A PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 1.00 Ls - 1.00 Ls
2 Pemasangan Bouwplank 1.00 Ls - 1.00 Ls
3 Direksekeet / Barak Kerja 1.00 Ls - 1.00 Ls
4 Pemasangan PLN 1.00 Unit - 1.00 Unit
5 Pemasangan Air PDAM 1.00 Unit - 1.00 Unit
6 Pembiayaan IMB 1.00 Unit - 1.00 Unit
I PEKERJAAN TANAH
1 Pek. Galian Tanah 15.12 15.12 15.12 M3
- Tiang Kolom 20 x 20 1.20 0.20 1.00 11.00 2.64
- Tiang Kolom 20 x 20 1.20 0.20 1.00 6.00 1.44
- Pondasi Batu Belah 92.00 0.30 0.40 11.04
C PEMBANGUNAN CAFÉ
I PEKERJAAN TANAH
1 Pek. Galian Tanah 3.31 3.31 3.31 M3
- Pondasi Tapak 50/70 0.70 0.50 0.60 3.00 0.63
- Pondasi Tapak 70/70 0.70 0.70 0.60 3.00 0.88
- Pondasi Tapak 50/50 0.50 0.50 0.60 12.00 1.80
2 Pek. Urugan Tanah kembali 1/3 3.31 1.10 1.10 M3
Err:509 ### 9.10 9.50 0.45 38.90 38.90 38.90 M3
- Pengurangan 44.48
SD 2.50 1.20 3.00 9.00
J1 2.50 1.74 1.00 4.35
J2 2.50 1.70 1.00 4.25
J3 2.50 2.74 1.00 6.85
J4 2.50 4.90 1.00 12.25
P1 2.00 0.80 2.00 3.20
P2 2.00 0.70 2.00 2.80
Dinding Pintu 2.00 0.80 1.00 1.60
Ventilasi (WC) 0.40 0.20 1.00 0.08
Ventilasi Dapur 0.50 0.20 1.00 0.10
2 Pek. Pas. Bata Selasar 1/2 Bata Ad. 1:4 3.32 3.32 3.32 M2
- Selasar 16.61 0.20 3.32
XI PEKERJAAN PENGECATAN
1 Pek. Pengecatan Plafond
2 Pek. Pengecatan list Plafond
Perhitungan Banyak Koef
NO. URAIAN PEKERJAAN Koef Luas/Volume
nya Bahan
Total Satuan UNIT Total Satuan
Panjang (m) Lebar (m) t (m) Jumlah
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
Perhitungan Banyak Koef
NO. URAIAN PEKERJAAN Koef Luas/Volume
nya Bahan
Total Satuan UNIT Total Satuan
Panjang (m) Lebar (m) t (m) Jumlah
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
Perhitungan Banyak Koef
NO. URAIAN PEKERJAAN Koef Luas/Volume
nya Bahan
Total Satuan UNIT Total Satuan
Panjang (m) Lebar (m) t (m) Jumlah
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
Perhitungan Banyak Koef
NO. URAIAN PEKERJAAN Koef Luas/Volume
nya Bahan
Total Satuan UNIT Total Satuan
Panjang (m) Lebar (m) t (m) Jumlah
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
REKAPITULASI ESTIMATE ENGINEER ( EE )
1 3
C PEMBANGUNAN CAFÉ
I PEKERJAAN TANAH 355,212.00
II PEKERJAAN BETON BERTULANG 61,024,648.79
III PEKERJAAN PASANGAN DAN PLASTERAN 77,113,155.67
IV PEKERJAAN KAP ATAP DAN PENUTUP ATAP 7,495,005.92
V PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI 23,350,000.00
VI PEKERJAAN KUNCI DAN PENGGANTUNGAN 1,350,000.00
VII PEKERJAAN LANGIT - LANGIT DAN LIST 10,438,302.78
VIII PEKERJAAN INSTALASI LISTRIK 5,395,000.00
IX PEKERJAAN INSTALASI AIR DAN SANITASI 4,804,000.00
X PEKERJAAN PENUTUP LANTAI DAN DINDING 10,549,599.50
XI PEKERJAAN PENGECATAN 3,343,264.93
TERBILANG : TIGA RATUS TIGA PULUH DUA JUTA SEMBILAN RATUS EMPAT PULUH TIGA RIBU RUPIAH
1 Err:509
2 Err:509
2 A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
3 Err:509
3 Err:509
4 Err:509
11 Err:509
11 Err:509
12 Err:509
Err:509
12 Err:509
A.A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100),
13 slump (3-6) cm, w/c = 0,87
13 A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
14 A. A.4.1.1.6. Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 225), slump (12 ± 2) cm, w/c = 0,61
14 Err:509
15 A.4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
15 Err:509
16 Err:509
16 Err:509
17 Err:509
17 Err:509
18 A.4.1.1.24. Pemasangan 1 m2 bekisting untuk lantai
18 Err:509
19 Err:509
19 Err:509
20 Err:509
20 A.4.1.1.29. Membuat 1 m3 sloof beton bertulang (227 kg besi + bekisting)
21 Membuat 1 m3 kolom beton bertulang f’c = 14,5 MPa + Bekisting
21 Err:509
22 Err:509
22 Err:509
23 Err:509
23 A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
24 A.4.1.1.36. Membuat 1 m’ Balok Pinggang beton bertulang (10x15) cm
24 Err:509
25 Err:509
25 Err:509
26 Err:509
26 Err:509
27 Err:509
27 Err:509
28 Err:509
28 Err:509
29 Err:509
Err:509
29 Err:509
30 Err:509
30 Err:509
31 Err:509
Err:509
Err:509
31 A.4.1.1.37. Membuat 1 M3 Plat Lantai Beton Bertulang t=12 cm // Beton K-225 ; Besi 138 Kg
32 Err:509
32 A.4.1.1.40. Membuat 1 M3 Plat Beton Bertulang t=10 cm // Beton K-175 ; Besi 60 Kg
33 Err:509
34 Err:509
33 Err:509
Err:509
34 Err:509
34 Err:509
35 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
35 Err:509
36 A.4.2.1.13. Pemasangan 1 m2 pintu kaca/ daun jendela rangka alluminium
36 Err:509
37 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
