Master Analisa permenPU16
Master Analisa permenPU16
JUMLAH = Rp 3,845,528,777.28
PPN 10 % = Rp 384,552,877.73
Jumlah BKF = Rp 4,230,081,655.01
Dibulatkan = Rp 4,230,081,000.00
Rp 3,959,629,000.00
270,452,000.00
Terbilang : // Empat Milyard Tujuh Ratus Enam Puluh Satu Juta Dua Ratus Enam Puluh Enam Ribu Rupiah //
Ir. SAHIRWAN
Direktur
RENCANA ANGGARAN BIAYA
Jumlah I 5,204,332.53
II Pekerjaan Beton
1 Rabatan lantai bangunan t : 5 cm m³ 27.60 854,325.24 23,579,376.61
2 Kolom KP, 15x15 m³ 1.80 6,254,757.55 11,258,563.59
3 Kolom KK, 10x10 m³ 0.06 7,307,541.10 438,452.47
4 Balok latai, 15x20 m³ 0.18 5,860,996.99 1,054,979.46
5 Meja dapur m³ 0.11 5,943,528.01 653,788.08
Jumlah II 36,985,160.21
III Pekerjaan Pasangan
1 Pasang Dinding Bata 1:3 m² 30.77 137,449.13 4,229,309.58
2 Pasang Dinding Bata 1:5 m² 319.68 131,155.75 41,927,870.16
3 Plesteran Dinding 1:5 m² 893.12 40,607.60 36,267,459.71
4 Acian m² 1,003.53 30,050.63 30,156,703.71
5 Skoning m' 1,548.96 24,067.45 37,279,517.35
Jumlah IV 65,032,933.87
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
V Pekerjaan granit tile & Keramik
1 Pasang granitile cream 60x60 m² 374.09 257,904.63 96,479,541.17
2 Pasang granitile warna coklat tua 60x60 m² 79.11 301,171.29 23,825,660.88
3 Pasang pola lantai m² 3.60 348,012.96 1,252,846.65
4 Pasang granitile warna hitam 60x60 m² 10.86 348,012.96 3,779,420.73
5 Pasang granitile warna cream aksen kotak 10x10 ttk 40.00 60,000.00 2,400,000.00
6 Batu sikat ( canopy + divable ) m² 107.20 258,410.08 27,701,560.04
7 Pasang granitile 40x40 sepatu pilar m² 7.20 411,585.15 2,963,413.07
8 Stepnosing / jasa membuat garis di granitile m' 52.2 38,685.69 2,019,393.21
9 Pasang plint warna cream 363.09 51,250.49 18,608,538.60
10 Pasang granitile kusen / gawangan pintu utama m² 9.60 411,585.15 3,951,217.42
11 Pasang keramik lantai 30x30 kasar ( KM/WC ) m² 13.4 278,457.25 3,731,327.15
12 Pasang keramik dinding 30x60 ( KM/WC ) m² 64.94 279,764.87 18,167,930.66
13 List keramik dinding 5x30 ( KM/WC ) m' 31.58 110,308.55 3,483,544.01
14 Pasang granitile 60x60 meja pantry dan dinding m² 2.41 257,904.63 621,550.15
Jumlah V 208,985,943.73
VI Pekerjaan Kusen, pintu, jendela dan Partisi
1 Pasang kusen Kayu Jati 6/15, Ex. Bojonegoro KW II m³ 0.69 47,417,562.50 32,718,118.13
2 Pasang daun pintu panil kayu jati
Ukuran 80x210 cm Lbr 4.00 5,325,474.00 21,301,896.00
3 Pasang daun pintu panil kayu jati
Ukuran 75x210 cm Lbr 2.00 4,992,631.88 9,985,263.75
4 Pasang daun pintu panil kayu jati
Ukuran 70x210 cm Lbr 2.00 4,659,789.75 9,319,579.50
5 Pasang daun pintu panil kayu jati
Ukuran 40x210 cm Lbr 2.00 2,662,737.00 5,325,474.00
6 Pasang daun pintu panil kaca es kayu jati
Ukuran 80x210 cm Lbr 3.00 4,644,252.62 13,932,757.87
7 Pasang pintu triplek lapis HPL
Ukuran 70x210 cm Lbr 4.00 1,283,030.21 5,132,120.84
8 Pasang daun BV panil kaca bevel kayu jati
Ukuran 80x40 cm Lbr 5.00 730,533.76 3,652,668.80
9 Pasang daun BV panil kaca bevel kayu jati
Ukuran 75x40 cm Lbr 2.00 684,875.40 1,369,750.80
10 Pasang daun BV panil kaca bevel kayu jati
Ukuran 70x40 cm Lbr 2.00 639,217.04 1,278,434.08
11 Pasang daun BV panil kaca bevel kayu jati
Ukuran 57x40 cm Lbr 4.00 520,505.30 2,082,021.22
12 Pasang kusen aluminium 4" coklat + sialent m' 72.76 124,433.65 9,053,792.37
13 Pasang daun BV kaca frame almunium coklat, kitchment
Ukuran 40 x 60 Unit 25.00 343,508.04 8,587,700.88
14 Pasang pintu ( gabung partisi ) PT1 Unit 9.00 4,859,126.01 43,732,134.13
15 Pasang pintu ( gabung partisi ) PT2 Unit 1.00 4,072,702.60 4,072,702.60
16 Pasang pintu ( gabung partisi ) PT3 Unit 7.00 1,554,421.42 10,880,949.92
17 Pasang pintu ( gabung partisi ) PT4 Unit 1.00 4,590,843.08 4,590,843.08
18 Pasang pintu ( gabung partisi ) PT5 Unit 1.00 1,036,280.94 1,036,280.94
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
Jumlah VI 188,052,488.92
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
VII Pekerjaan Railling dan Backdroup
1 Pasang railling tangga ( Tangga Utama ) m' 10.35 750,000.00 7,762,500.00
2 Pasang railling tangga kayu 5/7 ( Tangga Utama ) m' 20.74 91,700.00 1,901,858.00
3 Pasang railling stainless steel Ø 2" untuk divable m' 4.82 135,000.00 650,700.00
4 Backdroup Ruang receptionis m² 25.91 881,000.00 22,826,710.00
5 Meja counter ruang receptionis m' 4.90 2,477,000.00 12,137,300.00
Jumlah IX 75,254,541.97
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
X Pekerjaan Perlengkapan Sanitary
