D PEEKRJAAN ATAP
1 RANGKA ATAP BAJA RINGAN 51.75 M2 Rp 309,799.00
2 PENUTUP ATAP 51.75 M2 Rp 346,132.00
3 KERPUS/ BUBUNGAN 25.875 M' Rp 35,000.00
4 LISPLANK GRC RANGKA KAYU 36 M' Rp 461,632.00
TOTAL
E PEKERJAAN LANGIT-LANGIT
PLAFOND GYPSUM 51.75 M2 Rp 42,550.00
TOTAL
F PEKERJAAN LANTAI
KERAMIK LANTAI 51.75 m2 Rp 133,981.00
KERAMIK LANTAI KM/ WC 2.7 m2 Rp 133,981.00
KERAMIK DINDING KM/WC 8.1 m2 Rp 133,981.00
KERAMIK MEJA DAPUR 4.5 m2 Rp 133,981.00
LANTAI RABAT 5.175 M2 Rp 853,776.00
TOTAL
G PEKERJAAN CAT
CAT DINDING 310.5 M2 Rp 24,440.00
CAT PLAFOND 51.75 M2 Rp 25,285.00
CAT KUSEN & DAUN PINTU 45.17 M2 Rp 28,000.00
CAT LISPLANK 7.2 M2 Rp 25,285.00
H PEKERJAAN LISTRIK
TITIK LAMPU 7 TITIK Rp 286,824.00
SAKLAR 5 BH Rp 286,824.00
LAMPU DOWNLIGHT + PL 14 W 7 BH Rp 59,180.00
STOP KONTAK 5 BH Rp 28,600.00
G PEKERJAAN SANITASI
CLOSED DUDUK 1 bh Rp 800,000.00
HAND SHOWER 1 bh Rp 145,000.00
KRAN AIR 1 bh Rp 50,000.00
FLOOR DRAIN 1 bh Rp 65,000.00
WASH BAK 1 bh Rp 525,000.00
KRAN DAPUR 1 bh Rp 65,000.00
SALURAN AIR BERSIH 11 bh Rp 20,000.00
SALURAN AIR BEKAS 7 bh Rp 20,000.00
SALURAN AIR KOTOR 3 bh Rp 20,000.00
SEPTITANK 1 bh Rp 2,550,000.00
PERESAPAN 1 bh Rp 250,000.00
TOTAL
H PEKERJAAN LAIN-LAIN
KOLOM FANTASI 2 BH Rp 1,691,480.44
PLESTERAN DINDING POLA 6 M2 Rp 50,283.72
BOUVENLIGHT 3.5 M2 Rp 300,000.00
TOTAL
TOTAL KESELURUHAN
JUMLAH HARGA
Rp 1,349,724
Rp 640,304
Rp 1,002,345
Rp 1,002,345
Rp 3,994,718.00
Rp 6,837,200.00
Rp 1,567,106.25
Rp 1,136,648.66
Rp 5,245,026.49
Rp 1,572,398.84
Rp 10,408,730.96
Rp 1,691,480.44
Rp 4,566,997.20
Rp 1,145,357.29
Rp 34,170,946.14
Rp1,505,766
Rp1,505,766
Rp491,633
Rp6,017,297
Rp9,520,461
Rp 4,008,024.56
Rp 17,912,331.00
Rp 905,625.00
Rp 16,618,752.00
Rp 39,444,732.56
Rp 2,201,962.50
Rp 2,201,962.50
Rp 6,933,516.75
Rp 361,748.70
Rp 1,085,246.10
Rp 602,914.50
Rp 4,418,290.80
Rp 13,401,716.85
Rp 7,588,620.00
Rp 1,308,498.75
Rp 1,264,760.00
Rp 182,052.00
Rp 10,343,930.75
Rp 2,007,768.00
Rp 1,434,120.00
Rp 414,260.00
Rp 143,000.00
Rp 3,999,148.00
Rp 800,000.00
Rp 145,000.00
Rp 50,000.00
Rp 65,000.00
Rp 525,000.00
Rp 65,000.00
Rp 220,000.00
Rp 140,000.00
Rp 60,000.00
Rp 2,550,000.00
Rp 250,000.00
Rp 4,870,000.00
Rp 3,382,960.89
Rp 301,702.35
Rp 1,050,000.00
Rp 1,050,000
Rp 122,997,616.15
TIME SCHEDULE & KURVA - S
Bobot
WAKTU PELAKSANAAN = 90 HARI KALENDER
NO URAIAN Nilai Pekerjaan Pekerjaan KET.
