Anda di halaman 1dari 81

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 737 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 25 25 1.00 ^𝑑
10.05 53.96
2 65 40 0.79 6.12 73.16
3 105 40 0.79 6.12 73.16
4 140 35 0.85 7.05 67.10
5 176 36 0.83 6.84 68.33
6 221 45 0.73 5.40 78.96
7 258 37 0.82 6.64 69.56
8 288 30 0.92 8.29 60.72
9 316 28 0.95 8.92 58.07
10 341 25 1.00 10.05 53.96
11 367 26 0.98 9.65 55.35
12 392 25 1.00 10.05 53.96
13 422 30 0.92 8.29 60.72
14 449 27 0.97 9.27 56.72
15 477 28 0.95 8.92 58.07
16 507 30 0.92 8.29 60.72
17 532 25 1.00 10.05 53.96
18 557 25 1.00 10.05 53.96
19 582 25 1.00 10.05 53.96
20 612 30 0.92 8.29 60.72
21 637 25 1.00 10.05 53.96
22 667 30 0.92 8.29 60.72
23 692 25 1.00 10.05 53.96
24 717 25 1.00 10.05 53.96
25 737 20 1.10 12.73 46.70
JUMLAH 737 1494.41
Nilai CBR Dititik ini =(𝑓 / 8.34
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 8.34 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 733 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 45 45 0.73 ^𝑑5.40 78.96
2 83 38 0.81 6.46 70.77
3 125 42 0.76 5.81 75.51
4 165 40 0.79 6.12 73.16
5 204 39 0.80 6.28 71.97
6 245 41 0.78 5.96 74.34
7 285 40 0.79 6.12 73.16
8 321 36 0.83 6.84 68.33
9 356 35 0.85 7.05 67.10
10 386 30 0.92 8.29 60.72
11 414 28 0.95 8.92 58.07
12 440 26 0.98 9.65 55.35
13 467 27 0.97 9.27 56.72
14 495 28 0.95 8.92 58.07
15 523 28 0.95 8.92 58.07
16 553 30 0.92 8.29 60.72
17 578 25 1.00 10.05 53.96
18 599 21 1.08 12.09 48.20
19 627 28 0.95 8.92 58.07
20 654 27 0.97 9.27 56.72
21 674 20 1.10 12.73 46.70
22 689 15 1.24 17.25 38.76
23 704 15 1.24 17.25 38.76
24 717 13 1.30 20.07 35.33
25 733 16 1.21 16.12 40.41
JUMLAH 733 1477.91
Nilai CBR Dititik ini =(𝑓 / 8.20
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 8.20 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 700 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 35 35 0.85 ^𝑑7.05 67.10
2 74 39 0.80 6.28 71.97
3 103 29 0.93 8.59 59.40
4 131 28 0.95 8.92 58.07
5 161 30 0.92 8.29 60.72
6 192 31 0.90 8.01 62.03
7 225 33 0.87 7.50 64.59
8 259 34 0.86 7.26 65.85
9 291 32 0.89 7.75 63.31
10 329 38 0.81 6.46 70.77
11 358 29 0.93 8.59 59.40
12 383 25 1.00 10.05 53.96
13 410 27 0.97 9.27 56.72
14 435 25 1.00 10.05 53.96
15 460 25 1.00 10.05 53.96
16 489 29 0.93 8.59 59.40
17 514 25 1.00 10.05 53.96
18 539 25 1.00 10.05 53.96
19 559 20 1.10 12.73 46.70
20 579 20 1.10 12.73 46.70
21 604 25 1.00 10.05 53.96
22 624 20 1.10 12.73 46.70
23 649 25 1.00 10.05 53.96
24 673 24 1.02 10.50 52.55
25 700 27 0.97 9.27 56.72
JUMLAH 700 1446.41
Nilai CBR Dititik ini =(𝑓 / 8.82
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 8.82 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 692 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 34 34 0.86 ^𝑑7.26 65.85
2 69 35 0.85 7.05 67.10
3 104 35 0.85 7.05 67.10
4 144 40 0.79 6.12 73.16
5 189 45 0.73 5.40 78.96
6 214 25 1.00 10.05 53.96
7 243 29 0.93 8.59 59.40
8 268 25 1.00 10.05 53.96
9 299 31 0.90 8.01 62.03
10 329 30 0.92 8.29 60.72
11 364 35 0.85 7.05 67.10
12 394 30 0.92 8.29 60.72
13 424 30 0.92 8.29 60.72
14 448 24 1.02 10.50 52.55
15 476 28 0.95 8.92 58.07
16 506 30 0.92 8.29 60.72
17 531 25 1.00 10.05 53.96
18 556 25 1.00 10.05 53.96
19 576 20 1.10 12.73 46.70
20 596 20 1.10 12.73 46.70
21 611 15 1.24 17.25 38.76
22 627 16 1.21 16.12 40.41
23 652 25 1.00 10.05 53.96
24 672 20 1.10 12.73 46.70
25 692 20 1.10 12.73 46.70
JUMLAH 692 1429.96
Nilai CBR Dititik ini =(𝑓 / 8.82