1 Pasang closet duduk unit 2.00 2,530,880.00 5,061,760.00
2 Pasang closet jongkok unit 2.00 553,745.50 1,107,491.00
4 Pasang washtafel gantung, komplit unit 2.00 2,151,381.10 4,302,762.20
5 Pasang shower sprey bh 2.00 300,960.00 601,920.00
6 Pasang kran bh 4.00 303,215.00 1,212,860.00
7 Floor drain bh 4.00 113,877.50 455,510.00
8 Pasang kitchen zink bh 1.00
9 Pasang kran kitchen zink bh 1.00
Jumlah X 12,742,303.20
Jumlah A1 852,537,809.04
A.II Lantai 2
I Pekerjaan Beton
1 Kolom 20x20 gawang pintu m³ 0.27 4,541,747.68 1,226,271.87
2 Kolom KP, 15x15 dinding dalam m³ 3.67 6,254,757.55 22,954,960.21
3 Kolom KK, 10x10 m³ 0.45 7,307,541.10 3,288,393.49
4 Balok latei , 15x20 dinding dalam m³ 0.96 5,860,996.99 5,626,557.11
5 Ring balk RB, 15x20 m³ 4.51 5,860,996.99 26,433,096.41
Jumlah I 59,529,279.10
II Pekerjaan Pasangan
1 Pasang Dinding Bata 1:3 m² 38.88 137,449.13 5,344,021.98
2 Pasang Dinding Bata 1:5 m² 512.99 131,155.75 67,281,588.19
3 Plesteran Dinding 1:5 m² 1,331.35 40,607.60 54,062,928.26
4 Acian tembok dan beton m² 1,307.25 30,050.63 39,283,679.53
5 Skoning m' 2,188.35 24,067.45 52,668,004.21
Jumlah II 218,640,222.17
III Pekerjaan Plafond
1 Pasang plafond gypsum 9 mm+ rangka hollow m² 431.10 141,494.65 60,998,343.62
2 Pasang plafond kalsiboard + rangka hollow m² 195.31 152,425.57 29,770,238.08
3 Pasang List tali air 5/5 m' 22.10 27,097.95 598,864.70
4 Pasang drop celling gypsum 9 mm, tinggi 20 cm m' 73.30 44,452.21 3,258,346.99
5 Pasang drop celling gypsum 9 mm, tinggi 10cm m' 59.60 24,711.17 1,472,785.73
6 Pasang List siku gypsum 20 cm m' 26.70 39,486.70 1,054,294.89
7 Pasang List siku gypsum 15 cm m' 333.32 37,066.70 12,355,072.44
8 Pasang List siku gypsum 5, cm m' 72.90 21,336.70 1,555,445.43
9 Pasang List siku gypsum 3 cm m' 96.33 20,073.90 1,933,718.79
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
Jumlah IV 158,142,872.77
V Pekerjaan Kusen, pintu dan jendela
1 Pasang kusen Kayu Jati 6/15, Ex. Bojonegoro KW II m³ 0.91 47,417,562.50 43,149,981.88
2 Pasang daun pintu panil kayu jati
Ukuran 75x210 cm Lbr 2.00 4,992,631.88 9,985,263.75
3 Pasang daun pintu panil kayu jati
Ukuran 80x210 cm Lbr 11.00 5,325,474.00 58,580,214.00
4 Pasang daun pintu panil kayu jati
Ukuran 70x210 cm Lbr 1.00 4,659,789.75 4,659,789.75
5 Pasang daun pintu panil kayu jati
Ukuran 40x210 cm Lbr 5.00 2,662,737.00 13,313,685.00
6 Pasang daun BV panil kaca bevel kayu jati
Ukuran 40x80 cm Lbr 6.00 730,533.76 4,383,202.56
7 Pasang daun BV panil kaca bevel kayu jati
Ukuran 40x75 cm Lbr 8.00 684,875.40 5,479,003.20
8 Pasang daun BV panil kaca bevel kayu jati
Ukuran 40x57 cm Lbr 10.00 520,505.30 5,205,053.04
9 Pasang pintu triplek lapis HPL
Ukuran 70x210 cm Lbr 6.00 1,283,030.21 7,698,181.26
10 Pasang kusen aluminium 4" coklat + sealent m' 214.60 124,433.65 26,703,461.29
11 Pasang daun jendela kaca frame almunium coklat, kitchment
Ukuran 60 x 110 Unit 20.00 944,647.10 18,892,941.94
12 Pasang daun BV kaca frame almunium coklat, kitchment
Ukuran 40 x 70 Unit 6.00 400,759.37 2,404,556.25
13 Pasang daun BV kaca frame almunium coklat, kitchment
Ukuran 40 x 60 Unit 60.00 343,508.04 20,610,482.11
Jumlah V 221,065,816.02
VI Pekerjaan Railling Void
1 Pasang railling void m' 4.96 750,000.00 3,720,000.00
2 Pasang railling void kayu 5/7 m' 4.96 91,700.00 454,832.00
Jumlah VI 4,174,832.00
VII Pekerjaan Kaca, Pengunci dan Penggantung
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
1 Handle stainless steel 1,5"x60cm bh 4.00 245,836.25 983,345.00
2 Engsel floor hing bh 4.00 1,500,000.00 6,000,000.00
3 Grendel tanam pintu bh 10.00 140,685.88 1,406,858.75
4 Engsel pintu kayu 4" bh 66.00 69,735.88 4,602,567.75
5 Engsel dan BV kayu 3" bh 46.00 47,957.25 2,206,033.50
6 Hak angin sikutan ( BV kayu ) bh 46.00 64,842.25 2,982,743.50
7 Grendel ( BV kayu ) bh 23.00 51,035.88 1,173,825.13
8 Kunci pintu dengan handle bh 19.00 398,227.50 7,566,322.50
9 Kaca polos 5 mm m² 3.01 133,816.10 402,786.46
10 Kaca polos 10 mm m² 15.80 328,893.13 5,196,511.38
11 Kaca reyben 5 mm m² 14.80 195,520.88 2,893,708.95
12 Kaca es 5 mm m² 7.80 171,925.88 1,341,021.83
Jumlah IX 24,793,978.00
Jumlah A2 926,896,529.14
Jumlah A 1,779,434,338.18
B PENEBALAN DINDING ORNAMEN
1 Rabatan t=5 cm di atas rabatan untuk dudukan rangka m² 0.83 854,325.24 709,089.95
2 Pasang Almunium Composit Panel ( ACP ) + rangka m² 446.28 836,826.65 373,458,997.36
Jumlah B 374,168,087.31
Jumlah I 611,375,950.84
