HARGA
NO JENIS JASA SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5
AI PANEL
A BAHAN
1.200 m' NYY 3 x 2,5 mm2 12,500.00 15,000.00
1.200 m' HIC dia.20mm 8,500.00 10,200.00
0.200 % Perlengkapan 35% dari harga konduit 15,000.00 3,000.00
C BIAYA PEMASANGAN
1.200 m' Biaya pasang 5,000.00 6,000.00
Total 6,000.00 30,410.00 36,410.00
A. BAHAN
1.000 unit PJU H=9 METER + HPL 150 WATT 7,550,000.00 7,550,000.00
0.100 % Material bantu ( klem, isolasi, las dop dll ) 7,550,000.00 755,000.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 500,000.00 500,000.00
A. BAHAN
1.000 unit Lampu TL-D 1 x 18 WATT BALK 365,000.00 365,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 365,000.00 27,375.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 35,000.00 35,000.00
A. BAHAN
1.000 unit Lampu TL-D 1 x 18 WATT BALK 421,500.00 421,500.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 421,500.00 31,612.50
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 40,000.00 40,000.00
A. BAHAN
1.000 unit Lampu DL + PL 9 WATT 195,000.00 195,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 195,000.00 14,625.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
A. BAHAN
1.000 unit Lampu DL + PL 18 WATT 215,000.00 215,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 215,000.00 16,125.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
A. BAHAN
1.000 unit Lampu spot taman 50 watt/12volt 125,000.00 125,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 125,000.00 9,375.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
A. BAHAN
1.000 unit Lampu tembok 18 watt/12volt 110,000.00 110,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 110,000.00 8,250.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
A. BAHAN
1.000 unit Lampu tembok 18 watt/12volt 97,000.00 97,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 97,000.00 7,275.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
A. BAHAN
1.000 unit Lampu 1000 watt/12volt 989,500.00 989,500.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 989,500.00 74,212.50
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
A. BAHAN
1.000 buah Saklar Tunggal 37,500.00 37,500.00
0.100 % Material bantu ( klem, isolasi, las dop dll ) 37,500.00 3,750.00
C. BIAYA PEMASANGAN
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6
1.000 lot Pemasangan 10,000.00 10,000.00
A. BAHAN
1.000 buah Saklar Seri 41,000.00 41,000.00
0.100 % Material bantu ( klem, isolasi, las dop dll ) 41,000.00 4,100.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 10,000.00 10,000.00
A. BAHAN
1.000 buah Saklar Hotel 44,500.00 44,500.00
0.750 % Material bantu ( klem, isolasi, las dop dll ) 44,500.00 33,375.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 12,500.00 12,500.00
A. BAHAN
1.000 buah Saklar Hotel Double 89,600.00 89,600.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 89,600.00 6,720.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 12,500.00 12,500.00
A. BAHAN
1.000 buah Stop Kontak 42,500.00 42,500.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 42,500.00 3,187.50
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 10,000.00 10,000.00
A. BAHAN
1.000 buah Stop Kontak 97,500.00 97,500.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 97,500.00 7,312.50
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 10,000.00 10,000.00
A. BAHAN
1.000 set Exhaust fan kamar madi 25 x 25 525,000.00 525,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 525,000.00 39,375.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 10,000.00 10,000.00
A. BAHAN
1.000 set CEILING FAN 1,525,000.00 1,525,000.00
0.075 % Material bantu ( klem, isolasi, las dop dll ) 1,525,000.00 114,375.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 10,000.00 10,000.00
A. BAHAN
1.000 buah Saklar Seri 386,000.00 386,000.00
0.010 % Material bantu ( klem, isolasi, las dop dll ) 386,000.00 3,860.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 10,000.00 10,000.00
A BAHAN
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A. BAHAN
40.000 m' Kabel NYM 3 x 2,5 mm2 13,200 528,000
0.100 lot Material bantu ( klem, isolasi, dll ) 528,000 52,800
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 136,160 136,160
A. BAHAN
20.000 m' Kabel NYM 3 x 2,5 mm2 13,200 264,000
0.100 lot Material bantu ( klem, isolasi, dll ) 264,000 26,400
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 110,400 110,400
A. BAHAN
30.000 buah NYY 3x2,5mm2 13,200.00 396,000.00
0.100 % Material bantu ( klem, isolasi, las dop dll ) 396,000.00 39,600.00
C. BIAYA PEMASANGAN
1.000 lot Pemasangan 30,000.00 30,000.00
EV INSTALASI ELEKTRONIK
CCTV
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
C BIAYA PEMASANGAN
1,576,700.00 - 1,576,700.00
OVER HEAD DAN PROFIT 5% -
HARGA SATUAN PEKERJAAN 1,576,700.00
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
DATA
EV.18 PABX
EV.19 MDF 20
EV.20 TB
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
TATA UDARA
SOUND SYSTEM
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6
0.100 % Peralatan bantu, material terminasi dsb 3,767,000.00 376,700.00
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6
1.000 set CEILING SPEAKER 242,500.00 242,500.00
1.000 set Box Speaker costem 150,000.00 150,000.00
B PERALATAN BANTU
C BIAYA PEMASANGAN
A BAHAN
B PERALATAN BANTU
C BIAYA PEMASANGAN
FVI PLUMBING
SUMUR
A. BAHAN
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6
0.054 oh Pekerja 60,000.00 3,240.00
0.090 oh Tukang Pipa 75,000.00 6,750.00
0.009 oh Kepala Tukang 80,000.00 720.00
0.003 oh Mandor 80,000.00 240.00
10,950.00 48,993.18 59,943.18
OVER HEAD DAN PROFIT 5% 2,997.16
HARGA SATUAN PEKERJAAN 62,940.34
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
B. PERALATAN
C. TENAGA
VALVE
GVII.13 PEMASANGAN 1 BH RETURN VALVE & GATE VALVE DIA. 2" KITZ
VIII POMPA
A BAHAN
C BIAYA PEMASANGAN
1.000 lot Pemasangan 3,500,000.00 3,500,000.00 175,000.00
A BAHAN
C BIAYA PEMASANGAN
1.000 lot Pemasangan 3,500,000.00 3,500,000.00 175,000.00
A BAHAN
C BIAYA PEMASANGAN
1.000 lot Pemasangan 1,750,000.00 1,750,000.00
A BAHAN
C BIAYA PEMASANGAN
1.000 lot Pemasangan 1,750,000.00 1,750,000.00
SATUA
NO NAMA BARANG HARGA SATUAN
N
1 2 3 4
FINISHING
1 Amplas lbr Rp 5,500.00
2 Cat besi kg Rp 70,500.00
3 Cat dasar kg Rp 45,000.00
4 Cat emco kg Rp 61,000.00
5 Cat menie besi kanzai kg Rp 35,000.00
6 Cat menie kayu kg Rp 36,000.00
7 Cat tembok Decolith kg Rp 50,000.00
8 Cat tembok Dulux ltr Rp 55,000.00
9 Cat tembok Emco kg Rp 23,000.00
10 Cat tembok Paragon kg Rp 30,000.00
11 Cat tembok Toyopaint kg Rp 32,000.00
12 Cat tembok Vinilex kg Rp 35,000.00
13 Cat tembok catylaxs kg Rp 35,000.00
14 Dempul sanpolac ltr Rp 30,000.00
15 Kuas star 4" bh Rp 8,000.00
16 Mill zak Rp 12,000.00
17 Minyak cat ltr Rp 26,000.00
18 Plamir kayu@20 KG kg Rp 29,000.00
19 Plamir tembok@20 KG kg Rp 30,000.00
20 Politur ultra ltr Rp 65,000.00
21 Politur vernis ltr Rp 45,000.00
22 Thiner A Bonanza ltr Rp 43,000.00
23 Thiner B Spesial ltr Rp 40,000.00
24 Cat Aquaproof Warna kg Rp 48,000.00
PENUTUP ATAP
25 Alang-alang panjang 2,4 meter lbr Rp 12,500.00
26 Alluminium foil m2 Rp 185,000.00
27 Asbes Bubungan lbr Rp 45,000.00
28 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr Rp 38,000.00
29 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr Rp 45,000.00
30 Asbes Rata 2 m x 1 m x 4 mm lbr Rp 50,000.00
31 Atap metal Toratora 1 x 4 Extra m2 Rp 84,000.00
32 Atap metal Toratora 1 x 4 Premium m2 Rp 125,000.00
1 2 3 4
33 Atap metal Toratora 2 x 4 Extra m2 Rp 74,000.00
34 Atap metal Toratora 2 x 4 Premium m2 Rp 108,500.00
35 Atap metal Toratora 3 x 4 Extra m2 Rp 72,000.00
36 Atap metal Toratora 3 x 4 Premium m2 Rp 105,000.00
37 Atap metal Toratora 4 x 4 Extra m2 Rp 70,000.00
38 Atap metal Toratora 4 x 4 Premium m2 Rp 105,000.00
39 Bentala paras 70 cm bh Rp 75,000.00
40 Bentala tanah liat 70 cm bh Rp 52,000.00
41 Besi profil WF P.6m kg Rp 95,000.00
42 Besi profil WF P.12m kg Rp 85,000.00
43 Bubungan Biasa bj Rp 7,000.00
44 Bubungan Karang Pilang (gebang) isi 3,5/m bj Rp 20,000.00
45 Bubungan Karang Pilang (bisma /goodyear)isi 3,5/m bj Rp 20,000.00
46 Bubungan Ngalayur isi 3,5/m bj Rp 10,000.00
47 Bubungan Plentong bj Rp 16,000.00
48 Bubungan Utama isi 3,5/m bj Rp 12,000.00
49 Genteng Kanmuri (glazur) isi 14/m2 bj Rp 6,500.00
50 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj Rp 5,500.00
51 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj Rp 2,800.00
52 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj Rp 4,500.00
53 Genteng Flat (Good Year) isi 20/m2 bj Rp 9,000.00
54 Genteng Beton JS bj Rp 7,000.00
55 Genteng Beton BBC bj Rp 7,000.00
56 Genteng Morando Abadi isi 18/m2 bj Rp 2,800.00
57 Genteng Morando Jatiwangi isi 18/m2 bj Rp 2,900.00
58 Genteng Morando Ngalayur isi 20/m2 bj Rp 2,800.00
59 Genteng Plentong bj Rp 1,500.00
60 Genteng plentong dicat bj Rp 1,800.00
61 Genteng Plentong Jatiwangi isi 24/m2 bj Rp 2,500.00
62 Ijuk kg Rp 7,000.00
63 Ikut celedu paras 80 cm bh Rp 250,000.00
64 Ikut celedu tanah liat 80 cm bh Rp 182,000.00
65 Murda paras 30 cm bh Rp 200,000.00
66 Murda tanah liat 30 cm bh Rp 150,000.00
67 Murda paras 80 cm bh Rp 350,000.00
68 Murda cor tembaga bh Rp 200,000.00
67 Seng BJLS 0,20 gelombang lbr Rp 75,000.00
68 Seng BJLS 0,25 gelombang lbr Rp 80,000.00
69 Seng BJLS 0,28 gelombang lbr Rp 90,000.00
1 2 3 4
70 Seng BJLS 0,32 gelombang lbr Rp 95,000.00
71 Seng Plat 3" x 6" BJLS 28 lbr Rp 50,000.00
72 Sirap Jati bh Rp 7,000.00
73 Tali Ijuk kg Rp 34,000.00
74 Tali pengikat alang-alang ikat Rp 15,000.00
1 2 3 4
105 Prosted Glass/kaca es 5 mm m2 Rp 120,000.00
106 Tempered Glass 5 mm m2 Rp 65,000.00
107 Tempered Glass 6 mm m2 Rp 70,000.00
108 Tempered Glass 8 mm m2 Rp 80,000.00
109 Tempered Glass 10 mm m2 Rp 85,000.00
110 Tempered Glass 12 mm m2 Rp 120,000.00
111 Tempered Glass 15 mm m2 Rp 125,000.00
112 Tempered Glass 19 mm m2 Rp 150,000.00
113 Ice Glass 3 mm/kaca es m2 Rp 60,000.00
114 Ice Glass 5 mm/kaca es m2 Rp 70,000.00
115 Mirror Glass 3 mm m2 Rp 60,000.00
116 Mirror Glass 5 mm m2 Rp 70,000.00
117 Akrilik bening transparan 10 mm m2 Rp 1,170,000.00
118 Kait angin biasa bh Rp 50,000.00
119 Kunci pintu TOP bh Rp 100,000.00
120 Kunci pintu Union bh Rp 180,000.00
121 Kunci pintu Vanesa bh Rp 150,000.00
122 Kunci pintu Yale bh Rp 215,000.00
123 Kunci pintu YURI bh Rp 140,000.00
124 Kunci slot bh Rp 140,000.00
125 Kunci tanam 2 slag bh Rp 225,000.00
1 2 3 4
142 Kayu cempaka m3 Rp 2,500,000.00
143 Kayu jati m3 Rp 55,000,000.00
144 Kayu jati papan m3 Rp 67,000,000.00
145 Kayu kamper balok m3 Rp 6,000,000.00
146 Kayu kamper usuk/reng m3 Rp 6,000,000.00
147 Kayu kamper papan m3 Rp 6,000,000.00
148 Kayu kruing balok m3 Rp 4,800,000.00
149 Kayu kruing usuk/reng m3 Rp 4,500,000.00
150 Kayu kruing papan m3 Rp 5,500,000.00
151 Kayu meranti balok m3 Rp 2,500,000.00
152 Kayu meranti usuk/reng m3 Rp 3,000,000.00
153 Kayu meranti papan m3 Rp 5,500,000.00
154 Kayu merbau balok m3 Rp 13,000,000.00
155 Kayu merbau papan m3 Rp 13,500,000.00
156 Kayu bojonegoro balok m3 Rp 5,000,000.00
157 Kayu bojonegoro papan m3 Rp 7,500,000.00
158 Kayu profil usuk m1 Rp 15,000.00
159 Kayu seseh balok m3 Rp 4,000,000.00
160 Kayu seseh dolken m3 Rp 3,000,000.00
161 Lem Aibond kg Rp 33,000.00
162 Lem Kayu ltr Rp 15,000.00
163 List Gypsum standar m' Rp 12,000.00
164 Minyak bekisting ltr Rp 15,000.00
165 Multiplek 12 mm lbr Rp 180,000.00
166 Multiplek 18 mm lbr Rp 220,000.00
167 Multiplek 6 mm lbr Rp 150,000.00
168 Multiplek 9 mm lbr Rp 160,000.00
169 Plywood 12 mm lbr Rp 105,000.00
170 Plywood 3 mm lbr Rp 55,000.00
171 Plywood 4 mm lbr Rp 58,000.00
172 Plywood 6 mm lbr Rp 60,000.00
173 Plywood 9 mm lbr Rp 65,000.00
174 Plywood aluminium lbr Rp 220,000.00
175 Teak wood (0,9x2,20) m2 lbr Rp 80,000.00
176 Teak wood (1,20x2,40) m2 lbr Rp 90,000.00
KERAMIK
CUTTING ZISE
177 Cutting 5 x 40 cm bh Rp 15,000.00
1 2 3 4
178 Cutting 10 x 40 cm bh Rp 20,000.00
179 Cutting 20 x 60 cm bh Rp 30,000.00
180 Cutting 15 x 60 cm bh Rp 25,000.00
181 Cutting 10 x 60 cm bh Rp 23,000.00
IKAD
182 Ikad (Keramik) Kw. I 10 x 20 cm m2 Rp 50,000.00
183 Ikad (Keramik) Kw. I 20 x 20 cm m2 Rp 55,000.00
184 Ikad (Keramik) Kw. I 20 x 30 cm m2 Rp 60,000.00
185 Ikad (Keramik) Kw. I 30 x 30 cm m2 Rp 50,000.00
186 Ikad (Keramik) Kw. I 40 x 40 cm m2 Rp 52,000.00
187 Ikad (Keramik) Kw. II 10 x 20 cm m2 Rp 45,000.00
188 Ikad (Keramik) Kw. II 20 x 20 cm m2 Rp 48,000.00
189 Ikad (Keramik) Kw. II 20 x 30 cm m2 Rp 50,000.00
190 Ikad (Keramik) Kw. II 30 x 30 cm m2 Rp 48,000.00
191 Ikad (Keramik) Kw. II 40 x 40 cm m2 Rp 55,000.00
INESA
192 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2 Rp 45,000.00
193 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 Rp 45,000.00
194 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2 Rp 45,000.00
195 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2 Rp 45,000.00
196 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2 Rp 45,000.00
197 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2 Rp 55,000.00
198 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2 Rp 55,000.00
199 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 Rp 55,000.00
200 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2 Rp 55,000.00
201 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2 Rp 55,000.00
202 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2 Rp 65,000.00
ESSENZA
203 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 Rp 70,000.00
204 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 Rp 70,000.00
205 Keramik 30 x 30 Kelas I (Pepper G Price Rubert Silver star, P) m2 Rp 70,000.00
206 Keramik 30 x 30 Kelas I (Pepper G Price Rubert Silver star,UP) m2 Rp 70,000.00
207 Keramik 40 x 40 Kelas I (Pepper G Price Rubert Silver star, P) m2 Rp 85,000.00
208 Keramik 40 x 40 Kelas I (Pepper G Price Rubert Silver star,UP) m2 Rp 85,000.00
209 Keramik 60 x 60 Kelas I (Pepper G Price Rubert Silver star, P) m2 Rp 105,000.00
210 Keramik Kelas I Domus m2 Rp 150,000.00
1 2 3 4
211 Keramik Kelas I Granity Imperiali m2 Rp 160,000.00
212 Keramik Kelas I Lavagna m2 Rp 175,000.00
213 Keramik Kelas I Mountain Peak m2 Rp 175,000.00
214 Granit 30 x 60 magnetite rock m2 Rp 150,000.00
215 Granit 60 x 60 magnetite rock m2 Rp 140,000.00
216 Granit 60 x 60 pepper grey polished m2 Rp 160,000.00
217 Granit 60 x 60 coral bell polished m2 Rp 160,000.00
218 Granit 60 x 60 ivory polished m2 Rp 155,000.00
219 Granit 60 x 60 unica gold polished m2 Rp 180,000.00
220 Granit 60 x 60 alexandra polished m2 Rp 170,000.00
221 Granit 60 x 60 elit unpolished m2 Rp 180,000.00
222 Granit 60 x 60 absolute black unpolished m2 Rp 155,000.00
223 Granit 60 x 60 cosmo white unpolished m2 Rp 170,000.00
224 Granit 60 x 60 cotton brown unpolished m2 Rp 170,000.00
ROMAN
225 Keramik 20 x 20 tekstur kasar m2 Rp 50,000.00
226 Keramik 25 x 33 kelas I m2 Rp 50,000.00
227 Keramik 25 x 45 motif halus kelas I m2 Rp 50,000.00
228 Keramik 30 x 30 standard m2 Rp 60,000.00
229 Keramik 30 x 30 kelas I T. 1cm m2 Rp 60,000.00
230 Keramik 20 x 60 kelas I T. 1cm m2 Rp 60,000.00
231 Keramik 20 x 40 kelas I Motif standard m2 Rp 60,000.00
232 Keramik 30 x 60 kelas I Motif Dasar Muda m2 Rp 85,000.00
233 Keramik 40 x 40 kelas I krem m2 Rp 65,000.00
234 Keramik 40 x 40 kelas I white m2 Rp 65,000.00
235 Keramik 50 x 50 kelas I warna muda m2 Rp 70,000.00
PLATINUM
236 Keramik 25 x 33 kelas I m2 Rp 50,000.00
237 Keramik 25 x 40 kelas I m2 Rp 60,000.00