Minggu Ke
97.947
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14
93.716
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-89 90
85.123
A PEKERJAAN TANAH 3,994,718.00 3.248 3.248 100
B PEKERJAAN PASANGAN BETON 34,170,946.14 27.782 5.556 5.556 5.556 5.556 5.556
71.430
C PEKERJAAN PINTU DAN JENDELA 9,520,461.35 7.740 1.935 1.935 1.935 1.935
75
57.736
D PEEKRJAAN ATAP 39,444,732.56 32.070 6.414 6.414 6.414 6.414 6.414
47.208
E PEKERJAAN LANGIT-LANGIT 2,201,962.50 1.790 0.895 0.895
38.859
50
F PEKERJAAN LANTAI 13,401,716.85 10.896 2.179 2.179 2.179 2.179 2.179
29.388
G PEKERJAAN CAT 10,343,930.75 8.410 4.205 4.205
19.917
H PEKERJAAN LISTRIK 3,999,148.00 3.251 1.626 1.626 25
14.361
I PEKERJAAN SANITASI 4,870,000.00 3.959 1.980 1.980
8.804
3.248
J PEKERJAAN LAIN-LAIN 1,050,000.00 0.854 0.427 0.427
0
-
Jumlah Bobot Pekerjaan 122,997,616.155 100.000
Kemajuan Pekerjaan Mingguan 3.248 5.556 5.556 5.556 9.471 9.471 8.349 10.528 13.693 13.693 8.593 4.232 2.053 -
Kemajuan Pekerjaan Kumulatif - - 3.248 8.804 14.361 19.917 29.388 38.859 47.208 57.736 71.430 85.123 93.716 97.947 100.000 100.000
48
MENENTUKAN KOEFISIEN
P M
L M
T M
HASIL TEST
P 1M
L 1M
T 1M TANAH PASANGAN BETON ATAP
V 1 M3 36 288 51.75
BERAPA CANGKUL 555 KALI
WAKTU 7 JAM 98 196 98
KOEFISIEN 0.142857 0.367347 0.680556 1.89372
HARGA DASAR SATUAN UPAH
BETMAN LUBIS, SE
Direktur
HARGA DASAR SATUAN BAHAN HARGA PEROLEHAN
HARGA Harga
No. URAIAN KODE SATUAN SATUAN No.
( Rp.)
1 Pasir cor M01a m³ 250,000.00###
2 Pasir cor M01b kg 178.57###
3 Pasir Pasang M09 KG 160.00###
4 Pasir Urug M17 m³ 150,000.00###
5 Tanah Urug M25 m³ 65,000.00###
6 Sirtu M26 m³ 150,000.00###
7 Batu pecah 2/3 cm (split) M27 m³ 260,000.00###
8 Batu pecah 2/3 cm (split) M28 Kg 184.62###
9 Air M30 liter 50.00###
10 Batu belah M31a m³ 220,000.00###
11 PC M31b kg 1,250.00###
12 Semen warna (40 kg) M35 zak 680,000.00###
13 Semen putih (40 kg) M35 zak 92,500.00###
14 Batu Bata M36 bh 750.00###
15 Kapur Pasang M37 m³ 270,000.00###
16 Besi Beton (Polos/Ulir) M38.a kg 13,250.00###
17 Kawat bendrat M38.b kg 19,800.00###
18 Besi Profil Siku M38.b kg 13,800.00###
19 Besi Profil C M39.a kg 13,800.00###
20 Paku usuk/ reng/ eternit M39.b kg 15,000.00###
21 Paku Sekrup M39.c kg 15,000.00###
22 Keramik Lantai KM/WC 20/20 cm Roman Anti Selip M40 m² 95,000.00###
23 Keramik Dinding 20/25 Roman m² 97,500.00
24 Keramik 20/20 cm Roman Polos Dinding muda m² 94,500.00
25 Keramik 20/20 cm Roman Polos meja pantry M41 m² 95,000.00###
26 Keramik 5/20 cm sekualitas Roman Motif Teracota M42 m² 115,000.00
###
27 Keramik List Dinding 7 x 20 cm sekualitas Asia Tile M43 bh 7,500.00###
28 Keramik lantai 40/40 cm sekualitas Asia (warna muda) M56 m² 59,000.00 B e n s
29 Granite Tile Niro Granite Splash Beige M57 m² 175,000.00 S o l a r
30 Granite Tile Niro Unpolish 60/60 cm M58 m² 257,500.00 Minyak
31 Lem Kayu M59 kg 25,000.00 Minyak
32 Granit anti selip 8 x30 cm (ujung pas keramik tangga) M65.a bh 11,500.00 PCI Gird
33 Kalsiboard 1,2 x2,4 m tebal 4 mm M65.b lbr 85,000.00 PCI Gird
34 Bambu Ori M65.c bt 15,000.00 PCI Gird
35 Papan Sengon tebal 2 cm M65.d m³ 2,000,000.00 PCI Gird
36 kayu jati balok M65.e m³ 22,500,000.00 PCI Gird
37 kayu jati papan M65.f m³ 25,000,000.00 PCI Gird
38 kayu jati reng M66 m³ 8,625,000.00 Tiang P