II Pekerjaan Electronik
a Pekerjaan Sound System
Pengadaan dan pemasangan sistem lengkap dengan Fitting &
Material bantu sesuai Gambar dan Spesifikasi Teknis
Peralatan Utama
Power Amplifier 160 W bh 1.00 5,772,200.00 5,772,200.00
Mixer Pre Amplifier / Sistem Controller bh 3.00 17,616,400.00 52,849,200.00
Power Amplifier 120 W bh 3.00 4,737,200.00 14,211,600.00
Paging Microphone & Chime Tone + Key Pad bh 3.00 2,874,200.00 8,622,600.00
RECTIFIER bh 3.00 550,200.00 1,650,600.00
Change over swith (cos) bh 3.00 720,900.00 2,162,700.00
Jumlah a 104,961,700.00
Jumlah b 13,138,500.00
a. CCTV LANTAI 1
Peralatan Fixture
1 Dome Camera Colour Fixed bh 5.00 1,632,200.00 8,161,000.00
2 CCD Camera colour fixed c/w housing indoor type bh 4.00 3,702,200.00 14,808,800.00
3 Instalasi kabel Video
- Coaxial Cable RG-6 + Pipa Conduit 20mm bh 9.00 272,400.00 2,451,600.00
4 Instalasi kabel power
- NYM 3x2,5mm + Pipa Conduit 20mm ttk 9.00 303,400.00 2,730,600.00
b. CCTV LANTAI 2
Peralatan Fixture
1 Dome Camera Colour Fixed bh 3.00 1,632,200.00 4,896,600.00
2 Instalasi kabel Video
- Coaxial Cable RG-6 + Pipa Conduit 20mm bh 3.00 272,400.00 817,200.00
3 Instalasi kabel power
- NYM 3x2,5mm + Pipa Conduit 20mm ttk 3.00 303,400.00 910,200.00
Jumlah c 72,079,300.00
d Pekerjaan Telepon
PERALATAN UTAMA ( tidak dikerjakan )
1 MDP kapasitas 30 pairs,LSA plus conector,dilengkapi dgn panel, bh - - -
kunci dan lebel port dan surge arrester -
2 PABX kapasitas 50 EXT. dilengkapi dgn batteray cadangan lengkap bh - - -
3 Telepon Box sebagai Roset Telkom, bh - - -
5 UPS Cap. 1 KVA ( lengkap dengan lightning arrester ) bh - - -
a. TELEPHONE LANTAI 1
Instalasi
1 TB -TLP (10 Pair ) bh 1.00 637,700.00 637,700.00
2 Kabel ITC 10 x 2 pair x 0.6 mm mtr 10.00 86,100.00 861,000.00
3 Outlet Telepon RJ - 11 bh 5.00 174,100.00 870,500.00
4 Telephone ( tidak dikerjakan ) bh
5 Inst. Telp. ITC 2 X 2 X 06mm2 (dlm pipa PVC conduit Ø 20mm) bh 5.00 182,900.00 914,500.00
b. TELEPHONE LANTAI 2
Instalasi
1 TB -TLP (20 Pair ) bh 1.00 741,200.00 741,200.00
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
3 Kabel ( ITC 20 x 2 pair x 0.6 mm ) mtr 15.00 133,100.00 1,996,500.00
4 Outlet Telepon RJ - 11 bh 9.00 174,100.00 1,566,900.00
5 Telephone ( tidak dikerjakan ) bh
Inst. Telp. ITC 2 X 2 X 06mm2 (dlm pipa PVC conduit Ø 20mm) bh 9.00 182,900.00 1,646,100.00
Jumlah d 9,234,400.00
e Pekerjaan MATV
Pengadaan dan pemasangan sistem lengkap dengan Fitting & Material bantu
sesuai gambar dan Spesifikasi Teknis
1 ANTENA VHF bh 1.00 700,700.00 700,700.00
2 ANTENA UHF bh 1.00 700,700.00 700,700.00
3 Masthead Amplifier bh 1.00 3,702,200.00 3,702,200.00
4 Power surge arrester dan Line surge arrester bh 1.00 4,219,700.00 4,219,700.00
5 Wallmounted Rack bh 1.00 4,944,200.00 4,944,200.00
Pekerjaan Distribusi
MATV LANTAI 1
1 Terminal Box MATV bh 1.00 485,000.00 485,000.00
2 Booster bh 1.00 2,149,700.00 2,149,700.00
3 Splitter 8 Way bh 1.00 203,400.00 203,400.00
4 TV Outlet bh 4.00 174,100.00 696,400.00
5 Inst.cabel Coaxial Cable RG-6 + Pipa Conduit 20mm ttk 4.00 246,500.00 986,000.00
8 Coaxial Cable RG-11 + Pipa Conduit 20mm mtr 4.00 63,800.00 255,200.00
MATV LANTAI 2
1 Terminal Box MATV bh 1.00 485,000.00 485,000.00
2 Splitter 4 Way bh 1.00 148,200.00 148,200.00
3 TV Outlet bh 3.00 174,100.00 522,300.00
4 Inst.cabel Coaxial Cable RG-6 + Pipa Conduit 20mm ttk 3.00 246,500.00 739,500.00
Jumlah e 20,938,200.00
Jumlah II 220,352,100.00
III Pekerjaan Instalasi Plumbing
Lantai 1
a. Instalasi Pipa air bersih
1 Pipa PPR Diameter. 25 mtr 30.00 37,250.00 1,117,500.00
2 Pipa PPR Diameter. 20 mtr 215.00 18,100.00 3,891,500.00
3 Pipa PPR Diameter. 40 mtr 78.00 62,860.00 4,903,080.00
4 Pompa Transfer Cap. 200 ltr/menit + rumah pompa 0,8x0,8x1,00m unit 1.00 3,950,000.00 3,950,000.00
- Assesoris Pompa (gate valve,cek valve,gauge strainer, dll)
- Fiting-fiting dan material bantu lainnya
5 Fitting & alat bantu ls 1.00 250,000.00 250,000.00
b. Instalasi Pipa air Buangan
1 Pipa PVC Diameter 100 mtr 96.00 84,970.00 8,157,120.00
2 Pipa PVC Diameter 80 mtr 72.00 60,300.00 4,341,600.00
3 Pipa PVC Diameter 65 mtr 50.00 49,790.00 2,489,500.00
4 Pipa PVC Diameter 50 VENT mtr 26.00 41,110.00 1,068,860.00
5 Fitting & alat bantu ls 1.00 250,000.00 250,000.00
Harga Satuan Jumlah
No Uraian Pekerjaan Sat Volume
(Rp) (Rp)
c Sanitary & Accessories
1 Clean Out Dia.100 bh 4.00 375,600.00 1,502,400.00
