
MED3 Downlight CFL 8W bh 368.700,00
MED4 Downlight CFL 8W + Nicad Battery bh 1.509.600,00
MED5 Lampu Baret 20W + Nicad Battery (R) bh 1.455.800,00
MED51 Lampu Baret Isi TL Bulat 20 Watt bh 439.200,00
MED6 Lampu Taman 1 x 80W tipe Bollard bh 1.765.000,00
MED7 Saklar tunggal (R) bh 40.900,00
MED8 Saklar ganda bh 52.300,00
MED9 Saklar Hotel bh 57.700,00
MED10 Grid switch 6 gang bh 583.700,00
MED11 Kotak kontak 10A, 1 phasa tipe dinding bh 42.300,00

Instalasi
MEF0 Kabel NYA 3 x 1 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF1 Lampu ttk 237.200,00
MEF2 Saklar Tunggal ttk 78.800,00
MEF3 Kabel NYM 3 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF4 Kotak kontak 10A, 1 phasa tipe dinding ttk 308.000,00
MEF5 Kabel NYA 4 x 1 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF6 Lampu + Nicad Battery ttk 1.072.800,00
MEF7 Saklar ganda ttk 90.600,00
MEF8 Saklar hotel ttk 114.200,00
MEF9 Kabel NYA 8 x 1 x 2,5 mm2 di dalam PVC conduit dia 20mm
MEF10 Grid switch 6 gang ttk 151.800,00

Instalasi Penangkal Petir


MEG1 Kepala Penangkal Petir tipe konvensional (splitzen) bh 249.200,00
MEG2 Kabel BC diam. 35 mm2 + conduit m 40.600,00
MEG3 Bak kontrol ukuran 400 x 400 x 400 mm incld grounding bh 2.749.200,00

PLUMBING AIR BERSIH


MEH1 Pipa PPR 15 mm m 29.700,00
MEH2 Pipa PPR 20 mm m 39.500,00
MEH3 Pipa PPR 25 mm m 63.800,00
MEH31 Pipa PPR 32 mm m 95.600,00
MEH4 Pipa PPR 40 mm m 145.400,00
MEH5 Pipa PPR 50 mm m 228.700,00
MEH6 Pipa PPR 80 mm m 514.500,00
MEH7 Pipa header 100 mm, panjang 2 m m 2.371.700,00

ME I0 Gate valve 15 mm bh 87.500,00


ME I1 Gate valve 25 mm bh 145.900,00
ME I2 Gate valve 32 mm bh 300.100,00
ME I3 Gate valve 40 mm bh 350.200,00
ME I4 Gate valve 50 mm bh 502.500,00
ME I5 Check valve 50 mm bh 610.200,00
ME I6 Gate valve 80 mm bh 2.807.500,00
ME I61 Floating Valve dia 50 mm bh 402.700,00
ME I62 Clean Out (CO) dia 200 mm bh 1.234.800,00
ME I63 Clean Out (CO) dia 150 mm bh 825.500,00
ME I64 Clean Out (CO) dia 80 mm bh 234.900,00
ME I65 Clean Out (CO) dia 50 mm bh 186.600,00
ME I7 Strainer dia 50 mm bh 2.384.400,00
ME I8 Pressure gauge set 1.883.400,00
ME I81 Meteran Air c/w GV dia. 50 & Box meteran set 2.980.500,00
ME I9 Kran taman bh 424.600,00
ME I10 Tangki air kap 2m3 incld base frame unit 11.224.300,00
ME I11 Booster Pump 100l/mnt 0.75 Kw, 1 Ph, 220 V, RPM 1450, 50 Hz unit 27.850.950,00
ME I12 Holding Tank, fibre kapasitas 2 bh x 2 m3. unit 22.448.500,00
ME I13 Jet-pump kap 75 ltr/menit, termasuk Sumur Pantek. unit 30.562.200,00
ME I14 Lift Pump kap 100 ltr/menit, 0.75 Kw, 1 PH, 50 Hz 220 V. unit 18.754.100,00