238 Keramik 30 x 60 kelas II bulgari m2 Rp 65,000.00
239 Keramik 40 x 40 kelas I brown m2 Rp 50,000.00
240 Keramik 20 x 50 kelas I m2 Rp 70,000.00
241 Keramik 25 x 40 kelas II m2 Rp 55,000.00
242 Keramik 40 x 40 kelas II cream m3 Rp 45,000.00
SINCERE
243 Granit natural marble wht L.60 m2 Rp 130,000.00
1 2 3 4
244 Granit popular wht L.60 m2 Rp 135,000.00
245 Granit micro diamond wht L. 60 m2 Rp 145,000.00
246 Granit micro diamond blk L. 60 m2 Rp 160,000.00
247 Granit poly cristal cream L. 60 m2 Rp 185,000.00
GRANITO
248 Granito Castello Tera 60 x 60 m2 Rp 125,000.00
249 Granito Monalisa TD6602 60 x 60 m2 Rp 130,000.00
250 Granito Monalisa TD6602 80 x 80 m2 Rp 140,000.00
251 Granito Niro FR660IY 60 x 60 m2 Rp 160,000.00
252 Granito Essenza Grey 60 x 60 m2 Rp 185,000.00
253 Granito Indogress Cristallo 80 x 80 m2 Rp 185,000.00
254 Granito salsa ivary 40 x 40 polished m2 Rp 150,000.00
255 Granito salsa ivary 40 x 40 unpolished m2 Rp 150,000.00
256 Granito salsa ivary 60 x 60 polished m2 Rp 180,000.00
257 Granito salsa ivary 60 x 60 unpolished m2 Rp 180,000.00
258 Granito salsa ivary 80 x 80 polished m2 Rp 190,000.00
259 Granito salsa ivary 30 x 60 polished m2 Rp 180,000.00
260 Granito palazzo monza 60 x 60 polished m2 Rp 180,000.00
261 Granito Aurora silk 60 x 60 polished m2 Rp 295,000.00
262 Granito Aurora silk 30 x 60 polished m2 Rp 250,000.00
263 Granito sabbia villa 60 x 60 polished m2 Rp 180,000.00
264 Granito castello rosso 40 x 40 unpolished m2 Rp 150,000.00
265 Granito castello pietra 60 x 60 unpolished m2 Rp 165,000.00
266 Granito lunar terra 30 x 60 unpolished m2 Rp 150,000.00
267 Granito lunar terra 60 x 60 unpolished m2 Rp 180,000.00
268 Granito lunar alumina 60 x 60 unpolished m2 Rp 180,000.00
269 Granito lunar alumina 30 x 60 unpolished m2 Rp 150,000.00
270 Granito salsa ivary 30 x 30 polished m2 Rp 135,000.00
271 Granito salsa ivary 30 X 30 unpolished m2 Rp 135,000.00
MARMER
272 Marmer cream BA 60 x 60 m2 Rp 250,000.00
273 Marmer cream BA 40 x 40 m2 Rp 210,000.00
274 Marmer cream BA 30 x 30 m2 Rp 200,000.00
MOZAIK
275 Mozaik keramik zehn crystal glass 30 x 30 biji Rp 65,000.00
276 Mozaik batu alam 30 x 30 biji Rp 85,000.00
1 2 3 4
ASIA
277 Keramik 20 x 25 kelas I m2 Rp 50,000.00
278 Keramik 30 x 30 kelas I wht m2 Rp 50,000.00
279 Keramik 30 x 30 kelas I m2 Rp 50,000.00
280 Keramik 40 x 40 kelas I crm m2 Rp 55,000.00
281 Keramik 10 x 20 kelas II m2 Rp 40,000.00
282 Keramik 20 x 20 kelas I m2 Rp 48,000.00
283 Keramik 20 x 30 kelas II m2 Rp 50,000.00
284 Keramik 30 x 30 kelas II m2 Rp 48,000.00
285 Keramik 40 x 40 kelas II m2 Rp 50,000.00
MULIA
286 Keramik 10 x 20 cm kelas I m2 Rp 40,000.00
287 Keramik 20 x 20 cm kelas I m2 Rp 40,000.00
288 Keramik 20 x 30 cm kelas I m2 Rp 40,000.00
289 Keramik 30 x 30 cm kelas I m2 Rp 40,000.00
290 Keramik 40 x 40 cm kelas I m2 Rp 40,000.00
291 Keramik 10 x 20 cm kelas II m2 Rp 40,000.00
292 Keramik 20 x 20 cm kelas II m2 Rp 40,000.00
293 Keramik 20 x 30 cm kelas II m2 Rp 40,000.00
294 Keramik 30 x 30 cm kelas II m2 Rp 40,000.00
295 Keramik 40 x 40 cm kelas II m2 Rp 40,000.00
SANITAIR
296 Bak mandi fibre glass 55x55x60 cm bh Rp 350,000.00
297 Bak mandi keramik 50x50 bh Rp 300,000.00
298 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh Rp 225,000.00
299 Floor drain plastik bh Rp 25,000.00
300 Floor drain stainless bh Rp 45,000.00
301 Kloset duduk Amerika Standar ECST wht bh Rp 1,500,000.00
302 Kloset duduk OULU A626 wht bh Rp 1,500,000.00
303 Kloset duduk Zehn 040 A wht bh Rp 1,500,000.00
304 Kloset duduk "TOTO Type AVANTE CW 821J"/SW 821JP COMPLIT bh Rp 2,000,000.00
305 Kloset duduk " TOTO Type AVANTE CW 823 J bh Rp 2,000,000.00
306 Kloset duduk " TOTO Type CW 660J complit bh Rp 2,000,000.00
307 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh Rp 2,000,000.00
308 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh Rp 2,000,000.00
309 Kloset duduk " TOTO Type CW 420 wht bh Rp 2,000,000.00
1 2 3 4
310 Kloset duduk " TOTO Type CW 637 wht bh Rp 2,000,000.00
311 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh Rp 2,000,000.00
312 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh Rp 2,000,000.00
313 Kloset jongkok " TOTO komplit wht Ce 6 bh Rp 450,000.00
314 Kloset jongkok " TOTO komplit wht bh Rp 450,000.00
315 Kloset porselin jongkok Kia (standar) bh Rp 165,000.00
316 Kloset porselin jongkok pozzi bh Rp 165,000.00
317 Kloset porselin jongkok liga bh Rp 165,000.00
318 Kloset porselin jongkok Ina (standar) bh Rp 150,000.00
277 Penyekat Urinoir " TOTO " Type A 100 " bh Rp 835,000.00
278 Shower Spray " TOTO Tx bh Rp 700,000.00
279 Shower Spray " American standard TP45 bh Rp 700,000.00
280 Shower Spray " ONDA bh Rp 700,000.00
281 Soap holder Biasa Trisensa bh Rp 700,000.00
282 Seal tape ONDA bh Rp 3,000.00
283 Urinoir " TOTO komplit bh Rp 1,250,000.00
284 Urinoir " American standard m1w bh Rp 1,250,000.00
285 Urinoir " HCG u999m bh Rp 1,250,000.00
286 Wastafel american Standard studio bh Rp 750,000.00
287 Wastafel HCG l61 bh Rp 750,000.00
288 Wastafel Komplit " Tidy 001b bh Rp 750,000.00
289 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh Rp 750,000.00
290 Wastafel Toto komplit LW631JW/F segi 4 bh Rp 750,000.00
291 Wastafel Toto LW352JW/F bulat bh Rp 750,000.00
292 Wastafel Toto komplit LW645+T6JV5 kotak bh Rp 750,000.00
293 Wastafel Toto LW248JR bh Rp 750,000.00
294 Shower ONDA exclusive s.80 bh Rp 450,000.00
295 Shower ONDA eco sense bh Rp 450,000.00
296 Shower ONDA eco sns.931 bh Rp 450,000.00
297 Shower CARLO exclusive bh Rp 650,000.00
298 Tidy cuci piring doble bh Rp 860,000.00
299 Tidy cuci piring single bh Rp 860,000.00
300 Zehn cuci piring doble bh Rp 860,000.00
PAKU
301 Paku 10 cm kg Rp 14,000.00
302 Paku kalsiboard kg Rp 20,000.00
303 Paku list SQ kg Rp 20,000.00
304 Paku pancing 60 x 230 kg Rp 20,000.00
1 2 3 4
305 Paku reng/usuk SQ kg Rp 20,000.00
306 Paku seng kg Rp 20,000.00
307 Paku seng import kg Rp 3,000.00
308 Paku skrup 1/2" kg Rp 20,000.00
309 Paku skrup 2" kg Rp 20,000.00
310 Paku skrup 3.5" kg Rp 20,000.00
311 Paku sumbat 1/2" kg Rp 20,000.00
1 2 3 4
351 Batu pilah Singaraja 20 x 20 m2 Rp 83,000.00
352 Batu hitam Jember 5 x 20 halus m2 Rp 70,000.00
353 Batu hitam Jember 20 x 40 halus m2 Rp 70,000.00
354 Batu hitam Jember 15 x 30 halus m2 Rp 70,000.00
355 Batu hitam Singaraja 15 x 30 halus m2 Rp 70,000.00
356 Batu hitam Singaraja 20 x 40 halus m2 Rp 70,000.00
357 Batu AND 60 x 60 abu m2 Rp 95,000.00
358 Batu AND 50 x 50 hitam m2 Rp 95,000.00
359 Batu AND 40 x 40 hitam bkr m2 Rp 95,000.00
360 Batu AND 30 x 60 hitam bkr m2 Rp 95,000.00
361 Batu AND 40 x 60 hitam kilap m2 Rp 95,000.00
362 Batu AND 30 x 40 abu SS m2 Rp 95,000.00
363 Batu marmer kuning 10 x 20 m2 Rp 250,000.00
364 Batu marmer kuning PB1 10 x 20 m2 Rp 260,000.00
365 Batu marmer kuning PB2 10 x 20 m2 Rp 260,000.00
366 Batu marmer kuning 15 x 30 m2 Rp 260,000.00
367 Batu kuning serat 30 x 30 m2 Rp 65,000.00
368 Batu kuning serat 20 x 30 m2 Rp 65,000.00
369 Batu palimanan cirebon 20 x 30 m2 Rp 75,000.00
370 Batu palimanan cirebon 20 x 40 m2 Rp 75,000.00
371 Batu paras Jogja 60 x 60 m2 Rp 65,000.00
372 Batu candi hitam 60 x 60 m2 Rp 65,000.00
373 Batu candi hitam 20 x 20 m2 Rp 65,000.00
374 Batu candi hitam 30 x 30 m2 Rp 65,000.00
375 Batu candi hitam 40 x 40 T.5cm m2 Rp 50,000.00
376 Batu candi hitam 20 x 30 m2 Rp 55,000.00
377 Batu Bali green gelombang 20 x 40 m2 Rp 80,000.00
378 Batu Bali green kombinasi 20 x 40 m2 Rp 55,000.00
379 Batu serayu 20 x 60 m2 Rp 65,000.00
380 Pasir halus ( diayak) m3 Rp 195,000.00
381 Pasir beton / cor Ex. 4 per 2,75 M3 m3 Rp 180,000.00
382 Pasir pasang m3 Rp 190,000.00
383 Pasir urug m3 Rp 135,000.00
384 Sirtu m3 Rp 115,000.00
385 Tanah urug m3 Rp 95,000.00
386 Batu serai m2 Rp 65,000.00
PIPA
386 Pipa Galvanis 1/2" m1 Rp 10,000.00
1 2 3 4
387 Pipa Galvanis 3/4" m1 Rp 10,000.00
388 Pipa Galvanis 1 1/4" m1 Rp 15,000.00
389 Pipa Galvanis 1 1/2" m1 Rp 15,000.00
390 Pipa Galvanis 1" m1 Rp 15,000.00
391 Pipa Galvanis 1,5 BSA m1 Rp 15,000.00
392 Pipa Galvanis 2" m1 Rp 20,000.00
393 Pipa Galvanis 3" m1 Rp 20,000.00
394 Pipa Maspion AW 1 ljr Rp 45,000.00
395 Pipa Maspion AW 1/2 ljr Rp 40,000.00
396 Pipa Maspion AW 10 ljr Rp 1,000,000.00
397 Pipa Maspion AW 1-1/2 ljr Rp 75,000.00
398 Pipa Maspion AW 1-1/4 ljr Rp 60,000.00
399 Pipa Maspion AW 12 ljr Rp 1,200,000.00
400 Pipa Maspion AW 14 ljr Rp 1,300,000.00
401 Pipa Maspion AW 16 ljr Rp 1,400,000.00
402 Pipa Maspion AW 2 ljr Rp 113,000.00
403 Pipa Maspion AW 2-1/2 ljr Rp 146,000.00
404 Pipa Maspion AW 3 ljr Rp 200,000.00
405 Pipa Maspion AW 3/4 ljr Rp 35,000.00
406 Pipa Maspion AW 4 ljr Rp 300,000.00
407 Pipa Maspion AW 5 ljr Rp 450,000.00
408 Pipa Maspion AW 6 ljr Rp 600,000.00
409 Pipa Maspion AW 8 ljr Rp 900,000.00
410 Pipa Maspion C 1 ljr Rp 50,000.00
411 Pipa Maspion C 1-1/2 ljr Rp 50,000.00
412 Pipa Maspion C 1-1/4 ljr Rp 50,000.00
413 Pipa Maspion C 2 ljr Rp 55,000.00
414 Pipa Maspion C 2-1/2 ljr Rp 55,000.00
415 Pipa Maspion C 3 ljr Rp 85,000.00
416 Pipa Maspion C 3/4 ljr Rp 85,000.00
417 Pipa Maspion C 4 ljr Rp 85,000.00
418 Pipa Maspion C 5/8 ljr Rp 150,000.00
419 Pipa Maspion D 10 ljr Rp 50,000.00
420 Pipa Maspion D 1-1/2 ljr Rp 50,000.00
421 Pipa Maspion D 1-1/4 ljr Rp 50,000.00
422 Pipa Maspion D 12 ljr Rp 85,000.00
423 Pipa Maspion D 14 ljr Rp 90,000.00
424 Pipa Maspion D 16 ljr Rp 105,000.00
425 Pipa Maspion D 2 ljr Rp 65,000.00
1 2 3 4
426 Pipa Maspion D 2-1/2 ljr Rp 65,000.00
427 Pipa Maspion D 3 ljr Rp 70,000.00
428 Pipa Maspion D 4 ljr Rp 85,000.00
429 Pipa Maspion D 5 ljr Rp 150,000.00
430 Pipa Maspion D 6 ljr Rp 155,000.00
431 Pipa Maspion D 8 ljr Rp 160,000.00
KRAN AIR
432 TOTO T.30AR13V7N bh Rp 70,000.00
433 TOTO T.60N bh Rp 70,000.00
434 TOTO TX-116 LI bh Rp 70,000.00
435 TOTO TX-116 LEBR bh Rp 70,000.00
436 TOTO TX 101 LB bh Rp 70,000.00
437 ONDA exclusive walltaps bh Rp 85,000.00
438 ONDA exclusive basintaps bh Rp 85,000.00
439 ONDA walltaps bh Rp 85,000.00
440 ONDA sinktaps bh Rp 85,000.00
441 ONDA swinging basin bh Rp 85,000.00
442 Kran biasa bh Rp 20,000.00
443 Kran Sunei bh Rp 45,000.00
HANDEL PINTU
444 Gradino Handel Luar HP.6106 bh Rp 150,000.00
445 Gradino Handel Luar HP.99.01 bh Rp 165,000.00
446 Solid HRE 99.14 bh Rp 140,000.00
447 ELT handle pintu dobel P99.62 set Rp 250,000.00
448 ELT handle pintu dobel PR 511.05 set Rp 275,000.00
449 ELT bulat PHB 308SS bh Rp 100,000.00
450 PALOMA HPP 502 bh Rp 120,000.00
451 PALOMA HRP 215 bh Rp 120,000.00
452 PALOMA PHP 241 bh Rp 120,000.00
453 DEKSON HPT 021 bh Rp 240,000.00
454 DEKSON HPT 017 bh Rp 200,000.00
455 DEKSON LHP set Rp 200,000.00
456 TIDY handle set 905 set Rp 200,000.00
457 PALOMA set handle set Rp 200,000.00
458 DLD handle bulat set Rp 200,000.00
1 2 3 4
459 Semen Bosowa 50 kg zak Rp 55,000.00
460 Semen Gresik 40 kg zak Rp 50,000.00
461 Semen Gresik 50 kg zak Rp 58,000.00
462 Semen Tiga Roga 40 kg zak Rp 58,000.00
463 Semen Tonasa 40 kg zak Rp 46,000.00
464 Semen warna/semen grouting kg Rp 17,000.00
465 Semen Instan Plesteran @40 kg sak Rp 12,000.00
466 Semen instan @25 kg sak Rp 9,500.00
467 Semen Instan Pasangan Bata Ringan@40 kg sak Rp 12,000.00
468 Air Campuran Beton ltr Rp 250.00
469 Drymix floor hardener @ 25 kg sak Rp 145,000.00
470 Drymix floor hardener @ 25 kg sak Rp 145,000.00
471 Sika RainTite @ 1 kg kg Rp 55,000.00
472 Sika RainTite @ 4 kg kg Rp 200,000.00
473 Sika RainTite @ 20 kg kg Rp 899,000.00
474 Sikalastic 560 @ 4 kg kg Rp 200,000.00
475 Sikalastic 560 @ 20 kg kg Rp 800,000.00
Sika Raintite Membrane
476 lbr Rp 12,500.00
(Kasa untuk Sika RainTite) 0,2 x 1m
477 Sika Waterproofing Mortar @ 5 kg kg Rp 85,000.00
478 Sika Waterproofing Mortar @ 25 kg kg Rp 320,000.00
478 SikaTop Seal 107 (A+B) @ 25 kg kg Rp 440,000.00
479 SikaTop Seal 107 (A) @ 5 kg kg Rp 370,000.00
479 SikaTop Seal 107+ @ 4 kg kg Rp 135,000.00
480 Sika Multiseal 10 cm x 3 meter Rp 125,000.00
1 2 3 4
483 Kawat beton RRT kg Rp 19,000.00
484 Pagar BRC asli T.120 diameter 6mm m' Rp 170,000.00
485 Pagar BRC asli T.150 diameter 6mm m' Rp 178,000.00
486 Pagar BRC asli T.175 diameter 7mm m' Rp 251,000.00
487 Pagar BRC asli T.190 diameter 7mm m' Rp 268,000.00
488 Pagar BRC asli T.90 diameter 6mm m' Rp 137,000.00
489 Pagar HotDip Galvanized T.120 diameter 6mm m' Rp 140,000.00
490 Pagar HotDip Galvanized T.150 diameter 7mm m' Rp 191,000.00
491 Pagar HotDip Galvanized T.175 diameter 7mm m' Rp 205,000.00
492 Pagar HotDip Galvanized T.190 diameter 7mm m' Rp 220,000.00
493 Pagar HotDip Galvanized T.90 diameter 6mm m' Rp 120,000.00
494 Tiang BRC asli T. 120 diameter 1 1/2" bh Rp 167,000.00
495 Tiang BRC asli T. 150 diameter 2" bh Rp 215,000.00
496 Tiang BRC asli T. 175 diameter 2" bh Rp 245,000.00
497 Tiang BRC asli T. 190 diameter 2" bh Rp 25,000.00
498 Tiang BRC asli T. 90 diameter 1 1/2" bh Rp 140,000.00
499 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh Rp 147,000.00
500 Tiang HotDip Galvanized T. 150 diameter 2" bh Rp 172,000.00
501 Tiang HotDip Galvanized T. 175 diameter 2" bh Rp 190,000.00
502 Tiang HotDip Galvanized T. 190 diameter 2" bh Rp 200,000.00
503 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh Rp 127,000.00
504 Besi CNP 100 x 50 x 20, t = 2,3 mm, p= 6 m ljr Rp 220,000.00
505 Besi CNP 100 x 50 x 20, t = 3,2 mm, p= 6 m ljr Rp 297,500.00
506 Besi CNP 125 x 50 x 20, t=2,3 mm, p= 6 m ljr Rp 245,000.00
507 Besi CNP 125 x 50 x 20,t=3,2 mm, p= 6 m ljr Rp 333,500.00
508 Besi CNP 150 x 50 x 20,t=2,3 mm, p=6 m ljr Rp 268,500.00
509 Besi CNP 150 x 50 x 20,t=3,2 mm,p= 6 m ljr Rp 370,000.00
510 Besi CNP 150 x 65 x 20, t=2,3 mm, p= 6 m ljr Rp 298,500.00
511 Besi CNP 150 x 65 x 20,t=3,2 mm, p= 6 m ljr Rp 405,000.00
512 Besi CNP 200 x 75 x 20,t=2,3 mm, p= 6 m ljr Rp 365,500.00
513 Besi CNP 200 x 75 x 20,t=3,2 mm, p= 6 m ljr Rp 500,500.00
514 Grating Got (Grill Penutup Got Terpasang) m1 Rp 500,000.00
BAHAN LISTRIK
515 Saklar (Broco) bh Rp 35,000.00
516 Stop Kontak bh Rp 35,000.00
517 Fitting bh Rp 18,000.00
518 Steker bh Rp 15,000.00
519 Coaxial cable 5C - 75 ohm commscof m1 Rp 3,000.00
1 2 3 4
520 Kabel NYM 3 x 2.5 mm ex. Supreme m1 Rp 16,000.00
521 Kabel NYM 4 mm m1 Rp 18,000.00
522 Kabel telephone m1 Rp 9,500.00
499 Lampu pijar 8 Watt (Philip) Rp 30,000.00
500 Lampu pijar 10 Watt (Philip) bh Rp 35,000.00
501 Lampu pijar 15 Watt (Philip) bh Rp 35,000.00
502 Lampu pijar 25 Watt (Philip) bh Rp 35,000.00
503 Lampu TL 10 Watt (10 Watt) Philip bh Rp 150,000.00
504 Lampu TL 20 Watt (10 Watt) Philip bh Rp 150,000.00
505 Lampu TL 25 Watt (10 Watt) Philip bh Rp 150,000.00
506 Pipa clipsal 20 mm bt Rp 9,000.00
507 Pipa flexible clipsal 20 mm m1 Rp 3,000.00
508 Sock clipsal 20 mm bj Rp 1,500.00
509 Tee dos clipsal 20 mm bh Rp 2,000.00
510 Klem clipsal 20 mm bj Rp 500.00
511 Inbow dos plastik clipsal E 157 P bj Rp 1,000.00
BUIS BETON
512 Buis beton 20 x 75 x 3 bh Rp 115,000.00
513 Buis beton 25 x 75 x 3 bh Rp 120,000.00
514 Buis beton 30 x 75 x 3 bh Rp 125,000.00
515 Buis beton 40 x 75 x 5 bh Rp 130,000.00
516 Buis beton 50 x 75 x 5 bh Rp 135,000.00
517 Buis beton 80 x 75 x 7.5 bh Rp 150,000.00
PAVING
518 Paving 10 x 20 cm tebal 6 cm K225 Pc m2 Rp 40,000.00
519 Paving 10 x 20 cm tebal 6 cm K300 Pc m2 Rp 42,000.00
520 Paving 10 x 20 cm tebal 6 cm K350 Pc m2 Rp 45,000.00
521 Paving 10 x 20 cm tebal 8 cm K225 Pc m2 Rp 50,000.00
563 Paving 10 x 20 cm tebal 8 cm K300 Pc m2 Rp 52,000.00
522 Paving 10 x 20 cm tebal 8 cm K350 Pc m2 Rp 55,000.00
523 Paving 10 x 20 cm tebal 8 cm K400 Pc m2 Rp 57,000.00
