Anda di halaman 1dari 1

120°

L 90.90.9
.9 0.9 L9
90 0. 9
L 0.9
L9 0.9
0 .9 0.9
0.9 L9

30° 30°
L 90.90.9 L 90.90.9
65

16 25

6000

KUDA-KUDA RANGKA ATAP


Skala 1:50

NO PERBAIKAN/REVISI PARAF/TGL

POLITEKNIK NEGERI BANDUNG


JURUSAN TEKNIK SIPIL
PROGRAM STUDI D3
TEKNIK KONSTRUKSI GEDUNG

50
JUDUL PEKERJAAN

60
KUDA-KUDA RANGKA ATAP

60
50
JUDUL GAMBAR

KUDA-KUDA DAN DETAIL RANGKA

50 60 60 60 60 50 PARAF/TGL

DIGAMBAR M. ALIF FATHUROHMAN

DETAIL A DIPERIKSA

DISETUJUI
HERI KASYANTO, ST,M.Eng.

SKALA KODE GBR NO GBR

Skala 1:10
1 : 50

Anda mungkin juga menyukai