C PEKERJAAN PONDASI
1 Pemasangan 1 m3 Pondasi Batu
Belah Campuran 1 SP : 4 PP
- Pekerja OH 1.500 85,000.00 127,500.00
- Tukang Batu OH 0.750 100,000.00 75,000.00
- Kepala Tukang OH 0.075 110,000.00 8,250.00
- Mandor OH 0.075 100,000.00 7,500.00
- Batu Belah m3 1.200 210,000.00 252,000.00
- PC Kg 163.000 1,160.00 189,080.00
- Pasir Pasang Cepu m3 0.520 303,750.00 157,950.00