39 kayu kruing 5/7 cm M67 m³ 6,730,000.00 Tiang P
40 kayu kamper balok 6/12 M68 m³ 9,100,000.00 Mini Tim
41 kayu kamper papan M69 m³ 10,250,000.00 Mikro P
42 kayu kruing papan 20 cm M70.a m³ 7,500,000.00 Joint So
43 kayu bangkirai balok M70.b m³ 12,100,000.00 Joint So
44 kayu bangkirai 5/7 cm M71 m³ 9,000,000.00 Elastom
45 kayu bangkirai papan M72.a m³ 14,000,000.00 Elastom
46 kayu meranti/ lanan bekisting M72.b m³ 6,000,000.00 Elastom
47 balok kayu meranti/ lanan M72.c m³ 5,250,000.00 Elastom
48 tripleks 9 mm M73 lbr 121,000.00 Anchora
49 tripleks 4 mm M74 lbr 62,700.00 Ducting
50 rangka holo galvanis 4/4 cm, panj 4 m profile tebal 0,65 M75 M 3,166.67 Ducting
51 rangka holo galvanis 2/4 cm, panj 4 m profile tebal 0,65 M76 M 2,583.33 Expansi
52 rod (besi penggantung) M77 m 4,500.00 Expansi
53 gypsum jaya board 9 mm M78 lbr 75,000.00 Expansi
HARGA Harga
No. URAIAN KODE SATUAN SATUAN No.
( Rp.)
1 Pasir cor M01a m³ 250,000.00###
54 GRC tebal 6 mm (1,2 x2,4) M79 lbr 155,000.00 Expansi
55 meni kayu cap pedang M80 kg 28,000.00 Expansi
56 woodplank tekstur kayu tebal 8 mm M81 ljr (4m) 79,000.00 Strip Be
57 cat genteng sekualitas mowilex kg 74,000.00 Bunker
58 cat tembok sekualitas catylac kg 30,000.00 Pemant
59 cat kayu sekualitas duco nippe M82 kg 65,000.00 Arbocel
60 cat mowilex weather shield M83 kg 120,000.00 Cat
61 cat mowilex interior M84 kg 80,000.00
62 cat lantai tennocote WA M85 kg 55,000.00
63 alkalie kg 25,000.00
64 minyak cat affiner B liter 16,000.00
65 minyak bekisting liter 9,000.00
66 plamur kayu merk pedang kg 28,000.00
67 water profing aquaprof kg 47,500.00
68 lem kayu kg 25,000.00
69 dempul kg 28,000.00
70 batu apung kg 9,700.00
71 politur impra liter 72,000.00
72 plamur tembok kg 27,000.00
73 amplas lbr 4,000.00
74 kaca bening 5 mm sekualitas ashahi m² 115,000.00
75 kaca flora warna 3 mm sekualitas ashahi bh 120,000.00
76 kunci tanam sekualitas merk solid bh 300,000.00
77 kunci tanam kamar mandi sekualitas ALPHA bh 75,000.00
78 engsel; 4" nylon bh 20,000.00
79 engsel 3" nylon bh 16,000.00
80 kait angin bh 16,000.00
81 expagnolet sekualitas solid bh 250,000.00
82 handel/ pegangan pintu 1 35,000.00
83 spring knip 1 12,000.00
84 handel jendela 1 12,500.00
85 profil kaca m 8,000.00
86 skrup metal roof bh 300.00
87 sealent tube 75,000.00
88 wastafel sekualitas TOTO unit 900,000.00
89 urinoir sekualitas TOTO UNIT 1,800,000.00
90 was bak stainless 1 lubang sekualitas royal/ waren UNIT 250,000.00
91 kloset jongkok sekualitas toto UNIT 450,000.00
92 kloset duduk sekualitas toto UNIT 2,460,000.00
93 floor drain stainless bh 40,000.00
94 roof drain kuningan bh 65,700.00
95 kran air d 3/4 sekualitas san ei bh 75,000.00
96 stop kran d1 bh 45,000.00
97 seal tape bh 3,750.00
98 galvalum lebar 60 cm tbl 0,3 m' 38,500.00
99 galvalum lebar 90 cm tbl 0,3 m' 43,000.00
100 buis beton d 20 cm m' 65,000.00
101 buis beton d 30 cm m' 72,000.00
102 buis beton u 20 cm m' 55,000.00
103 buis beton u 30 cm m' 60,000.00
104 ijuk kg 11,500.00
105 pipa pvc d 1/2 4m type AW sesuai sekualitas maspion ljr 22,500.00
106 pipa pvc d 3/4 4m type AW sesuai sekualitas maspion ljr 28,700.00
107 pipa pvc d 1 1/4 4m type AW sesuai sekualitas maspion ljr 67,600.00
HARGA Harga
No. URAIAN KODE SATUAN SATUAN No.