2 Clean Out Dia. 50 bh 4.00 315,000.00 1,260,000.00
Lantai 2
a Instalasi Pipa air bersih
1 Pipa Riser Diameter. 50 mtr 42.00 83,300.00 3,498,600.00
2 Pipa PPR Diameter. 25 mtr 17.00 37,250.00 633,250.00
3 Pipa PPR Diameter. 20 mtr 68.00 18,100.00 1,230,800.00
4 Fitting & alat bantu ls 1.00 250,000.00 250,000.00
ROOF TANK
a Pompa Boster + rumah pompa 0,8 x 0,8 x1,00 m set 1.00 3,050,000.00 3,050,000.00
Kapasitas = 100 Lt/min
Head = 20 meter
Power = 1 KW
Jumlah II 57,171,979.94
III Tiang Bendera
1 Galian tanah m³ 0.29 56,237.50 16,308.88
2 Bor strous Ø25 - 2m m' 2.00 70,683.25 141,366.50
3 Urugan kembali m³ 0.07 15,734.40 1,101.41
4 Urugan pasir bawah pondasi m³ 0.13 214,555.00 27,463.04
5 Lantai kerja t=5 cm m³ 0.02 854,325.24 15,377.85
6 Poer 15x60x60 m³ 0.05 4,502,996.44 243,161.81
7 Kolom 30x30 m³ 0.11 4,762,715.52 535,805.50
8 Urugan kembali m³ 0.33 15,734.40 5,208.09
9 Pasangan batu bata 1 : 3 m² 0.36 137,449.13 49,481.69
10 Pasangan lantai keramik 30x30 m² 1.08 213,765.75 230,867.01
11 Plesteran 1 : 3 m² 0.81 44,034.65 35,668.07
12 Skoning m' 7.20 24,067.45 173,285.64
13 Acian m² 0.81 30,050.63 24,341.01
14 Stainles steel Ø4" t= 2,8m m' 3.40 241,395.00 820,743.00
15 Stainles steel Ø3,5" t= 2,8m m' 3.30 181,045.00 597,448.50
16 Stainles steel Ø3" t= 2,8m m' 3.50 150,865.00 528,027.50
17 Roda bendera bh 1.00 60,345.00 60,345.00
18 Bola stainles steel Ø4" bh 1.00 150,865.00 150,865.00
19 Tempat pengikat tali bendera bh 1.00 30,170.00 30,170.00
20 Tali bendera ( khusus ) m' 20.00 18,100.00 362,000.00
21 Cat dinding exterior m² 0.81 38,204.76 30,945.86
IV Halaman Paving
1 Urugan sirtu lokal t=30cm m³ 247.31 146,547.50 36,242,808.77
2 Urugan pasir t=10cm m³ 82.44 214,555.00 17,687,270.54
3 Pasang paving t=8cm, K-300 m² 824.37 144,520.75 119,138,570.68
4 Pasang paving uskup m' 215.46 84,845.75 18,280,865.30
5 Pasang kanstin m' 74.81 119,565.44 8,944,690.19
Jumlah IV 200,294,205.47
V Saluran drainase
1 Pasangan saluran ( type A ) m' 33.86 1,565,377.26 53,003,674.10
2 Pasangan saluran ( type B ) m' 41.82 1,863,317.31 77,923,929.93
3 Pasangan saluran ( type C ) m' 12.20 852,553.28 10,401,149.96
4 Pasangan saluran PVC Ø 4" ( type D ) m' 20.60 92,042.50 1,896,075.50
5 Pasangan saluran ( type F ) m' 38.24 1,683,228.22 64,366,647.28
Jumlah V 207,591,476.78
Jumlah D 784,052,490.95
DAFTAR HARGA BAHAN DAN UPAH
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR MAHKAMAH AGUNG
KEGIATAN : RENOVASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA SAMPANG TAHAP III
LOKASI : Jl. JAKSA AGUNG SUPRAPTO - KAB. SAMPANG
SUMBER DANA : APBN TAHUN ANGGARAN 2018
II BAHAN
1 Pasir Urug m³ 145,500 145,000.00
2 Pasir Pasang m³ 145,500
3 Pasir beton m³ 326,600 345,800.00
4 Pudel ( lokal ) m³ 105,000
5 Sirtu lokal m³ 95,500
5 Tanah biasa m³
6 Batu belah m³ 216,600 211,350.00
7 Koral Beton 1/2 m³ 285,500 275,400.00
8 Koral Beton 2/3 m³
8 Batu Bata, Bakaran Kayu bh 975 1,000.00
9 Pavingstone Abu-abu t = 8 cm K-300 m² 95,500
9 Pavingstone Abu-abu t = 6 cm, K-300 m² 56,000
10 Kanstin bh 27,500
11 Uskup bh 12,500
10 Bataco roster salip bj 9,000
12 Semen PC (Ex. Gresik @ 40 kg) zak 55,000 1,890.00
13 Semen warna kg 19,500 17,600.00
14 Keramik lantai 25x25 cm, kw 1 m² 52,000
14 Keramik lantai 30x30 cm, ( kasar ) m² 115,000
15 Keramik lantai 30x30 cm, ( putih ) m² 60,500
15 Keramik lantai 40x40 cm, ( motif ) m² 57,500
Keramik lantai 40x40 cm, ( kasar ) 59,000
16 Keramik lantai 60x60 cm m² 121,000
16 Keramik dinding 30x60, cm kw1 m² 122,100
17 Keramik dinding 25x40 cm m² 75,000
18 Keramik Dinding 25x45 cm, kw 1 m²
19 List keramik 5/30 Bh 15,000
20 Plint kayu 1,5 x 8 cm Bh
20 Granitile 60 x 60 ( warna muda ), ex Visensa m² 120,000
21 Granitile 60 x 60 ( warna tua ), ex Terra m² 175,000 161,040.00
22 Granitile 60 x 60, SALSA crystal coffee, m²
23 SALSA crystal almunium, SALSA crystal white sand m²
24 Granitile 60 x 60 ( hitam ), SALSA crystal black m²
22 Granit stone 60 x 60 cm m² 360,000
23 Granitile 40 x 40, ex Granito m² 243,100
24 Batu andesit uk. 20 x 40 m² 102,600
16 Batu sikat m² 126,170
SATUAN HARGA SATUAN CATATAN
NO. NAMA BAHAN BANGUNAN DAN UPAH
( Rp )
25 Granite stone m² -
22 Kayu Jati Balok 8/12, 6/15, kw2 ex Bojonegoro m³ 37,000,000
23 Kayu Jati Papan 3/20, 2/30, kw2 ex Bojonegoro m³ 36,000,000
23 Kayu Kamfer Balok 8/12, 6/15 m³ 14,000,000
24 Kayu Kamfer Papan 3/25 m³ 14,000,000
25 Kayu Kamfer Usuk 5/7 m³ 8,500,000
26 Kayu Bengkirai balok 8/12, 6/15 m³ 5,628,750
