RINCIAN KOLAM YANG SUDAH JADI dan RENCANA KOLAM BARU

KOLAM RESERVOIR KOLAM TANDON KOLAM IPAL


ID JENIS LUAS ID JENIS LUAS ID JENIS LUAS
RV1 Reservoir 2171 TD1 Tandon 3533 IPAL1A IPAL 908
RV2 Reservoir 1833 TD2 Tandon 3424 IPAL1B IPAL 940
RV3 Reservoir 3627 TD3 Tandon 3420 IPAL1C IPAL 803
RV4 Reservoir 4063 TD4 Tandon 4925 IPAL2 IPAL 2752
SUB TOTAL 11694 TD5 Tandon 2096 IPAL3 IPAL 2219
TD6 Tandon 2738 IPAL4 IPAL 2773
TD7 Tandon 3687 IPAL5 IPAL 1711
TD8 Tandon 3612 IPAL6 IPAL 1186
SUB TOTAL 27435 SUB TOTAL 13292

KOLAM BUDIDAYA BLOK A KOLAM BUDIDAYA BLOK B KOLAM BUDIDAYA BLOK C


ID JENIS LUAS ID JENIS LUAS ID JENIS LUAS
A1 Budidaya 2500 B1 Budidaya 2500 C1 Budidaya 2500
A2 Budidaya 2500 B2 Budidaya 2500 C2 Budidaya 2500
A3 Budidaya 2500 B3 Budidaya 2500 C3 Budidaya 2500
A4 Budidaya 2500 B4 Budidaya 2500 C4 Budidaya 2500
A5 Budidaya 2500 B5 Budidaya 2500 C5 Budidaya 2500
A6 Budidaya 2500 B6 Budidaya 2500 C6 Budidaya 2500
A7 Budidaya 2500 B7 Budidaya 2500 C7 Budidaya 2500
A8 Budidaya 2500 B8 Budidaya 2500 C8 Budidaya 2500
SUB TOTAL 20000 SUB TOTAL 20000 C9 Budidaya 2500
C10 Budidaya 2500
SUB TOTAL 25000

KOLAM BUDIDAYA BLOK D KOLAM BUDIDAYA BLOK E KOLAM BUDIDAYA BLOK F


ID JENIS LUAS ID JENIS LUAS ID JENIS LUAS
D1 Budidaya 2500 E1 Budidaya 2500 F1 Budidaya 2500
D2 Budidaya 2500 E2 Budidaya 2500 F2 Budidaya 2500
D3 Budidaya 2500 E3 Budidaya 2500 F3 Budidaya 2500
D4 Budidaya 2500 E4 Budidaya 2500 F4 Budidaya 2500
D5 Budidaya 2500 E5 Budidaya 2500 F5 Budidaya 2500
D6 Budidaya 2500 E6 Budidaya 2500 SUB TOTAL 12500
D7 Budidaya 2500 E7 Budidaya 2500
D8 Budidaya 2500 E8 Budidaya 2500
D9 Budidaya 2500 E9 Budidaya 2500
D10 Budidaya 2500 E10 Budidaya 2500
D11 Budidaya 2500 SUB TOTAL 25000
D12 Budidaya 2500
SUB TOTAL 30000

KOLAM BUDIDAYA BLOK G KOLAM BUDIDAYA BLOK H (Alternatif 1)


ID JENIS LUAS ID JENIS LUAS ID JENIS LUAS
G1 Budidaya 900 H1 Budidaya 64 H14 Budidaya 64
G2 Budidaya 900 H2 Budidaya 64 H15 Budidaya 64
G3 Budidaya 900 H3 Budidaya 64 H16 Budidaya 64
G4 Budidaya 900 H4 Budidaya 64 H17 Budidaya 64
G5 Budidaya 900 H5 Budidaya 64 H18 Budidaya 64
G6 Budidaya 400 H6 Budidaya 64 H19 Budidaya 64
G7 Budidaya 400 H7 Budidaya 64 H20 Budidaya 64
G8 Budidaya 400 H8 Budidaya 64 H21 Budidaya 64
G9 Budidaya 400 H9 Budidaya 64 H22 Budidaya 64
G10 Budidaya 400 H10 Budidaya 64 H23 Budidaya 64
G11 Budidaya 400 H11 Budidaya 64 H24 Budidaya 64
G12 Budidaya 400 H12 Budidaya 64 SUB TOTAL 704
G13 Budidaya 400 H13 Budidaya 64
SUB TOTAL 7700 SUB TOTAL 832 KOLAM BUDIDAYA BLOK H
(Alternatif 2)
ID JENIS LUAS
Keterangan : H1 Budidaya 256
H2 Budidaya 256
Kolam yang sudah jadi : 36 Kolam H3 Budidaya 256
H4 Budidaya 256
Kolam yang belum jadi : 55 Kolam (pakai data alt.2) H5 Budidaya 256
H6 Budidaya 256
SUB TOTAL 1536