524 Paving 20 x 20 cm tebal 6 cm K225 Pc m2 Rp 60,000.00
525 Paving 20 x 20 cm tebal 6 cm K225 warna merah m2 Rp 60,000.00
526 Paving 20 x 20 cm tebal 6 cm K225 warna hitam m2 Rp 60,000.00
527 Paving 20 x 20 cm tebal 6 cm K300 Pc m2 Rp 70,000.00
528 Paving 20 x 20 cm tebal 8 cm K225 Pc m2 Rp 75,000.00
529 Paving 20 x 20 cm tebal 8 cm K225 warna merah m2 Rp 75,000.00
1 2 3 4
530 Paving 20 x 20 cm tebal 8 cm K225 warna hitam m2 Rp 75,000.00
531 Paving 20 x 20 cm tebal 8 cm K300 Pc m2 Rp 80,000.00
532 Paving 20 x 20 cm tebal 8 cm K400 Pc m2 Rp 85,000.00
533 Paving 20 x 20 cm tebal 10 cm K225 Pc m2 Rp 90,000.00
534 Paving 20 x 20 cm tebal 10 cm K350 Pc m2 Rp 95,000.00
535 Paving 20 x 20 cm tebal 10 cm K400 Pc m2 Rp 100,000.00
536 Paving segi enam xexagon 6 cm K225 Pc m2 Rp 120,000.00
537 Paving segi enam xexagon 6 cm K350 Pc m2 Rp 125,000.00
538 Paving segi enam xexagon 8 cm K225 Pc m2 Rp 130,000.00
539 Paving segi enam xexagon 8 cm K350 Pc m2 Rp 135,000.00
540 Paving segi enam xexagon 8 cm K400 Pc m2 Rp 140,000.00
541 Paving kotak bujur sangkar tanpa tias 6 cm K225 Pc m2 Rp 100,000.00
542 Paving kotak bujur sangkar tanpa tias 8 cm K225 Pc m2 Rp 100,000.00
543 Paving Tiga Berlian tebal 6 cm K225 Pc m2 Rp 80,000.00
544 Paving Tiga Berlian tebal 6 cm K300 Pc m2 Rp 85,000.00
545 Kanstein kotak (P:50,T:20,La:10,Lb:16 cm K225) bh Rp 40,000.00
546 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) bh Rp 40,000.00
547 Kanstein Jumbo (P:50,L:15,T:30 cm K225) bh Rp 40,000.00
548 Kanstein Segi Lima (P:50,L:15, T:20 cm K225) bh Rp 40,000.00
549 Kanstein Segi Lima (P:40,L:10, T:20 cm K225) bh Rp 40,000.00
550 Kanstein Segi Lima jumbo(P:50,L:15, T:40 cm K225) bh Rp 40,000.00
551 Kanstein kursi ( P:50, L:10, T:40 cm, lb 17,5 cm K225 ) bh Rp 40,000.00
552 Grass Block lobang 8, 36 X 54 cm tebal 9 cm K 225 m2 Rp 30,000.00
553 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2 Rp 25,000.00
554 Tutup got (grill) P. 45, L. 24, T.9cm K350 bh Rp 300,000.00
555 Tutup got (grill) P. 30, L. 24, T.9cm K350 bh Rp 300,000.00
556 Tutup kabel PLN P.20, L.40, T.6cm bh Rp 7,500.00
557 Tutup uskup 8 cm zak Rp 8,500.00
558 Koral Sikat (10 Kg) zak Rp 45,000.00
1 2 3 4
564 Dugul batu hitam 70 x 70 x 250 tempel unit Rp 6,000,000.00
565 Padmasari batu hitam 50 x 50 x 200 tempel unit Rp 5,500,000.00
566 Padmasari batu hitam 65 x 75 x 255 tempel unit Rp 6,500,000.00
567 Padmasari batu hitam 70 x 70 x 250 tempel unit Rp 8,000,000.00
568 Dugul batu hitam 50 x 50 x 200 masive unit Rp 2,500,000.00
569 Dugul batu hitam 60 x 70 x 250 masive unit Rp 4,500,000.00
570 Dugul batu hitam 70 x 70 x 300 masive unit Rp 6,000,000.00
571 Padmasari batu hitam 50 x 50 x 200 masive unit Rp 5,500,000.00
572 Padmasari batu hitam 65 x 75 x 255 masive unit Rp 6,500,000.00
573 Padmasari batu hitam 70 x 70 x 250 masive unit Rp 8,000,000.00
574 Padmasari paras taro 50 x 70 x 250 unit Rp 5,000,000.00
575 Padmasari paras taro 65 x 65 x 250 unit Rp 5,500,000.00
576 Padmasari paras taro 65 x 65 x 250 unit Rp 5,500,000.00
577 Pilar/saka ukir Bali+cahngawang, kayu jati unit Rp 1,500,000.00
578 Lambang ukir Bali komplit, kayu jati m1 Rp 60,000.00
579 Tugeh ukir Bali komplit+patung, kayu jati unit Rp 600,000.00
580 Waton + barba ukir Bali komplit, kayu jati unit Rp 600,000.00
581 Metal Stud 5 cm panjang 3 m ljr Rp 35,000.00
582 Metal Stud 7 cm Panjang 3 m ljr Rp 40,000.00
583 Metal Furing / Runner 5 cm ljr Rp 35,000.00
584 Metal Furing / Runner 7 cm ljr Rp 40,000.00
585 Lapisan Kulit Jeruk m2 Rp 43,000.00
586 Plat Bondex m2 Rp 100,000.00
3
1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
1.2500 btg Dolken Kayu Ø 88 - 10/4m 35,000.00 43,750.00
0.1800 m3 Kayu Meranti 2,500,000.00 450,000.00
0.8500 kg Paku Biasa 2" - 5" 14,000.00 11,900.00
1.1000 kg Besi Strip 8,000.00 8,800.00
35.0000 kg Semen Portland 1,250.00 43,750.00
0.1500 m3 Pasir Pasang 190,000.00 28,500.00
0.1000 m3 Pasir Beton 170,000.00 17,000.00
0.1500 m3 Koral Beton 170,000.00 25,500.00
30.0000 bh Bata Merah 700.00 21,000.00
0.2500 lbr Seng Plat 50,000.00 12,500.00
2.0000 bh Jendela Nako 29,000.00 58,000.00
0.0800 m2 Kaca Polos 100,000.00 8,000.00
0.1500 bh Kunci Tanam 225,000.00 33,750.00
0.0600 lbr Plywood 4 mm 65,000.00 3,900.00
2.0000 oh Tukang Kayu 85,000.00 170,000.00
1.0000 oh Tukang Batu 85,000.00 85,000.00
2.0000 oh Pekerja 60,000.00 120,000.00
0.3000 oh Kepala Tukang 87,500.00 26,250.00
0.0500 oh Mandor 90,000.00 4,500.00
Total : 405,750.00 766,350.00 1,172,100.00
13 10 M2 MENGHAPUS PLESTERAN
0.5000 oh Pekerja 60,000.00 30,000.00
0.0250 oh Mandor 90,000.00 2,250.00
Total : 32,250.00 32,250.00
13a 1 M2 MENGHAPUS PLESTERAN 32,250.00
9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian 19,350.0000
10 1 M2 PLESTERAN 1 PC : 2 KP : 8 PP,TEBAL 15 MM
3.0000 kg Semen Portland 1,150.00 3,450.00
0.0050 M3 Kapur Padam 85,000.00 425.00
0.0200 m3 Pasir Pasang 180,000.00 3,600.00
0.3600 oh Pekerja 60,000.00 21,600.00
0.1200 oh Tukang Batu 85,000.00 10,200.00
0.0120 oh Kepala Tukang 87,500.00 1,050.00
0.0180 oh Mandor 90,000.00 1,620.00
Total : 34,470.00 7,475.00 41,945.00
27 1 M2 PEKERJAAN ACIAN
3.2500 kg Semen Portland 50 Kg 1,150.00 3,737.50
0.2000 oh Pekerja 60,000.00 12,000.00
0.1000 oh Tukang Labur/Cat 80,000.00 8,000.00
0.0100 oh Kepala Tukang 87,500.00 875.00
0.0100 oh Mandor 90,000.00 900.00
Total : 21,775.00 3,737.50 25,512.50
28 1 M2 PEKERJAAN PLESTERAN SEMEN INSTAN
0.4170 zak Semen Instan @40 kg 12,000.00 5,004.00
0.2000 oh Pekerja 60,000.00 12,000.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 4 3 4 5 6
0.1000 oh Tukang Labur/Cat 80,000.00 8,000.00
0.0100 oh Kepala Tukang 87,500.00 875.00
0.0100 oh Mandor 90,000.00 900.00
Total : 21,775.00 5,004.00 26,779.00
29 1 M2 PEKERJAAN ACIAN SEMEN INSTAN
0.0500 zak Semen Instan @25 kg 9,500.00 475.00
0.2000 oh Pekerja 60,000.00 12,000.00
0.1000 oh Tukang Labur/Cat 80,000.00 8,000.00
0.0100 oh Kepala Tukang 87,500.00 875.00
0.0100 oh Mandor 90,000.00 900.00
Total : 21,775.00 475.00 22,250.00
30 1 M1 PEKERJAAN BENANGAN SUDUT
1.6250 kg Semen Portland 1,150.00 1,868.75
0.0200 oh Pekerja 60,000.00 1,200.00
0.0100 oh Tukang Labur/Cat 80,000.00 800.00
0.0010 oh Kepala Tukang 87,500.00 87.50
0.0010 oh Mandor 90,000.00 90.00
Total : 2,177.50 1,868.75 4,046.25
31 1 M' PEKERJAAN OPENING PINTU DAN JENDELA
1.0000 m' Plesteran Semen Instan@40 kg 26,779.00 26,779.00
1.0000 m' Acian Semen Instan@25 kg 22,250.00 22,250.00
0.2000 oh Pekerja 60,000.00 12,000.00
0.0100 oh Tukang Labur/Cat 80,000.00 800.00
0.0010 oh Kepala Tukang 87,500.00 87.50
0.0010 oh Mandor 90,000.00 90.00
Total : 12,977.50 49,029.00 62,006.50
1
MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
1.1000 m3 Kayu bingkirai balok 14,000,000.00 15,400,000.00
1.2500 Kg Paku 10 Cm 14,000.00 17,500.00
1.0000 Kg Lem Kayu 15,000.00 15,000.00
7.0000 oh Pekerja 60,000.00 420,000.00
21.0000 oh Tukang Kayu 85,000.00 1,785,000.00
2.1000 oh Kepala Tukang 87,500.00 183,750.00
0.3500 oh Mandor 90,000.00 31,500.00
Total : 2,420,250.00 15,432,500.00 17,852,750.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU
KELAS II/III
1.2000 m3 Kayu bingkirai balok 14,000,000.00 16,800,000.00
1.2500 Kg Paku 10 Cm 14,000.00 17,500.00
1.0000 Kg Lem Kayu 15,000.00 15,000.00
6.0000 oh Pekerja 60,000.00 360,000.00
18.0000 oh Tukang Kayu 85,000.00 1,530,000.00
1.8000 oh Kepala Tukang 87,500.00 157,500.00
0.3000 oh Mandor 90,000.00 27,000.00
Total : 2,074,500.00 16,832,500.00 18,907,000.00
3
MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II
0.0400 m3 Kayu bingkirai papan 15,000,000.00 600,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00 700.00
0.3500 oh Pekerja 60,000.00 21,000.00
1.0500 oh Tukang Kayu 85,000.00 89,250.00
0.1050 oh Kepala Tukang 87,500.00 9,187.50
0.0180 oh Mandor 90,000.00 1,620.00
Total : 121,057.50 600,700.00 721,757.50
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
UNTUK GUDANG SEMENTARA
0.0400 m3 Kayu bingkirai balok 14,000,000.00 560,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00 700.00
0.3500 oh Pekerja 60,000.00 21,000.00
1.0500 oh Tukang Kayu 85,000.00 89,250.00
0.1050 oh Kepala Tukang 87,500.00 9,187.50
0.0180 oh Mandor 90,000.00 1,620.00
Total : 121,057.50 560,700.00 681,757.50
5
MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II
0.0400 m3 Kayu bingkirai balok 14,000,000.00 560,000.00
0.5000 Kg Lem Kayu 15,000.00 7,500.00
1.0000 oh Pekerja 60,000.00 60,000.00
3.0000 oh Tukang Kayu 85,000.00 255,000.00
0.3000 oh Kepala Tukang 87,500.00 26,250.00
0.0500 oh Mandor 90,000.00 4,500.00
Total : 345,750.00 567,500.00 913,250.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 4 3 4 5 6
5.a MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II +
LAPISAN KULIT JERUK
0.0400 m3 Kayu bingkirai papan 15,000,000.00 600,000.00
1.0000 m2 Lapisan Kulit jeruk 43,000.00 43,000.00
0.5000 Kg Lem Kayu 15,000.00 7,500.00
1.0000 oh Pekerja 60,000.00 60,000.00
3.0000 oh Tukang Kayu 85,000.00 255,000.00
0.3000 oh Kepala Tukang 87,500.00 26,250.00
0.0500 oh Mandor 90,000.00 4,500.00
Total : 345,750.00 650,500.00 996,250.00
6 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA KACA, KAYU KLS
I/II
0.0240 m3 Kayu bingkirai balok 15,000,000.00 360,000.00
1.0000 m2 Kaca Bening 8 mm 212,000.00 212,000.00
0.3000 Kg Lem Kayu 15,000.00 4,500.00
0.8000 oh Pekerja 60,000.00 48,000.00
2.4000 oh Tukang Kayu 85,000.00 204,000.00
0.2400 oh Kepala Tukang 87,500.00 21,000.00
0.0400 oh Mandor 90,000.00 3,600.00
Total : 276,600.00 576,500.00 853,100.00
7
MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
0.0640 m3 Kayu bingkirai papan 15,000,000.00 960,000.00
0.5000 Kg Lem Kayu 15,000.00 7,500.00
1.0000 oh Pekerja 60,000.00 60,000.00
3.0000 oh Tukang Kayu 85,000.00 255,000.00
0.3000 oh Kepala Tukang 87,500.00 26,250.00
0.0500 oh Mandor 90,000.00 4,500.00
Total : 345,750.00 967,500.00 1,313,250.00
8 MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP RANGKA
TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 6,000,000.00 150,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00 420.00
0.5000 Kg Lem Kayu 15,000.00 7,500.00
1.0000 Lbr Plywood 4 mm 65,000.00 65,000.00
1.0000 oh Pekerja 60,000.00 60,000.00
3.0000 oh Tukang Kayu 85,000.00 255,000.00
0.3000 oh Kepala Tukang 87,500.00 26,250.00
0.0500 oh Mandor 90,000.00 4,500.00
Total : 345,750.00 222,920.00 568,670.00
9
MEMBUAT 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 6,000,000.00 153,600.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00 420.00
0.5000 Kg Lem Kayu 15,000.00 7,500.00
1.0000 Lbr Plywood 4 mm 65,000.00 65,000.00
0.8000 oh Pekerja 60,000.00 48,000.00
2.4000 oh Tukang Kayu 85,000.00 204,000.00
0.2400 oh Kepala Tukang 87,500.00 21,000.00
0.0400 oh Mandor 90,000.00 3,600.00
Total : 276,600.00 226,520.00 503,120.00
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II
0.0600 m3 Papan Kayu Kamper 6,000,000.00 360,000.00
0.1500 Kg Paku 1-2,5 Cm 14,000.00 2,100.00
0.6700 oh Pekerja 60,000.00 40,200.00
2.0000 oh Tukang Kayu 85,000.00 170,000.00
0.2000 oh Kepala Tukang 87,500.00 17,500.00
0.3350 oh Mandor 90,000.00 30,150.00
Total : 257,850.00 362,100.00 619,950.00
11
MEMBUAT 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I
0.0256 m3 Papan Kayu Kamper 6,000,000.00 153,600.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00 420.00
0.5000 Kg Lem Kayu 15,000.00 7,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 90,000.00 90,000.00
0.8000 oh Pekerja 60,000.00 48,000.00
2.4000 oh Tukang Kayu 85,000.00 204,000.00
0.2400 oh Kepala Tukang 87,500.00 21,000.00
0.0400 oh Mandor 90,000.00 3,600.00
Total : 276,600.00 251,520.00 528,120.00
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE,
KAYU KELAS II
0.0250 m3 Papan Kayu Kamper 6,000,000.00 150,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00 420.00
0.8000 Kg Lem Kayu 15,000.00 12,000.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 90,000.00 90,000.00
0.5000 Lbr Formika 50,000.00 25,000.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 4 3 4 5 6
0.8000 oh Pekerja 60,000.00 48,000.00
2.4000 oh Tukang Kayu 85,000.00 204,000.00
0.2400 oh Kepala Tukang 87,500.00 21,000.00
0.0400 oh Mandor 90,000.00 3,600.00
Total : 276,600.00 277,420.00 554,020.00
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS
I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper 6,000,000.00 6,600,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00 120,000.00
5.6000 Kg Paku 12 Cm 14,000.00 78,400.00
4.0000 oh Pekerja 60,000.00 240,000.00
12.0000 oh Tukang Kayu 85,000.00 1,020,000.00
1.2000 oh Kepala Tukang 87,500.00 105,000.00
0.2000 oh Mandor 90,000.00 18,000.00
Total : 1,383,000.00 6,798,400.00 8,181,400.00
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
24 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
299.0000 kg Semen Portland 1,150.00 343,850.00
799.0000 kg Pasir Beton 121.43 97,021.43
1,017.0000 kg Koral Beton 125.93 128,066.67
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 611,938.10 744,233.10
4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
326.0000 kg Semen Portland 1,150.00 374,900.00
760.0000 kg Pasir Beton 121.43 92,285.71
1,029.0000 kg Koral Beton 125.93 129,577.78
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 639,763.49 772,058.49
5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
352.0000 kg Semen Portland 1,150.00 404,800.00
731.0000 kg Pasir Beton 121.43 88,764.29
1,031.0000 kg Koral Beton 125.93 129,829.63
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 666,393.92 798,688.92
6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
371.0000 kg Semen Portland 1,150.00 426,650.00
698.0000 kg Pasir Beton 121.43 84,757.14
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 4 3 4 5 6
1,047.0000 kg Koral Beton 125.93 131,844.44
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 686,251.59 818,546.59
7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
384.0000 kg Semen Portland 1,150.00 441,600.00
692.0000 kg Pasir Beton 121.43 84,028.57
1,039.0000 kg Koral Beton 125.93 130,837.04
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 699,465.61 831,760.61
8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
406.0000 kg Semen Portland 1,150.00 466,900.00
684.0000 kg Pasir Beton 121.43 83,057.14
1,026.0000 kg Koral Beton 125.93 129,200.00
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 722,157.14 854,452.14
9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
413.0000 kg Semen Portland 1,150.00 474,950.00
681.0000 kg Pasir Beton 121.43 82,692.86
1,021.0000 kg Koral Beton 125.93 128,570.37
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 729,213.23 861,508.23
10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
439.0000 kg Semen Portland 1,150.00 504,850.00
670.0000 kg Pasir Beton 121.43 81,357.14
1,006.0000 kg Koral Beton 125.93 126,681.48
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 755,888.62 888,183.62
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
448.0000 kg Semen Portland 1,150.00 515,200.00
667.0000 kg Pasir Beton 121.43 80,992.86
1,000.0000 kg Koral Beton 125.93 125,925.93
215.0000 lt Air 200.00 43,000.00
1.6500 oh Pekerja 60,000.00 99,000.00
0.2750 oh Tukang Batu 85,000.00 23,375.00
0.0280 oh Kepala Tukang 87,500.00 2,450.00
0.0830 oh Mandor 90,000.00 7,470.00
Total : 132,295.00 765,118.78 897,413.78
1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 16,000.00 128,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 9,000.00 27,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 2,000.00 4,000.00