Err:509
37 A. 3.2.1.1 Pemasangan 1m3 Pondasi Batu Belah 1 PC : 4 PP
38 A. 4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1PC : 2PP
38 Err:509
39 A.4.4.1.9. Pemasangan 1m2 dinding bata merah (10x10x20) cm tebal ½ batu campuran 1PC :4PP
39 Err:509
44 Err:509
44 Err:509
45 A.4.4.3.34.1 Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm
45 Err:509
46 Err:509
46 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
47 Err:509
47 Err:509
48 Err:509
48 Err:509
49 Err:509
49 Err:509
50 Err:509
50 A.4.4.3.58. Pemasangan 1 m2 dinding batu alam tempel
51 Err:509
51 A.4.6.1.20. Pemasangan 1 m2 Rangka Kayu, modul 60 x120 cm, plafond Kayu Kelas III
52 A.4.5.1.5. Pemasangan 1 m2 langit-langit Tripleks Uk. (120 x 240) cm, Tebal 3 mm,4 mm,& 6 mm
52 Err:509
53 Err:509
53 A.4.5.1.9. Pemasangan 1 m’ list langit-langit Kayu Profil
54 Err:509
54 Err:509
55 Err:509
55 Err:509
56 Err:509
56 Err:509
57 Err:509
57 Err:509
58 Err:509
58 Err:509
Err:509
Err:509
59 Err:509
59 Err:509
60 Err:509
60 Err:509
61 Err:509
61 Err:509
62 Err:509
62 Err:509
63 Err:509
63 Err:509
64 Err:509
64 Err:509
65 Err:509
65 Err:509
66 Err:509
66 Err:509
67 Err:509
67 Err:509
68 Err:509
68 Err:509
69 Err:509
69 Err:509
70 Err:509
70 Err:509
71 Err:509
Err:509
71 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Err:509
72 Err:509
72 A.4.7.1.10.a. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
73 Err:509
73 Err:509
74 Err:509
74 Err:509
75 A.4.7.1.19. Pengecatan 1 m2 Plafond
75 Err:509
76 Err:509
Err:509
76 Err:509
77 Err:509
77 Err:509
78 Err:509
78 Err:509
79 Err:509
79 Err:509
80 Err:509
80 Err:509
81 Err:509
81 Err:509
82 Err:509
82 Err:509
83 Err:509
83 Err:509
84 Err:509
84 Err:509
85 Err:509
85 A.6.2.1.1b. Memasang 1 Bh Titik lampu LC 20 Watt
86 Err:509
86 Err:509
87 Err:509
87 Err:509
88 Err:509
88 Err:509
89 Err:509
89 Err:509
90 Err:509
90 Err:509
91 Err:509
91 A.6.2.1.8. Memasang 1 Bh Memasang 1 Bh Saklar Tunggal
92 A.6.2.1.9. Memasang 1 Bh Memasang 1 Bh Saklar Ganda
92 A.6.2.1.10. Memasang 1 Bh Memasang 1 Bh Stop Kontak
93 Err:509
93 Err:509
JUMLAH
HARGA
Err:509
Err:509
65,120.00
Err:509
Err:509
Err:509
86,350.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
62,700.00
Err:509
158,400.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
763,486.14
961,706.34
1,179,454.59
Err:509
160,919.00
Err:509
Err:509
Err:509
Err:509
Err:509
360,239.00
Err:509
Err:509
Err:509
Err:509
5,716,111.50
3,894,911.34
Err:509
Err:509
Err:509
Err:509
91,657.50
142,263.55
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
5,651,630.54
Err:509
4,629,012.84
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
126,441.70
Err:509
858,869.00
Err:509
259,787.00
Err:509
812,515.00
135,538.70
Err:509
94,875.00
Err:509
68,205.10
Err:509
69,808.20
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
167,032.80
Err:509
Err:509
1,897,830.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
472,469.25
Err:509
107,184.00
54,532.50
Err:509
Err:509
25,377.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
56,369.50
Err:509
Err:509
41,827.50
Err:509
Err:509
Err:509
Err:509
33,117.70
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
162,580.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
57,035.00
63,910.00
63,566.25
Err:509
Err:509
ESTIMASI ENGINEER ( EE )
A PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 1.00 Ls 800,000.00 800,000.00
2 Pemasangan Bouwplank 1.00 Ls 500,000.00 500,000.00
3 Direksekeet / Barak Kerja 1.00 Ls 1,500,000.00 1,500,000.00
4 Pemasangan PLN 1.00 Unit 6,004,500.00 6,004,500.00
5 Pemasangan Air PDAM 1.00 Unit 1,650,000.00 1,650,000.00
6 Pembiayaan IMB 1.00 Unit 800,000.00 800,000.00
C PEMBANGUNAN CAFÉ
I PEKERJAAN TANAH
1 Pek. Galian Tanah 3.31 M3 86,350.00 285,991.20
2 Pek. Urugan Tanah kembali 1.10 M3 62,700.00 69,220.80
XI PEKERJAAN PENGECATAN
1 Pek. Pengecatan Plafond 57.77 M2 33,117.70 1,913,242.65
2 Pek. Pengecatan list Plafond 43.18 M2 33,117.70 1,430,022.29
C FASILITAS UMUM
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi ( Awal dan Akhir ) 1.00 1.00 Ls
2 Pek. Pemasangan Bouwplank 1.00 1.00 M'
3 Pek. Papan Nama Kegiatan / Proyek 1.00 1.00 Ls
4 Pek. Penyediaan Air Kerja Dan Listrik 1.00 1.00 Ls
1 2 3
C FASILITAS UMUM
I PEKERJAAN PENDAHULUAN 1,692,600.00
II PEMBANGUNAN PAGAR PEMBATAS #REF!