25 Kayu Bengkirai Usuk 5/7, reng 2/3 m³ 6,750,000
26 Kayu Meranti MC 5/7 m³ 5,500,000
27 Kayu meranti papan m³ 4,500,000
27 Kayu Meranti MC 2/20 m³ 4,500,000
28 Dolken Kayu Gelam dia.8-10/4 m btg 30,000
29 Plywood ( 1,20 x 2,40 ) m, t = 9 mm lbr 230,000
30 Teakwood (1,22 x 2,44)m, t = 4 mm lbr 90,250
30 Triplek (1,20 x 2,40) m, t = 4 mm lbr 75,000
31 Multiplek (1,20 x 2,40) m, t = 6 mm lbr 93,500
32 HPL (1,20 x 2,40) m lbr 180,000
33 Gypsum board (1,2 x 2,4) m, t = 9 mm lbr 68,000
34 Calsiboard (1,20 x 2,40) m, t = 4,5 mm lbr 95,300
35 Lisplank kalsiplank t = 9 mm, l = 30 cm m' 70,000
36 Pipa hollow 4/4, galvalum m' 6,875
37 Pipa hollow 2/4, galvalum m' 5,600 8,250.00
38 Seng BJLS 40 m' 39,500
38 Rangka galvalume C-80 mm m' 11,000
39 Reng galvalume C-45 mm m' 5,000
38 Kasau galvalum U-75 m' 12,800
39 Reng galvalume C-30 m' 5,500
40 Triplek Lapis formika lbr
41 Atap sular tuf m' 80,000
40 Besi Beton ulir kg 13,600 13,585.00
41 Besi Beton Polos kg 11,600
42 Kawat Bendrat kg 18,600 18,700.00
43 Besi WF kg 12,700 15,850.00
44 Besi CNP kg 12,600 14,850.00
SATUAN HARGA SATUAN CATATAN
NO. NAMA BAHAN BANGUNAN DAN UPAH
( Rp )
45 Besi Plat landasan ,Trekstang kg 16,500 15,950.00
46 Kawat las RB kg 25,500
47 Paku Reng kg 19,700
48 Paku Usuk kg 19,700 19,800.00
49 Paku Eternit kg 24,500
50 Paku Skrup kg 22,450 22,000.00
51 Angker + baut Æ 19 mm ST. 41 bh 46,850
52 Angker + baut Æ 12 mm ST. 41 bh 9,950
52 Mur + baut Æ 16 mm bh 22,850
53 Mur + baut Æ 12 mm bh 20,950
54 Paku GRC bh 750
55 Formite / Penjaga jarak bekisting bh 23,750
41 Kusen Aluminium 3" putih ( coating ) m' 73,150
55 Kusen Aluminium 4" coklat m' 90,000
42 Aluminium strip putih m' 28,000
56 Aluminium strip coklat m' 27,000
57 Almunium Composit Panel ( ACP ) m² 354,200
57 Skrup / Ripet bh 2,000
58 Silent / karet kaca tube 55,000
59 Pipa gas 3/4" m' 49,600
60 Pipa PVC 5/8", 4 m ljr 8,800
61 Pipa PVC AW dia. 3/4", 4 m ljr 29,500
62 Pipa PVC AW dia. 1", 4 m ljr 45,500
63 Pipa PVC D dia. 2", 4 m ljr 56,400
64 Pipa PVC D dia. 2,5", 4 m ljr 61,750
63 Pipa PVC D dia. 3", 4 m ljr 115,000
64 Pipa PVC D dia. 4", 4 m ljr 163,000
65 Buis Beton U20 cm bh 20,950
66 Buis Beton U30 cm bh 25,650
67 Buis Beton U40 cm bh 34,950
68 Buis Beton dia 30 cm bh 49,400
64 Atap PVC / rooftop m² 200,200
67 Bubungan PVC / rooftop m' 92,950
67 Genteng glazur Type Natural bh 10,500
68 Genteng bubungan glazur Type Natural bh 17,500
65 Genteng Beton flat ( warna ) bh 10,000
66 Nok AGV ( warna ) bh 11,250
67 Genteng tepi LPV ( warna ) bh 16,300
68 Akhiran nok USPV ( warna ) bh 22,350
67 Eternit 1 X 1 m , t =3, 5 mm lbr 13,750
68 List gypsum 20 cm m' 30,000
69 List gypsum 15 cm m' 28,000
51 List gypsum 10 cm m' 17,500
70 List gypsum 5 cm m' 15,000
List gypsum 3 cm m' 14,000
71 List gypsum 2 cm m' 10,000
72 List gypsum 2 x 10 m' 20,000
71 List kayu 20 cm ( Nyatoh ) m' 23,000
72 List kayu 15 cm ( Nyatoh ) m' 20,500
73 List kayu 10 cm ( Nyatoh ) m' 18,000
73 List kayu 5 cm ( Nyatoh ) m' 15,000
74 List kayu 3 cm ( Nyatoh ) m' 12,500
75 List kayu 2 cm ( Nyatoh ) m' 10,000
75 List kayu 1,5 x 2 ( Nyatoh ) m' 8,500
76 Kertas Gosok lbr 5,000
70 Plamur Tembok kg 27,500
71 Plamur Kayu "Pedang" kg 27,150
SATUAN HARGA SATUAN CATATAN
NO. NAMA BAHAN BANGUNAN DAN UPAH
( Rp )
71 Cat Kayu/Besi EMCO/Setara kg 58,300
72 Cat Tembok interior kg 41,800
73 Cat Tembok exterior kg 86,460
74 Cat Dasar kg 23,100
75 Cat Meni Kayu kg 27,150
75 Cat Meni Besi kg 30,000
76 Minyak Cat / Thinner B ltr 18,200
77 Plitur Jadi ltr -
78 Lem Putih kg 25,000
79 Wood filler Ultran kg 38,500
80 Sanding sealer Ultran kg 44,000
81 Cat warna Ultran kg 58,000
82 Melamic Impra kg 62,200
83 Waterprofing coating, Zinc coat kg 65,500
84 Coating kg 71,500
84 Kaca Tempered 12 mm m² 1,200,000
Kaca polos 10 mm m² 247,500
1 Kaca Polos 8 mm m² 154,000
84 Kaca Polos 6 mm m² 99,000
85 Kaca Polos 5 mm m² 95,000
86 Kaca Rayben 5 mm m² 146,000
87 Kaca Es 5 mm m² 126,500
88 Kaca Painting m² -
88 Acrylic susu 4mm m² -
88 Kunci Pintu Pelor, ex Solid bh 230,500
86 Kaca film m² -
89 Kunci Pintu + Handle, ex Solid bh 320,000
90 Grendel Kunci Toilet, ex Solid Set 78,000
91 Kunci pintu kaca bh 950,000
92 Handle 1,5" x 120 cm, stainless steel bh 325,000
93 Handle 1,5" x 100 cm Pasang 500,000
94 Handle 2" x 60 cm Pasang 300,000
93 Handle 1,5" x 60 cm bh 175,500
95 Handle 40 cm Pasang -
Floor hing, ex Dorma bh 1,250,000
93 Engsel 4”, ex DHS bh 49,000
94 Engsel 3”, DHS bh 34,000