15.0000 bj Klem clipsal 20 mm hitam 500.00 7,500.00
3.0000 bj Sock clipsal 20 mm hitam 1,500.00 4,500.00
1.0000 bj Inbow dos plastik clipsal E 157 P 1,000.00 1,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 172,000.00 197,000.00
2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 16,000.00 160,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 9,000.00 27,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 2,000.00 2,000.00
15.0000 bj Klem clipsal 20 mm hitam 500.00 7,500.00
4.0000 bj Sock clipsal 20 mm hitam 1,500.00 6,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 1,000.00 1,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 3,000.00 3,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00
Total : 25,000.00 231,500.00 256,500.00
2 1 Bh. Pasang Saklar/ Stop Kontak
1.0000 bh Saklar tunggal [1 way 1 gang] setara brocco 35,000.00 35,000.00
1.0000 bh Saklar double [1 way 2 gang] setara brocco 40,000.00 40,000.00
1.0000 bh Stop kontak setara brocco 35,000.00 35,000.00
1.0000 bh bok MK 4,000.00 4,000.00
2a Saklar tunggal [1 way 1 gang] setara brocco Total : 35,000.00 35,000.00
2b Saklar double [1 way 2 gang] setara brocco Total : 40,000.00 40,000.00
2c Stop kontak setara brocco Total : - 35,000.00 35,000.00
Hal. 83
NO URAIAN PEKERJAAN HARGA
1 2 3
4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS Rp. 199,340.00
5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS Rp. 198,685.00
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 106,357.50
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 101,450.50
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS Rp. 98,690.00
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 96,957.00
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 96,113.00
11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS Rp. 94,200.00
12 1 M2 PASANGAN BATA RYAN (ABBLE) 1 BATA 140 KG PC Rp. 175,000.00
Hal. 84
NO URAIAN PEKERJAAN HARGA
1 2 3
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 17,852,750.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU KELAS II/III Rp. 18,907,000.00
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 721,757.50
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III UNTUK GUDANG SEMENT Rp. 681,757.50
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II Rp. 913,250.00
6 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA KACA, KAYU KLS I/II Rp. 853,100.00
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II Rp. 1,313,250.00
8 MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP RANGKA TERTUTUP, KAYU KELAS II
(Lebar Sampai 90 Cm) Rp. 568,670.00
9 MEMBUAT 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I/II
Rp. 503,120.00
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II Rp. 619,950.00
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I Rp. 528,120.00
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II
Rp. 554,020.00
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M'
Rp. 8,181,400.00
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 9,714,925.00
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 7,591,800.00
16 PAS 1 M2 RANGKA ATAP USUK RENG GENTENG KERAMIK, KAYU KLS II KAMPER Rp. 160,925.00
17 PAS 1 M2 RANGKA ATAP GENTENG KERAMIK, TANPA USUK,
KAYU KLS II KAMPER Rp. 124,925.00
18 PAS 1 M2 RANGKA ATAP USUK RENG GENTENG BETON, KAYU KLS II KAMPER Rp. 209,525.00
19 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 1,011,790.00
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III Rp. 115,975.00
21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III Rp. 117,875.00
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II Rp. 91,400.00
23 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II Rp. 91,900.00
24 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III Rp. 222,007.50
Hal. 85
NO URAIAN PEKERJAAN HARGA
1 2 3
14 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 162,265.00
15 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 162,265.00
16 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 325,657.50
17 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 304,557.50
18 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 280,157.50
19 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 438,657.50
20 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 353,682.50
21 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 94,307.50
22 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 3,015,150.00
23 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) Rp. 3,712,507.50
24 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) Rp. 6,167,057.50
25 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 4,857,482.50
26 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING Rp. 4,339,012.50
27 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 4,246,750.00
28 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 4,431,407.50
29 1 M1 MEMBUAT KOLOM/PRAKTIS PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 54,200.00
30 1 M1 MEMBUAT RING BALOK BETON BERTULANG (10 X 15 CM) Rp. 76,195.00
Hal. 86
NO URAIAN PEKERJAAN HARGA
1 2 3
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 37,357.50
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 54,841.00
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp. 25,384.50
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 30,520.50
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4" Rp. 38,035.25
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 95,500.00
12a Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " Rp. 235,425.00
12b Floor Drain plastik Rp. 35,425.00
13 MEMASANG 1 M1 PIPA PVC TYPE AW f 6'' Rp. 249,710.25
Hal. 87
NO URAIAN PEKERJAAN HARGA
1 2 3
7 1 M2 PASANGAN PARAS DIUKIR Rp. 205,250.00
8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp. 233,512.50
Hal. 88
DAFTAR ISI
I Pekerjaan Persiapan
II Pekerjaan Tanah
IV Pekerjaan Dinding
V Pekerjaan Plesteran
VI Pekerjaan Kayu
VII Pekerjaan Beton
IX Pekerjaan Langit-langit
X Pekerjaan Sanitasi
XII Pekerjaan Besi dan Aluminium
PEKERJAAN : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
TAHUN : 2017
LOKASI : SD No. 3 Kuta
15 Pek. Lisplank
a. Beton K. 250 11.66 m3 VII.7 831,760.61 9,694,169.89
b. Pembesian wiremesh M6 421.21 kg VII.13a 9,212.25 3,880,307.48
c. Bekisting plat 101.01 m2 VII.20a 140,078.75 14,149,354.54
.
PEKERJAAN PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
TAHUN 2017
LOKASI SD No. 3 Kuta
DOKUMEN RISALAH
PEMBANGUNAN RKB
Jumlah Rp 1,503,757,536.09
PPN 10 % Rp 150,375,753.61
Jumlah Rp 1,654,133,289.70
Dibulatkan Rp 1,654,133,000.00
TERBILANG :
…………,………………..
PT/CV……………………………..
………………………………
………………..
TIME SCHEDULE / JANGKA WAKTU PELAKSANAAN
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA
Tahun : 2017 175.00
7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
H A
2 Pek. Pembuatan Papan Nama Proyek 1.00 unit 0.036 0.036
TE S
II PEKERJAAN TANAH DAN PONDASI RI A
1 Pek. Galian tanah pondasi menerus 76.77 m3 0.229 0.114 0.114
M P
2 Pek. Galian tanah pondasi setempat 104.92 m3 0.356 0.178 0.178
3 Pek. Urugan kembali tanah Pondasi menerus 25.59 m3 0.025 0.013 0.013 A E
4
5
Pek. Urugan kembali tanah Pondasi setempat
Pek. Urugan tanah peninggian lantai
34.97 m3 0.040 0.020 0.020
PE M
178.20 m3 0.781 0.260 0.260 0.260
6 Pek. Urugan pasir di bawah pondasi menerus 3.50 m3 0.039 0.020 0.020
KE E
7
8
Pek. Urugan pasir di bawah pondasi setempat
Pek. Urugan pasir di bawah lantai
2.80 m3
15.38 m3
0.036
0.200
0.018 0.018
0.067 0.067 0.067 RJ L
9 Pek. Pasangan batu kosong batu kali 15.54 m3 0.384 0.192 0.192
AA I
10
11
Pek. Pasangan pondasi batu kali 1 pc : 6 psr
Pek. Pas. Pondasi batako pd panggung
53.35 m3
44.20 m2
2.289
0.217
0.763 0.763
0.108
0.763
0.108 N H
A
III PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 229.25 m2 1.171 0.390 0.390 0.390
R
2 Pek. Plesteran dinding 551.73 m2 1.473 0.491 0.491 0.491 A
3 Pek. Acian dinding + beton 749.42 m2 1.244 0.415 0.415 0.415
A
IV PEKERJAAN BETON N
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.139 0.069 0.069
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.150 0.717 0.717 0.717
7
3 Pek. Pile cup 1.2 x 1.2 m (F1)
a. Beton K.250 19.58 m3 1.169 0.584 0.584
3
b. Begesting Pasangan Batako 65.28 m2 0.320 0.160 0.160 0
c. Pembesian 1,893.12 kg 1.251 0.626 0.626
H
4 Pek. Pile cup 1.0 x 1.0 m (F2) A
a. Beton K.250 2.10 m3 0.125
b. Begesting Pasangan Batako 8.40 m2 0.041 0.021
0.063
0.021
0.063
90 R
c. Pembesian 142.41 kg 0.094 0.047 0.047 I
5 Pek. Sloof I 30/40 (K 250) K
a. Beton K.250
b. Pembesian
26.08 m3 1.167 0.584 0.584 A
4,141.16 kg 2.053 0.684 0.684 0.684
c. Begesting Sloof 173.88 m2 1.012 0.506 0.506 L
6 Pek. Kolom K1 30 x 45 (K 250)
E
a. Beton K.250 17.97 m3 0.993 0.496 0.496 N
b. Pembesian
c. Begesting Kolom
3,720.74 kg
199.65 m2
2.460
1.602
0.820
0.534
0.820
0.534
0.820
0.534
D
E
7 Pek. Kolom K2 30 x 30 (K 250)
a. Beton K.250 4.36 m3 0.241 0.120 0.120
R
b. Pembesian 1,093.43 kg 0.723 0.241 0.241 0.241
c. Begesting Kolom 58.08 m2 0.466 0.155 0.155 0.155
TA
12 Pek. Pelat Lantai
a. Beton K.250 32.80 m3 1.729
N 0.576 0.576 0.576
b. Pembesian Wiremesh M10 1 Layer 2,147.23 kg 1.253 G 0.313 0.313 0.313 0.313
c. Pembesian Wiremesh M10 Tul. Tumpuan
d. Pembesian D10 (overstek penyalur ke bondek)
1,908.65 kg
520.50 kg
1.114
0.681
GA 0.279 0.279
0.227
0.279
0.227
0.279
0.227
e. pek. Plat Floordeck tbl. 0.75 mm 252.32 m2 2.629 L 0.876 0.876 0.876
12
JU
NI
20
17
SP 80
M
K
TA
N
G MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
2 Pek. Pasang lantai keramik antiselip selasar 40 x 40 cm 150.43 m2 1.657 0.552 0.552 0.552
3 Pek. Pasang lantai keramik Km/Wc 20 x 20 cm 7.50 m2 0.079 0.026 0.026 0.026
4 Pek. Pasang dinding keramik Km/Wc 20 x 25 cm 7.50 m2 0.089 0.030 0.030 0.030
5 Pek. Pasang lantai keramik tangga 30 x 40 cm 17.48 m2 0.186 0.062 0.062 0.062
6 Pek. Pasang Plint Tangga 16.20 m1 0.024 0.012 0.012
Y Y
D PEKERJAAN STYLE BALI PADA LANTAI I A A 50
1 Tempelan Batu candi hitam pada kolom 64.48 m2 0.750
ID ID 0.375 0.375
0 0
1 1
7 7
A A 50
ID ID
U U
L L
FI FI
T T MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
BOBOT JUNI RI RI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. URAIAN PEKERJAAN VOLUME SAT KETERANGAN
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
15 s/d 21 Juni 22 s/d 28 Juni 29 s/d 5Juli 6 s/d 12 Juli 13 s/d 19 Juli 20 s/d 26 Juli 27 s/d 2 Ags 3 s/d 9 Ags 10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep 7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt 12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov 2 s/d 8 Nov 9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov 30 s/d 6 des 7 s/d 11 Des
40
30
20
ID ID
U U
L L
FI FI
T T
RI RI MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
BOBOT JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. URAIAN PEKERJAAN VOLUME SAT KETERANGAN
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
2
15 s/d 21 Juni 22 s/d 28 Juni 2
29 s/d 5Juli 6 s/d 12 Juli 13 s/d 19 Juli 20 s/d 26 Juli 27 s/d 2 Ags 3 s/d 9 Ags 10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep 7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt 12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov 2 s/d 8 Nov 9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov 30 s/d 6 des 7 s/d 11 Des
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.172 0.724 0.724 0.724
2 Pek. Plesteran dinding 720.74 m2 2.204 0.735 0.735 0.735
4 Pek. Acian dinding + beton 720.74 m2 1.319 0.440 0.440 0.440
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.595 0.298 0.298
b. Pembesian 1,807.43 kg 1.163 0.388 0.388 0.388
c. Begesting Kolom 125.40 m2 1.058 0.353 0.353 0.353
VI PEKERJAAN PENGECATAN SE
1
2
Pek. Pengecatan dinding dan beton
Pek. Pengecatan Plafond
720.74 m2
400.09 m2
1.145
0.581
0.382
0.194
0.382
0.194
0.382
0.194
RA
3 Pek Polituran Kayu kusen 34.68 m2 0.124 0.062 0.062 H
4
5
Pek. Polituran daun pintu + daun jendela + papan ram
Pek. polituran List plafond kayu 2.5/8
26.59 m2
17.92 m2
0.095
0.064
0.048
0.032
0.048
0.032
TE
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.200 0.100 0.100 RI
VII PEKERJAAN STYLE BALI
M
1 Tempelan Batu Candi hitam pada pintu utama 12.80 m2 0.149 0.074 0.074 A
2 Tempelan Batu candi hitam pada kolom 41.77 m2 0.486 0.162 0.162 0.162
PE
VIII PEKERJAAN SANITAIR/ PLUMBING KE
1 Pipa PVC AW Ø 1/2" 14.25 m1 0.026 0.026
RJ
2 Fiting pipa 1.00 ls 0.000 0.000 AA
B Instalasi pemipaan untuk air kotor (dari kloset)
1 Pipa PVC AW Ø 4" 6.75 m1 0.018 0.009 0.009
N
3 Fiting pipa PVC 4'' 1.00 ls 0.000 0.000
C Instalasi pemipaan untuk air buangan
1 Pipa PVC AW Ø 3" 24.25 m1 0.066 0.033 0.033
2 Fiting pipa PVC 3'' 1.00 ls 0.000 0.000
10
D Pekerjaan alat-alat sanitary
1 Closet Jongkok Ex. TOTO 2.00 bh 0.114 0.114
2 Kran air setara TOTO 2.00 set 0.014 0.014
3 Floor Drain setara TOTO 2.00 bh 0.005 0.005
4 Wastafel setara TOTO komplit 2.00 set 0.153 0.153
E Pekerjaan tangki air
1 Pek. Beton plat tangki air K 250 1.40 m3 0.084 0.042 0.042
2 Pek. Pembesian plat tangki air, wiremesh M7 116.76 kg 0.077 0.039 0.039
3 Pek. Bekesting plat tangki air (2 kali pakai) 14.00 m2 0.306 0.153 0.153
4 Pek. Tangki air komplit 1.00 unit 0.054 0.027 0.027
5 Pek. Mesin pompa air jet pump ex. Grounfos 1.00 unit 0.093 0.047 0.047
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.032 0.016 0.016
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 29.00 ttk 0.410 0.410
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.141 0.141
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.028 0.028
5 Instalasi stop kontak AC 6.00 ttk 0.085 0.085
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.008 0.008
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.014 0.014
8 Stop kontak 10.00 bh 0.025 0.025
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.232 0.232
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.039 0.039
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.144 0.144
12 Exhausfan 2.00 bh 0.028 0.028
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.042 0.042
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.110 0.110
15 Pek. Stop Kontak AC 6.00 bh 0.015 0.015
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.076 0.538 0.538
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.258 0.258
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.108 0.108 0
100.000
RENCANA KEMAJUAN PEKERJAAN % 0.230 - - 3.353 4.147 5.225 3.528 3.261 3.248 2.716 3.209 4.677 6.243 7.499 7.033 5.249 3.964 1.174 1.794 5.170 7.545 7.336 5.188 3.304 4.262 0.646
KONTRAK
RENCANA KOMULATIF KEMAJUAN PEKERJAAN % 0 0.230 0.230 0.230 3.583 7.730 12.954 16.482 19.744 22.992 25.708 28.916 33.594 39.837 47.336 54.368 59.617 63.581 64.756 66.549 71.719 79.264 86.600 91.788 95.092 99.354 100.000
REALISASI KEMAJUAN PEKERJAAN %
REALISASI
REALISASI KOMULATIF KEMAJUAN PEKERJAAN %
DEVIASI %
MENGETAHUI / MENYETUJUI : MENGETAHUI / MENYETUJUI : MENYETUJUI : DIPERIKSA OLEH : Mangupura, 15 Juni 2017
PEJABAT PEMBUAT KOMITMEN / PPK PEJABAT PELAKSANA TEKNIS KEGIATAN / PPTK DIREKSI TEKNIS KONSULTAN PENGAWAS CV. KARYA UNTUNG JAYA
KEPALA BIDANG CIPTA KARYA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. MITRA TRI SAKTI KSO CV. GANESHA TEKNIKA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BADUNG 1. I Made Sujendra
KABUPATEN BADUNG NIP.19601225 200604 1 013
……………..