III PEMBANGUNAN JALAN MASUK / CARPORT 28,896,743.27
IV PEMBUATAN MENARA TOWER + TEDMON #REF!
V PEMBUATAN CANOPY DEPAN 47,021,534.21
JAMBI, 2019
Dibuat Oleh :
KONSULTAN PERENCANA
CV. BAHARI MEKANIKA CONSULTANT
M. RAIS, ST
Team Leader
ESTIMASI ENGINEER ( EE )
Pekerjaan : Perencanaan Rumdin dan Fasum
Lokasi : Kota jambi
Tahun Anggaran : 2019
C FASILITAS UMUM
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi ( Awal dan Akhir ) 1.00 Ls 567,000.00 567,000.00
2 Pek. Pemasangan Bouwplank 5.00 M' 65,120.00 325,600.00
3 Pek. Papan Nama Kegiatan / Proyek 1.00 Ls 300,000.00 300,000.00
4 Pek. Penyediaan Air Kerja Dan Listrik 1.00 Ls 500,000.00 500,000.00
Sub Jumlah Rp. 1,692,600.00
A.A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100),
slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Tukang Batu L.02 OH 0.2000 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.0200 140,000.00 2,800.00
Mandor L.04 OH 0.0600 140,000.00 8,400.00
JUMLAH HARGA TENAGA -------------------- 156,200.00
B BAHAN
Portland Cement (PC) kg 230.0000 1,300.00 299,000.00
Pasir Beton kg 893.0000 71.43 63,785.71
Kerikil (Maks 30 mm) kg 1,027.0000 92.59 95,092.59
Air Liter 200.0000 400.00 80,000.00
JUMLAH HARGA BAHAN -------------------- 537,878.31
C PERALATAN
- -
JUMLAH HARGA PERALATAN -------------------- -
1 2 3 4
B. BAHAN LANTAI
C. BAHAN KAYU
H. BAHAN PLAFOND
I. BAHAN PENGECATAN
J. BAHAN KACA
1 Kaca T. 3 mm M2 Rp 75,000.00
2 Kaca T. 5 mm M2 Rp 120,000.00
3 Kaca T. 8 mm M2 Rp 250,000.00
4 Kaca ES T.5 mm M2 Rp 92,500.00
5 Sealent Kaca M1 Rp 10,000.00
L. BAHAN SANITASI
HARGA SATUAN
NO URAIAN SATUAN
( Rp. )
HARGA SATUAN
NO. URAIAN BAHAN SATUAN
( Rp. )
A. AGREGAT
1 Pasir Pasangan Rp. 102,500.00 / M3
2 Pasir Beton Rp. 112,500.00 / M3
3 Pasir Beton ( dalam Kg ) Rp. 80.36 / Kg
4 Pasir Urug Rp. 99,000.00 / M3
5 Kerikil (2 Cm/3 Cm ) Rp. 437,500.00 / M3
6 Kerikil (2 Cm/3 Cm ) dalam Kg Rp. 324.07 / Kg
7 Batu Pecah uk. 2-3 cm ( Split ) Rp. 487,500.00 / M3
8 Batu Pecah uk. 2-3 cm ( Split ) dalam Kg Rp. 361.11 / Kg
9 Tanah Timbunan Biasa ( Didatangkan ) Rp. 43,750.00 / M3
10 Tanah Timbunan Pilihan ( Didatangkan ) Rp. 136,500.00 / M3
B. SEMEN
1 Semen PC Rp. 1,360.00 / Kg
2 Semen PC @ 40 Kg Rp. 55,200.00 / Zak
3 Semen PC @ 50 Kg Rp. 68,000.00 / Zak
4 Semen Warna Rp. 9,500.00 / Kg
5 Semen Putih Rp. 6,000.00 / Kg
C. BETON / MORTAR
1 Batu Bata Besar Rp. 775.00 / Bh
2 Roster Batu Terawang Rp. 25,000.00 / Bh
3 Conblok Rp. 2,500.00 / Bh
Page 37 BAHAN
E. BAHAN KAYU
1 Kayu Klas I Rp. 7,150,000.00 / M3
2 Kayu Klas II Rp. 3,750,000.00 / M3
3 Kayu Klas III Rp. 2,316,800.00 / M3
4 Papan Klas I Rp. 5,082,000.00 / M3
5 Papan klas II Rp. 3,675,000.00 / M3
