A.1 Konstruksi Penambahan Lantai
A.1.1 Kolom
A.1.1.1 Pengecoran
A.1.1.2 Bekisting
A.1.1.3 Pembesian
A.1.2 Balok
A.1.1.1 Pengecoran
A.1.1.2 Bekisting
A.1.1.3 Pembesian
A.1.3 Pelat
A.1.1.1 Pengecoran
A.1.1.2 Bekisting
A.1.1.3 Pembesian
B.1 Perkuatan Struktur
B.1.1 FRP
B.1.1.1 Pekerjaan Persiapan
B.1.1.2 Pekerjaan Pelaksanaan
B.1.1.3 Pekerjaan akhir
B.1.2 Concrete Jacketing
B.1.2.1 pembobokan
B.1.2.2 pengeboran
B.1.2.3 dibersihkan pk kompresor
B.1.2.4 menyuntikan epoksy
B.1.2.5 pasang tulangan
B.1.2.6 pengecoran pk compresor
B.1.2.7 pelepasan bekisting
Keterangan
Lantai 5-8

lt 1-4

Pemasangan
DAFTAR HARGA SATUAN DASAR (BASIC PRICE)

No. Sumber daya Satuan Harga


1 Pekerja OH 65000
2 Tukang Besi OH 95000
3 Tukang Kayu OH 95000
4 Kepala Tukang OH 125000
5 Tukang Batu OH 95000
6 Mandor OH 200000
7 Besi Ø10 m1 5083
8 Besi Ø8 m1 3292
9 Besi Ø6 m1 1932
10 Besi Ø12 m1 8667
11 Kawat Beton Kg 20000
12 Papan kayu 3/20 Kelas III lbr 136950
13 Balok 3/5 m3 1300000
14 Balok 4/6 m3 1500000
15 Paku kg 25000
16 Minyak Bekisting Ltr 5500
17 Semen Kg 1120
18 Pasir Beton m3 215000
19 Koral beton m3 196000
20 Air Ltr 100
21 Papan 2/20 m3 2900000
22 Besi beton Kg 23500
23 Bor bobok bh 1200000
24 Epoxy m2 120000
25 Compressor bh 200000
26 Mesin injeksi bh 300000
27 Bata merah (5x11x22)cm bh 850
28 Pasir Pasang m3 80000
No. Uraian Koef Satuan Harga
1 Konstruksi Penambahan Lantai Rp 2,880,060
1.1 Kolom Rp 901,276
1.1.1 Pembesian 1 Kg Rp 10,988
Pekerja 0.007 OH Rp 455
Tukang Besi 0.007 OH Rp 665
Kepala Tukang 0.001 OH Rp 88
Mandor 0.000 OH Rp 80
Besi beton 0.400 kg Rp 9,400
Kawat beton 0.015 kg Rp 300
1.1.2 Bekisting 1 m2 Rp 80,478
Pekerja 0.52 OH Rp 33,800
Tukang Kayu 0.26 OH Rp 24,700
Kepala Tukang 0.03 OH Rp 3,250
Mandor 0.03 OH Rp 5,200
Papan kayu 3/20 Kelas III 0.04 m3 Rp 5,478
Paku 5 - 10 cm 0.30 kg Rp 7,500
Minyak bekisting 0.10 Ltr Rp 550
1.1.3 Pengecoran Beton K-300 1 m3 Rp 890,289
Semen 413 kg Rp 462,560
Pasir Beton 0.4864285714 m3 Rp 104,582
Koral beton 0.7562962963 m3 Rp 148,234
Air 215 Ltr Rp 21,500
Pekerja 1.65 oh Rp 107,250
Tukang Batu 0.275 oh Rp 26,125
Kepala Tukang 0.0275 oh Rp 3,438
Mandor 0.083 oh Rp 16,600
1.2 Balok Rp 981,754
1.2.1 Pembesian 1 Kg Rp 10,988
Pekerja 0.007 OH Rp 455
Tukang Besi 0.007 OH Rp 665
Kepala Tukang 0.001 OH Rp 88
Mandor 0.000 OH Rp 80
Besi beton 0.400 kg Rp 9,400
Kawat beton 0.015 kg Rp 300
1.2.2 Bekisting 1 m2 Rp 80,478
Pekerja 0.52 OH Rp 33,800
Tukang Kayu 0.26 OH Rp 24,700
Kepala Tukang 0.03 OH Rp 3,250
Mandor 0.03 OH Rp 5,200
Papan kayu 3/20 Kelas III 0.04 m3 Rp 5,478
Paku 5 - 10 cm 0.30 kg Rp 7,500
Minyak bekisting 0.10 Ltr Rp 550
1.2.3 Pengecoran Beton K-300 1 m3 Rp 890,289
Semen 413 kg Rp 462,560
Pasir Beton 0.4864285714 m3 Rp 104,582
Koral beton 0.7562962963 m3 Rp 148,234
Air 215 Ltr Rp 21,500
Pekerja 1.65 oh Rp 107,250
Tukang Batu 0.275 oh Rp 26,125
Kepala Tukang 0.0275 oh Rp 3,438
Mandor 0.083 oh Rp 16,600
1.2 Pelat Rp 997,029
1.2.1 Pembesian 1 Kg Rp 26,263