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 8.82 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 696 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 39 39 0.80 ^𝑑6.28 71.97
2 79 40 0.79 6.12 73.16
3 106 27 0.97 9.27 56.72
4 135 29 0.93 8.59 59.40
5 161 26 0.98 9.65 55.35
6 188 27 0.97 9.27 56.72
7 218 30 0.92 8.29 60.72
8 256 38 0.81 6.46 70.77
9 284 28 0.95 8.92 58.07
10 309 25 1.00 10.05 53.96
11 338 29 0.93 8.59 59.40
12 368 30 0.92 8.29 60.72
13 394 26 0.98 9.65 55.35
14 423 29 0.93 8.59 59.40
15 451 28 0.95 8.92 58.07
16 481 30 0.92 8.29 60.72
17 506 25 1.00 10.05 53.96
18 531 25 1.00 10.05 53.96
19 556 25 1.00 10.05 53.96
20 581 25 1.00 10.05 53.96
21 606 25 1.00 10.05 53.96
22 636 30 0.92 8.29 60.72
23 661 25 1.00 10.05 53.96
24 676 15 1.24 17.25 38.76
25 696 20 1.10 12.73 46.70
JUMLAH 696 1440.44
Nilai CBR Dititik ini =(𝑓 / 8.86
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 8.86 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 573 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 30 30 0.92 ^𝑑8.29 60.72
2 68 38 0.81 6.46 70.77
3 93 25 1.00 10.05 53.96
4 113 20 1.10 12.73 46.70
5 133 20 1.10 12.73 46.70
6 153 20 1.10 12.73 46.70
7 168 15 1.24 17.25 38.76
8 186 18 1.15 14.23 43.62
9 206 20 1.10 12.73 46.70
10 219 13 1.30 20.07 35.33
11 236 17 1.18 15.12 42.03
12 266 30 0.92 8.29 60.72
13 286 20 1.10 12.73 46.70
14 296 10 1.42 26.49 29.81
15 321 25 1.00 10.05 53.96
16 345 24 1.02 10.50 52.55
17 365 20 1.10 12.73 46.70
18 390 25 1.00 10.05 53.96
19 415 25 1.00 10.05 53.96
20 445 30 0.92 8.29 60.72
21 470 25 1.00 10.05 53.96
22 500 30 0.92 8.29 60.72
23 528 28 0.95 8.92 58.07
24 553 25 1.00 10.05 53.96
25 573 20 1.10 12.73 46.70
JUMLAH 573 1264.47
Nilai CBR Dititik ini =(𝑓 / 10.75
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 10.75 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 615 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 28 28 0.95 ^𝑑8.92 58.07
2 53 25 1.00 10.05 53.96
3 82 29 0.93 8.59 59.40
4 102 20 1.10 12.73 46.70
5 121 19 1.13 13.44 45.17
6 146 25 1.00 10.05 53.96
7 173 27 0.97 9.27 56.72
8 203 30 0.92 8.29 60.72
9 228 25 1.00 10.05 53.96
10 254 26 0.98 9.65 55.35
11 282 28 0.95 8.92 58.07
12 312 30 0.92 8.29 60.72
13 339 27 0.97 9.27 56.72
14 364 25 1.00 10.05 53.96
15 392 28 0.95 8.92 58.07
16 412 20 1.10 12.73 46.70
17 437 25 1.00 10.05 53.96
18 462 25 1.00 10.05 53.96
19 487 25 1.00 10.05 53.96
20 505 18 1.15 14.23 43.62
21 530 25 1.00 10.05 53.96
22 549 19 1.13 13.44 45.17
23 574 25 1.00 10.05 53.96
24 595 21 1.08 12.09 48.20
25 615 20 1.10 12.73 46.70
JUMLAH 615 1331.72
Nilai CBR Dititik ini =(𝑓 / 10.15
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 10.15 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 614 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 35 35 0.85 ^𝑑7.05 67.10
2 65 30 0.92 8.29 60.72
3 92 27 0.97 9.27 56.72
4 118 26 0.98 9.65 55.35
5 138 20 1.10 12.73 46.70
6 158 20 1.10 12.73 46.70
7 183 25 1.00 10.05 53.96
8 212 29 0.93 8.59 59.40
9 237 25 1.00 10.05 53.96
10 262 25 1.00 10.05 53.96
11 287 25 1.00 10.05 53.96
12 315 28 0.95 8.92 58.07
13 341 26 0.98 9.65 55.35
14 368 27 0.97 9.27 56.72
15 393 25 1.00 10.05 53.96
16 421 28 0.95 8.92 58.07
17 446 25 1.00 10.05 53.96
18 466 20 1.10 12.73 46.70
19 486 20 1.10 12.73 46.70
20 516 30 0.92 8.29 60.72
21 543 27 0.97 9.27 56.72
22 563 20 1.10 12.73 46.70
23 578 15 1.24 17.25 38.76
24 596 18 1.15 14.23 43.62
25 614 18 1.15 14.23 43.62
JUMLAH 614 1328.17
Nilai CBR Dititik ini =(𝑓 / 10.12
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 10.12 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