6 Papan klas III Rp. 2,400,000.00 / M3
7 Papan Bekisting Rp. 2,300,000.00 / M3
8 Triplek 2,8 mm Rp. 70,500.00 / Lbr
9 Triplek 3,6 mm Rp. 80,250.00 Lbr
10 Teakwood/Plywood t. 4 mm ( Motif Jati ) Rp. 121,000.00 / Lbr
11 Multiplek tebal 6 mm Rp. 98,400.00 / Lbr
12 Multiplek tebal 9 mm Rp. 136,400.00 / Lbr
15 Kayu Bulat Cerucuk Ø 12 Panjang 4 M Rp. 29,000.00 / Btg
16 Dolken kayu biasa, Ø (8-10) cm, panjang 4m Rp. 35,000.00 / Btg
17 Kayu kelukup Panjang 5 m Rp. 30,000.00 / Btg
18 Kayu Cerucuk / Kelukup Panjang 2,5 M Rp. 30,000.00 / Btg
Page 38 BAHAN
I. BAHAN KACA
1 Kaca 3 mm Rp. 86,300.00 / M2
2 Kaca 5 mm Rp. 165,000.00 / M2
3 Kaca 12 mm Rp. 450,000.00 / M2
4 Kaca 8 mm Rp. 299,000.00 / M2
5 Kaca Buram 5 mm Rp. 115,000.00 / M2
6 Kaca Cermin 5 mm Rp. 169,750.00 / M2
7 Glass Block Rp. 29,100.00 / Bh
Page 39 BAHAN
K. BAHAN SANITER
1 Instalasi Air Bersih Rp. 85,000.00 / Ttk
3 Pipa PVC Tipe AW Ø 3/4" Rp. 27,500.00 / M1
6 Pipa PVC Tipe AW Ø 2" Rp. 91,000.00 / M1
9 Pipa PVC Tipe AW Ø 4" Rp. 294,500.00 / M1
16 Closed Duduk Keramik Terpasang Rp. 1,975,000.00 / Unit
18 Wastafel lengkap Rp. 852,500.00 / Bh
19 Sower Air + Accesories Terpasang Rp. 125,000.00 / Bh
20 Kran Air 3/4" Rp. 35,000.00 / Bh
21 Floor Drain Rp. 30,000.00 / Bh
22 Sealtape Rp. 2,500.00 / Bh
23 Tedmond Air Kap. 1 M3 Rp. 1,746,000.00 / Bh
24 Sumur Bor + Acessories Rp. 25,000,000.00 / Unit
25 Mesin Air + Accesories terpasang Rp. 4,850,000.00 / Unit
Page 40 BAHAN
L. BAHAN FINISHING
1 Amplas Rp. 6,700.00 / Lbr
2 Cat Kilat Rp. 85,000.00 / Kg
3 Cat Kilat Dasar Rp. 39,300.00 / Kg
5 Cat Tembok Merk Bagus Rp. 87,500.00 / Kg
6 Cat Tembok Dasar Rp. 39,300.00 / Kg
7 Cat Meni Rp. 56,100.00 / Kg
8 Cat Melamik Rp. 53,700.00 / Kg
9 Water Profing Rp. 135,800.00 / Kg
10 Dempul Rp. 33,600.00 / Kg
11 Plamour Rp. 8,800.00 / Kg
12 Politur Rp. 60,400.00 / Ltr
13 Minyak Cat Rp. 14,400.00 / Ltr
14 Lem Kayu Rp. 38,500.00 / Kg
15 Lem Aibon Rp. 39,100.00 / Kg
16 Lem vinyl Rp. 20,900.00 / Kg
17 Spritus Rp. 8,730.00 / Btl
18 Minyak Bekisting Rp. 13,500.00 / Kg
19 Residu kap Rp. 1,455.00 / Ltr
20 Kuwas Rp. 31,400.00 / Bh
O. LAIN - LAIN
1 Air Rp. 100.00 / Liter
KEPOLISIAN NEGARA REPUBLIK INDONESIA
DAERAH JAMBI
BIRO SARANA DAN PRASARANA
KEGIATAN
PEMBANGUNAN RUMAH NEGARA
PEKERJAAN
PEMBANGUNAN RUMAH DINAS T.70 POLDA JAMBI
LOKASI
PROVINSI JAMBI
Lapis 1
Besi Beton Ø 12 mm 0.892 / Kg x 59.33 M1 .= 52.93 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 45.33 M1 .= 40.44 Kg
Lapis 2
Besi Beton Ø 12 mm 0.892 / Kg x 46.96 M1 .= 41.89 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 41.92 M1 .= 37.39 Kg
172.64 Kg
Lapis 1