Pekerja 0.007 OH Rp 455
Tukang Besi 0.007 OH Rp 665
Kepala Tukang 0.001 OH Rp 88
Mandor 0.0004 OH Rp 80
Besi beton 1.050 kg Rp 24,675
Kawat beton 0.015 kg Rp 300
1.2.2 Bekisting 1 m2 Rp 80,478
Pekerja 0.52 OH Rp 33,800
Tukang Kayu 0.26 OH Rp 24,700
Kepala Tukang 0.03 OH Rp 3,250
Mandor 0.03 OH Rp 5,200
Papan kayu 3/20 Kelas III 0.04 m3 Rp 5,478
Paku 5 - 10 cm 0.30 kg Rp 7,500
Minyak bekisting 0.10 Ltr Rp 550
1.2.3 Pengecoran Beton K-300 1 m3 Rp 890,289
Semen 413 kg Rp 462,560
Pasir Beton 0.4864285714 m3 Rp 104,582
Koral beton 0.7562962963 m3 Rp 148,234
Air 215 Ltr Rp 21,500
Pekerja 1.65 oh Rp 107,250
Tukang Batu 0.275 oh Rp 26,125
Kepala Tukang 0.0275 oh Rp 3,438
Mandor 0.083 oh Rp 16,600
2 Perkuatan Struktur
2.1 FRP
2.1.1 Pekerjaan Persiapan
2.1.2 Pekerjaan Pelaksanaan
2.1.3 Pekerjaan Akhir
2.2 Concrete Jacketing Rp 1,810,681
2.2.1 Pembobokan dan Pelubangan 1 m3 Rp 469,110
Pekerja 1.334 OH Rp 86,710
Mandor 0.666 OH Rp 133,200
Compressor 1 OH Rp 200,000
Bor bobok 0.041 jam Rp 49,200
2.2..2 Pemasangan Epoxy m3 Rp 281,855
Pekerja 0.007 OH Rp 455
Mandor 0.007 OH Rp 1,400
Injector 1 OH Rp 200,000
Epoxy 0.3 kg Rp 80,000
2.2.2 Pembesian 1 Kg Rp 10,988
Pekerja 0.007 OH Rp 455
Tukang Besi 0.007 OH Rp 665
Kepala Tukang 0.001 OH Rp 88
Mandor 0.0004 OH Rp 80
Besi beton 0.400 kg Rp 9,400
Kawat beton 0.015 kg Rp 300
2.2.3 Bekisting 1 m2 Rp 80,478
Pekerja 0.52 OH Rp 33,800
Tukang Kayu 0.26 OH Rp 24,700
Kepala Tukang 0.03 OH Rp 3,250
Mandor 0.03 OH Rp 5,200
Papan kayu 3/20 Kelas III 0.04 m3 Rp 5,478
Paku 5 - 10 cm 0.30 kg Rp 7,500
Minyak bekisting 0.10 Ltr Rp 550
2.2.4 Pengecoran Beton K-350 1 m3 Rp 968,250
Semen 448 kg Rp 501,760
Pasir Beton 0.48 m3 Rp 103,200
Koral beton 0.74 m3 Rp 145,040
Air 215 Ltr Rp 21,500
Pekerja 2.1 oh Rp 136,500
Tukang Batu 0.35 oh Rp 33,250
Kepala Tukang 0.04 oh Rp 5,000
Mandor 0.11 oh Rp 22,000
3 Pekerjaan Dinding 293,006.00
3.1 Pekerjaan Pasangan Bata Merah 1 m2 Rp 215,980
Bata merah 140.00 bh 119,000.00
Semen 18.50 kg 20,720.00
Pasir pasang 0.12 m3 9,760.00
Pekerja 0.60 oh 39,000.00
Tukang batu 0.20 oh 19,000.00
Kepala tukang 0.02 oh 2,500.00
Mandor 0.03 oh 6,000.00
3.2 Pekerjaan Plesteran 1pc : 3ps tebal 20mm 1 m2 Rp 77,026
Pekerja 0.25 oh Rp 16,250
Tukang Batu 0.2 oh Rp 19,000
Kepala Tukang 0.2 oh Rp 25,000
Mandor 0.013 oh Rp 2,600
Semen 10.8 kg Rp 12,096
Pasir pasang 0.026 m3 Rp 2,080
NO URAIAN PEKERJAAN SATUAN HARGA
1 Pembesian Kg Rp 10,988
2 Bekisting m2 Rp 80,478
3 Pengecoran Beton K-300 m3 Rp 890,289
4 Pembobokan dan Pelubangan m3 Rp 469,110
5 Pemasangan Epoxy m3 Rp 281,855
6 Pemasangan Bata Merah m2 Rp 215,980
7 Pekerjaan Plesteran m2 Rp 77,026
8 Pengecoran Beton K-350 m3 Rp 968,250
A PEKERJAAN KOLOM LANTAI 5 (K1)
1 A1 VOLUME PEKERJAAN PEMBESIAN
2 A3 VOLUME PEKERJAAN BEKISTING
3 A4 VOLUME PEKERJAAN PENGECORAN
B PEKERJAAN KOLOM LANTAI 5 (K2)
1 B1 VOLUME PEKERJAAN PEMBESIAN
2 B2 VOLUME PEKERJAAN BEKISTING
3 B3 VOLUME PEKERJAAN PENGECORAN
C PEKERJAAN KOLOM LANTAI 6 (K1)