PLUMBING AIR KOTOR


MEJ1 Pipa AW 50 mm m 61.200,00
MEJ2 Pipa AW 80 mm m 116.900,00
MEJ3 Pipa AW 100 mm m 178.200,00
MEJ4 Elbow 100 mm bh 50.900,00
MEJ5 TY 80 x 80 x 80 mm bh 47.800,00
MEJ6 TY 100 x 100 x 100 mm bh 94.600,00
MEJ7 Elbow 80 mm bh 27.400,00
MEJ8 Roof drain 125 mm bh 375.800,00
MEJ81 Roof drain 80 mm bh 318.100,00
MEJ82 Roof drain 65 mm bh 253.700,00
MEJ83 Roof drain 50 mm bh 234.900,00
MEJ9 Floor drain 80 mm bh 339.600,00
MEJ10 Tee 100 x 100 x 50 mm bh 94.600,00
MEJ11 Floor clean out 100 mm bh 327.500,00
MEJ12 Roof drain 80 mm bh 318.100,00
MEJ13 Floor drain 80 mm bh 339.600,00
MEJ14 STP BIO 9MPD unit 108.719.400,00
MEJ15 STP BIO 7MPD unit 84.559.500,00
MEJ16 STP BIO 5MPD unit 60.399.700,00
MEJ17 STP BIO 3MPD unit 36.239.800,00

MEK1 Pipa D 50 mm m 32.800,00


MEK2 Pipa D 80 mm m 66.800,00
MEK3 Pipa D 100 mm m 98.700,00
MEK4 Vent guard 50 mm bh 40.200,00
MEK5 Elbow 80 mm bh 27.400,00
MEK6 Elbow 100 mm bh 50.900,00
MEK7 TY 80 x 80 x 50 mm bh 28.900,00
MEK8 TY 100 x 100 x 50 mm bh 46.300,00
MEK9 TY 100 x 100 x 80 mm bh 46.300,00
MEK10 TY 100 x 100 x 100 mm bh 94.600,00
MEK11 Tee 80 x 80 x 50 mm bh 25.800,00
MEK12 Tee 100 x 100 x 50 mm bh 94.600,00
MEK13 Ceiling clean out 80 mm bh 75.000,00
MEK14 Ceiling clean out 100 mm bh 126.800,00

PEKERJAAN PEMADAM KEBAKARAN


MEL1 Dry Chemical kapasitas 3,5 kg (APAR) bh 1.073.800,00

PEKERJAAN VENTILASI
MEM1 Exhaust fan, tipe axial duct, air flow 300 CFM, unit 1.117.400,00
PEKERJAAN TESTING COMMISSIONING & PENYAMBUNGAN DAYA PLN
MEN1 Biaya penyambungan Daya PLN 10.5 KVA lot 1.300,00

O FIRE ALARM
MEO1 Main Control Panel - Fire Alarm ( MCFA ) 10 Zone bh 20.133.200,00
MEO2 Main Control Panel - Fire Alarm ( MCFA ) 5 Zone bh 13.422.200,00
MEO3 Main Distribution Frame - Fire ( MDF - FA ) Alarm 10 Zone bh 5.368.900,00
MEO4 Terminal Box - Fire Alarm ( TB - FA ) bh 872.400,00
MEO5 Kabel NYA 10x2x1.5 mm2 Dari MCFA ke MDF - FA m 68.100,00
MEO6 Kabel NYA 4x( 1 x 1.5 mm2 ) + Pipa Hi Conduit dia 3/4" : m 29.500,00
MEO61 Kabel twisted sheilded AWG 2 pair + NYM 3 x 2.5 mm2 m 41.300,00
MEO7 Rate of Rise Heat Detector bh 283.900,00
MEO8 Smoke Detector bh 849.000,00
MEO9 Manual Break Glass Switch bh 432.900,00
MEO10 Alarm bell bh 540.200,00
MEO11 Lampu Indikator bh 199.300,00
MEO12 Instalasi Detector titik 327.000,00
MEO13 Installasi Manual Break Glass Switch titik 687.600,00
MEO14 Installasi Alarm Bell titik 793.800,00
MEO15 installasi Lampu Indicator titik 793.800,00

P INSTALLASI TV
MEP1 Coaxial 7C/2V + Pipa Hi Conduit dia 3/4" m' 16.300,00
MEP2 Coaxial 5C/2V + Pipa Hi Conduit dia 3/4" m' 13.400,00
MEP21 Junction box (JB-MATV.1) lengkap dengan tap-off 6 way, UNIT 671.100,00
MEP3 Outlet TV bh 68.700,00
MEP4 Splitter 2 x 3 Port bh 307.600,00
MEP5 Splitter 1 x 6 Port bh 307.600,00
MEP6 TB-Splitter-TV/lt.1 bh 150.000,00
MEP7 Instalasi Outlet TV titik 201.300,00