Besi Beton Ø 12 mm 0.892 / Kg x 66.67 M1 .= 59.47 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 50 M1 .= 44.60 Kg
Lapis 2
Besi Beton Ø 12 mm 0.892 / Kg x 44.87 M1 .= 40.02 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 42.73 M1 .= 38.12 Kg
182.21 Kg
Lapis 1
Besi Beton Ø 12 mm 0.892 / Kg x 90.74 M1 .= 80.94 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 70.37 M1 .= 62.77 Kg
Lapis 2
Besi Beton Ø 12 mm 0.892 / Kg x 57.46 M1 .= 51.25 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 56.36 M1 .= 50.27 Kg
245.23 Kg
1 KOLOM UTAMA 20/20
Ukuran 0.20 x 0.20 .= 0.04 M2
Panjang 1 M3 .= 25.00 M1
Volume 0.20 x 0.20 x 25.00 M1 .= 1.00 M3
Besi Cincin 0.15 x 0.15 x .= 0.70 M1
10 BALOK 13/25
Ukuran 0.13 x 0.25 .= 0.03 M2
Panjang 1 M3 .= 30.77 M1
Volume 0.13 x 0.25 x 30.77 M1 .= 1.00 M3
Besi Cincin 0.08 x 0.20 x .= 0.66 M1
12 BALOK 20/30
Ukuran 0.20 x 0.30 .= 0.06 M2
Panjang 1 M3 .= 16.67 M1
Volume 0.20 x 0.30 x 16.67 M1 .= 1.00 M3
Besi Cincin 0.15 x 0.25 x .= 0.90 M1
13 BALOK 10/40
Ukuran 0.10 x 0.40 .= 0.04 M2
Panjang 1 M3 .= 25.00 M1
Volume 0.10 x 0.40 x 25.00 M1 .= 1.00 M3
Besi Cincin 0.05 x 0.35 x .= 0.90 M1
Besi Beton Ø 12 mm 0.892 / Kg x 25.00 M1 4 Btg .= 89.20 Kg
Besi Beton Ø 12 mm 0.892 / Kg x 25.00 M1 4 Btg .= 89.20 Kg
Besi Beton Ø 8 mm 0.395 / Kg x 0.90 M1 x 166.67 Bh .= 59.25 Kg
237.65 Kg
13 BALOK 15/50
Ukuran 0.15 x 0.50 .= 0.08 M2
Panjang 1 M3 .= 13.33 M1
Volume 0.15 x 0.50 x 13.33 M1 .= 1.00 M3
Besi Cincin 0.10 x 0.45 x .= 1.20 M1
Lapis 1
Besi Beton Ø 10 mm 0.617 / Kg x 6.667 x 8.33 x 1.5 .= 51.42 Kg
Lapis 2
Besi Beton Ø 10 mm 0.617 / Kg x 55.56 x 1.00 x 1.5 .= 51.42 Kg
102.83 Kg
Lapis 1
Besi Beton Ø 10 mm 0.617 / Kg x 6.667 x 10.00 x 1.5 .= 61.70 Kg
Lapis 2
Besi Beton Ø 10 mm 0.617 / Kg x 66.67 x 1.00 x 1.5 .= 61.70 Kg
123.40 Kg
18 PLAT LEUVEL / DAK
Ukuran 0.1 x 1.00 .= 0.10 M2
Panjang 1 M3 .= 10.00 M1
Volume 0.1 x 1.00 .x 10.00 M1 .= 1.00 M3
Lapis 1
Besi Beton Ø 10 mm 0.617 / Kg x 6.667 x 10.00 x 1.5 .= 61.70 Kg
Lapis 2 0.00
Besi Beton Ø 10 mm 0.617 / Kg x 66.67 x 1.00 x 1.5 .= 61.70 Kg
123.40 Kg
PERHITUNGAN BIAYA SMK3 KONSTRUKSI
Kegiatan : Pembangunan Gedung Café " SEGARA BIRU"
Pekerjaan : Err:509
Lokasi : Muara Bungo
Tahun Anggaran : 2021
LANTAI 1
A/E/I 7.20 3.60 3.00 77.76
F 3.60 3.60 1.00 12.96
JUMLAH TOTAL
LANTAI II
A/I 7.20 3.70 2.00 53.28
E 3.60 3.70 1.00 13.32
F1 3.60 3.70 1.00 13.32 0.82 2.10 1.00
G 3.60 3.70 1.00 13.32
JUMLAH TOTAL
ngan Type Total Luas 1/2 Batu Sisi Plaster 1 : 4
Pas 1 Batu KET.
Luas Kusen 1:4 1:3 1:2 Luar
13.35
12.96
13.97
2.95 P2 20.33
25.92
1.72 P1 8.69
0.39 BV1
2.95 P2 8.69
1.72 P1 13.04
5.82
25.20
16.80
10.15
7.00
7.54
5.07
2.08
ngan Type Total Luas 1/2 Batu Sisi Plaster 1 : 4
Pas 1 Batu KET.