1 C1 VOLUME PEKERJAAN PEMBESIAN
2 C2 VOLUME PEKERJAAN BEKISTING
3 C3 VOLUME PEKERJAAN PENGECORAN
D PEKERJAAN KOLOM LANTAI 6 (K2)
1 D1 VOLUME PEKERJAAN PEMBESIAN
2 D2 VOLUME PEKERJAAN BEKISTING
3 D3 VOLUME PEKERJAAN PENGECORAN
E PEKERJAAN KOLOM LANTAI 7 (K1)
1 E1 VOLUME PEKERJAAN PEMBESIAN
2 E2 VOLUME PEKERJAAN BEKISTING
3 E3 VOLUME PEKERJAAN PENGECORAN
F PEKERJAAN KOLOM LANTAI 7 (K2)
1 F1 VOLUME PEKERJAAN PEMBESIAN
2 F2 VOLUME PEKERJAAN BEKISTING
3 F3 VOLUME PEKERJAAN PENGECORAN
G PEKERJAAN KOLOM LANTAI 8 (K1)
1 G1 VOLUME PEKERJAAN PEMBESIAN
2 G2 VOLUME PEKERJAAN BEKISTING
3 G3 VOLUME PEKERJAAN PENGECORAN
H PEKERJAAN KOLOM LANTAI 8 (K2)
1 H1 VOLUME PEKERJAAN PEMBESIAN
2 H2 VOLUME PEKERJAAN BEKISTING
3 H3 VOLUME PEKERJAAN PENGECORAN
I PEKERJAAN BALOK LANTAI 5 (B1)
1 I1 VOLUME PEKERJAAN PEMBESIAN
2 I2 VOLUME PEKERJAAN BEKISTING
3 I3 VOLUME PEKERJAAN PENGECORAN
K PEKERJAAN BALOK LANTAI 5 (B2)
1 K1 VOLUME PEKERJAAN PEMBESIAN
2 K2 VOLUME PEKERJAAN BEKISTING
3 K3 VOLUME PEKERJAAN PENGECORAN
L PEKERJAAN BALOK LANTAI 5 (B3)
1 L1 VOLUME PEKERJAAN PEMBESIAN
2 L2 VOLUME PEKERJAAN BEKISTING
3 L3 VOLUME PEKERJAAN PENGECORAN
M PEKERJAAN BALOK LANTAI 5 (B4)
1 M1 VOLUME PEKERJAAN PEMBESIAN
2 M2 VOLUME PEKERJAAN BEKISTING
3 M3 VOLUME PEKERJAAN PENGECORAN
N PEKERJAAN BALOK LANTAI 5 (B5)
1 N1 VOLUME PEKERJAAN PEMBESIAN
2 N2 VOLUME PEKERJAAN BEKISTING
3 N3 VOLUME PEKERJAAN PENGECORAN
O PEKERJAAN BALOK LANTAI 6 (B1)
1 O1 VOLUME PEKERJAAN PEMBESIAN
2 O2 VOLUME PEKERJAAN BEKISTING
3 O3 VOLUME PEKERJAAN PENGECORAN
P PEKERJAAN BALOK LANTAI 6 (B2)
1 P1 VOLUME PEKERJAAN PEMBESIAN
2 P2 VOLUME PEKERJAAN BEKISTING
3 P3 VOLUME PEKERJAAN PENGECORAN
Q PEKERJAAN BALOK LANTAI 6 (B3)
1 Q1 VOLUME PEKERJAAN PEMBESIAN
2 Q2 VOLUME PEKERJAAN BEKISTING
3 Q3 VOLUME PEKERJAAN PENGECORAN
R PEKERJAAN BALOK LANTAI 6 (B4)
1 R1 VOLUME PEKERJAAN PEMBESIAN
2 R2 VOLUME PEKERJAAN BEKISTING
3 R3 VOLUME PEKERJAAN PENGECORAN
S PEKERJAAN BALOK LANTAI 6 (B5)
1 S1 VOLUME PEKERJAAN PEMBESIAN
2 S2 VOLUME PEKERJAAN BEKISTING
3 S3 VOLUME PEKERJAAN PENGECORAN
T PEKERJAAN BALOK LANTAI 6 (B1)
1 T1 VOLUME PEKERJAAN PEMBESIAN
2 T2 VOLUME PEKERJAAN BEKISTING
3 T3 VOLUME PEKERJAAN PENGECORAN
U PEKERJAAN BALOK LANTAI 6 (B2)
1 U1 VOLUME PEKERJAAN PEMBESIAN
2 U2 VOLUME PEKERJAAN BEKISTING
3 U3 VOLUME PEKERJAAN PENGECORAN
V PEKERJAAN BALOK LANTAI 6 (B3)
1 V1 VOLUME PEKERJAAN PEMBESIAN
2 V2 VOLUME PEKERJAAN BEKISTING
3 V3 VOLUME PEKERJAAN PENGECORAN
W PEKERJAAN BALOK LANTAI 6 (B4)
1 W1 VOLUME PEKERJAAN PEMBESIAN
2 W2 VOLUME PEKERJAAN BEKISTING
3 W3 VOLUME PEKERJAAN PENGECORAN
X PEKERJAAN BALOK LANTAI 6 (B5)
1 X1 VOLUME PEKERJAAN PEMBESIAN
2 X2 VOLUME PEKERJAAN BEKISTING
3 X3 VOLUME PEKERJAAN PENGECORAN
Y PEKERJAAN BALOK LANTAI 7 (B1)
1 Y1 VOLUME PEKERJAAN PEMBESIAN
2 Y2 VOLUME PEKERJAAN BEKISTING
3 Y3 VOLUME PEKERJAAN PENGECORAN
Z PEKERJAAN BALOK LANTAI 7 (B2)
1 Z1 VOLUME PEKERJAAN PEMBESIAN
2 Z2 VOLUME PEKERJAAN BEKISTING
3 Z3 VOLUME PEKERJAAN PENGECORAN
AA PEKERJAAN BALOK LANTAI 7 (B3)