2. I Made Geria
NIP.19650114 200604 1 004
……………..
3. I Made Gd Bayu Janasuputra I Nyoman Suasana, SE I Wayan Wartana, ST
I Gusti A. Ngr. Arinda Trisnawati, ST Kadek Dwi Lantari, ST Direktur Utama Direktur
4. Kadek Hendra Robiawan , ST ……………..
Pembina Penata Tk. I
NIP.19690524 199803 2 005 NIP.1976116 200604 2 018
……………..
RESCHEDULE
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
No. Amandemen I : 21/AMD.CK/DPUPR/2017, TANGGAL 10 AGUSTUS 2017
Nilai Amandemen : Rp. 1.598.495.086,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA
Tahun : 2017 175.00
7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
N
10 Pek. Balok B2 30/40 (K 250)
a. Beton K.250 9.01 7.06 m3 0.404
DE 0.202 0.202
b. Pembesian 1,710.60 1,374.20 kg 0.871 M 0.290 0.290 0.290
c. Begesting Balok 95.68 74.11 m2 0.580 SP EN
0.193 0.193 0.193 80
JU L
NI 11
20 AG
17 US
TU
S
M KO
K NT
TA RA
N KI
G TA
GA N MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
VOLUME BOBOT JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. URAIAN PEKERJAAN VOLUME
MCO-1
SAT
(%) L 1 2 3 4 5 6 7 8 G9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
KETERANGAN
12 15 s/d 21 Juni 22 s/d 28 Juni 29 s/d 5Juli 6 s/d 12 Juli 13 s/d 19 Juli 20 s/d 26 Juli 27 s/d 2 Ags 3 s/d 9 Ags 10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep
GA 7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt 12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov 2 s/d 8 Nov 9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov 30 s/d 6 des 7 s/d 11 Des
1 Tempelan Batu candi hitam pada kolom 64.48 78.12 m2 0.871 ID ID 0.435 0.435
B
2 Fiting pipa
Instalasi pemipaan untuk air kotor (dari kloset)
1.00 1.00 ls 0.000 T T 0.000 0.000
1 1
7 7
ID ID
U U
L L
FI FI
T T
RI RI MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
VOLUME BOBOT JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. URAIAN PEKERJAAN VOLUME SAT KETERANGAN
MCO-1 (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
2
15 s/d 21 Juni 22 s/d 28 Juni
2
29 s/d 5Juli 6 s/d 12 Juli 13 s/d 19 Juli 20 s/d 26 Juli 27 s/d 2 Ags 3 s/d 9 Ags 10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep 7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt 12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov 2 s/d 8 Nov 9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov 30 s/d 6 des 7 s/d 11 Des
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2
Pek. Pasang bata ringan 367.44 m2 2.124 0.425 0.425 0.425 0.425 0.425
2 Pek. Plesteran dinding 720.74 734.88 m2 2.155 0.539 0.539 0.539 0.539
4 Pek. Acian dinding + beton 720.74 734.88 m2 1.290 0.430 0.430 0.430
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 9.97 11.61 m3 0.665 0.332 0.332
b. Pembesian 1,759.86 2,096.69 kg 1.329 0.443 0.443 0.443
c. Begesting Kolom 122.10 132.00 m2 1.097 0.366 0.366 0.366
VI PEKERJAAN PENGECATAN SE
1
2
Pek. Pengecatan dinding dan beton
Pek. Pengecatan Plafond
720.74
400.09
734.88 m2
376.89 m2
1.119
0.574
0.373
0.191
0.373
0.191
0.373
0.191
RA
3 Pek Polituran Kayu kusen 34.68 34.82 m2 0.120 0.060 0.060 H
4
5
Pek. Polituran daun pintu + daun jendela + papan ram
Pek. polituran List plafond kayu 2.5/8
26.59
17.92
12.19 m2
17.92 m2
0.042
0.062
0.021
0.031
0.021
0.031
TE
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 25.63 m2 0.174 0.087 0.087 RI
VII PEKERJAAN STYLE BALI
M
1 Tempelan Batu Candi hitam pada pintu utama 12.80 23.40 m2 0.261 0.130 0.130 A
2 Tempelan Batu candi hitam pada kolom 41.77 52.73 m2 0.588 0.196 0.196 0.196
PE
VIII PEKERJAAN SANITAIR/ PLUMBING KE
1 Pipa PVC AW Ø 1/2" 14.25 14.25 m1 0.025 0.025
RJ
2 Fiting pipa 1.00 1.00 ls 0.000 0.000 AA
B Instalasi pemipaan untuk air kotor (dari kloset)
1 Pipa PVC AW Ø 4" 6.75 6.75 m1 0.018 0.009 0.009
N
3 Fiting pipa PVC 4'' 1.00 1.00 ls 0.000 0.000
C Instalasi pemipaan untuk air buangan
1 Pipa PVC AW Ø 3" 24.25 24.25 m1 0.063 0.032 0.032
2 Fiting pipa PVC 3'' 1.00 1.00 ls 0.000 0.000
10
D Pekerjaan alat-alat sanitary
1 Closet Jongkok Ex. TOTO 2.00 2.00 bh 0.109 0.109
2 Kran air setara TOTO 2.00 2.00 set 0.013 0.013
3 Floor Drain setara TOTO 2.00 2.00 bh 0.005 0.005
4 Wastafel setara TOTO komplit 2.00 2.00 set 0.147 0.147
E Pekerjaan tangki air
1 Pek. Beton plat tangki air K 250 1.40 1.40 m3 0.080 0.040 0.040
2 Pek. Pembesian plat tangki air, wiremesh M7 116.76 116.76 kg 0.074 0.037 0.037
3 Pek. Bekesting plat tangki air (2 kali pakai) 14.00 14.00 m2 0.293 0.147 0.147
4 Pek. Tangki air komplit 1.00 1.00 unit 0.052 0.026 0.026
5 Pek. Mesin pompa air jet pump ex. Grounfos 1.00 2.00 unit 0.089 0.045 0.045
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 1.00 unit 0.031
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 29.00 29.00 ttk 0.393 0.015 0.015
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 9.00 ttk 0.122 0.393
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 2.00 ttk 0.027 0.122
5 Instalasi stop kontak AC 6.00 6.00 ttk 0.081 0.027
6 Saklar tunggal [1 way 1 gang] 3.00 3.00 bh 0.007 0.081
7 Saklar ganda[1 way 2 gang] 5.00 5.00 bh 0.014 0.007
8 Stop kontak 10.00 9.00 bh 0.022 0.014 0.022
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 18.00 set 0.223 0.223
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 11.00 set 0.038 0.038
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 1.00 unit 0.138 0.138
12 Exhausfan 2.00 2.00 bh 0.027 0.027
13 Pekerjaan Instalasi Proyektor 3.00 3.00 bh 0.041 0.041
14 Pek. Instalasi AC Ex. Daikin 6.00 6.00 bh 0.106 0.106
15 Pek. Stop Kontak AC 6.00 6.00 bh 0.014 0.014
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 6.00 bh 1.032 0.516 0.516
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 120.00 bh 0.248 0.248
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 3.00 bh 0.103 0.103
0
100.000
RENCANA KEMAJUAN PEKERJAAN % 0.445 - - 3.314 4.105 4.998 3.473 4.238 4.320 2.413 2.876 4.444 5.310 5.282 2.851 1.318 1.917 1.999 3.768 7.128 9.257 8.713 7.660 5.276 4.276 0.619
KONTRAK
RENCANA KOMULATIF KEMAJUAN PEKERJAAN % 0 0.445 0.445 0.445 3.759 7.864 12.863 16.335 20.573 24.894 27.307 30.182 34.626 39.936 45.218 48.070 49.387 51.304 53.303 57.071 64.200 73.457 82.169 89.829 95.105 99.381 100.000
REALISA REALISASI KEMAJUAN PEKERJAAN %
SI REALISASI KOMULATIF KEMAJUAN PEKERJAAN %
DEVIASI %
MENGETAHUI / MENYETUJUI : MENGETAHUI / MENYETUJUI : MENYETUJUI : DIPERIKSA OLEH : Mangupura, 11 Agustus 2017
PEJABAT PEMBUAT KOMITMEN / PPK PEJABAT PELAKSANA TEKNIS KEGIATAN / PPTK DIREKSI TEKNIS KONSULTAN PENGAWAS CV. KARYA UNTUNG JAYA
KEPALA BIDANG CIPTA KARYA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. MITRA TRI SAKTI KSO CV. GANESHA TEKNIKA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BADUNG 1. I Made Sujendra
KABUPATEN BADUNG NIP.19601225 200604 1 013
……………..
2. I Made Geria
NIP.19650114 200604 1 004
……………..
3. I Made Gd Bayu Janasuputra I Nyoman Suasana, SE I Wayan Wartana, ST
I Gusti A. Ngr. Arinda Trisnawati, ST Kadek Dwi Lantari, ST Direktur Utama Direktur
4. Kadek Hendra Robiawan , ST ……………..
Pembina Penata Tk. I
NIP.19690524 199803 2 005 NIP.19761116 200604 2 018
……………..
RESCHEDULE
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
No. Amandemen I : 21/AMD.CK/DPUPR/2017, TANGGAL 10 AGUSTUS 2017
Nilai Amandemen : Rp. 1.598.495.086,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksan : CV. KARYA UNTUNG JAYA
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA
Tahun : 2017 175.00
7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
N
11 Pek. Balok B3 20/30 (K 250)
a. Beton K.250 1.130 0.936 1.019 m3 0.057
DE 0.028 0.028
b. Pembesian 322.388 277.007 482.741 kg 0.298 M 0.099 0.099 0.099
c. Begesting Balok 17.584 15.109 16.800 m2 0.128 SP EN
0.043 0.043 0.043
80
M KO
K NT
VOLUME VOLUME BOBOT
TA JUNI JULI RA
AGUSTUS
MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. URAIAN PEKERJAAN VOLUME
MCO-1 MCO-2
SAT
(%) N 1 2 3 4 5 6 7 8
K9 I 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
KETERANGAN
G 15 s/d 21 Juni 22 s/d 28 Juni 29 s/d 5Juli 6 s/d 12 Juli 13 s/d 19 Juli 20 s/d 26 Juli 27 s/d 2 Ags 3 s/d 9 Ags 10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep
TA
7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt 12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov 2 s/d 8 Nov 9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov 30 s/d 6 des 7 s/d 11 Des
15 Pek. Lisplank
17 US
a. Beton K. 250
b. Pembesian wiremesh M6
11.655
421.212
11.601
421.212
9.961 m3
277.889 kg
0.555
0.171
TU 0.086
0.277
0.086
0.277
16 Pek. Kolom praktis 11 x 11 73.000 73.000 75.000 m1 0.272 0.091 0.091 0.091
17 Pek. Sloof praktis 15 x 25 26.700 38.100 38.100 m1 0.194 0.097 20
0.097
18 Pek. Besi Beton Wiremesh BRC Type M6 pada rabat 760.746 265.500 265.500 m2 0.164 0.082 0.082
17
V PEKERJAAN PASANG KERAMIK LANTAI & DINDING
1 Pek. Pasang lantai keramik 40 x 40 cm 169.900 174.040 245.081 m2 2.519 0.504 0.504 0.504 0.504 0.504
2 Pek. Pasang lantai keramik antiselip selasar 40 x 40 cm 150.430 173.180 98.448 m2 1.012 0.337 0.337 0.337
3 Pek. Pasang lantai keramik Km/Wc 20 x 20 cm 7.500 5.717 - m2 -
Pek. Pasang lantai keramik Km/Wc 20 x 40 cm 7.080 m2 0.070 0.023 0.023 0.023
4 Pek. Pasang dinding keramik Km/Wc 20 x 25 cm 7.500 15.552 29.190 m2 0.323 0.108 0.108 0.108
5 Pek. Pasang lantai keramik tangga 30 x 40 cm 17.475 17.475 19.035 m2 0.189 0.063 0.063 0.063
70
6 Pek. Pasang Plint Tangga 16.200 16.200 25.200 m1 0.036 0.018 0.018
A A
D PEKERJAAN STYLE BALI PADA LANTAI I Y Y
1 Tempelan Batu candi hitam pada kolom 64.480 78.120 97.140 m2 1.054
A A 0.527 0.527
RI RI
2 2
0 0
1 1
R R
A A
Y Y
A A
ID ID 50
U U
MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
VOLUME VOLUME BOBOT JUNI L L JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. URAIAN PEKERJAAN VOLUME SAT KETERANGAN
MCO-1 MCO-2 (%) 1
FI
2
15 s/d 21 Juni 22 s/d 28 Juni
FI
3
29 s/d 5Juli
4
6 s/d 12 Juli
5
13 s/d 19 Juli
6
20 s/d 26 Juli
7
27 s/d 2 Ags
8
3 s/d 9 Ags
9 10 11 12 13 14
10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep
15 16 17 18
7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt
19 20
12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov
21
2 s/d 8 Nov
22 23 24
9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov
25
30 s/d 6 des
26
7 s/d 11 Des
T T
3 Fiting pipa PVC Ø 4"
C Instalasi pemipaan untuk air buangan
1.000 1.000 1.000 ls 0.000
RI RI 0.000 0.000
0 0
1 1
7 7
40
30
20
A A
ID ID 50
U U
L L
FI FI
T T MASA PELAKSANAAN 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER
15 s/d 21 Juni 22 s/d 28 Juni 29 s/d 5Juli 6 s/d 12 Juli 13 s/d 19 Juli 20 s/d 26 Juli 27 s/d 2 Ags 3 s/d 9 Ags 10 s/d 16 Ags 17 s/d 23 Ags 24 s/d 30 Ags 31 s/d 6 Sep 7 s/d 13 Sep 14 s/d 20 Sep 21 s/d 27 Sep 28 s/d 4 Okt 5 s/d 11 Okt 12 s/d 18 Okt 19 s/d 25 Okt 26 s/d 1 Nov 2 s/d 8 Nov 9 s/d 15 Nov 16 s/d 22 Nov 23 s/d 29 Nov 30 s/d 6 des 7 s/d 11 Des
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.000 1.000 - unit - 0.000 0.000 0.000
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.000 1.000 1.000 ls 0.100 0.033 0.033 0.033
2 Box Panel MCB 1.000 1.000 1.000 unit 0.030 0.015 0.015
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 30.000 31.000 30.000 ttk 0.396 0.198 0.198
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.000 7.000 7.000 ttk 0.092 0.046 0.046
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.000 3.000 3.000 ttk 0.040 0.020 0.020
6 Instalasi stop kontak AC 1.000 1.000 1.000 bh 0.013 0.007 0.007
7 Saklar tunggal [1 way 1 gang] 5.000 6.000 5.000 bh 0.012 0.006 0.006
8 Saklar ganda[1 way 2 gang] 4.000 4.000 4.000 bh 0.011 0.005 0.005
9 Stop kontak 9.000 7.000 7.000 bh 0.016 0.016
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.000 10.000 10.000 set 0.121 0.121
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.000 21.000 20.000 set 0.067 0.067
12 Exhausfan 3.000 3.000 3.000 bh 0.040 0.040
13 Pek. Instalasi AC Ex. Daikin 1.000 1.000 1.000 titik 0.017 0.017
14 Pek. Stop Kontak AC 1.000 1.000 1.000 unit 0.002 0.002
40
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.000 1.000 1.000 unit 0.234 0.234
16 Pek. Pasangan Selang buangan Ac 1/2" 17.000 17.000 5.000 m1 0.010 0.010
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.372 - - m2 -
Pek. Pasang bata ringan - 367.439 435.299 m2 2.450 0.490 0.490 0.490 0.490 0.490
2 Pek. Plesteran dinding 720.745 734.877 870.597 m2 2.485 0.621 0.621 0.621 0.621
4 Pek. Acian dinding + beton 720.745 734.877 870.597 m2 1.488 0.496 0.496 0.496
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 9.972 11.613 12.073 m3 0.673 0.336 0.336
b. Pembesian 1,759.864 2,096.694 1,982.890 kg 1.224 0.408 0.408 0.408
c. Begesting Kolom 122.100 132.000 136.950 m2 1.108 0.369 0.369 0.369
30
III PEKERJAAN PASANG KERAMIK LANTAI & DINDING
1 Pek. Pasang lantai keramik 40 x 40 cm 161.318 167.966 182.000 m2 1.871 0.624 0.624 0.624
2 Pek. Pasang lantai keramik selasar antiselip 40 x 40 cm 195.500 61.931 65.170 m2 0.670 0.223 0.223 0.223
3 Pek. Pasang lantai keramik Km/Wc 20 x 40 cm 7.400 4.107 4.720 m2 0.046 0.015 0.015 0.015
4 Pek. Pasang dinding keramik 40 x 40 cm 144.000 144.000 108.120 m2 1.196 0.399 0.399 0.399
5 Pek. Pasang dinding keramik Km/Wc 20 x 25 cm 22.050 18.086 19.460 m2 0.215 0.072 0.072 0.072
6 Pek. Pasang border keramik 10 x 40 cm 12.000 12.000 - m1 - 0.000 0.000
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.745 734.877 870.597 m2 1.291 0.430 0.430 0.430
2 Pek. Pengecatan Plafond 400.090 376.893 378.799 m2 0.562 0.187 0.187 0.187
3 Pek Polituran Kayu kusen 34.675 34.820 34.747 m2 0.116 0.058 0.058
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.593 12.193 53.195 m2 0.178 0.089 0.089
5 Pek. polituran List plafond kayu 2.5/8 17.924 17.924 - m2 -
* Pek. pengecatan List plafond sedoline - - 57.021 m2 0.085 0.042 0.042
6 Pek. Waterproofing KM Dan plat lemari tanam 28.275 25.632 10.705 m2 0.071 0.035 0.035
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.000 1.000 1.000 unit 0.030 0.015 0.015
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 29.000 29.000 29.000 ttk 0.383 0.191 0.191
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.000 9.000 15.000 ttk 0.198 0.198
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.000 2.000 2.000 ttk 0.026 0.026
5 Instalasi stop kontak AC 6.000 6.000 6.000 ttk 0.079 0.079
6 Saklar tunggal [1 way 1 gang] 3.000 3.000 3.000 bh 0.007 0.007
7 Saklar ganda[1 way 2 gang] 5.000 5.000 5.000 bh 0.013 0.013
8 Stop kontak 10.000 9.000 10.000 bh 0.023 0.012 0.012
* Stop kontak - - 5.000 bh 0.008 0.004 0.004
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.000 18.000 18.000 set 0.217 0.217
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.000 11.000 11.000 set 0.037 0.037
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.000 1.000 1.000 unit 0.134 0.134
12 Exhausfan 2.000 2.000 2.000 bh 0.026 0.026
13 Pekerjaan Instalasi Proyektor 3.000 3.000 3.000 bh 0.040 0.040
14 Pek. Instalasi AC Ex. Daikin 6.000 6.000 6.000 bh 0.103 0.103
15 Pek. Stop Kontak AC 6.000 6.000 6.000 bh 0.014 0.014
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.000 6.000 6.000 bh 1.005 0.502 0.502
17 Pek. Pasangan Selang buangan Ac 1/2" 120.000 120.000 79.000 bh 0.159 0.159
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.000 3.000 3.000 bh 0.100 0.100
XI PEKERJAAN TAMBAHAN
1 Pek. Jembatan penghubung bangunan baru - - 1.000 ls 1.675 0.558 0.558 0.558
2 Pek. Pasang kanopi jembatan penghubung - - 5.740 m2 0.198 0.066 0.066 0.066
0
100.000
RENCANA KEMAJUAN PEKERJAAN % 0.411 - - 3.119 3.819 4.221 3.314 3.986 4.145 2.878 3.260 4.905 5.247 5.081 2.682 1.173 1.776 1.936 3.760 7.006 8.938 8.345 7.696 6.297 4.777 1.227
KONTRAK
RENCANA KOMULATIF KEMAJUAN PEKERJAAN % 0 0.411 0.411 0.411 3.530 7.348 11.569 14.883 18.870 23.014 25.892 29.152 34.058 39.305 44.385 47.067 48.241 50.017 51.954 55.714 62.720 71.658 80.004 87.700 93.996 98.773 100.000
REALISA REALISASI KEMAJUAN PEKERJAAN %
SI REALISASI KOMULATIF KEMAJUAN PEKERJAAN %
DEVIASI %
MENGETAHUI / MENYETUJUI : MENGETAHUI / MENYETUJUI : MENYETUJUI : DIPERIKSA OLEH : Mangupura, 11 Oktober 2017
PEJABAT PEMBUAT KOMITMEN / PPK PEJABAT PELAKSANA TEKNIS KEGIATAN / PPTK DIREKSI TEKNIS KONSULTAN PENGAWAS CV. KARYA UNTUNG JAYA
KEPALA BIDANG CIPTA KARYA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. MITRA TRI SAKTI KSO CV. GANESHA TEKNIKA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BADUNG 1. I Made Sujendra
KABUPATEN BADUNG NIP.19601225 200604 1 013
……………..