Luas Kusen 1:4 1:3 1:2 Luar
3.89
33.39
2.43
165.60
46.00
13.32
1.72 P1 11.60
13.32
7.40
26.64
1.72 P1 8.99
0.39 BV1
2.95 P2 8.15
26.27
5.55
103.68
25.92
9.25
139.10
26.08
84.02
26.70
12.96 7.02
13.97 7.02
16.66
25.92 11.52
8.69 8.69
5.38
9.68
5.64
13.63 5.43
25.20
16.80
10.15
7.00
7.54
5.07 -
2.08
Sisi Plaster 1 : 4 Sisi Plaster 1 : 3 Sisi Plaster 1 : 2
Volume
Dalam Luar Dalam Luar Dalam
53.28
26.64
26.64
26.64
9.25
144.50
86.51
33.39
2.43
165.60
46.00
13.32 7.02
13.32 7.02
11.60 7.02
13.32 7.02
6.80
26.64 12.24
8.99 8.99
11.70
26.27 13.85
5.85
14.04 8.00
Sisi Plaster 1 : 4 Sisi Plaster 1 : 3 Sisi Plaster 1 : 2
Volume
Dalam Luar Dalam Luar Dalam
748.38 - 95.50 -
PEKERJAAN PASANGAN PINTU JERUJI
Kusen Total
Jenis Panjang Tinggi Unit Luas
P/T Jumlah Sub Total Total Kebutuhan
LANTAI I
PJ1 1.40 2.60 3.00 10.92 2.60 2.00 5.20 15.35 46.05
2.40 0.85 3.00 6.12 3.80 2.00 7.60
0.85 3.00 2.55
PJ2 1.40 2.60 1.00 3.64 2.60 2.00 5.20 10.45 10.45
0.80 0.85 1.00 0.68 2.20 2.00 4.40
0.85 1.00 0.85
-
J4 1.65 1.60 1.00 2.64 1.65 3.00 4.95 9.75 9.75
1.60 3.00 4.80 -
BV1 0.70 0.55 2.00 0.77 0.70 2.00 1.40 2.50 5.00
0.55 2.00 1.10
BV2 1.35 0.55 1.00 0.74 1.35 2.00 2.70 4.35 4.35
0.55 3.00 1.65
Fasad 3.15 2.20 2.00 13.86 3.15 3.00 9.45 18.25 36.50
2.20 4.00 8.80
PJ2 1.40 2.60 1.00 3.64 2.60 2.00 5.20 10.45 10.45
0.80 0.85 1.00 0.68 2.20 2.00 4.40
0.85 1.00 0.85
-
J4 1.65 1.60 1.00 2.64 1.65 3.00 4.95 9.75 9.75
Kebutuhan Kaca Mati Total
Panjang Lebar Jumlah Total Luas Kebutuhan
- -
41.83
0.45 1.30 1.00 0.59 1.76
0.75 0.75 3.00 1.69 5.06
- -
RENCANA ANGGARAN BIAYA
(RAB)
PEKERJAAN : REHAB DAN RENOVASI SARANA PRASARANA SEKOLAH
No. LOKASI : KABUPATEN TAJUNG JABUNG BARAT
JENIS BARANG/ DAN KABUPATEN BINGO TAHUN
JASA 2021
SATUAN VOLUME HARGA SATUAN TOTAL (Rp)
(Rp)
- REHABILITASI DAN RENOVASI SEKOLAH KABUPATEN BUNGO
I. REHABILITASI DAN RENOVASI SEKOLAH SDN 008 / II RANTAU DUKU KAB. BUNGO
1 PEKERJAAN PERSIAPAN
1. Pek. Papan Nama Proyek Unit 1.00
Sub Total
2
SMK3
1. Sosialisasi dan Promosi K3
. -Spanduk (Banner) Lb 2.00
. -Poster Lb 2.00
. -Papan Informasi K3 Lb 2.00
5. Rambu - rambu
. -Rambu Petunjuk Bh 2.00
. -Rambu Larangan Bh 2.00
. -Rambu Peringatan Bh 2.00
. -Rambu Kewajiban Bh 2.00
. -Rambu Informasi Bh 2.00
II. REHABILITASI DAN RENOVASI SEKOLAH SDN 014 / II PASAR RANTAU AMBACANG KAB. BUNGO
1 PEKERJAAN PERSIAPAN
1. Pek. Papan Nama Proyek Unit 1.00
Sub Total
2 SMK3
1. Sosialisasi dan Promosi K3
. -Spanduk (Banner) Lb 2.00
. -Poster Lb 2.00
. -Papan Informasi K3 Lb 2.00
5. Rambu - rambu
. -Rambu Petunjuk Bh 2.00
. -Rambu Larangan Bh 2.00
. -Rambu Peringatan Bh 2.00
. -Rambu Kewajiban Bh 2.00
. -Rambu Informasi Bh 2.00
III. REHABILITASI DAN RENOVASI SEKOLAH SDN 020 / II LUBUK MENGKUANG KAB. BUNGO
1 PEKERJAAN PERSIAPAN
1. Pek. Papan Nama Proyek Unit 1.00
Sub Total
2 SMK3
1. Sosialisasi dan Promosi K3
. -Spanduk (Banner) Lb 2.00
. -Poster Lb 2.00
. -Papan Informasi K3 Lb 2.00
5. Rambu - rambu
. -Rambu Petunjuk Bh 2.00
. -Rambu Larangan Bh 2.00
. -Rambu Peringatan Bh 2.00
. -Rambu Kewajiban Bh 2.00
. -Rambu Informasi Bh 2.00
IV. REHABILITASI DAN RENOVASI SEKOLAH SDN 043 / II TANJUNG BELIT KAB. BUNGO
1 PEKERJAAN PERSIAPAN
1. Pek. Papan Nama Proyek Unit 1.00
Sub Total