1 AA1 VOLUME PEKERJAAN PEMBESIAN
2 AA2 VOLUME PEKERJAAN BEKISTING
3 AA3 VOLUME PEKERJAAN PENGECORAN
AB PEKERJAAN BALOK LANTAI 7 (B4)
1 AB1 VOLUME PEKERJAAN PEMBESIAN
2 AB2 VOLUME PEKERJAAN BEKISTING
3 AB3 VOLUME PEKERJAAN PENGECORAN
AC PEKERJAAN BALOK LANTAI 7 (B5)
1 AC1 VOLUME PEKERJAAN PEMBESIAN
2 AC2 VOLUME PEKERJAAN BEKISTING
3 AC3 VOLUME PEKERJAAN PENGECORAN
AD PEKERJAAN BALOK LANTAI 8 (B1)
1 AD1 VOLUME PEKERJAAN PEMBESIAN
2 AD2 VOLUME PEKERJAAN BEKISTING
3 AD3 VOLUME PEKERJAAN PENGECORAN
AE PEKERJAAN BALOK LANTAI 8 (B2)
1 AE1 VOLUME PEKERJAAN PEMBESIAN
2 AE2 VOLUME PEKERJAAN BEKISTING
3 AE3 VOLUME PEKERJAAN PENGECORAN
AF PEKERJAAN BALOK LANTAI 8 (B3)
1 AF1 VOLUME PEKERJAAN PEMBESIAN
2 AF2 VOLUME PEKERJAAN BEKISTING
3 AF3 VOLUME PEKERJAAN PENGECORAN
AG PEKERJAAN BALOK LANTAI 8 (B4)
1 AG1 VOLUME PEKERJAAN PEMBESIAN
2 AG2 VOLUME PEKERJAAN BEKISTING
3 AG3 VOLUME PEKERJAAN PENGECORAN
AH PEKERJAAN BALOK LANTAI 8 (B5)
1 AH1 VOLUME PEKERJAAN PEMBESIAN
2 AH2 VOLUME PEKERJAAN BEKISTING
3 AH3 VOLUME PEKERJAAN PENGECORAN
AI PEKERJAAN PELAT LANTAI 5
1 AI1 VOLUME PEKERJAAN PEMBESIAN
2 AI2 VOLUME PEKERJAAN BEKISTING
3 AI3 VOLUME PEKERJAAN PENGECORAN
AJ PEKERJAAN PELAT LANTAI 6
1 AJ1 VOLUME PEKERJAAN PEMBESIAN
2 AJ2 VOLUME PEKERJAAN BEKISTING
3 AJ3 VOLUME PEKERJAAN PENGECORAN
AK PEKERJAAN PELAT LANTAI 7
1 AK1 VOLUME PEKERJAAN PEMBESIAN
2 AK2 VOLUME PEKERJAAN BEKISTING
3 AK3 VOLUME PEKERJAAN PENGECORAN
AL PEKERJAAN PELAT LANTAI 8
1 AL1 VOLUME PEKERJAAN PEMBESIAN
2 AL2 VOLUME PEKERJAAN BEKISTING
3 AL3 VOLUME PEKERJAAN PENGECORAN
AM PEKERJAAN CONCRETE JACKETTING LANTAI 1 (K1)
1 AM1 VOLUME PEKERJAAN PEMBESIAN
2 AM2 VOLUME PEKERJAAN BEKISTING
3 AM3 VOLUME PEKERJAAN PENGECORAN
AN PEKERJAAN CONCRETE JACKETTING LANTAI 2 (K1)
1 AN1 VOLUME PEKERJAAN PEMBESIAN
2 AN2 VOLUME PEKERJAAN BEKISTING
3 AN3 VOLUME PEKERJAAN PENGECORAN
AO PEKERJAAN CONCRETE JACKETTING LANTAI 3 (K1)
1 AO1 VOLUME PEKERJAAN PEMBESIAN
2 AO2 VOLUME PEKERJAAN BEKISTING
3 AO3 VOLUME PEKERJAAN PENGECORAN
AP PEKERJAAN CONCRETE JACKETTING LANTAI 4 (K1)
1 AP1 VOLUME PEKERJAAN PEMBESIAN
2 AP2 VOLUME PEKERJAAN BEKISTING
3 AP3 VOLUME PEKERJAAN PENGECORAN
AQ PEKERJAAN CONCRETE JACKETTING LANTAI 1 (K2)
1 AQ1 VOLUME PEKERJAAN PEMBESIAN
2 AQ2 VOLUME PEKERJAAN BEKISTING
3 AQ3 VOLUME PEKERJAAN PENGECORAN
AR PEKERJAAN CONCRETE JACKETTING LANTAI 2 (K2)
1 AR1 VOLUME PEKERJAAN PEMBESIAN
2 AR2 VOLUME PEKERJAAN BEKISTING
3 AR3 VOLUME PEKERJAAN PENGECORAN
AS PEKERJAAN CONCRETE JACKETTING LANTAI 3 (K2)
1 AS1 VOLUME PEKERJAAN PEMBESIAN
2 AS2 VOLUME PEKERJAAN BEKISTING
3 AS3 VOLUME PEKERJAAN PENGECORAN
AT PEKERJAAN CONCRETE JACKETTING LANTAI 4 (K2)
1 AT1 VOLUME PEKERJAAN PEMBESIAN
2 AT2 VOLUME PEKERJAAN BEKISTING
3 AT3 VOLUME PEKERJAAN PENGECORAN
AU PEKERJAAN PEMBOBOKAN KOLOM
1 AU1 VOLUME PEKERJAAN PEMBOBOKAN KOLOM
AV PEKERJAAN INJEKSI
1 AV1 VOLUME PEKERJAAN INJEKSI
AW PEKERJAAN DINDING
1 AW1 VOLUME PEMASANGAN BATA
2 AW2 VOLUME PLESTERAN
2756.40 Kg
97.20 m2
13.20 m2