95 Grendel Tanam Pintu bh 113,500
96 Grendel Jendela bh 32,000
97 Hak Angin bh 34,600
98 Kran Air 3/4" san-ei bh 110,500
98 Kran Bebek, ex San Ei bh 85,000
99 Closed jongkok, type CE 7 bh 280,000
100 Closed jongkok, type CE 9 / TV150NWV12J bh 3,170,000
101 Flush valve C. jongkok, TOTO type TV 150 NWV 12 bh 2,220,000
100 Closed duduk, type CW421J / SW420JP bh 1,870,000
Washtafel meja, type L521 V3 bh 638,000
Kran wastafel, type TX 109 LH bh 738,100
101 Kran wastafel, type T 205 MB bh 313,500
102 Pop-Up, type T6JV4N bh 248,600
103 Sifon THX1A-5N bh 290,400
104 Flexible + stop kran, type TX 2275 bh 194,700
105 Wastafel gantung, type LW 236 CJ bh 635,800
106 Sifon THX1A-3N bh 264,000
107 Wastafel sudut, type LW 7 CJ bh 640,200
108 Sifon TX 709 AN bh 412,500
109 Urinal , type U 57 M bh 2,673,000
SATUAN HARGA SATUAN CATATAN
NO. NAMA BAHAN BANGUNAN DAN UPAH
( Rp )
1 Kaca Wastafel bh -
105 Floor drain, bola bh 93,500
110 Avur lantai, type TX 1 BN bh -
106 Avur besi bh 49,500
107 Kitchen Zink bh 253,000
108 Tempat sabun keramik, standart Bh -
111 Tempat sabun, type S6 NV 1 bh 108,900
108 Hand Shower, type THX 118 SJN bh 624,800
109 Double kran TX 423 STI bh 567,600
110 Gantungan handuk, type AW 371 NJ bh 591,800
109 Tempat tisue, type TS 116 R bh 583,000
107 Shower sprey, type THX 20 NB bh 250,800
108 Kran standart, type T23B13V7NB bh 266,200
109 Gantungan pakaian, type TS 118 WSB bh 143,636
110 Hand Dryer, type 4000 C bh 4,700,000
109 Seal tape bh 3,000
110 Septictank + Resapan Komplit unit -
Tandon stailess steel 1 m³ unit 3,250,000
111 Kabel NYY 3 x 2,5 mm m' 45,500
110 Kabel NYM 3 x 2,5 mm m' 17,800
111 Kabel NYM 2 x 2,5 mm m' 8,500
112 T Doos PVC bh 1,650
113 Isolator bh 150
114 Fitting plafond bh 25,000
### Lampu LED philips bh -
115 Lampu PL 12 w ( putih DL ) bh -
116 Lampu PL 6 w ( putih out bow ) bh -
117 Lampu PL 7 w ( putih DL ) bh -
118 Lampu LED 6 w ( out bow kuning ) bh -
119 Lampu pagar PL ( 18 watt ) bh -
120 Lampu taman 14 w ( kuning ) bh -
115 Lampu Down light DN051B, LED 12W bh -
116 Lampu Hiled Panel out bow kotak LED 6W bh -
117 Lampu whastafel philips 38110 bh -
118 Box MCB/Presto isi 6 group bh -
119 MCB bh 45,100
120 Sakelar tunggal bh 15,000
121 Sakelar ganda bh 18,000
122 Stop kontak bh 15,100
123 Stop kontak AC bh 35,000
123 Ceiling fan 8" unit -
124 Minyak begesting ltr 15,500
ANALISA HARGA SATUAN
I PEKERJAAN PERSIAPAN
1 Pembersihan 1m² Lapangan dan Perataan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 65,000.00 6,500.00
Mandor L.04 OH 0.0050 95,000.00 475.00
Jumlah tenaga kerja 6,975.00
B BAHAN
-
Jumlah harga bahan -
C PERALATAN
-
-
-
Jumlah harga alat -
-
Jumlah harga bahan -
C PERALATAN
-
-
-
Jumlah harga alat -
-
Jumlah harga bahan -
C PERALATAN
-
-
-
Jumlah harga alat -
II PEKERJAAN TANAH
1 Penggalian 1m³ tanah biasa sedalam 1m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 65,000.00 48,750.00
Mandor L.04 OH 0.0250 95,000.00 2,375.00
1 Pemasangan 1m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1sp : 3pp
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 65,000.00 39,000.00
Tukang batu L.02 OH 0.200 80,000.00 16,000.00
Kepala tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
Jumlah tenaga kerja 59,650.00
B BAHAN
Bata merah m³ 140.000 975.00 136,500.00
Semen portland Kg 32.950 1,375.00 45,306.25
Pasir pasang m³ 0.091 145,500.00 13,240.50
Jumlah harga bahan 195,046.75
C PERALATAN
-
-
-
Jumlah harga alat -
1 Pemasangan 1m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1sp : 3pp
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.320 65,000.00 20,800.00 ###
Tukang batu L.02 OH 0.100 80,000.00 8,000.00 ###
Kepala tukang L.03 OH 0.010 90,000.00 900.00 ###
Mandor L.04 OH 0.015 95,000.00 1,425.00 ###
Jumlah tenaga kerja 31,125.00
B BAHAN
Bata merah m³ 70.000 975.00 68,250.00 ###
Semen portland Kg 14.370 1,375.00 19,758.75 ###
Pasir pasang m³ 0.040 145,500.00 5,820.00 ###
Jumlah harga bahan 93,828.75
C PERALATAN
-
-
-
Jumlah harga alat -
XI PEKERJAAN KAYU
1 Pembuatan dan pemasangan 1m³ kusen pintu dan kusen jendela, kayu kelas II 6/15
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 65,000.00 455,000.00 ###
Tukang kayu L.03 OH 21.0000 80,000.00 1,680,000.00 ###
Kepala tukang L.03 OH 2.1000 90,000.00 189,000.00 ###
Mandor L.04 OH 0.3500 95,000.00 33,250.00 ###
Jumlah tenaga kerja 2,357,250.00
B BAHAN
Balok kayu jati m³ 1.1000 37,000,000.00 40,700,000.00 ###
