A reservoir
B junction base demand x L/s, elevasi 5 m
C junction base demand 2 x L/s, elevasi 7 m
D junction base demand 3 x L/s, elevasi 10 m
E junction base demand 2 x L/s, elevasi 15 m
F junction base demand 3 x L/s, elevasi 20 m
G junction elevasi 20 m
H junction base demand x L/s, elevasi 10 m
X = 1 nim terakhir anda
Rencanakan
a. Head yg diperlukan di A
b. diameter terkecil masing masing pipa