2. I Made Geria
NIP.19650114 200604 1 004
3. I Made Gd Bayu Janasuputra …………….. I Wayan Wartana, ST
I Nyoman Suasana, SE Direktur
I Gusti A. Ngr. Arinda Trisnawati, ST Kadek Dwi Lantari, ST Direktur Utama
Pembina Penata Tk. I 4. Kadek Hendra Robiawan , ST ……………..
NIP.19690524 199803 2 005 NIP.19761116 200604 2 018
……………..
LEMBAR KERJA KOREKSI ARITMATIK (EVALUASI HARGA)
KUANTITAS
SA NO DOKU
NO URAIAN PEKERJAAN TU ANALISA MEN /
AN DITE
TAPKAN
1 2 3 4
PEKERJAAN RUANG KELAS BARU
A PEKERJAAN LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pek. Bowplank dan Pengukuran m1 I.2 38.85
2 Pek. Pembuatan Papan Nama Proyek unit dihit 1.00
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup m3 VII.1 2.80
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai m3 VII.1 43.38
15 Pek. Lisplank
a. Beton K. 250 m3 VII.7 11.66
b. Pembesian wiremesh M6 kg VII.13a 421.21
c. Bekisting plat m2 VII.20a 77.70
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan unit dihit 1.00
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik ls dihit 1.00
2 Box Panel MCB unit dihit 1.00
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 da ttk XVII.1 30.00
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam ko ttk XVII.1 7.00
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit ttk XVII.1 3.00
6 Instalasi stop kontak AC bh XVII.1 1.00
7 Saklar tunggal [1 way 1 gang] bh dihit 5.00
8 Saklar ganda[1 way 2 gang] bh dihit 4.00
9 Stop kontak bh dihit 9.00
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt set dihit 14.00
11 Pek. Pas. Lampu down light PL 14 Watt philips set dihit 18.00
12 Exhausfan bh dihit 3.00
13 Pek. Instalasi AC Ex. Daikin titik XVII.2 1.00
14 Pek. Stop Kontak AC unit dihit 18.00
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand unit dihit 1.00
16 Pek. Pasangan Selang buangan Ac 1/2" m1 dihit 17.00
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako m2 IV.12 360.37
2 Pek. Plesteran dinding m2 V.8 720.74
4 Pek. Acian dinding + beton m2 V.27 720.74
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 m3 VII.7 9.97
b. Pembesian kg VII.13a 1,759.86
c. Begesting Kolom m2 VII.16a 122.10
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton m2 XIV.3 720.74
2 Pek. Pengecatan Plafond m2 XIV.3 366.06
3 Pek Polituran Kayu kusen m2 XIV.7 34.68
4 Pek. Polituran daun pintu + daun jendela + papan ram m2 XIV.7 26.59
5 Pek. polituran List plafond kayu 2.5/8 m2 XIV.7 17.92
6 Pek. Waterproofing KM Dan plat lemari tanam m2 XIV.10 28.28
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB unit dihit 1.00
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 da ttk XVII.1 29.00
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam ko ttk XVII.1 10.00
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit ttk XVII.1 2.00
5 Instalasi stop kontak AC ttk XVII.1 6.00
6 Saklar tunggal [1 way 1 gang] bh dihit 3.00
7 Saklar ganda[1 way 2 gang] bh dihit 5.00
8 Stop kontak bh dihit 10.00
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka set dihit 18.00
10 Pek. Pas. Lampu down light PL 14 Watt philips set dihit 11.00
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) unit dihit 1.00
12 Exhausfan bh dihit 2.00
13 Pekerjaan Instalasi Proyektor bh XVII.1 3.00
14 Pek. Instalasi AC Ex. Daikin bh XVII.2 6.00
15 Pek. Stop Kontak AC bh dihit 6.00
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand bh dihit 6.00
17 Pek. Pasangan Selang buangan Ac 1/2" m1 dihit 120.00
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm bh dihit 3.00
REKAPITULASI :
PEMBANGUNAN RKB
PEKERJAAN LANTAI 1
PEKERJAAN LANTAI 2
ER, UKS DAN PENATAAN HALAMAN SD NO. 3 KUTA
892,226,117.41 820,822,406.11
579,379,683.12 572,797,542.89
360.37 227,763.00 84,010.00 30,274,872.72 30,274,872.72 KLARIF (-) 2.172
720.74 47,554.72 42,606.90 30,708,688.84 30,708,688.84 MS 2.204
720.74 27,336.88 25,512.50 18,387,994.06 18,387,994.06 MS 1.319
79,371,555.62 79,371,555.62
1,532,981,943.00
Pekerjaan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Tahun : 2017
Lokasi : SD No. 3 KUTA
1 2 4 5
6 Pek. Urugan pasir di bawah pondasi menerus 77.70 x 0.90 x 0.05 = 3.50 4.76 m3
7.96 x 0.50 x 0.05 = 0.20
12.90 x 1.65 x 0.05 = 1.06 +
4.76 m3
7 Pek. Urugan pasir di bawah pilecup 1.20 x 1.20 x 0.05 x 34.00 = 2.45 2.80 m3
1.00 x 1.00 x 0.05 x 7.00 = 0.35 +
2.80 m3
8 Pek. Urugan pasir di bawah lantai 30.00 x 8.85 x 0.05 = 13.28 15.38 m3
peninggian panggung 7.00 x 6.00 x 0.05 = 2.10 +
15.38 m3
9 Pek. Pasangan batu kosong batu kali 77.70 x 1.00 x 0.20 = 15.54 16.14 m3
7.96 x 0.50 x 0.15 = 0.60 +
16.14 m3
10 Pek. Pasangan pondasi batu kali 1 : 6 77.70 x 0.55 x 1.00 = 42.74 54.92 m3
7.96 x 0.28 x 1.00 = 2.19
tangga 9.30 x 1.08 x 1.00 = 10.00 +
54.92 m3
11 Pek. Pas. Pondasi Batako pd. Panggung 1.70 x 25.68 x 1.00 = 43.66 m2 43.66 m2
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3
F1 34.00 x 1.20 x 1.20 x 0.05 = 2.45
F2 7.00 x 1.00 x 1.00 x 0.05 = 0.35 +
2.80 m3
1 2 4 5
12 Pek. Lisplank
a. Beton K.250 60.00 x 17.70 x 0.15 = 11.66 m3 11.60 m3
dikurangi besi 11.66 - 0.05 = 11.60 m3
1 2 4 5
16 Pek. Besi Beton Wiremesh BRC Type M6 30.00 x 8.85 x 1.00 = 265.50 265.50 kg
V PEKERJAAN PASANG KERAMIK LANTAI & DINDING
1 Pek. Pasang lantai keramik 40 x 40 cm 174.04 m2
r. aula terbuka & panggung 18.00 x 7.00 = 126.00
r. uks 5.39 x 3.35 = 18.06
1.36 x 1.16 = 1.58
r. pramuka 6.53 x 4.35 = 28.41 +
174.04 m2
3 Pek. Pasang lantai keramik Km/ Wc 20 x 40 cm 3.00 x 1.85 x 1.03 = 5.72 5.72 m2
5.72 m2
4 Pek. Pasang dinding keramik Km/ Wc 20 x 25 cm 3.00 x 1.85 x 1.80 = 9.99 15.55 m2
3.00 x 1.03 x 1.80 = 5.56
15.55 m2
4 Pek. Pasang daun pintu shaft kayu Kamper 1.00 x 1.12 x 0.65 = 0.73 m2 0.73 m2
8 Pek. Pasang kunci pintu KM/WC 4.00 x 1.00 = 4.00 set 4.00 set
9 Pek. Pasang kunci pintu Utama Komplite 5.00 x 1.00 = 5.00 5.00 set
16 Pas. Kaca Cermin atas wastafel 0.80 x 2.00 x 2.00 = 3.20 m2 3.20 m2
NO URAIAN PEKERJAAN VOLUME SAT
1 2 4 5
VII PEKERJAAN ATAP & PLAFOND
1 Pek. Pasang plafond Gypsum 9 mm + Rangka hollow 308.50 m2
r. aula terbuka 125.10 x 1.00 = 125.10
r. teras 55.50 x 1.00 = 55.50
r. wastavel 28.00 x 1.00 = 28.00
toilet/wc 2.50 x 3.00 = 7.50
toilet ruang guru 1.25 x 1.30 = 1.63
r. uks 24.50 x 1.00 = 24.50
r. pramuka 31.50 x 1.00 = 31.50
selasar luar 52.30 x 0.67 = 34.78 +
308.50 m2
1 2 4 5
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 unit
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 31.00 titik
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 titik
1 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 titik
Instalasi stop kontak AC 1.00 titik
5 Saklar tunggal [1 way 1 gang] 6.00 bh
8 Pek. Pas. Lampu TMS 2 x 18 Watt + kap lampu setara saka 10.00 bh
10 Exhausfan 3.00 bh
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 22.00 x 4.00 x 0.30 x 0.45 = 11.88 m3 11.61 m3
dikurangi besi 11.88 - 0.27 = 11.61 m3
3 Pek. Pasang lantai keramik Km/Wc 20 x 40 cm 2.00 x 1.85 x 1.11 = 4.11 m2 4.11 m2
1 2 4 5
5 Pek. Pasang dinding keramik Km/Wc 20 x 25 cm 4.81 x 1.80 x 2.00 = 17.32 18.09 m2
0.44 x 1.75 x 1.00 = 0.77 +
18.09 m2
6 Pek. Pasang border keramik 10 x 40 cm 32.00 x 0.10 x 2.00 = 6.40 12.00 m'
30.00 x 0.10 x 1.00 = 3.00
depan 26.00 x 0.10 x 1.00 = 2.60 +
12.00 m1
3 Pek. Pasang daun pintu shaft kayuKamper 1.00 x 1.12 x 0.65 = 0.73 m2 0.73 m2
8 Pek. Pas. List Kayu Kamper 2/12 1.00 x 3.00 x 1.00 x 7.80 = 23.40 m' 23.40 m'
9 Pek. Pasang kunci pintu KM/WC 2.00 x 1.00 = 2.00 set 2.00 set
17 Pas. Kaca Cermin atas wastafel 0.80 x 2.00 x 2.00 = 3.20 m2 3.20 m2
2 Pek. Pasang atap genteng karang pilang 12.25 x 33.40 = 409.15 : 0.77 = 534.55 m2 534.55 m2
3 Pek. Pasang bubungan genteng karang pilang 21.15 + 8.81 x 4.00 = 56.39 m1 56.39 m1
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 734.88 m2
1 2 4 5
4 Pek. Polituran daun pintu + daun jendela + papan ram 12.19 m2
5 Pek. polituran List plafond kayu 2.5/8 170.70 x 0.11 = 17.92 m2 17.92 m2
6 Pek. Waterproofing KM Dan Plat Lemari Tanam 2.00 x 5.76 x 1.80 = 20.74 m2 20.74
3.00 x 2.50 x 0.65 = 4.90 m2 4.90
25.63 m2
VII PEKERJAAN STYLE BALI
1 Tempelan Batu Candi hitam pada Pintu Utama 11.40 - 3.60 x 3.00 = 23.40 m2 23.40 m2
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 29.00 titik
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 9.00 titik
4 Instalasi exhause fan 2.00 titik
5 Instalasi stop kontak AC 6.00 titik
6 Saklar tunggal [1 way 1 gang] 3.00 bh
7 Saklar ganda[1 way 2 gang] 5.00 bh
8 Stop kontak 9.00 bh
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 bh
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 bh
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 bh
12 Pek. Exhausfan 2.00 bh
13 Pekerjaan Instalasi Proyektor 3.00 bh
14 Pek. Instalasi AC Ex. Daikin 6.00 titik
15 Pek. Stop Kontak AC 6.00 unit
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 unit
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 m1
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh
PERHITUNGAN BESI
Pekerjaan : Pembangunan RKB, Lab Komputer, Ruang UKS dan Penataan Halaman SD No. 3 Kuta
Tahun : 2017
Lokasi : SD No. 3 Kuta
65.80 m'
Pek. Sloof praktis 15 x 25
14.05 m'
14.05 m'
RKB LANTAI 2
2. I Made Geria
NIP.19650114200604 1 004
……………..
……………..