( Rp.)
1 Pasir cor M01a m³ 250,000.00###
108 pipa pvc d 1" 4m type AW sesuai sekualitas maspion ljr 39,200.00
109 pipa pvc d 3" 4m type AW sesuai sekualitas maspion ljr 170,000.00
110 pipa pvc d 4" 4m type AW sesuai sekualitas maspion ljr 281,000.00
111 pipa pvc d 6" 4m type AW sesuai sekualitas maspion ljr 616,000.00
112 pipa pvc d 2" 4m type AW sesuai sekualitas maspion ljr 86,500.00
113 kaca bening tebal 12 mm m2 440,000.00
114 kaca dop tebal 5 mm m2 165,000.00
115 kaca bening teball 8 mm m2 310,000.00
116 kaca bening tebal 10 mm m2 365,000.00
117 kaca flora warna tebal 5 mm m2 160,000.00
118 kaca es tebal 5 mm m2 160,000.00
119 pipa besi hitam d 6" (15,4 cm) tebal 6,2 mm lonjor 2,190,000.00
120 pipa besi hitam d 4" (10,16 cm) tebal 4,2 mm lonjor 804,000.00
121 pipa besi hitam d 2" (5,08 cm) tebal 2 mm lonjor 165,000.00
122 pipa besi hitam d 3" (7,62 cm) tebal 3 mm lonjor 603,000.00
123 batu andesit bakar 20 x 20 cm tebal 3 cm m2 320,000.00
124 paving segienam tebal 8 cm k 300 m2 140,250.00
125 grass block 8 cm sekualitas diamond m2 96,000.00
126 list profil gypsum sedang m 9,000.00
127 rot drat m' 4,250.00
128 lem kuning (fox) kg 35,650.00
129 kalsiboard 6 mm m2 120,000.00
130 GRC 6 mm (1,2 x 2,4) m lbr 155,000.00
131 mandor hari 92,000.00
132 pekerja hari 71,000.00
133 tukang batu hari 83,000.00
134 kepala tukang batu hari 88,000.00
135 tukang kayu hari 83,000.00
136 kepala tukang kayu hari 88,000.00
137 tukang besi hari 83,000.00
138 kepala tukang besi hari 88,000.00
139 tukang cat hari 83,000.00
140 kepala tukang cat hari 88,000.00
141 tukang plitur hari 83,000.00
142 kepala tukang plitur hari 88,000.00
ATAP M2 50,000.00
KANOPI BUAH 400,000.00
PINTU KAMAR MANDI/ WC BUAH 200,000.00
BOUVENLIGHT BUAH 300,000.00
BETMAN LUBIS, SE
Direktur
ANALISA HARGA SATUAN PEKERJAAN
A. TENAGA
B. BAHAN
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
A. TENAGA
B. BAHAN
1. pasir urug m3 1.0000 150,000.00 150,000.00
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
A. TENAGA
B. BAHAN
1. pasir urug m3 1.2000 150,000.00 180,000.00
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
TAHUN : 2021
A. TENAGA
B. BAHAN
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
A. TENAGA
B. BAHAN
1. Sirtu m3 1.20 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C. PERALATAN
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
A. TENAGA
B. BAHAN
1. Batu belah 15/20 cm m3 1.00 220,000.00 220,000.00
2. Pasir Urug m3 1.00 150000 150,000.00
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC m3 1.00 92,500.00 92,500.00
2. PASIR m3 2.00 250000 500,000.00
3. BATU m3 2.00 260,000.00 520,000.00
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC kg 1.00 1,250.00 1,250.00
2. PASIR kg 2.00 178.57 357.14
3. BATA buah 31.05 750.00 23,287.50
JUMLAH HARGA BAHAN 24,894.64
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC kg 1.00 1,250.00 1,250.00
2. PASIR kg 2.00 178.57 357.14
3. BATA buah 1 750.00 750.00
JUMLAH HARGA BAHAN 2,357.14
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC kg 1.00 1,250.00 1,250.00
2. PASIR kg 6.00 178.57 1,071.42
JUMLAH HARGA BAHAN 2,321.42
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC kg 1.00 1,250.00 1,250.00
2. PASIR kg 4.00 178.57 714.28
JUMLAH HARGA BAHAN 1,964.28
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC kg 1.00 1,250.00 1,250.00
2. PASIR kg 2.00 178.57 357.14
3. BATU kg 3.00 184.62 553.86