Tanggal :

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 399+1/2 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 700 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e
0 0 0 = 〖 10 〗
1 35 35 0.85 ^𝑑7.05
2 100 65 0.56 3.66
3 145 45 0.73 5.40
4 195 50 0.68 4.83
5 255 60 0.60 3.99
6 295 40 0.79 6.12
7 350 55 0.64 4.37
8 400 50 0.68 4.83
9 455 55 0.64 4.37
10 498 43 0.75 5.67
11 520 22 1.06 11.51
12 560 40 0.79 6.12
13 610 50 0.68 4.83
14 665 55 0.64 4.37
15 700 35 0.85 7.05
16
17
18
19
20
21
22
23
24
25
JUMLAH 700
Nilai CBR Dititik ini =(𝑓 /
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 399+1/2


MATERIAL Tanah Dasar
CBR 5.09 %
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad
Kontraktor

PT. KA PROPERTI MANAJEMEN

12 DESEMBER 2020

NIM s.d. STA. MUARALAWAI

TER
KORELASI DCP TO CBR
f =𝑐 𝑥
= 〖 10 〗 𝑒^(1/3)
^𝑑 67.10
100.19
78.96
84.53
95.13
73.16
89.92
84.53
89.92
76.67
49.67
73.16
84.53
89.92
67.10
1204.49
𝑓/ 5.09

Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani

Kontraktor

PT. KA PROPERTI MANAJEMEN

NIM s.d. STA. MUARALAWAI


28
Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani
0 1 2 3 4 5 6
Km.232+050 0 20 40 70 100 135 165
Km.232+100 0 5 15 35 55 70 85
Km.232+175 0 10 25 45 85 110 135
Km.232+225 5 25 75 120 140 160 190
Km.232+300 0 25 50 90 130 160 185
Km.232+350 10 20 60 90 130 160 195
7 8 9 10 11 12 13 14 15 16
205 230 260 290 330 370 420 450 460 465
105 130 170 190 210 230 260 290 310 340
140 190 245 275 280 290 310 340 370 385
230 270 310 350 400 440 460 490 530 570
210 240 280 300 320 340 360 380 395 405
225 250 275 300 335 370 400 440 470 510
17 18 19 20 21 22 23 24 25
470 480 490 495 505 510 520 530 540
360 375 410 430 460 485 520 550 590
420 430 445 495 510 530 580 610 630
610 650 680 710 740 760 780 800 820
420 435 450 465 480 490 505 515 530
550 580 600 630 665 670 680 685 690
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

Tanggal :

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 399+200 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 730 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e
0 0 0 = 〖 10 〗
1 55 55 0.64 ^𝑑4.37
2 140 85 0.44 2.76
3 210 70 0.53 3.39
4 290 80 0.47 2.94
5 360 70 0.53 3.39
6 450 90 0.41 2.60
7 545 95 0.39 2.45
8 620 75 0.50 3.15
9 730 110 0.32 2.10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
JUMLAH 730
Nilai CBR Dititik ini =(𝑓 /
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 399+200


MATERIAL Tanah Dasar
CBR 2.86 %
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad
Kontraktor

PT. KA PROPERTI MANAJEMEN

12 DESEMBER 2020

NIM s.d. STA. MUARALAWAI

TER
KORELASI DCP TO CBR
f =𝑐 𝑥
= 〖 10 〗 𝑒^(1/3)
^𝑑 89.92
119.20
105.12
114.61
105.12
123.70
128.11
109.92
140.87
1036.56
𝑓/ 2.86

Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani

Kontraktor

PT. KA PROPERTI MANAJEMEN

NIM s.d. STA. MUARALAWAI


29.2
Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani
0 1 2 3 4 5 6
Km.232+050 0 20 40 70 100 135 165
Km.232+100 0 5 15 35 55 70 85
Km.232+175 0 10 25 45 85 110 135
Km.232+225 5 25 75 120 140 160 190
Km.232+300 0 25 50 90 130 160 185
Km.232+350 10 20 60 90 130 160 195
7 8 9 10 11 12 13 14 15 16
205 230 260 290 330 370 420 450 460 465
105 130 170 190 210 230 260 290 310 340
140 190 245 275 280 290 310 340 370 385
230 270 310 350 400 440 460 490 530 570
210 240 280 300 320 340 360 380 395 405
225 250 275 300 335 370 400 440 470 510
17 18 19 20 21 22 23 24 25
470 480 490 495 505 510 520 530 540
360 375 410 430 460 485 520 550 590
420 430 445 495 510 530 580 610 630
610 650 680 710 740 760 780 800 820
420 435 450 465 480 490 505 515 530
550 580 600 630 665 670 680 685 690
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 18 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+950-399+0


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 580 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 15 15 1.24 ^𝑑
17.25 38.76
2 30 15 1.24 17.25 38.76
3 50 20 1.10 12.73 46.70
4 70 20 1.10 12.73 46.70
5 90 20 1.10 12.73 46.70
6 120 30 0.92 8.29 60.72
7 160 40 0.79 6.12 73.16
8 200 40 0.79 6.12 73.16
9 230 30 0.92 8.29 60.72
10 250 20 1.10 12.73 46.70
11 270 20 1.10 12.73 46.70
12 300 30 0.92 8.29 60.72
13 320 20 1.10 12.73 46.70
14 345 25 1.00 10.05 53.96
15 370 25 1.00 10.05 53.96
16 400 30 0.92 8.29 60.72
17 420 20 1.10 12.73 46.70
18 445 25 1.00 10.05 53.96
19 470 25 1.00 10.05 53.96
20 490 20 1.10 12.73 46.70
21 510 20 1.10 12.73 46.70
22 530 20 1.10 12.73 46.70
23 550 20 1.10 12.73 46.70
24 565 15 1.24 17.25 38.76
25 580 15 1.24 17.25 38.76
JUMLAH 580 1273.76
Nilai CBR Dititik ini =(𝑓 / 10.59
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+950-399+0