REKAPITULASI LUAS KOLAM TAMBAK


Pakai data Alt.2
BUDIDAYA RESERVOIR TANDON IPAL
JUMLAH ( Kolam ) 72 4 8 6
LUAS ( m2 ) 141736 11694 27435 13292
( Hectare ) 14.1736 1.1694 2.7435 1.3292
PERSENTASE (%) 8% 19% 9%

ESTIMASI KEBUTUHAN TANAH TANGGUL


Kebutuhan tanah untuk kontruksi tanggul tambak
* Jika diasumsikan kebutuhan tanah untuk 1 m2 tanggul kolam membutuhkan sebanyak 10 m3
* Jika diasumsikan 1 dump truck muat tanah sebanyak 6.5 m3

BLOK E
* Panjang Tanggul 1350 m membutuhkan tanah sebanyak 13,500 m3
jumlah dump truck 2,077 ritase
BLOK B
* Jumlah Kolam : 900 m membutuhkan tanah sebanyak 9,000 m3
jumlah dump truck 1,385 ritase
ID JENIS LUAS
RV1 Reservoir 2171
RV2 Reservoir 1833
RV3 Reservoir 3627
RV4 Reservoir 4063
TD1 Tandon 3533
TD2 Tandon 3424
TD3 Tandon 3420
TD4 Tandon 4925
TD5 Tandon 2096
TD7 Tandon 3687
TD8 Tandon 3612
A1 Budidaya 2500
A2 Budidaya 2500
A3 Budidaya 2500
A4 Budidaya 2500
A5 Budidaya 2500
A6 Budidaya 2500
A7 Budidaya 2500
A8 Budidaya 2500
B1 Budidaya 2500
B2 Budidaya 2500
B3 Budidaya 2500
B4 Budidaya 2500
B5 Budidaya 2500
B6 Budidaya 2500
B7 Budidaya 2500
B8 Budidaya 2500
C1 Budidaya 2500
C2 Budidaya 2500
C3 Budidaya 2500
C4 Budidaya 2500
C5 Budidaya 2500
C6 Budidaya 2500
C7 Budidaya 2500
C8 Budidaya 2500
C9 Budidaya 2500
C10 Budidaya 2500
D1 Budidaya 2500
D2 Budidaya 2500
D3 Budidaya 2500
D4 Budidaya 2500
D5 Budidaya 2500
D6 Budidaya 2500
D7 Budidaya 2500
D8 Budidaya 2500
D9 Budidaya 2500
D10 Budidaya 2500
D11 Budidaya 2500
D12 Budidaya 2500
E1 Budidaya 2500
E2 Budidaya 2500
E3 Budidaya 2500
E4 Budidaya 2500
E5 Budidaya 2500
E6 Budidaya 2500
E7 Budidaya 2500
E8 Budidaya 2500
E9 Budidaya 2500
E10 Budidaya 2500
F1 Budidaya 2500
F2 Budidaya 2500
F3 Budidaya 2500
F4 Budidaya 2500
F5 Budidaya 2500
G1 Budidaya 900
G2 Budidaya 900
G3 Budidaya 900
G4 Budidaya 900
G5 Budidaya 900
G6 Budidaya 400
G7 Budidaya 400
G8 Budidaya 400
G9 Budidaya 400
IPAL1A IPAL 908
IPAL1B IPAL 940
IPAL1C IPAL 803
IPAL2 IPAL 2752
IPAL3 IPAL 2219
IPAL4 IPAL 2773
IPAL5 IPAL 1711
IPAL6 IPAL 1186
TD6 Tandon 2738
G10 Budidaya 400
G11 Budidaya 400
G12 Budidaya 400
G13 Budidaya 400
H1 Budidaya 256
H2 Budidaya 256
H3 Budidaya 256
H4 Budidaya 256
H5 Budidaya 256
H6 Budidaya 256
RENCANA WAKTU KERJA PERLUASAN TAMBAK
Desa Penyak, Kecamatan Koba, Kabupaten Bangka Tengah, Kepulauan Bangka Belitung