621.60 Kg
33.60 m2
3.15 m2

2756.40 Kg
97.20 m2
13.20 m2

621.60 Kg
33.60 m2
3.15 m2

2756.40 Kg
97.20 m2
13.20 m2

621.60 Kg
33.60 m2
3.15 m2

2756.40 Kg
97.20 m2
13.20 m2

621.60 Kg
33.60 m2
3.15 m2

3785.40 kg
75.60 m2
7.80 m3

4109.00 kg
72.00 m2
7.00 m3

88.10 kg
6.30 m2
0.50 m3
3038.00 kg
35.00 m2
2.10 m3

327.30 kg
18.00 m2
0.80 m3

3785.40 kg
75.60 m2
7.80 m3

4109.00 kg
72.00 m2
7.00 m3

88.10 kg
6.30 m2
0.50 m3

3038.00 kg
35.00 m2
2.10 m3

327.30 kg
18.00 m2
0.80 m3

3785.40 kg
75.60 m2
7.80 m3

4109.00 kg
72.00 m2
7.00 m3

88.10 kg
6.30 m2
0.50 m3

3038.00 kg
35.00 m2
2.10 m3
327.30 kg
18.00 m2
0.80 m3

3785.40 kg
75.60 m2
7.80 m3

4109.00 kg
72.00 m2
7.00 m3

1502.70 kg
112.00 m2
1363.20 m3

3038.00 kg
35.00 m2
2.10 m3

327.30 kg
18.00 m2
0.80 m3

3785.40 kg
75.60 m2
7.80 m3

4109.00 kg
72.00 m2
7.00 m3

1502.70 kg
112.00 m2
1363.20 m3

3038.00 kg
35.00 m2
2.10 m3

327.30 kg
18.00 m2
0.80 m3

44782.50 kg
253.10 m2
35.40 m3

44782.50 kg
253.10 m2
35.40 m3

44782.50 kg
253.10 m2
35.40 m3

44782.50 kg
253.10 m2
35.40 m3

4918.03 kg
99.96 m2
24.99 m3

4918.03 kg
99.96 m2
24.99 m3

4918.03 kg
99.96 m2
24.99 m3

4918.03 kg
99.96 m2
24.99 m3

228.31 kg
30.24 m2
0.81 m3

228.31 kg
30.24 m2
0.81 m3

228.31 kg
30.24 m2
0.81 m3

228.31 kg
30.24 m2
0.81 m3

383.04 m3

382.98 m3

870.00 m2
1740.40 m2
RENCANA ANGGARAN BIAYA
ID
NAMA PROJECT
LOKASI
TAHUN

A
1 A1
2 A2
3 A3

B
1 B1
2 B2
3 B3

C
1 C1
2 C2
3 C3

D
1 D1
2 D2
3 D3

E
1 E1
2 E2
3 E3

F
1 F1
2 F2
3 F3

G
1 G1
2 G2
3 G3

H
1 H1
2 H2
3 H3

I
1 I1
2 I2
3 I3

K
1 K1
2 K2
3 K3

L
1 L1
2 L2
3 L3

M
1 M1
2 M2
3 M3
N
1 N1
2 N2
3 N3

O
1 O1
2 O2
3 O3

P
1 P1
2 P2
3 P3

Q
1 Q1
2 Q2
3 Q3

R
1 R1
2 R2
3 R3

S
1 S1
2 S2
3 S3

T
1 T1
2 T2
3 T3

U
1 U1
2 U2
3 U3

V
1 V1
2 V2
3 V3

W
1 W1
2 W2
3 W3

X
1 X1
2 X2
3 X3

Y
1 Y1
2 Y2
3 Y3

U
1 U1
2 U2
3 U3
W
1 W1
2 W2
3 W3

X
1 X1
2 X2
3 X3

Y
1 Y1
2 Y2
3 Y3

Z
1 Z1
2 Z2
3 Z3

AA
1 AA1
2 AA2
3 AA3

AB
1 AB1
2 AB2
3 AB3
AC
1 AC1
2 AC2
3 AC3

AD
1 AD1
2 AD2
3 AD3

AE
1 AE1
2 AE2
3 AE3

AF
1 AF1
2 AF2
3 AF3

AG
1 AG1
2 AG2
3 AG3

AH
1 AH1
2 AH2
3 AH3

AI
1 AI1
2 AI2
3 AI3

AI
1 AI1
2 AI2
3 AI3

AJ
1 AJ1

AK
1 AK1

AL
1 AL1
2 AL2
RENCANA ANGGARAN BIAYA
TOTAL RAB :

PEKERJAAN KOLOM LANTAI 5 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 2756.40 Kg
VOLUME PEKERJAAN BEKISTING 97.20 m2
VOLUME PEKERJAAN PENGECORAN 13.20 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 5 (K2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 621.60 Kg
VOLUME PEKERJAAN BEKISTING 33.60 m2
VOLUME PEKERJAAN PENGECORAN 3.15 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 6 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 2756.40 Kg
VOLUME PEKERJAAN BEKISTING 97.20 m2
VOLUME PEKERJAAN PENGECORAN 13.20 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 6 (K2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 621.60 Kg
VOLUME PEKERJAAN BEKISTING 33.60 m2
VOLUME PEKERJAAN PENGECORAN 3.15 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 7 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 2756.40 Kg
VOLUME PEKERJAAN BEKISTING 97.20 m2
VOLUME PEKERJAAN PENGECORAN 13.20 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 7 (K2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 621.60 Kg
VOLUME PEKERJAAN BEKISTING 33.60 m2
VOLUME PEKERJAAN PENGECORAN 3.15 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 8 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 2756.40 Kg
VOLUME PEKERJAAN BEKISTING 97.20 m2
VOLUME PEKERJAAN PENGECORAN 13.20 m2

SUBTOTAL

PEKERJAAN KOLOM LANTAI 8 (K2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 621.60 Kg
VOLUME PEKERJAAN BEKISTING 33.60 m2
VOLUME PEKERJAAN PENGECORAN 3.15 m2

SUBTOTAL

PEKERJAAN BALOK LANTAI 5 (B1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3785.40 kg
VOLUME PEKERJAAN BEKISTING 75.60 m2
VOLUME PEKERJAAN PENGECORAN 7.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 5 (B2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4109.00 kg
VOLUME PEKERJAAN BEKISTING 72.00 m2
VOLUME PEKERJAAN PENGECORAN 7.00 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 5 (B3) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 88.10 kg
VOLUME PEKERJAAN BEKISTING 6.30 m2
VOLUME PEKERJAAN PENGECORAN 0.50 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 5 (B4) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3038.00 kg
VOLUME PEKERJAAN BEKISTING 35.00 m2
VOLUME PEKERJAAN PENGECORAN 2.10 m3
SUBTOTAL

PEKERJAAN BALOK LANTAI 5 (B5) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 327.30 kg
VOLUME PEKERJAAN BEKISTING 18.00 m2
VOLUME PEKERJAAN PENGECORAN 0.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 6 (B1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3785.40 kg
VOLUME PEKERJAAN BEKISTING 75.60 m2
VOLUME PEKERJAAN PENGECORAN 7.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 6 (B2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4109.00 kg
VOLUME PEKERJAAN BEKISTING 72.00 m2
VOLUME PEKERJAAN PENGECORAN 7.00 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 6 (B3) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 88.10 kg
VOLUME PEKERJAAN BEKISTING 6.30 m2
VOLUME PEKERJAAN PENGECORAN 0.50 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 6 (B4) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3038.00 kg
VOLUME PEKERJAAN BEKISTING 35.00 m2
VOLUME PEKERJAAN PENGECORAN 2.10 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 6 (B5) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 327.30 kg
VOLUME PEKERJAAN BEKISTING 18.00 m2
VOLUME PEKERJAAN PENGECORAN 0.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 7 (B1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3785.40 kg
VOLUME PEKERJAAN BEKISTING 75.60 m2
VOLUME PEKERJAAN PENGECORAN 7.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 7 (B2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4109.00 kg
VOLUME PEKERJAAN BEKISTING 72.00 m2
VOLUME PEKERJAAN PENGECORAN 7.00 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 7 (B3) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 88.10 kg
VOLUME PEKERJAAN BEKISTING 6.30 m2
VOLUME PEKERJAAN PENGECORAN 0.50 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 7 (B4) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3038.00 kg
VOLUME PEKERJAAN BEKISTING 35.00 m2
VOLUME PEKERJAAN PENGECORAN 2.10 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 7 (B5) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 327.30 kg
VOLUME PEKERJAAN BEKISTING 18.00 m2
VOLUME PEKERJAAN PENGECORAN 0.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 8 (B1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3785.40 kg
VOLUME PEKERJAAN BEKISTING 75.60 m2
VOLUME PEKERJAAN PENGECORAN 7.80 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 8 (B2) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4109.00 kg
VOLUME PEKERJAAN BEKISTING 72.00 m2
VOLUME PEKERJAAN PENGECORAN 7.00 m3
SUBTOTAL