NAMA KEGIATAN : PEMBANGUNAN RKB, LAB KOMPUTER, UKS DAN PENATAAN HALAMAN SD NO. 3 KUTA
TAHUN : 2017
LOKASI : SD No. 3 Kuta
NILAI KONTRAK : Rp1,532,981,943.00
NO. KONTRAK : 163/KNT.DPUPR.TB/2017
NO. SPMK : 214/SPMK.CK/DPUPR.TB/2017
KONTRAKTOR : CV. KARYA UNTUNG JAYA
KONSULTAN PENGAWAS : PT. MITRA TRI SAKTI KSO CV. GANESHA TEKNIKA
NB : *) Harga Timpang
2. I Made Geria
NIP.19650114200604 1 004
I Gusti A. Ngr. Arinda Trisnawati, ST Kadek Dwi Lantari, ST I Nyoman Suasana, SE I Wayan Wartana, ST
Pembina Penata Tk. I 3. I Made Gd Bayu Janasuputra Direktur Utama Direktur
NIP.19690524 199803 2 005 NIP.19761116 200604 2 018
Pek. Batako
LANTAI 2
Pek. Pasang kusen 5/14 kayuKamper VI.1 1.01 m3 9,052,750.00 9,155,589.24
Pek. Pasang daun pintu Kamper VI.5 8.45 m2 593,250.00 5,015,691.45
Pek. Pasang daun jendela kaca 8 mm VI.6 0.73 m2 637,100.00 463,808.80
Pek. Pasang daun pintu shaft kayu Kamper VI.5 3.00 m2 593,250.00 1,779,750.00
Pekerjaan Daun Pintu Kamper Lapis Kulit Jeruk VI.5a 3.01 m2 636,250.00 1,915,112.50
37,449,124.64
Total Harga Rp37,449,124.64
LANTAI 2
Pek. Pasang kusen 5/14 kayu Bangkirai VI.1 1.01 m3 18,952,750.00 19,168,053.24
Pek. Pasang daun pintu Bangkirai VI.5 8.45 m2 913,250.00 7,721,163.45
Pek. Pasang daun jendela kaca 8 mm VI.6 0.73 m2 829,100.00 603,584.80
Pek. Pasang daun pintu shaft kayu Bangkirai VI.5 3.00 m2 913,250.00 2,739,750.00
Pekerjaan Daun Pintu Bangkirai Lapis Kulit Jeruk VI.5a 3.01 m2 956,250.00 2,878,312.50
64,940,210.24
Total Harga Rp64,940,210.24
PEKERJAAN JEMBATAN
1 1 LS PASANG JEMBATAN PENGHUBUNG
1.00 ls Jembatan pipa galvanis 25,000,000.00 25,000,000.00
Total : 25,000,000.00 25,000,000.00
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 1
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :15 s/d 21 Juni
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 2
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :22 s/d 28 Juni
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 3
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal : 29 s/d 5Juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 4
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :6 s/d 12 Juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14 0.06 0.06 40% 0.055
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15 0.54 0.54 25% 0.538
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Bulan : 1
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :15 s/d 12 juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D BULA BULAN S/D BULA Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14 0.06 0.06 40% 0.055
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15 0.54 0.54 25% 0.538
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
MENGETAHUI / MENYETUJUI :
PEJABAT PEMBUAT KOMITMEN / PPK
KEPALA BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BADUNG
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 5
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :13 s/d 19 Juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14 0.06 0.06 0.11 80% 0.111
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15 0.54 1.29 1.83 85% 1.828
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 6
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :20 s/d 26 Juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 7
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal : 29 s/d 5Juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Minggu : 8
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :6 s/d 12 Juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D MING MINGGU S/D MING Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14 0.06 0.06 40% 0.055
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15 0.54 0.54 25% 0.538
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
Kegiatan : PEMBANGUNAN RKB, LAB KOMPUTER, RUANG UKS, DAN PENATAAN HALAMAN SD NO. 3 KUTA
Lokasi : SD No. 3 Kuta
No. Kontrak : 163/KNT.DPUPR.TB/2017
No. SPMK : 214/SPMK.CK/DPUPR.TB/2017
Nilai Kontrak : Rp 1.532.981.943,00
Waktu Pelaksanaan : 180 hari kalender ( 15 Juni s/d 11 Desember 2017 )
Kontraktor Pelaksana : CV. KARYA UNTUNG JAYA Bulan : 2
Konsultan Pengawas : PT. MITRA TRISAKTI KSO CV. GANESHA TEKNIKA Tanggal :15 s/d 12 juli
Progres
Progres
VOLUME PEKERJAAN Thd.
Thd Tiap
Seluruh
NO. URAIAN PEKERJAAN VOLUME SAT BOBOT (%)S/D BULA BULAN S/D BULA Bagian Pekerjaan
LALU INI INI Pekerjaan
%
1 2 3 4 5 6 7 8 (%)
9
IV PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada Pile Cup 2.80 m3 0.14 0.06 0.06 40% 0.055
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 43.38 m3 2.15 0.54 0.54 25% 0.538
E Pekerjaan Lain-lain
1 Pekerjaan Septictank + peresapan 1.00 unit 0.18
XI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 1.00 ls 0.11
2 Box Panel MCB 1.00 unit 0.03
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 30.00 ttk 0.42
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 7.00 ttk 0.10
5 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 3.00 ttk 0.04
6 Instalasi stop kontak AC 1.00 bh 0.01
7 Saklar tunggal [1 way 1 gang] 5.00 bh 0.01
8 Saklar ganda[1 way 2 gang] 4.00 bh 0.01
9 Stop kontak 9.00 bh 0.02
10 Pek. Pas. TMS 012 118 Batten 2x TLD 18 Watt 14.00 set 0.18
11 Pek. Pas. Lampu down light PL 14 Watt philips 18.00 set 0.06
12 Exhausfan 3.00 bh 0.04
13 Pek. Instalasi AC Ex. Daikin 1.00 titik 0.02
14 Pek. Stop Kontak AC 1.00 unit 0.05
15 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 1.00 unit 0.25
16 Pek. Pasangan Selang buangan Ac 1/2" 17.00 m1 0.04
B PEKERJAAN LANTAI 2
I PEKERJAAN DINDING & PLESTERAN
1 Pek. Pasang batako 360.37 m2 2.17
2 Pek. Plesteran dinding 720.74 m2 2.20
4 Pek. Acian dinding + beton 720.74 m2 1.32
II PEKERJAAN BETON
1 Pek. Kolom K3 30 x 45 (K 250)
a. Beton K.250 10.24 m3 0.60
b. Pembesian 1,807.43 kg 1.16
c. Begesting Kolom 125.40 m2 1.06
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton 720.74 m2 1.14
2 Pek. Pengecatan Plafond 400.09 m2 0.58
3 Pek Polituran Kayu kusen 34.68 m2 0.12
4 Pek. Polituran daun pintu + daun jendela + papan ram 26.59 m2 0.10
5 Pek. polituran List plafond kayu 2.5/8 17.92 m2 0.06
6 Pek. Waterproofing KM Dan plat lemari tanam 28.28 m2 0.20
IX PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit 0.03
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kon 29.00 ttk 0.41
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 10.00 ttk 0.14
4 Instalasi exhausfan kabel NYM 3 x 2,5 mm dalam konduit 2.00 ttk 0.03
5 Instalasi stop kontak AC 6.00 ttk 0.08
6 Saklar tunggal [1 way 1 gang] 3.00 bh 0.01
7 Saklar ganda[1 way 2 gang] 5.00 bh 0.01
8 Stop kontak 10.00 bh 0.03
9 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 set 0.23
10 Pek. Pas. Lampu down light PL 14 Watt philips 11.00 set 0.04
11 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 unit 0.14
12 Exhausfan 2.00 bh 0.03
13 Pekerjaan Instalasi Proyektor 3.00 bh 0.04
14 Pek. Instalasi AC Ex. Daikin 6.00 bh 0.11
15 Pek. Stop Kontak AC 6.00 bh 0.02
16 Pek. Pasangan AC Ex. Daikin 1,5 PK Standart Thailand 6.00 bh 1.08
17 Pek. Pasangan Selang buangan Ac 1/2" 120.00 bh 0.26
X PEKERJAAN LAIN-LAIN
1 Papan Tulis White Board 120X240cm 3.00 bh 0.11
MENGETAHUI / MENYETUJUI :
PEJABAT PEMBUAT KOMITMEN / PPK
KEPALA BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BADUNG
### : #REF!
### : #REF!
### : #REF!
D #REF! #REF!
### #REF!
#REF! #REF! #REF! ### II.1 47,250.00 #REF!
#REF! #REF! #REF! ### II.2 58,050.00 #REF!
#REF! #REF! #REF! ### II.9 15,750.00 #REF!
#REF! #REF! #REF! ### II.9 19,350.00 #REF!
#REF! #REF! #REF! ### II.14 148,500.00 #REF!
#REF! #REF! #REF! ### II.11 180,900.00 #REF!
#REF! #REF! #REF! ### II.11 180,900.00 #REF!
#REF! #REF! #REF! ### III.8 352,792.50 #REF!
#REF! #REF! #REF! ### IV.5 198,685.00 #REF!
### #REF!
#REF! #REF! #REF! ### XIII.9a - #REF!
### #REF!
#REF! #REF!
#REF! #REF! ### VI.1 17,852,750.00 #REF!
#REF! #REF! ### VI.5 913,250.00 #REF!
#REF! #REF! ### XII.1 269,425.00 #REF!
#REF! #REF! ### XII.2 65,034.50 #REF!
#REF! #REF!
#REF! #REF! ### VI.1 17,852,750.00 #REF!
### #REF!
#REF! #REF! #REF! ### IX.6a - #REF!
#REF! #REF! #REF! ### DIHIT 20,000.00 #REF!
#REF! #REF! #REF! ### VIII.6 - #REF!
#REF! #REF! #REF! ### VIII.7 - #REF!
#REF! #REF! #REF! ### DIHIT 3,500,000.00 #REF!
#REF! #REF! #REF! ### DIHIT 2,500,000.00 #REF!
#REF! #REF! #REF! ### IX.3a - #REF!
#REF! #REF! #REF! ### VI.23 91,900.00 #REF!
#REF! #REF! #REF! ### VI.23 91,900.00 #REF!
#REF! #REF! #REF! ### VI.23 91,900.00 #REF!
#REF! #REF! #REF! ### VI.23 91,900.00 #REF!
#REF! #REF! #REF! ### IX.4a - #REF!
### #REF!
#REF! #REF! #REF! ### XIV.3 - #REF!
#REF! #REF! #REF! ### XIV.3 - #REF!
#REF! #REF! #REF! ### XIV.7 - #REF!
#REF! #REF! #REF! ### XIV.3 - #REF!
#REF! #REF! #REF! ### XIV.7 - #REF!
#REF! #REF! #REF! ### XIV.7 - #REF!
#REF! #REF! #REF! ### XIV.7 - #REF!
#REF! #REF! #REF! ### XIV.7 - #REF!
### #REF!
#REF! #REF! #REF! ### DIHIT 50,000.00 #REF!
DAFTAR HARGA SATUAN BAHAN DAN UPAH
BULAN MEI 2016
A. Harga Satuan Bahan
SATUA
NO NAMA BARANG HARGA SATUAN
N
1 2 3 4
FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kanzai kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex@ 25 KG kg
13 Cat tembok Vinippaint kg
14 Dempul sanpolac ltr
15 Kuas star 4" bh
16 Mill zak
17 Minyak cat ltr
18 Plamir kayu@20 KG kg
19 Plamir tembok@20 KG kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr
PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
1 2 3 4
35 Atap metal Toratora 3 x 4 Extra m2
36 Atap metal Toratora 3 x 4 Premium m2
37 Atap metal Toratora 4 x 4 Extra m2
38 Atap metal Toratora 4 x 4 Premium m2
39 Bentala paras 70 cm bh
40 Bentala tanah liat 70 cm bh
41 Besi profil WF P.6m kg
42 Besi profil WF P.12m kg
43 Bubungan Biasa bj
44 Bubungan Karang Pilang (glazur) isi 3,5/m bj
45 Bubungan Karang Pilang isi 3,5/m bj
46 Bubungan Ngalayur isi 3,5/m bj
47 Bubungan Plentong bj
48 Bubungan Utama isi 3,5/m bj
49 Genteng Kanmuri (glazur) isi 14/m2 bj
50 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
51 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
52 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
53 Genteng Flat (Good Year) isi 20/m2 bj
54 Genteng Beton JS bj
55 Genteng Beton BBC bj
56 Genteng Morando Abadi isi 18/m2 bj
57 Genteng Morando Jatiwangi isi 18/m2 bj
58 Genteng Morando Ngalayur isi 20/m2 bj
59 Genteng Plentong bj
60 Genteng plentong dicat bj
61 Genteng Plentong Jatiwangi isi 24/m2 bj
62 Ijuk kg
63 Ikut celedu paras 80 cm bh
64 Ikut celedu tanah liat 80 cm bh
65 Murda paras 30 cm bh
66 Murda tanah liat 30 cm bh
67 Seng BJLS 0,20 gelombang lbr
68 Seng BJLS 0,25 gelombang lbr
69 Seng BJLS 0,28 gelombang lbr
70 Seng BJLS 0,32 gelombang lbr
71 Seng Plat 3" x 6" BJLS 28 lbr
72 Sirap Jati bh
73 Tali Ijuk kg
74 Tali pengikat alang-alang ikat
1 2 3 4
PENGGANTUNG DAN KACA
75 Engsel kupu-kupu ps
76 Engsel nylon ps
77 Espagnoleth set
78 Grendel biasa bh
79 Grendel hararo bh
80 Kaca 3 mm bening m2
81 Kaca 5 mm bening m2
82 Kaca 6 mm bening m2
83 Kaca 8 mm bening m2
84 Kaca 10 mm bening m2
85 Kaca 12 mm bening m2
85 Kaca 19 mm bening m2
86 Kaca Es/Kapur 3 mm m2
87 Kaca Es/Kapur 5 mm m2
88 Kaca nako daun
89 Kaca nako teralis bening m2
90 Kaca ryben 3 mm m2
91 Kaca ryben 5 mm m2
92 Laminated Glass Clear 3+0,38+10 m2
93 Laminated Glass Clear 4+0,38+10 m2
94 Laminated Glass Clear 5+0,38+10 m2
95 Laminated Glass Clear 6+0,38+10 m2
96 Laminated Glass Clear 8+0,38+10 m2
97 Laminated Glass Clear 10+0,38+10 m2
98 Laminated Glass Tempered 3+0,38+3 m2
99 Laminated Glass Tempered 4+0,38+4 m2
100 Laminated Glass Tempered 5+0,38+5 m2
101 Laminated Glass Tempered 6+0,38+6 m2
102 Laminated Glass Tempered 8+0,38+8 m2
103 Laminated Glass Tempered 10+0,38+10 m2
104 Prosted Glass/kaca es 3 mm m2
105 Prosted Glass/kaca es 5 mm m2
106 Tempered Glass 5 mm m2
107 Tempered Glass 6 mm m2
106 Tempered Glass 8 mm m2
107 Tempered Glass 10 mm m2
108 Tempered Glass 12 mm m2
109 Tempered Glass 15 mm m2
110 Tempered Glass 19 mm m2
111 Ice Glass 3 mm/kaca es m2
1 2 3 4
112 Ice Glass 5 mm/kaca es m2
113 Mirror Glass 3 mm m2
114 Mirror Glass 5 mm m2
115 Kait angin biasa bh
116 Kunci pintu TOP bh
117 Kunci pintu Union bh
118 Kunci pintu Vanesa bh
119 Kunci pintu Yale bh
120 Kunci pintu YURI bh
121 Kunci slot bh
122 Kunci tanam 2 slag bh
1 2 3 4
151 Kayu merbau balok m3
152 Kayu merbau papan m3
153 Kayu profil usuk m1
154 Kayu seseh balok m3
155 Kayu seseh dolken m3
156 Lem Aibond kg
157 Lem Kayu ltr
158 List Gypsum standar m'
159 Minyak bekisting ltr
160 Multiplek 12 mm lbr
161 Multiplek 18 mm lbr
162 Multiplek 6 mm lbr
163 Multiplek 9 mm lbr
164 Plywood 12 mm lbr
165 Plywood 3 mm lbr
166 Plywood 4 mm lbr
167 Plywood 6 mm lbr
168 Plywood 9 mm lbr
169 Plywood aluminium lbr
170 Teak wood (0,9x2,20) m2 lbr
171 Teak wood (1,20x2,40) m2 lbr
KERAMIK
STEP NOSING
172 Cutting Ukuran 10×60 bh
173 Bolnus Ukuran 10x60 bh
174 Step Nosing Polos Ukuran 10x60 bh
175 Step Nosing + Warna Ukuran 10x60 bh
176 Step Nosing Ukuran 30x60 bh
177 Step Nosing + Warna Ukuran 10x40 bh
IKAD
178 Ikad (Keramik) Kw. I 10 x 20 cm m2
179 Ikad (Keramik) Kw. I 20 x 20 cm m2
180 Ikad (Keramik) Kw. I 20 x 30 cm m2
181 Ikad (Keramik) Kw. I 30 x 30 cm m2
182 Ikad (Keramik) Kw. I 40 x 40 cm m2
183 Ikad (Keramik) Kw. II 10 x 20 cm m2
184 Ikad (Keramik) Kw. II 20 x 20 cm m2
185 Ikad (Keramik) Kw. II 20 x 30 cm m2
186 Ikad (Keramik) Kw. II 30 x 30 cm m2
1 2 3 4
187 Ikad (Keramik) Kw. II 40 x 40 cm m2
INESA
188 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
189 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
190 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
191 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
192 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
193 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2
194 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2
195 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
196 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
197 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
198 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2
ESSENZA
199 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
200 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
201 Keramik 30 x 30 Kelas I (Pepper G Price Rubert Silver star, P) m2
202 Keramik 30 x 30 Kelas I (Pepper G Price Rubert Silver star,UP) m2
203 Keramik 40 x 40 Kelas I (Pepper G Price Rubert Silver star, P) m2
204 Keramik 40 x 40 Kelas I (Pepper G Price Rubert Silver star,UP) m2