MATERIAL Tanah Dasar
CBR 10.59 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 18 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 399+100


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 30 30 0.92 ^𝑑8.29 60.72
2 60 30 0.92 8.29 60.72
3 75 15 1.24 17.25 38.76
4 100 25 1.00 10.05 53.96
5 130 30 0.92 8.29 60.72
6 210 80 0.47 2.94 114.61
7 250 40 0.79 6.12 73.16
8 300 50 0.68 4.83 84.53
9 340 40 0.79 6.12 73.16
10 380 40 0.79 6.12 73.16
11 410 30 0.92 8.29 60.72
12 450 40 0.79 6.12 73.16
13 480 30 0.92 8.29 60.72
14 510 30 0.92 8.29 60.72
15 535 25 1.00 10.05 53.96
16 560 25 1.00 10.05 53.96
17 580 20 1.10 12.73 46.70
18 600 20 1.10 12.73 46.70
19
20
21
22
23
24
25
JUMLAH 600 1150.15
Nilai CBR Dititik ini =(𝑓 / 7.04
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 399+100


MATERIAL Tanah Dasar
CBR 7.04 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 670 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 0 0 = 〖 10 〗 𝑒^(1/3)
1 25 25 1.00 ^𝑑
10.05 53.96
2 42 17 1.18 15.12 42.03
3 70 28 0.95 8.92 58.07
4 90 20 1.10 12.73 46.70
5 115 25 1.00 10.05 53.96
6 143 28 0.95 8.92 58.07
7 170 27 0.97 9.27 56.72
8 200 30 0.92 8.29 60.72
9 230 30 0.92 8.29 60.72
10 260 30 0.92 8.29 60.72
11 295 35 0.85 7.05 67.10
12 325 30 0.92 8.29 60.72
13 355 30 0.92 8.29 60.72
14 382 27 0.97 9.27 56.72
15 410 28 0.95 8.92 58.07
16 440 30 0.92 8.29 60.72
17 465 25 1.00 10.05 53.96
18 490 25 1.00 10.05 53.96
19 515 25 1.00 10.05 53.96
20 545 30 0.92 8.29 60.72
21 570 25 1.00 10.05 53.96
22 600 30 0.92 8.29 60.72
23 625 25 1.00 10.05 53.96
24 650 25 1.00 10.05 53.96
25 670 20 1.10 12.73 46.70
JUMLAH 670 1407.62
Nilai CBR Dititik ini =(𝑓 / 9.27
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 9.27 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Tanggal : 14 DESEMBER 2020

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 399+200 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 520 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR KORELASI DCP TO CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e f =𝑐 𝑥
0 10 0 = 〖 10 〗 𝑒^(1/3)
1 30 20 1.10 ^𝑑
12.73 46.70
2 60 30 0.92 8.29 60.72
3 110 50 0.68 4.83 84.53
4 185 75 0.50 3.15 109.92
5 270 85 0.44 2.76 119.20
6 330 60 0.60 3.99 95.13
7 410 80 0.47 2.94 114.61
8 530 120 0.28 1.92 149.03
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
JUMLAH 520 779.86
Nilai CBR Dititik ini =(𝑓 / 3.37
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARALAWAI
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 399+200


MATERIAL Tanah Dasar
CBR 3.37 %

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJEMEN

Lily Fitriani
Nipp. adaadadad
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

Tanggal :