2 SMK3
1. Sosialisasi dan Promosi K3
. -Spanduk (Banner) Lb 2.00
. -Poster Lb 2.00
. -Papan Informasi K3 Lb 2.00
5. Rambu - rambu
. -Rambu Petunjuk Bh 2.00
. -Rambu Larangan Bh 2.00
. -Rambu Peringatan Bh 2.00
. -Rambu Kewajiban Bh 2.00
. -Rambu Informasi Bh 2.00
1 2
A PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi
2 Pemasangan Bouwplank
3 Direksekeet / Barak Kerja
4 Pemasangan PLN
5 Pemasangan Air PDAM
6 Pembiayaan IMB
I PEKERJAAN TANAH
1 Pek. Galian Tanah
- Pondasi Tapak 40 x 40
- Sloof 15 x 20
- Pembesian
- Pondasi Tapak 40 x 40
- Pokok Dia 10
- Sengkang Dia 6-15
- Sloof 15 x 20
- Pokok Dia 10
- Sengkang Dia 6-15
- Bekisting
- Pondasi Tapak 40 x 40
- Sloof 15 x 20
- Pembesian
- Kolom Elevasi 0
- Pokok Dia 10
- Sengkang dia 6-15
- Bekisting
Err:509 Pek. Balok Gantung
- Cor Beton 1:3:5
- Balok Gantung 10/20
- Pembesian
- Balok Gantung 10/20
- Pokok Dia 10
- Sengkang dia 6-15
- Bekisting
I PEKERJAAN TANAH
1 Pek. Galian Tanah
- Pondasi Batu Belah
2 Pek. Urugan Tanah kembali
Err:509 ###
- Pembesian
- Pondasi Batu Belah
- Melintang dia 10
- Memanjang dia 10
- Pembesian
- Kolom Elevasi +2,66
- Pokok Dia 10
- Sengkang dia 6-15
- Kolom Elevasi +2,93
- Pokok Dia 10
- Sengkang dia 6-15
- Kolom Elevasi +2,95
- Pokok Dia 10
- Sengkang dia 6-15
- Kolom Elevasi +3,15
- Pokok Dia 10
- Sengkang dia 6-15
- Kolom Elevasi +3,34
- Pokok Dia 10
- Sengkang dia 6-15
- Kolom elevasi +3,36
- Pokok Dia 10
- Sengkang dia 6-15
- Kolom Elevasi +3,63
- Pokok Dia 10
- Sengkang dia 6-15
- Pembesian
- Kolom Elevasi 0
- Pokok Dia 10
- Sengkang dia 6-15
- Bekisting
4 Pek. Sloof Beton Bertulang
- Cor Beton 1:3:5
- Balok 15/20
- Pembesian
- Balok 15/20
- Pokok Dia 10
- Sengkang dia 6-15
- Bekisting
- Bekisting
8 Pek. Ringbalk Beton Bertulang
- Cor Beton 1:3:5
- Pembesian
- Pokok Dia 8
- Sengkang dia 6-15
- Bekisting
9 Pek. Plat Beton Bertulang T = 10 cm
- Pengurangan
SD
J1
J2
J3
J4
P1
P2
Dinding Pintu
Ventilasi (WC)
Ventilasi Dapur
XI PEKERJAAN PENGECATAN
1 Pek. Pengecatan Plafond
2 Pek. Pengecatan list Plafond
ACK UP DATA PERHITUNGAN
0.98
0.50 0.50 0.50 4.00 0.50
8.00 0.20 0.15 2.00 0.48
1/3 0.98
0.32
0.40 0.40 0.50 4.00 0.32
6.22 4.00
1.48
0.40 3.00 0.62 0.74 5.92
0.40 3.00 0.62 0.74
0.12
0.20 0.20 0.50 4.00 0.08
0.20 0.20 0.50 2.00 0.04
4.62 4.00
2.31
0.50 6.00 0.62 1.85
0.69 3.00 0.22 0.46
2.31
0.50 6.00 0.62 1.85
0.69 3.00 0.22 0.46
0.80
0.80 0.50 0.40
0.80 0.50 0.40
0.62
0.20 0.20 3.85 4.00 0.62
13.33 4.00
53.33
3.85 4.00 0.62 9.50 53.33
0.69 25.00 0.22 3.83
5.60
28.00 0.40 0.50 5.60
1/3 5.60
9.10 9.50 0.45 38.90
3.36
0.50 0.70 0.20 - -
28.00 0.30 0.40 3.36
4,029.07 -
3.39
0.70 5.00 0.62 2.16
0.50 4.00 0.62 1.23
4,025.68
0.30 2.00 0.62 0.37
28.00 233.00 0.62 4,025.31
-
- - 0.62 -
- - 0.62 -
1.34
0.20 0.20 2.36 4.00 0.38
0.20 0.20 2.63 - -
0.20 0.20 2.65 - -
0.20 0.20 2.85 4.00 0.46
0.20 0.20 3.04 - -
0.20 0.20 3.06 - -
0.20 0.20 3.18 4.00 0.51
92.95 12.00
157.94 473.82
2.36 6.00 0.62 8.74 44.14
0.69 15.00 0.22 2.30
-
2.63 6.00 0.62 9.74
0.69 17.00 0.22 2.60
-
2.65 6.00 0.62 9.81
0.69 17.00 0.22 2.60
0.62
0.20 0.20 3.85 4.00 0.62
13.33 4.00
53.33
3.85 4.00 0.62 9.50 53.33
0.69 25.00 0.22 3.83
0.84
28.00 0.15 0.20 0.84
128.02
1.38
46.00 0.10 0.30 1.38
#REF!