Paku 10 cm kg 1.2500 19,700.00 24,625.00 ###
Lem kayu kg 1.0000 25,000.00 25,000.00
4 Pembuatan dan pemasangan 1m² pintu dan jendela kaca , kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 65,000.00 52,000.00 ###
Tukang kayu L.03 OH 2.4000 80,000.00 192,000.00 ###
Kepala tukang L.03 OH 0.2400 90,000.00 21,600.00 ###
Mandor L.04 OH 0.0240 95,000.00 2,280.00 ###
Jumlah tenaga kerja 267,880.00
B BAHAN
Papan kayu jati m³ 0.0500 36,000,000.00 1,800,000.00 ###
Lem kayu kg 0.3000 25,000.00 7,500.00
Jumlah harga bahan 1,807,500.00
C PERALATAN
-
-
-
Jumlah harga alat -
11 Pembuatan dan pemasangan 1m² pintu triplek lapis HPL , kayu kamper
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 65,000.00 52,000.00
Tukang kayu L.03 OH 2.4000 80,000.00 192,000.00
Kepala tukang L.03 OH 0.2400 90,000.00 21,600.00
Mandor L.04 OH 0.0240 95,000.00 2,280.00
Jumlah tenaga kerja 267,880.00
B BAHAN
Papan kayu kamper m³ 0.0240 14,000,000.00 336,000.00
Triplek 4 mm m² 2.0000 26,041.67 52,083.33
HPL m² 2.0000 62,500.00 125,000.00
Lem kayu kg 0.5000 25,000.00 12,500.00
12 Pasang 1 Lbr daun pintu triplek lapis HPL ,kayu kamper uk.90x210cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
12 Pasang 1 Lbr daun pintu triplek lapis HPL ,kayu kamper uk.80x210cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
13 Pasang 1 Lbr daun pintu triplek lapis HPL ,kayu kamper uk.70x210cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
14 Pasang 1 Lbr daun pintu triplek lapis HPL ,kayu kamper uk.70x190cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 Pengecatan 1m² plafond + tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 65,000.00 1,300.00
Tukang cat L.02 OH 0.0630 80,000.00 5,040.00
Kepala tukang L.03 OH 0.0063 90,000.00 567.00
Mandor L.04 OH 0.0030 95,000.00 285.00
Jumlah tenaga kerja 7,192.00
B BAHAN
Plamuur kg 0.1000 27,500.00 2,750.00
Cat dasar kg 0.1000 23,100.00 2,310.00
Cat penutup kg 0.2600 41,800.00 10,868.00
Jumlah harga bahan 15,928.00
C PERALATAN
Ampelas lbr 0.250 5,000.00 1,250.00
Kuas/roll bh 0.020 25,000.00 500.00
-
Jumlah harga alat 1,750.00
2 Pengecatan 1m² exterior plafond + tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 65,000.00 1,300.00 ###
Tukang cat L.02 OH 0.0630 80,000.00 5,040.00 ###
Kepala tukang L.03 OH 0.0063 90,000.00 567.00 ###
Mandor L.04 OH 0.0030 95,000.00 285.00 ###
Jumlah tenaga kerja 7,192.00 ###
B BAHAN ###
Plamuur kg 0.1000 27,500.00 2,750.00 ###
Cat dasar kg 0.1000 23,100.00 2,310.00
Cat penutup kg 0.2600 86,460.00 22,479.60
Jumlah harga bahan 27,539.60
C PERALATAN
-
-
-
Jumlah harga alat -
HARGA
NO JENIS PEKERJAAN SATUAN
(Rp)
IPEKERJAAN PERSIAPAN
Pembersihan Lapangan dan Perataan m² 7,672.50
1 Pengukuran dan pemasangan bouwplank m' 125,145.90
2 Pembongkaran tembok bata m³ 511,489.00
3 Pembongkaran beton bertulang m³ 1,022,978.00
II PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1m m³ 56,237.50
2 Pengeboran strous Ø25cm m' 70,683.25
3 Pengeboran strous Ø30cm m' 72,322.25
4 Pengurugan kembali galian tanah m³ 15,734.40
5 Pengurugan dengan pasir urug m³ 214,555.00
5 Pengurugan pedel ( lokal ) m³ 159,087.50
6 Pengurugan sirtu lokal m³ 146,547.50
IV PEKERJAAN BETON
1 Membuat lantai kerja beton m³ 854,325.24
2 Membuat beton ( K-225 ) m³ 1,189,014.18
3 Membuat bekisting untuk pondasi m² 315,557.00
4 Membuat bekisting untuk sloop m² 345,807.00
5 Membuat bekisting untuk balok m² 625,223.50
6 Membuat bekisting untuk kolom m² 602,948.50
7 Membuat bekisting untuk lantai m² 734,948.50
8 Membuat bekisting untuk tangga m² 460,839.50
9 Pembesian besi besi ulir 10 kg 172,425.00
10 Pembesian besi polos 10 kg 149,325.00
11 Membuat Beton Strous Ø25 m³ 2,655,982.98
12 Membuat Beton Strous Ø30 m³ 3,330,036.03
13 Membuat pile cap 40x40x30 m³ 3,795,866.86
14 Membuat pile cap 60x60x15 m³ 4,502,996.44
Membuat pile cap PC0, 120x80x50 m³ 3,701,024.06
14 Membuat pile cap , 120x60x50 m³ 3,909,410.26
15 Membuat pile cap , 60x60x50 m³ 3,260,329.47
16 Membuat sloof , 15x20 m³ 4,292,608.41
Membuat sloof 15x25 m³ 4,227,435.55
17 Membuat sloof 15x30 m³ 4,885,816.90
18 Membuat sloof , 20x30 m³ 4,786,679.62
19 Membuat sloof , 20x40 m³ 5,391,025.62
Membuat kolom 30x60 m³ 5,268,739.94
Membuat kolom 40x40 m³ 5,567,676.43
Membuat kolom 50x50 m³ 3,763,371.73
Membuat kolom 30x40 m³ 5,268,739.94
Membuat kolom 30x50 m³ 5,009,742.74
Membuat kolom 30x30 m³ 4,762,715.52
20 Membuat kolom K0, 30x30 m³ 7,772,907.04