JAN FEB MAR APR MAY JUNE JULY


NO RENCANA KERJA DETIL KEGIATAN
M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4

I DISAIN TAMBAK/SITEPLAN
1 Pengukuran global area perluasan Pengukuran keliling area perluasan yang akan
dipakai
2 Pengukuran elevasi lahan rencana tambak Pengukuran tinggi permukaan tanah dengan
tambak yang sudah jadi
3 Pembuatan draft siteplan tambak Gambar draft siteplan
4 Croscek siteplan dengan aktual dilapangan Croscek siteplan di lapangan
6 Finalisasi Siteplan Gambar final siteplan
7 Pematokan dilapangan berdasarkan siteplan Penerapan batas berdasarkan final siteplan

II KONTRUKSI TAMBAK
1 Kontruksi petakan/kolam Setelah dilakukan pengukuran elevasi tanah,
disepakati acuan dasar kolam awal berada di
elevasi Blok D

□ Pengurangan elevasi tanggul blok E yang


sudah ada
□ Pembuatan Outlet dan Jalan akses ke Area
Mess
2 Kontruksi tanggul Dilakukan penentuan dasar tanggul pada
tinggi 170 dari dasar kolam mengukuti tinggi
kolam yang sudah jadi
3 Kontruksi saluran (outlet dan inlet) Pembuatan saluran outlet dilakukan sistem
berjenjang atau bertingkat turun ke arah IPAL.
Sedangkan Inlet dibuat di sisi tanggul dalam
kolam budidaya

4 Pengerasan jalan utama dan jalan panen Penambahan tanah Puru pada level jalan
5 Pemasangan Pipa
□ Pemasangan pompa dan pipa inlet dari laut Pemasangan pompa di pantai, dan menarik
pipa ke arah laut sepanjang batas surut
tertinggi
□ Pemasangan pipa penghubung antara kolam Pemasangan pipa penghubung atar kolam
yang diperlukan
□ Pemasangan pipa inlet Pemasangan pipa inlet dibuat di sisi tanggul
dalam kolam budidaya (Kebijakannya bisa di
atas tanggul atau didalam tanggul????)

□ Pemasangan pipa central drain dan sub soil Pemasangan pipa di tengah kolam 2 titik,
berada dibawah dasar kolam
□ Pemasangan pipa samping Pemasangan pipa di bawah tanggul samping
sisi outlet, guna membantu dalam
pengurangan air melalui samping
□ Pemasangan pipa IPAL Pemasangan pipa yang berada di IPAL baik
Pipa masuk dari outlet, overflow antar kolam
IPAL, dan pipa keluar ke sungai
JAN FEB MAR APR MAY JUNE JULY
NO RENCANA KERJA DETIL KEGIATAN
M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4

6 Pemasangan HDPE Pemasangan HDPE oleh pihak kedua di


seluruh areal tambak
7 Pembuatan dan Pemasangan jembatan anco Pembuatan dan pemasangan jembatan anco,
dibuat di ke empat sisi tanggung budidaya dan
dibuat semi permanen guna monitoring
budidaya

III UTILITY, FASUM DAN ALAT BUDIDAYA TAMBAK


1 Pembuatan pos jaga
2 Pembuatan gudang pakan Transit dan Workshop

3 Pembuatan tempat panen


4 Pembuatan Mess Kayawan
Pemasangan panel dan instalasi listrik Blok E&B
5
6 Pembuatan dan pemasangan tiang pengait kincir

7 Pembuatan anco Blok E&B

PERSIAPAN BUDIDAYA

PEKERJAAN WAKTU PEKERJAAN


I DISAIN TAMBAK/SITEPLAN 3 Minggu (Januari 2021)
II KONTRUKSI TAMBAK 4 Bulan pembentukan tanggul dan 2 Bulan
Instalasi paralon
III UTILITY, FASUM DAN ALAT BUDIDAYA Tentative
TAMBAK