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 398+9/399+0 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 725 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e
0 0 0 = 〖 10 〗
1 40 40 0.79 ^𝑑6.12
2 120 80 0.47 2.94
3 165 45 0.73 5.40
4 208 43 0.75 5.67
5 265 57 0.62 4.21
6 320 55 0.64 4.37
7 390 70 0.53 3.39
8 510 120 0.28 1.92
9 610 100 0.37 2.32
10 725 115 0.30 2.00
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
JUMLAH 725
Nilai CBR Dititik ini =(𝑓 /
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 398+9/399+0


MATERIAL Tanah Dasar
CBR 3.10 %
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad
Kontraktor

PT. KA PROPERTI MANAJEMEN

12 DESEMBER 2020

NIM s.d. STA. MUARALAWAI

TER
KORELASI DCP TO CBR
f =𝑐 𝑥
= 〖 10 〗 𝑒^(1/3)
^𝑑 73.16
114.61
78.96
76.67
92.02
89.92
105.12
149.03
132.43
144.98
1056.90
𝑓/ 3.10

Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani

Kontraktor

PT. KA PROPERTI MANAJEMEN

NIM s.d. STA. MUARALAWAI


29
Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani
0 1 2 3 4 5 6
Km.232+050 0 20 40 70 100 135 165
Km.232+100 0 5 15 35 55 70 85
Km.232+175 0 10 25 45 85 110 135
Km.232+225 5 25 75 120 140 160 190
Km.232+300 0 25 50 90 130 160 185
Km.232+350 10 20 60 90 130 160 195
7 8 9 10 11 12 13 14 15 16
205 230 260 290 330 370 420 450 460 465
105 130 170 190 210 230 260 290 310 340
140 190 245 275 280 290 310 340 370 385
230 270 310 350 400 440 460 490 530 570
210 240 280 300 320 340 360 380 395 405
225 250 275 300 335 370 400 440 470 510
17 18 19 20 21 22 23 24 25
470 480 490 495 505 510 520 530 540
360 375 410 430 460 485 520 550 590
420 430 445 495 510 530 580 610 630
610 650 680 710 740 760 780 800 820
420 435 450 465 480 490 505 515 530
550 580 600 630 665 670 680 685 690
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

Tanggal :

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 399+1/2 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 700 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e
0 0 0 = 〖 10 〗
1 35 35 0.85 ^𝑑7.05
2 100 65 0.56 3.66
3 145 45 0.73 5.40
4 195 50 0.68 4.83
5 255 60 0.60 3.99
6 295 40 0.79 6.12
7 350 55 0.64 4.37
8 400 50 0.68 4.83
9 455 55 0.64 4.37
10 498 43 0.75 5.67
11 520 22 1.06 11.51
12 560 40 0.79 6.12
13 610 50 0.68 4.83
14 665 55 0.64 4.37
15 700 35 0.85 7.05
16
17
18
19
20
21
22
23
24
25
JUMLAH 700
Nilai CBR Dititik ini =(𝑓 /
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 399+1/2


MATERIAL Tanah Dasar
CBR 5.09 %
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad
Kontraktor

PT. KA PROPERTI MANAJEMEN

12 DESEMBER 2020

NIM s.d. STA. MUARALAWAI

TER
KORELASI DCP TO CBR
f =𝑐 𝑥
= 〖 10 〗 𝑒^(1/3)
^𝑑 67.10
100.19
78.96
84.53
95.13
73.16
89.92
84.53
89.92
76.67
49.67
73.16
84.53
89.92
67.10
1204.49
𝑓/ 5.09

Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani

Kontraktor

PT. KA PROPERTI MANAJEMEN

NIM s.d. STA. MUARALAWAI


28
Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani
0 1 2 3 4 5 6
Km.232+050 0 20 40 70 100 135 165
Km.232+100 0 5 15 35 55 70 85
Km.232+175 0 10 25 45 85 110 135
Km.232+225 5 25 75 120 140 160 190
Km.232+300 0 25 50 90 130 160 185
Km.232+350 10 20 60 90 130 160 195
7 8 9 10 11 12 13 14 15 16
205 230 260 290 330 370 420 450 460 465
105 130 170 190 210 230 260 290 310 340
140 190 245 275 280 290 310 340 370 385
230 270 310 350 400 440 460 490 530 570
210 240 280 300 320 340 360 380 395 405
225 250 275 300 335 370 400 440 470 510
17 18 19 20 21 22 23 24 25
470 480 490 495 505 510 520 530 540
360 375 410 430 460 485 520 550 590
420 430 445 495 510 530 580 610 630
610 650 680 710 740 760 780 800 820
420 435 450 465 480 490 505 515 530
550 580 600 630 665 670 680 685 690
Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

Tanggal :

PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
PROYEK : WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM : 399+200 Jalur Kiri


MATERIAL : Tanah Dasar
KEDALAMAN (mm) : 730 mm

PENGUJIAN NILAI CBR DENGAN DYNAMIC CONE PENETROMETER


DATA LAPANGAN SELISIH CBR
LOG CBR
N TUMBUKAN PEMBACAAN MISTAR PENETRASI (%)
a 0 c d = 2,48-(1,057*LOG(c)) e
0 0 0 = 〖 10 〗
1 55 55 0.64 ^𝑑4.37
2 140 85 0.44 2.76
3 210 70 0.53 3.39
4 290 80 0.47 2.94
5 360 70 0.53 3.39
6 450 90 0.41 2.60
7 545 95 0.39 2.45
8 620 75 0.50 3.15
9 730 110 0.32 2.10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
JUMLAH 730
Nilai CBR Dititik ini =(𝑓 /
catatan : 〖𝑑 ) 〗 ^3

Pemilik Proyek Kontraktor


PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad

Pemilik Proyek Kontraktor

PT. KAI (Persero) PT. KA PROPERT

PROYEK : PEKERJAAN PEMBANGUNAN DOUBLE TRACK ANTARA STA. MUARAENIM s.d. STA. MUARAL
WILAYAH DIVRE III PALEMBANG

TITIK UJI/KM+HM 399+200


MATERIAL Tanah Dasar
CBR 2.86 %
Pemilik Proyek Kontraktor
PT. KAI (Persero) PT. KA PROPERTI MANAJE

Lily Fitriani
Nipp. adaadadad
Kontraktor

PT. KA PROPERTI MANAJEMEN

12 DESEMBER 2020

NIM s.d. STA. MUARALAWAI

TER
KORELASI DCP TO CBR
f =𝑐 𝑥
= 〖 10 〗 𝑒^(1/3)
^𝑑 89.92
119.20
105.12
114.61
105.12
123.70
128.11
109.92
140.87
1036.56
𝑓/ 2.86

Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani

Kontraktor

PT. KA PROPERTI MANAJEMEN

NIM s.d. STA. MUARALAWAI


29.2
Kontraktor
T. KA PROPERTI MANAJEMEN

Lily Fitriani
0 1 2 3 4 5 6
Km.232+050 0 20 40 70 100 135 165
Km.232+100 0 5 15 35 55 70 85
Km.232+175 0 10 25 45 85 110 135
Km.232+225 5 25 75 120 140 160 190
Km.232+300 0 25 50 90 130 160 185
Km.232+350 10 20 60 90 130 160 195
7 8 9 10 11 12 13 14 15 16
205 230 260 290 330 370 420 450 460 465
105 130 170 190 210 230 260 290 310 340
140 190 245 275 280 290 310 340 370 385
230 270 310 350 400 440 460 490 530 570
210 240 280 300 320 340 360 380 395 405
225 250 275 300 335 370 400 440 470 510
17 18 19 20 21 22 23 24 25
470 480 490 495 505 510 520 530 540
360 375 410 430 460 485 520 550 590
420 430 445 495 510 530 580 610 630
610 650 680 710 740 760 780 800 820
420 435 450 465 480 490 505 515 530
550 580 600 630 665 670 680 685 690