21 Membuat kolom K1, 30x30 m³ 6,776,807.82
22 Membuat kolom K2(pendek), 25x25 m³ 6,683,436.52
23 Membuat kolom 20x20 m³ 4,541,747.68
24 Membuat kolom 20x20 ( struktur ) m³ 6,214,270.18
21 Membuat penebalan, 10x30 m³ 5,710,562.91
HARGA
NO JENIS PEKERJAAN SATUAN
(Rp)
22 Membuat kolom 15x25 m³ 7,328,323.51
23 Membuat kolom 15x20 m³ 8,833,329.92
25 Membuat kolom 25x30 m³ 6,120,082.68
26 Membuat kolom 15x15 m³ 6,254,757.55
27 Membuat kolom 10x10 m³ 7,307,541.10
28 Membuat balok B0, 30x70 m³ 5,266,033.83
29 Membuat balok B0, 30x60 m³ 5,236,958.96
30 Membuat balok B2, 30x50 m³ 5,839,941.67
Membuat balok B2, 30x45 m³ 5,180,332.11
31 Membuat balok B3, 25x40 m³ 6,418,746.43
32 Membuat balok B3, 25x35 m³ 6,163,271.65
33 Membuat balok B4, 20x35 m³ 6,434,249.17
34 Membuat balok B5, 20x30 m³ 6,062,161.80
35 Membuat balok KS, 20x40 m³ 6,211,094.92
36 Membuat balok BLP, 20x30 m³ 6,773,737.99
37 Membuat balok 15x25 m³ 6,457,499.76
37 Membuat balok 15x20 m³ 5,860,996.99
38 Membuat balok 10x15 m³ 7,583,537.42
39 Membuat beton plat level t= 8cm m³ 5,943,528.01
40 Membuat beton plat t= 10cm m³ 5,618,215.33
41 Membuat beton plat t= 12cm m³ 4,301,206.01
42 Membuat beton tangga t= 12cm m³ 5,780,080.82
43 Membuat beton lisplank m³ 4,748,355.24
HARGA
NO JENIS PEKERJAAN SATUAN
(Rp)
V PEKERJAAN BESI DAN ALMUNIUM
1 Pemasangan besi CNP kg 29,617.50
2 Pemasangan rangka kuda - kuda baja IWF kg 29,744.00
3 Memasang Plat simpul , landasan, ikatan gording & Trekstang kg 33,990.00
4 Pemasangan kusen pintu almunium m' 124,433.65
5 Pemasangan frame almunium m' 192,797.00
6 Pemasangan pintu / jendela kaca frame almunium coklat m² 1,431,283.48
Pasang daun pintu kaca frame almunium coklat, uk.90x210cm unit 2,705,125.78
7 Pasang daun pintu kaca frame almunium coklat, uk.80x210cm unit 2,404,556.25
9 Pasang daun pintu kaca frame almunium coklat, uk.40x210cm unit 1,202,278.12
8 Pasang daun jendela kaca frame almunium coklat, uk.60x110cm unit 944,647.10
9 Pasang daun BV kaca frame almunium coklat, uk.40x80cm unit 458,010.71
Pasang daun BV kaca frame almunium coklat, uk.40x70cm unit 400,759.37
10 Pasang daun BV kaca frame almunium coklat, uk.40x60cm unit 343,508.04
14 Pasang daun BV kaca frame almunium coklat, uk.60x84cm unit 721,366.87
15 Pasang daun BV kaca frame almunium coklat, uk.60x70cm unit 601,139.06
16 Pemasangan rangka atap , galvalum m² 379,637.50
11 Pemasangan kasau + reng , galvalum m² 84,328.75
Pemasangan rangka plafond galvalum hollow, modul 60x60cm untuk plafond m² 98,983.50
12 Pemasangan rangka plafond galvalum hollow, modul 60x120cm untuk partisi m² 77,739.75
13 Pemasangan talang datar / jurai seng BJLS 28 lebar 90 cm m' 173,982.05
Pemasangan Almunium Composit Panel ( ACP ) m² 836,826.65
IX PEKERJAAN PLAFOND
1 Pemasangan langit - langit gypsum board ukuran ( 120x240x9 ) mm, t=9mm m² 42,511.15
2 Pemasangan langit - langit calsiboard m² 53,442.07
3 Pemasangan partisi gypsum m² 108,985.80
3 Pemasangan 1 m² langit - langit multyplek lapis HPL m² 163,421.50
HARGA
NO JENIS PEKERJAAN SATUAN
(Rp)
4 Pemasangan langit - langit teakwood m² 163,421.50
4 Pemasangan drop celling gypsum 9mm T.10 cm 24,711.17
5 Pemasangan drop celling gypsum 9mm T.15 cm m' 24,935.57
6 Pemasangan drop celling gypsum 9mm T.20 cm m' 44,452.21
7 Pemasangan drop celling gypsum 9mm T.25 cm 44,527.01
7 Pemasangan drop celling gypsum 9mm T.45 cm m' 58,992.89
8 Pemasangan drop celling multyplek 6mm lapis HPL T.20 cm m' 73,967.96
9 Pemasangan drop celling multyplek 6mm lapis HPL T.35 cm m' 95,909.44
10 Pemasangan drop celling multyplek 6mm lapis tekwood T.45 cm m' 90,730.64
9 Pemasangan drop celling multyplek 6mm lapis HPL T.65 cm m' 144,332.32
10 Pemasangan drop celling multyplek 6mm lapis tekwood T.75 cm m' 154,657.69
7 Pemasangan list gypsum board 2 cm m' 15,233.90
4 Pemasangan list gypsum board 3 cm m' 20,073.90
8 Pemasangan list gypsum board 5 cm m' 21,336.70
8 Pemasangan list gypsum board 2x10 cm m' 27,386.70
5 Pemasangan list gypsum board 15 cm m' 37,066.70
17 Pemasangan list gypsum board 20 cm m' 39,486.70
PROGRAM :
PENINGKATAN SARANA DAN PRASARANA APARATUR
MAHKAMAH AGUNG
KEGIATAN :
RENOVASI DAN PERLUASAN GEDUNG
KANTOR PENGADILAN AGAMA SAMPANG ( TAHAP II )
LOKASI :
Jl. JAKSA AGUNG SUPRAPTO - KAB. SAMPANG
SUMBER DANA :
APBN TAHUN ANGGARAN 2017
MEI 2017
KONSULTAN PERENCANA
PT. KOSA MATRA GRAHA
SUMBER DANA :
APBN TAHUN ANGGARAN 2017
MEI 2017
KONSULTAN PERENCANA
PT. KOSA MATRA GRAHA