PEKERJAAN BALOK LANTAI 8 (B4) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 3038.00 kg
VOLUME PEKERJAAN BEKISTING 35.00 m2
VOLUME PEKERJAAN PENGECORAN 2.10 m3

SUBTOTAL

PEKERJAAN BALOK LANTAI 8 (B5) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 327.30 kg
VOLUME PEKERJAAN BEKISTING 18.00 m2
VOLUME PEKERJAAN PENGECORAN 0.80 m3

SUBTOTAL

PEKERJAAN PELAT LANTAI 5 VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 44782.50 kg
VOLUME PEKERJAAN BEKISTING 253.10 m2
VOLUME PEKERJAAN PENGECORAN 35.40 m3

SUBTOTAL

PEKERJAAN PELAT LANTAI 6 VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 44782.50 kg
VOLUME PEKERJAAN BEKISTING 253.10 m2
VOLUME PEKERJAAN PENGECORAN 35.40 m3

SUBTOTAL

PEKERJAAN PELAT LANTAI 7 VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 44782.50 kg
VOLUME PEKERJAAN BEKISTING 253.10 m2
VOLUME PEKERJAAN PENGECORAN 35.40 m3

SUBTOTAL

PEKERJAAN PELAT LANTAI 8 VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 44782.50 kg
VOLUME PEKERJAAN BEKISTING 253.10 m2
VOLUME PEKERJAAN PENGECORAN 35.40 m3

SUBTOTAL
PEKERJAAN CONCRETE JACKETTING LANTAI 1 (K1) VOLUME UNIT
VOLUME PEKERJAAN PEMBESIAN 4918.03 kg
VOLUME PEKERJAAN BEKISTING 99.96 m2
VOLUME PEKERJAAN PENGECORAN 24.99 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 2 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4918.03 kg
VOLUME PEKERJAAN BEKISTING 99.96 m2
VOLUME PEKERJAAN PENGECORAN 24.99 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 3 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4918.03 kg
VOLUME PEKERJAAN BEKISTING 99.96 m2
VOLUME PEKERJAAN PENGECORAN 24.99 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 4 (K1) VOLUME UNIT


VOLUME PEKERJAAN PEMBESIAN 4918.03 kg
VOLUME PEKERJAAN BEKISTING 99.96 m2
VOLUME PEKERJAAN PENGECORAN 24.99 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 1 (K2)


VOLUME PEKERJAAN PEMBESIAN 228.31 kg
VOLUME PEKERJAAN BEKISTING 30.24 m2
VOLUME PEKERJAAN PENGECORAN 0.81 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 2 (K2)


VOLUME PEKERJAAN PEMBESIAN 228.31 kg
VOLUME PEKERJAAN BEKISTING 30.24 m2
VOLUME PEKERJAAN PENGECORAN 0.81 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 3 (K2)


VOLUME PEKERJAAN PEMBESIAN 228.31 kg
VOLUME PEKERJAAN BEKISTING 30.24 m2
VOLUME PEKERJAAN PENGECORAN 0.81 m3

SUBTOTAL

PEKERJAAN CONCRETE JACKETTING LANTAI 4 (K2)