205 Keramik 60 x 60 Kelas I (Pepper G Price Rubert Silver star, P) m2
206 Keramik Kelas I Domus m2
207 Keramik Kelas I Granity Imperiali m2
208 Keramik Kelas I Lavagna m2
209 Keramik Kelas I Mountain Peak m2
210 Granit 30 x 60 magnetite rock m2
211 Granit 60 x 60 magnetite rock m2
212 Granit 60 x 60 pepper grey polished m2
213 Granit 60 x 60 coral bell polished m2
214 Granit 60 x 60 ivory polished m2
215 Granit 60 x 60 unica gold polished m2
216 Granit 60 x 60 alexandra polished m2
217 Granit 60 x 60 elit unpolished m2
218 Granit 60 x 60 absolute black unpolished m2
219 Granit 60 x 60 cosmo white unpolished m2
220 Granit 60 x 60 cotton brown unpolished m2
ROMAN
221 Keramik 20 x 20 tekstur kasar m2
1 2 3 4
222 Keramik 25 x 33 kelas I m2
223 Keramik 25 x 45 motif halus kelas I m2
224 Keramik 30 x 30 standard m2
225 Keramik 30 x 30 kelas I T. 1cm m2
226 Keramik 20 x 60 kelas I T. 1cm m2
227 Keramik 20 x 40 kelas I Motif standard m2
228 Keramik 30 x 60 kelas I Motif Dasar Muda m2
229 Keramik 40 x 40 kelas I krem m2
230 Keramik 40 x 40 kelas I white m2
231 Keramik 50 x 50 kelas I warna muda m2
PLATINUM
232 Keramik 25 x 33 kelas I m2
233 Keramik 25 x 40 kelas I m2
234 Keramik 30 x 60 kelas II bulgari m2
235 Keramik 40 x 40 kelas I brown m2
236 Keramik 20 x 50 kelas I m2
237 Keramik 25 x 40 kelas II m2
238 Keramik 40 x 40 kelas II cream m3
SINCERE
239 Granit natural marble wht L.60 m2
240 Granit popular wht L.60 m2
241 Granit micro diamond wht L. 60 m2
242 Granit micro diamond blk L. 60 m2
243 Granit poly cristal cream L. 60 m2
GRANITO
244 Granito Castello Tera 60 x 60 m2
245 Granito Monalisa TD6602 60 x 60 m2
246 Granito Monalisa TD6602 80 x 80 m2
247 Granito Niro FR660IY 60 x 60 m2
248 Granito Essenza Grey 60 x 60 m2
249 Granito Indogress Cristallo 80 x 80 m2
250 Granito salsa ivary 40 x 40 polished m2
251 Granito salsa ivary 40 x 40 unpolished m2
252 Granito salsa ivary 60 x 60 polished m2
253 Granito salsa ivary 60 x 60 unpolished m2
254 Granito salsa ivary 80 x 80 polished m2
255 Granito salsa ivary 30 x 60 polished m2
256 Granito palazzo monza 60 x 60 polished m2
1 2 3 4
257 Granito Aurora silk 60 x 60 polished m2
258 Granito Aurora silk 30 x 60 polished m2
259 Granito sabbia villa 60 x 60 polished m2
260 Granito castello rosso 40 x 40 unpolished m2
261 Granito castello pietra 60 x 60 unpolished m2
262 Granito lunar terra 30 x 60 unpolished m2
263 Granito lunar terra 60 x 60 unpolished m2
264 Granito lunar alumina 60 x 60 unpolished m2
265 Granito lunar alumina 30 x 60 unpolished m2
MARMER
266 Marmer cream BA 60 x 60 m2
267 Marmer cream BA 40 x 40 m2
268 Marmer cream BA 30 x 30 m2
MOZAIK
269 Mozaik keramik zehn crystal glass 30 x 30 biji
270 Mozaik batu alam 30 x 30 biji
ASIA
271 Keramik 20 x 25 kelas I m2
272 Keramik 30 x 30 kelas I wht m2
273 Keramik 30 x 30 kelas I m2
274 Keramik 40 x 40 kelas I crm m2
275 Keramik 10 x 20 kelas II m2
276 Keramik 20 x 20 kelas I m2
277 Keramik 20 x 30 kelas II m2
278 Keramik 30 x 30 kelas II m2
279 Keramik 40 x 40 kelas II m2
MULIA
280 Keramik 10 x 20 cm kelas I m2
281 Keramik 20 x 20 cm kelas I m2
282 Keramik 20 x 30 cm kelas I m2
283 Keramik 30 x 30 cm kelas I m2
284 Keramik 40 x 40 cm kelas I m2
285 Keramik 10 x 20 cm kelas II m2
286 Keramik 20 x 20 cm kelas II m2
287 Keramik 20 x 30 cm kelas II m2
1 2 3 4
288 Keramik 30 x 30 cm kelas II m2
289 Keramik 40 x 40 cm kelas II m2
SANITAIR
290 Bak mandi fibre glass 55x55x60 cm bh
291 Bak mandi keramik 50x50 bh
292 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
293 Floor drain plastik bh
294 Floor drain stainless bh
295 Kloset duduk Amerika Standar ECST wht bh
296 Kloset duduk OULU A626 wht bh
297 Kloset duduk Zehn 040 A wht bh
298 Kloset duduk "TOTO Type AVANTE CW 821J"/SW 821JP COMPLIT bh
299 Kloset duduk " TOTO Type AVANTE CW 823 J bh
300 Kloset duduk " TOTO Type CW 660J complit bh
301 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
302 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh
303 Kloset duduk " TOTO Type CW 420 wht bh
304 Kloset duduk " TOTO Type CW 637 wht bh
305 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
306 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
307 Kloset jongkok " TOTO komplit wht Ce 6 bh
308 Kloset jongkok " TOTO komplit wht bh
309 Kloset porselin jongkok Kia (standar) bh
310 Kloset porselin jongkok pozzi bh
311 Kloset porselin jongkok liga bh
312 Kloset porselin jongkok Ina (standar) bh
277 Penyekat Urinoir " TOTO " Type A 100 " bh
278 Shower Spray " TOTO Tx bh
279 Shower Spray " American standard TP45 bh
280 Shower Spray " ONDA bh
281 Soap holder Biasa Trisensa bh
282 Seal tape ONDA bh
283 Urinoir " TOTO komplit bh
284 Urinoir " American standard m1w bh
285 Urinoir " HCG u999m bh
286 Wastafel american Standard studio bh
287 Wastafel HCG l61 bh
288 Wastafel Komplit " Tidy 001b bh
289 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh
290 Wastafel Toto komplit LW631JW/F segi 4 bh
1 2 3 4
291 Wastafel Toto LW352JW/F bulat bh
292 Wastafel Toto komplit LW645+T6JV5 kotak bh
293 Wastafel Toto LW248JR bh
294 Shower ONDA exclusive s.80 bh
295 Shower ONDA eco sense bh
296 Shower ONDA eco sns.931 bh
297 Shower CARLO exclusive bh
298 Tidy cuci piring doble bh
299 Tidy cuci piring single bh
300 Zehn cuci piring doble bh
PAKU
301 Paku 10 cm kg
302 Paku kalsiboard kg
303 Paku list SQ kg
304 Paku pancing 60 x 230 kg
305 Paku reng/usuk SQ kg
306 Paku seng kg
307 Paku seng import bj
308 Paku skrup 1/2" kg
309 Paku skrup 2" kg
310 Paku skrup 3.5" kg
311 Paku sumbat 1/2" kg
1 2 3 4
338 Paras Kerobokan bh
339 Paras Malem bh
340 Paras Putih Bukit Tebal 6 cm M2
341 Paras Silakarang tebal bh
342 Paras Silakarang tipis bh
343 Paras untuk pondasi bh
344 Batu alam RTM hijau 10 x 20 halus m2
345 Batu alam RTM hijau 20 x 20 halus m2
346 Batu alam RTS hijau 10 x 20 kasar m2
347 Batu pilah Jember 30 x 30 m2
348 Batu pilah Jember 20 x 30 m2
349 Batu pilah Jember 40 x 40 m2
350 Batu pilah Singaraja 30 x 30 m2
351 Batu pilah Singaraja 20 x 20 m2
352 Batu hitam Jember 5 x 20 halus m2
353 Batu hitam Jember 20 x 40 halus m2
354 Batu hitam Jember 15 x 30 halus m2
355 Batu hitam Singaraja 15 x 30 halus m2
356 Batu hitam Singaraja 20 x 40 halus m2
357 Batu AND 60 x 60 abu m2
358 Batu AND 50 x 50 hitam m2
359 Batu AND 40 x 40 hitam bkr m2
360 Batu AND 30 x 60 hitam bkr m2
361 Batu AND 40 x 60 hitam kilap m2
362 Batu AND 30 x 40 abu SS m2
363 Batu marmer kuning 10 x 20 m2
364 Batu marmer kuning PB1 10 x 20 m2
365 Batu marmer kuning PB2 10 x 20 m2
366 Batu marmer kuning 15 x 30 m2
367 Batu kuning serat 30 x 30 m2
368 Batu kuning serat 20 x 30 m2
369 Batu palimanan cirebon 20 x 30 m2
370 Batu palimanan cirebon 20 x 40 m2
371 Batu paras Jogja 60 x 60 m2
372 Batu candi hitam 60 x 60 m2
373 Batu candi hitam 20 x 20 m2
374 Batu candi hitam 30 x 30 m2
375 Batu candi hitam 40 x 40 T.5cm m2
376 Batu candi hitam 20 x 30 m2
377 Batu Bali green gelombang 20 x 40 m2
378 Batu Bali green kombinasi 20 x 40 m2
1 2 3 4
379 Batu serayu 20 x 60 m2
380 Pasir halus ( diayak) m3
381 Pasir beton / cor Ex. 4 per 2,75 M3 m3
382 Pasir pasang m3
383 Pasir urug m3
384 Sirtu m3
385 Tanah urug m3
PIPA
386 Pipa Galvanis 1/2" m1
387 Pipa Galvanis 3/4" m1
388 Pipa Galvanis 1 1/4" m1
389 Pipa Galvanis 1 1/2" m1
390 Pipa Galvanis 1" m1
391 Pipa Galvanis 1,5 BSA m1
392 Pipa Galvanis 2" m1
393 Pipa Galvanis 3" m1
394 Pipa Maspion AW 1 ljr
395 Pipa Maspion AW 1/2 ljr
396 Pipa Maspion AW 10 ljr
397 Pipa Maspion AW 1-1/2 ljr
398 Pipa Maspion AW 1-1/4 ljr
399 Pipa Maspion AW 12 ljr
400 Pipa Maspion AW 14 ljr
401 Pipa Maspion AW 16 ljr
402 Pipa Maspion AW 2 ljr
403 Pipa Maspion AW 2-1/2 ljr
404 Pipa Maspion AW 3 ljr
405 Pipa Maspion AW 3/4 ljr
406 Pipa Maspion AW 4 ljr
407 Pipa Maspion AW 5 ljr
408 Pipa Maspion AW 6 ljr
409 Pipa Maspion AW 8 ljr
410 Pipa Maspion C 1 ljr
411 Pipa Maspion C 1-1/2 ljr
412 Pipa Maspion C 1-1/4 ljr
413 Pipa Maspion C 2 ljr
414 Pipa Maspion C 2-1/2 ljr
415 Pipa Maspion C 3 ljr
416 Pipa Maspion C 3/4 ljr
417 Pipa Maspion C 4 ljr
1 2 3 4
418 Pipa Maspion C 5/8 ljr
419 Pipa Maspion D 10 ljr
420 Pipa Maspion D 1-1/2 ljr
421 Pipa Maspion D 1-1/4 ljr
422 Pipa Maspion D 12 ljr
423 Pipa Maspion D 14 ljr
424 Pipa Maspion D 16 ljr
425 Pipa Maspion D 2 ljr
426 Pipa Maspion D 2-1/2 ljr
427 Pipa Maspion D 3 ljr
428 Pipa Maspion D 4 ljr
429 Pipa Maspion D 5 ljr
430 Pipa Maspion D 6 ljr
431 Pipa Maspion D 8 ljr
KRAN AIR
432 TOTO T.30AR13V7N bh
433 TOTO T.60N bh
434 TOTO TX-116 LI bh
435 TOTO TX-116 LEBR bh
436 TOTO TX 101 LB bh
437 ONDA exclusive walltaps bh
438 ONDA exclusive basintaps bh
439 ONDA walltaps bh
440 ONDA sinktaps bh
441 ONDA swinging basin bh
442 Kran biasa bh
443 Kran Sunei bh
HANDEL PINTU
444 Gradino Handel Luar HP.6106 bh
445 Gradino Handel Luar HP.99.01 bh
446 Solid HRE 99.14 bh
447 ELT handle pintu dobel P99.62 set
448 ELT handle pintu dobel PR 511.05 set
449 ELT bulat PHB 308SS bh
450 PALOMA HPP 502 bh
451 PALOMA HRP 215 bh
452 PALOMA PHP 241 bh
453 DEKSON HPT 021 bh
454 DEKSON HPT 017 bh
1 2 3 4
455 DEKSON LHP set
456 TIDY handle set 905 set
457 PALOMA set handle set
458 DLD handle bulat set
1 2 3 4
479 Besi beton Ø 16 ulir btg
480 Besi beton Ø 19 ulir btg
481 Besi beton Ø 22 ulir btg
482 Kawat berduri roll
483 Kawat beton RRT kg
484 Pagar BRC asli T.120 diameter 6mm m'
485 Pagar BRC asli T.150 diameter 6mm m'
486 Pagar BRC asli T.175 diameter 7mm m'
487 Pagar BRC asli T.190 diameter 7mm m'
488 Pagar BRC asli T.90 diameter 6mm m'
489 Pagar HotDip Galvanized T.120 diameter 6mm m'
490 Pagar HotDip Galvanized T.150 diameter 7mm m'
491 Pagar HotDip Galvanized T.175 diameter 7mm m'
492 Pagar HotDip Galvanized T.190 diameter 7mm m'
493 Pagar HotDip Galvanized T.90 diameter 6mm m'
494 Tiang BRC asli T. 120 diameter 1 1/2" bh
495 Tiang BRC asli T. 150 diameter 2" bh
496 Tiang BRC asli T. 175 diameter 2" bh
497 Tiang BRC asli T. 190 diameter 2" bh
498 Tiang BRC asli T. 90 diameter 1 1/2" bh
499 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
500 Tiang HotDip Galvanized T. 150 diameter 2" bh
501 Tiang HotDip Galvanized T. 175 diameter 2" bh
502 Tiang HotDip Galvanized T. 190 diameter 2" bh
503 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh
504 Besi CNP 100 x 50 x 20, t = 2,3 mm, p= 6 m ljr
505 Besi CNP 100 x 50 x 20, t = 3,2 mm, p= 6 m ljr
506 Besi CNP 125 x 50 x 20, t=2,3 mm, p= 6 m ljr
507 Besi CNP 125 x 50 x 20,t=3,2 mm, p= 6 m ljr
508 Besi CNP 150 x 50 x 20,t=2,3 mm, p=6 m ljr
509 Besi CNP 150 x 50 x 20,t=3,2 mm,p= 6 m ljr
510 Besi CNP 150 x 65 x 20, t=2,3 mm, p= 6 m ljr
511 Besi CNP 150 x 65 x 20,t=3,2 mm, p= 6 m ljr
512 Besi CNP 200 x 75 x 20,t=2,3 mm, p= 6 m ljr
513 Besi CNP 200 x 75 x 20,t=3,2 mm, p= 6 m ljr
BAHAN LISTRIK
514 Saklar (Broco) bh
515 Stop Kontak bh
516 Fitting bh
517 Steker bh
1 2 3 4
518 Coaxial cable 5C - 75 ohm commscof m1
519 Kabel NYM 3 x 2.5 mm ex. Supreme m1
520 Kabel NYM 4 mm m1
521 Kabel telephone m1
499 Lampu pijar 8 Watt (Philip)
500 Lampu pijar 10 Watt (Philip) bh
501 Lampu pijar 15 Watt (Philip) bh
502 Lampu pijar 25 Watt (Philip) bh
503 Lampu TL 10 Watt (10 Watt) Philip bh
504 Lampu TL 20 Watt (10 Watt) Philip bh
505 Lampu TL 25 Watt (10 Watt) Philip bh
506 Pipa clipsal 20 mm bt
507 Pipa flexible clipsal 20 mm m1
508 Sock clipsal 20 mm bj
509 Tee dos clipsal 20 mm bh
510 Klem clipsal 20 mm bj
511 Inbow dos plastik clipsal E 157 P bj
BUIS BETON
512 Buis beton 20 x 75 x 3 bh
513 Buis beton 25 x 75 x 3 bh
514 Buis beton 30 x 75 x 3 bh
515 Buis beton 40 x 75 x 5 bh
516 Buis beton 50 x 75 x 5 bh
517 Buis beton 80 x 75 x 7.5 bh
PAVING
518 Paving 10 x 20 cm tebal 6 cm K225 Pc m2
519 Paving 10 x 20 cm tebal 6 cm K300 Pc m2
520 Paving 10 x 20 cm tebal 6 cm K350 Pc m2
521 Paving 10 x 20 cm tebal 8 cm K225 Pc m2
563 Paving 10 x 20 cm tebal 8 cm K300 Pc m2
522 Paving 10 x 20 cm tebal 8 cm K350 Pc m2
523 Paving 10 x 20 cm tebal 8 cm K400 Pc m2
524 Paving 20 x 20 cm tebal 6 cm K225 Pc m2
525 Paving 20 x 20 cm tebal 6 cm K225 warna merah m2
526 Paving 20 x 20 cm tebal 6 cm K225 warna hitam m2
527 Paving 20 x 20 cm tebal 6 cm K300 Pc m2
528 Paving 20 x 20 cm tebal 8 cm K225 Pc m2
529 Paving 20 x 20 cm tebal 8 cm K225 warna merah m2
530 Paving 20 x 20 cm tebal 8 cm K225 warna hitam m2
1 2 3 4
531 Paving 20 x 20 cm tebal 8 cm K300 Pc m2
532 Paving 20 x 20 cm tebal 8 cm K400 Pc m2
533 Paving 20 x 20 cm tebal 10 cm K225 Pc m2
534 Paving 20 x 20 cm tebal 10 cm K350 Pc m2
535 Paving 20 x 20 cm tebal 10 cm K400 Pc m2
536 Paving segi enam xexagon 6 cm K225 Pc m2
537 Paving segi enam xexagon 6 cm K350 Pc m2
538 Paving segi enam xexagon 8 cm K225 Pc m2
539 Paving segi enam xexagon 8 cm K350 Pc m2
540 Paving segi enam xexagon 8 cm K400 Pc m2
541 Paving kotak bujur sangkar tanpa tias 6 cm K225 Pc m2
542 Paving kotak bujur sangkar tanpa tias 8 cm K225 Pc m2
543 Paving Tiga Berlian tebal 6 cm K225 Pc m2
544 Paving Tiga Berlian tebal 6 cm K350 Pc m2
545 Kanstein kotak (P:50,T:20,La:10,Lb:16 cm K225) bh
546 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) bh
547 Kanstein Jumbo (P:50,L:15,T:30 cm K225) bh
548 Kanstein Segi Lima (P:50,L:15, T:20 cm K225) bh
549 Kanstein Segi Lima (P:40,L:10, T:20 cm K225) bh
550 Kanstein Segi Lima jumbo(P:50,L:15, T:40 cm K225) bh
551 Kanstein kursi ( P:50, L:10, T:40 cm, lb 17,5 cm K225 ) bh
552 Grass Block lobang 8, 36 X 54 cm tebal 9 cm K 225 m2
553 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2
554 Tutup got (grill) P. 45, L. 24, T.9cm K350 bh
555 Tutup got (grill) P. 30, L. 24, T.9cm K350 bh
556 Tutup kabel PLN P.20, L.40, T.6cm bh
557 Tutup uskup 8 cm zak
558 Koral Sikat (10 Kg) zak
1 2 3 4
567 Padmasari batu hitam 70 x 70 x 250 tempel unit
568 Dugul batu hitam 50 x 50 x 200 masive unit
569 Dugul batu hitam 60 x 70 x 250 masive unit
570 Dugul batu hitam 70 x 70 x 300 masive unit
571 Padmasari batu hitam 50 x 50 x 200 masive unit
572 Padmasari batu hitam 65 x 75 x 255 masive unit
573 Padmasari batu hitam 70 x 70 x 250 masive unit
574 Padmasari paras taro 50 x 70 x 250 unit
575 Padmasari paras taro 65 x 65 x 250 unit
576 Padmasari paras taro 65 x 65 x 250 unit
577 Pilar/saka ukir Bali+cahngawang, kayu jati unit
578 Lambang ukir Bali komplit, kayu jati m1
579 Tugeh ukir Bali komplit+patung, kayu jati unit
580 Waton + barba ukir Bali komplit, kayu jati unit
581 Metal Stud 5 cm panjang 3 m ljr
582 Metal Stud 7 cm Panjang 3 m ljr
583 Metal Furing / Runner 5 cm ljr
584 Metal Furing / Runner 7 cm ljr