#REF!
46.00 4.00 0.62 113.53
46.00 2.00 0.40 36.34
0.69 306.00 #REF! #REF!
46.00 0.60 27.60
34.00
3.50 8.00 28.00
3.00 2.00 6.00
0.41
7.15 0.10 0.20 0.14
9.00 0.10 0.30 0.27
60.57
22.06
7.15 6.00 0.40 16.95
0.49 47.00 0.22 5.11
38.51
9.00 4.00 0.62 22.21
9.00 2.00 0.40 7.11
0.69 60.00 0.22 9.19
105.28
28.00 3.76 105.28
3.30 -
3.40 -
3.30 -
3.30 -
2.80 -
44.48
2.50 1.20 3.00 9.00
2.50 1.74 1.00 4.35
2.50 1.70 1.00 4.25
2.50 2.74 1.00 6.85
2.50 4.90 1.00 12.25
2.00 0.80 2.00 3.20
2.00 0.70 2.00 2.80
2.00 0.80 1.00 1.60
0.40 0.20 1.00 0.08
0.50 0.20 1.00 0.10
3.32
16.61 0.20 3.32
2.00 60.80
3.00 9.00
6.00
6.00
3.00
57.77
4.90 5.89 28.86
4.90 5.90 28.91
43.18 43.18
21.58
21.60
3.68
5.90 4.90 0.05 1.45
5.90 4.90 0.05 1.45
3.80 2.40 0.05 0.46
1.40 2.40 0.05 0.17
1.40 2.40 0.05 0.17
4.46
2.50 4.44 0.05 0.56
14.11 1.44 0.05 1.02
5.00 7.98 0.05 2.00
2.13 0.41 0.05 0.04
3.91 1.82 0.05 0.36
2.00 0.87 0.05 0.09
2.35 3.49 0.05 0.41
5.67
7.18 15.80 0.05 5.67
Total Satuan UNIT Total Satuan
12 13 14 15 16
1.00 Ls - 1.00 Ls
1.00 Ls - 1.00 Ls
1.00 Ls - 1.00 Ls
1.00 Unit - 1.00 Unit
1.00 Unit - 1.00 Unit
1.00 Unit - 1.00 Unit
0.98 0.98 M3
0.33 0.33 M3
M3
52.75 52.75 M3
140.66 140.66 M2
0.32 0.32 M3
24.89 24.89 Kg
0.12 0.12 M3
18.48 18.48 Kg
0.80 0.80 M2
0.24 0.24 M3
36.56 36.56 Kg
0.80 0.80 M2
0.62 0.62 M3
53.33 53.33 Kg
3.08 3.08 M2
0.14 0.14 M3
31.58 31.58 Kg
0.36 0.36 M2
80.00 80.00 M2
80.00 M2
6.00 M1
5.60 5.60 M3
1.87 1.87 M3
38.90 38.90 M3
3.36 3.36 M3
- - Kg
1.34 1.34 M3
157.94 157.94 Kg
28.00 28.00 M1
2.54 2.54 M2
0.62 0.62 M3
53.33 53.33 Kg
3.08 3.08 M2
0.84 0.84 M3
128.02 128.02 Kg
11.20 11.20 M2
1.38 1.38 M3
#REF! #REF! Kg
6.90 6.90 M2
34.00 34.00 M1
0.41 0.41 M3
60.57 60.57 Kg
1.01 1.01 M2
0.42 0.42 M3
60.34 60.34 Kg
1.40 1.40 M2
3.41 3.41 M3
60.80 60.80 M2
3.32 3.32 M2
121.60 121.60 M2
121.60 121.60 M2
62.54 62.54 M2
62.54 M2
6.00 M1
- Bh
3.00 Bh
3.00 Bh
1.30 M1
1.00 Bh
9.00 Bh
6.00 Bh
6.00 Bh
3.00 Bh
57.77 57.77 M2
57.77 M2
43.18 43.18 M1
3.68 3.68 M3
RENCANA ANGGARAN BIAYA ( RAB )
ENGINEERS ESTIMATE ( EE )
Pekerjaan : Rehabilitasi Ruang Kepsek, Kamar Asrama Putri Dan Ruangan Lobby
Lokasi : Sekolah Luar Biasa (SLB) Muara Bungo
Tahun Pekerjaan : 2021
I. PEKERJAAN PENDAHULUAN
1 - Pek. Pembersihan Ls 1.00 250,000.00 250,000.00
2 - Pek. Dokumentasi Dan Pelaporan Ls 1.00 500,000.00 500,000.00
X. PEKERJAAN ATAP
1 - Pek. Pas. Atap Baja Ringan M2 80.00 307,357.38 24,588,590.40
2 - Pek. Pas. Seng BJLS 20 Warna M2 80.00 87,648.00 7,011,840.00
3 - Pek. Pas. Talang Air PVC M1 6.00 75,000.00 450,000.00
4 - Pek. Pembersihan Akhir Ls 1.00 500,000.00 500,000.00
Kegiatan : Rehabilitasi Ruang Kepsek, Kamar Asrama Putri Dan Ruangan Lobby
Lokasi : Sekolah Luar Biasa (SLB) Muara Bungo
Tahun Anggaran : 2021
TERBILANG : SERATUS TUJUH PULUH TIGA JUTA TIGA PULUH LIMA RIBU RUPIAH