VOLUME PEKERJAAN PEMBESIAN 228.31 kg
VOLUME PEKERJAAN BEKISTING 30.24 m2
VOLUME PEKERJAAN PENGECORAN 0.81 m3

SUBTOTAL

PEKERJAAN PEMBOBOKAN KOLOM


VOLUME PEKERJAAN PEMBOBOKAN KOLOM 383.04 m3

SUBTOTAL

PEKERJAAN INJEKSI
VOLUME PEKERJAAN INJEKSI 382.98 m3

SUBTOTAL

PEKERJAAN DINDING
VOLUME PEMASANGAN BATA 870.00 m2
VOLUME PLESTERAN 1740.40 m2

SUBTOTAL
Rp 4,030,367,381

TOTAL
Rp 30,285,945
Rp 7,822,462
Rp 11,751,811

Rp 49,860,218

TOTAL
Rp 6,829,830
Rp 2,704,061
Rp 2,804,409

Rp 12,338,300

TOTAL
Rp 30,285,945
Rp 7,822,462
Rp 11,751,811

Rp 49,860,218

TOTAL
Rp 6,829,830
Rp 2,704,061
Rp 2,804,409

Rp 12,338,300

TOTAL
Rp 30,285,945
Rp 7,822,462
Rp 11,751,811

Rp 49,860,218

TOTAL
Rp 6,829,830
Rp 2,704,061
Rp 2,804,409

Rp 12,338,300

TOTAL
Rp 30,285,945
Rp 7,822,462
Rp 11,751,811

Rp 49,860,218

TOTAL
Rp 6,829,830
Rp 2,704,061
Rp 2,804,409

Rp 12,338,300

TOTAL
Rp 41,592,083
Rp 6,084,137
Rp 6,944,252

Rp 54,620,471

TOTAL
Rp 45,147,638
Rp 5,794,416
Rp 6,232,021

Rp 57,174,075

TOTAL
Rp 967,999
Rp 507,011
Rp 445,144

Rp 1,920,155

TOTAL
Rp 33,380,025
Rp 2,816,730
Rp 1,869,606
Rp 38,066,361

TOTAL
Rp 3,596,209
Rp 1,448,604
Rp 712,231

Rp 5,757,044

TOTAL
Rp 41,592,083
Rp 6,084,137
Rp 6,944,252

Rp 54,620,471

TOTAL
Rp 45,147,638
Rp 5,794,416
Rp 6,232,021

Rp 57,174,075

TOTAL
Rp 967,999
Rp 507,011
Rp 445,144

Rp 1,920,155

TOTAL
Rp 33,380,025
Rp 2,816,730
Rp 1,869,606

Rp 38,066,361

TOTAL
Rp 3,596,209
Rp 1,448,604
Rp 712,231

Rp 5,757,044

TOTAL
Rp 41,592,083
Rp 6,084,137
Rp 6,944,252

Rp 54,620,471

TOTAL
Rp 45,147,638
Rp 5,794,416
Rp 6,232,021

Rp 57,174,075

TOTAL
Rp 967,999
Rp 507,011
Rp 445,144

Rp 1,920,155

TOTAL
Rp 33,380,025
Rp 2,816,730
Rp 1,869,606

Rp 38,066,361

TOTAL
Rp 3,596,209
Rp 1,448,604
Rp 712,231

Rp 5,757,044

TOTAL
Rp 41,592,083
Rp 6,084,137
Rp 6,944,252

Rp 54,620,471

TOTAL
Rp 45,147,638
Rp 5,794,416
Rp 6,232,021
Rp 57,174,075

TOTAL
Rp 33,380,025
Rp 2,816,730
Rp 1,869,606

Rp 38,066,361

TOTAL
Rp 3,596,209
Rp 1,448,604
Rp 712,231

Rp 5,757,044

TOTAL
Rp 492,047,719
Rp 20,368,982
Rp 31,516,221

Rp 543,932,921

TOTAL
Rp 492,047,719
Rp 20,368,982
Rp 31,516,221

Rp 543,932,921

TOTAL
Rp 492,047,719
Rp 20,368,982
Rp 31,516,221

Rp 543,932,921

TOTAL
Rp 492,047,719
Rp 20,368,982
Rp 31,516,221

Rp 543,932,921
TOTAL
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568

Rp 86,278,003

TOTAL
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568

Rp 86,278,003

TOTAL
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568

Rp 86,278,003

TOTAL
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568

Rp 86,278,003

Rp 2,508,556
Rp 2,433,655
Rp 784,283

Rp 5,726,493

Rp 2,508,556
Rp 2,433,655
Rp 784,283

Rp 5,726,493

Rp 2,508,556
Rp 2,433,655
Rp 784,283

Rp 5,726,493

Rp 2,508,556
Rp 2,433,655
Rp 784,283

Rp 5,726,493

Rp 179,687,894

Rp 179,687,894

Rp 107,944,828

Rp 107,944,828

Rp 187,902,600
Rp 134,056,050

Rp 321,958,650
PEKERJAAN CONCRETE JACKETTING LANTAI
VOLUME PEKERJAAN PEMBES
VOLUME PEKERJAAN BEKISTI
VOLUME PEKERJAAN PENGEC
PEKERJAAN CONCRETE JACKETTING LANTAI
VOLUME PEKERJAAN PEMBES
VOLUME PEKERJAAN BEKISTI
AM VOLUME PEKERJAAN PENGEC
1 AM1 PEKERJAAN CONCRETE JACKETTING LANTAI
2 AM2VOLUME PEKERJAAN PEMBES
3 AM3VOLUME PEKERJAAN BEKISTI
AN VOLUME PEKERJAAN PENGEC
1 AN1 PEKERJAAN CONCRETE JACKETTING LANTAI
2 AN2 VOLUME PEKERJAAN PEMBES
3 AN3 VOLUME PEKERJAAN BEKISTI
AO VOLUME PEKERJAAN PENGEC
1 AO1 PEKERJAAN CONCRETE JACKETTING LANTAI 1
2 AO2 VOLUME PEKERJAAN PEMBES
3 AO3 VOLUME PEKERJAAN BEKISTI
AP VOLUME PEKERJAAN PENGEC
1 AP1 PEKERJAAN CONCRETE JACKETTING LANTAI 2
2 AP2 VOLUME PEKERJAAN PEMBES
3 AP3 VOLUME PEKERJAAN BEKISTI
AQ VOLUME PEKERJAAN PENGEC
1 AQ1 PEKERJAAN CONCRETE JACKETTING LANTAI 3
2 AQ2 VOLUME PEKERJAAN PEMBES
3 AQ3 VOLUME PEKERJAAN BEKISTI
AR VOLUME PEKERJAAN PENGEC
1 AR1 PEKERJAAN CONCRETE JACKETTING LANTAI 4
2 AR2 VOLUME PEKERJAAN PEMBES
3 AR3 VOLUME PEKERJAAN BEKISTI
AS VOLUME PEKERJAAN PENGEC
1 AS1 PEKERJAAN PEMBOBOKAN KOLOM
2 AS2 VOLUME PEKERJAAN PEMBO
3 AS3 PEKERJAAN INJEKSI
AT VOLUME PEKERJAAN INJEKSI
1 AT1 PEKERJAAN DINDING
2 AT2 VOLUME PEMASANGAN BATA
3 AT3 VOLUME PLESTERAN
AU
1 AU1
AV
1 AV1
AW
1 AW1
2 AW2
CRETE JACKETTING LANTAI 1 (K1)
4918.03 kg
99.96 m2
24.99 m3
CRETE JACKETTING LANTAI 2 (K1)
4918.03 kg
99.96 m2
24.99 m3
CRETE JACKETTING LANTAI 3 (K1)
4918.03 kg
99.96 m2
24.99 m3
CRETE JACKETTING LANTAI 4 (K1)
4918.03 kg
99.96 m2
24.99 m3
RETE JACKETTING LANTAI 1 (K2)
228.31 kg
30.24 m2
0.81 m3
RETE JACKETTING LANTAI 2 (K2)
228.31 kg
30.24 m2
0.81 m3
RETE JACKETTING LANTAI 3 (K2)
228.31 kg
30.24 m2
0.81 m3
RETE JACKETTING LANTAI 4 (K2)
228.31 kg
30.24 m2
0.81 m3
OBOKAN KOLOM
383.04 m3

382.98 m3

870.00 m2
1740.40 m2
Rp 86,278,003
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568
Rp 86,278,003
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568
Rp 86,278,003
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568
Rp 86,278,003
Rp 54,036,855
Rp 8,044,581
Rp 24,196,568
Rp 5,726,493
Rp 2,508,556
Rp 2,433,655
Rp 784,283
Rp 5,726,493
Rp 2,508,556
Rp 2,433,655
Rp 784,283
Rp 5,726,493
Rp 2,508,556
Rp 2,433,655
Rp 784,283
Rp 5,726,493
Rp 2,508,556
Rp 2,433,655
Rp 784,283
Rp 179,687,894
Rp 179,687,894
Rp 107,944,828
Rp 107,944,828
Rp 51,450,055
Rp 187,902,600
Rp 134,056,050
REKAPITULASI RENCANA ANGGARAN BIAYA
NAMA PROJECT : PEMBANGUNAN PENINGKATAN JUMLAH LANTAI GEDUNG DARUT
LOKASI : BANDUNG, JL. GEGERKALONG GIRANG NO 56
TAHUN :

NO NAMA PEKERJAAN
A PEKERJAAN KOLOM K1
B PEKERJAAN KOLOM K2
C PEKERJAAN BALOK B1
D PEKERJAAN BALOK B2
E PEKERJAAN BALOK B3
F PEKERJAAN BALOK B4
G PEKERJAAN BALOK B5
H PEKERJAAN PELAT
I PEKERJAAN CONCRETE JACKETING K1
J PEKERJAAN CONCRETE JACKETING K2
K PEKERJAAN PEMBOBOKAN KOLOM
L PEKERJAAN INJEKSI
M PEKERJAAN DINDING
NILAI RAB :
PPN 10% :
TOTAL :
DIBULATKAN :
Terbilang :
Empat Miliyar Empat Ratus Tiga Puluh Tiga Juta Empat Ratus Empat Lima Ribu Rupiah
ANGGARAN BIAYA
KATAN JUMLAH LANTAI GEDUNG DARUT
ONG GIRANG NO 56

BIAYA
Rp 199,440,871
Rp 49,353,201
Rp 218,481,885
Rp 228,696,298
Rp 5,760,464
Rp 152,265,445
Rp 23,028,175
Rp 2,175,731,685
Rp 345,112,012
Rp 22,905,973
Rp 179,687,894
Rp 107,944,828
Rp 321,958,650
Rp 4,030,367,381
Rp 403,036,738
Rp 4,433,404,119
Rp 4,433,405,000

uta Empat Ratus Empat Lima Ribu Rupiah


No URAIAN SATUAN VOLUME
1 PEKERJAAN KOLOM (K1) UNIT
PEMBESIAN Kg 229.7
BEKISTING m2 8.1
PENGECORAN BETON K300 m3 1.1
2 PEKERJAAN KOLOM (K2) UNIT
PEMBESIAN Kg 103.6
BEKISTING m2 5.6
PENGECORAN BETON K300 m3 0.525
3 PEKERJAAN BALOK (B1) UNIT
PEMBESIAN Kg 630.9
BEKISTING m2 12.6
PENGECORAN BETON K300 m3 1.3
4 PEKERJAAN BALOK (B2) UNIT
PEMBESIAN Kg 401.9
BEKISTING m2 7.2
PENGECORAN BETON K300 m3 0.7
5 PEKERJAAN BALOK (B3) UNIT
PEMBESIAN Kg 88.10
BEKISTING m2 6.30
PENGECORAN BETON K300 m3 0.50
6 PEKERJAAN BALOK (B4) UNIT
PEMBESIAN Kg 303.80
BEKISTING m2 3.50
PENGECORAN BETON K300 m3 0.20
7 PEKERJAAN BALOK (B5) UNIT
PEMBESIAN Kg 385.00
BEKISTING m2 3.20
PENGECORAN BETON K300 m3 0.10
8 PEKERJAAN PELAT UNIT
PEMBESIAN Kg 44782.50
BEKISTING m2 253.10
PENGECORAN BETON K300 m3 35.40
9 PEKERJAAN CONCRETE JACKETING K1 UNIT
PEMBESIAN Kg 409.39
BEKISTING m2 8.33
PENGECORAN BETON K350 m3 2.08
10 PEKERJAAN CONCRETE JACKETING K2 UNIT
PEMBESIAN Kg 131.31
BEKISTING m2 1.89
PENGECORAN BETON K350 m3 0.58
11 PEMBOBOKAN KOLOM UNIT
PEMBOBOKAN DAN PELUBANGAN m3 5.32
12 PEKERJAAN INJEKSI
PEKERJAAN INJEKSI m3 5.32
13 PEKERJAAN DINDING UNIT
PASANGAN BATA MERAH m2 217.50
PLESTERAN m2 435.00
HARGA
Rp 4,155,018
Rp 2,523,829
Rp 651,872
Rp 979,318
Rp 2,056,383
Rp 1,138,305
Rp 450,677
Rp 467,402
Rp 9,103,412
Rp 6,932,014
Rp 1,014,023
Rp 1,157,375
Rp 5,618,520
Rp 4,415,876
Rp 579,442
Rp 623,202
Rp 1,920,155
Rp 967,999
Rp 507,011
Rp 445,144
Rp 3,797,733
Rp 3,338,003
Rp 281,673
Rp 178,058
Rp 4,576,746
Rp 4,230,188
Rp 257,530
Rp 89,029
Rp 543,932,921
Rp 492,047,719
Rp 20,368,982
Rp 31,516,221
Rp 7,182,470
Rp 4,498,129
Rp 670,382
Rp 2,013,960
Rp 2,156,457
Rp 1,442,769
Rp 152,103
Rp 561,585
Rp 2,495,665
Rp 2,495,665
Rp 1,499,469
Rp 1,499,469
Rp 80,481,960
Rp 46,975,650
Rp 33,506,310