4. TULANGAN BESI kg 4.00 13250 53,000.00
5. PAPAN KRUNG kg 0.10 6,730,000.00 673,000.00
6. BALOK KAYU kg 0.10 9000000 900,000.00
7. PAKU kg 1.00 15,000.00 15,000.00
JUMLAH HARGA BAHAN 1,643,161.00
C. PERALATAN
A. TENAGA
B. BAHAN
1. PC kg 1.00 1,250.00 1,250.00
2. PASIR kg 2.00 178.57 357.14
3. BATU kg 3.00 184.62 553.86
4. TULANGAN BESI kg 4.00 13,250.00 53,000.00
5. PAPAN KRUNG kg 0.10 6,730,000.00 673,000.00
6. BALOK KAYU kg 0.10 9,000,000.00 900,000.00
7. PAKU kg 1.00 15,000.00 15,000.00
JUMLAH HARGA BAHAN 1,643,161.00
C. PERALATAN
A. TENAGA
B. BAHAN
1. ATAP M2 1.00 50,000.00 50,000.00
2. KANOPI BUAH 2.00 400,000.00 800,000.00
JUMLAH HARGA BAHAN 850,000.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG KAYU Org/hari 1.8937 83,000.00 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. HANDEL JENDELA BH 1.0000 12500
2. HANDEL PINTU BH 1.0000 35,000.00
3. KAYU JATI PAPAN M2 0.02 25,000,000.00 375,000.00
4. KACA BENING 5 MM M2 0.75 115,000.00 86,250.00
JUMLAH HARGA BAHAN 461,250.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG KAYU Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. HANDEL PINTU BH 1.0000 320,000.00 320,000.00
2. KAYU JATI PAPAN M2 0.02 20,000.00 300.00
JUMLAH HARGA BAHAN 320,300.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG KAYU Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. PINTU KAMAR MANDI/ WC BH 1.0000 200000 200,000.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG KAYU Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. KAYU JATI PAPAN BH 0.0250 25,000,000.00 625,000.00
KACA BENING 5 MM BH 0.7500 115,000.00 86,250.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG KAYU Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. BOUVENLIGHT BH 1.0000 300,000.00 300,000.00
2. PAKU KG 1.0000 15,000.00 15,000.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG BESI Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. rangka holo galvanis 4/4 cm, panj 4 m profile tebal M 1.0000 3,166.67 3,166.67
2. PAKU KG 1.0000 15,000.00 15,000.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG BESI Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. ATAP M 1.0000 50,000.00 50,000.00
2. BESI PENGGANTUNG KG 1.0000 4,500.00 4,500.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG BESI Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. PIPA PVC D 4" BH 1.0000 281,000.00 281,000.00
2. BESI PENGGANTUNG KG 1.0000 4,500.00 4,500.00
3. GALVALUM 1.00 43,000.00 43,000.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 1.8937 71,000.0000 134,454.1063
2. TUKANG BESI Org/hari 1.8937 83,000.0000 157,178.74
1.36546184738956 0.195066
B. BAHAN
1. GRC BH 1.0000 155,000.00 155,000.00
2. PAKU KG 1.0000 15,000.00 15,000.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 0.3673 71,000.0000 26,081.6327
2. TUKANG BATU Org/hari 0.3673 83,000.0000 30,489.80
1.36546184738956 0.195066
B. BAHAN
1. KERAMIK BH 1.0000 59,000.00 59,000.00
2. PASIR PASANG KG 1.0000 160.00 160.00
3. SEMEN PORTLAND KG 1.00 1,250.00 1,250.00
4. SEMEN WARNA KG 1.00 17,000.00 17,000.00
JUMLAH HARGA BAHAN 77,410.00
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Org/hari 0.3673 71,000.0000 26,081.6327
2. TUKANG BATU Org/hari 0.3673 83,000.0000 30,489.80
1.36546184738956 0.195066
B. BAHAN
1. KERAMIK BH 1.0000 59,000.00 59,000.00
2. PASIR PASANG KG 1.0000 160.00 160.00
3. SEMEN PORTLAND KG 1.00 1,250.00 1,250.00
4. SEMEN WARNA KG 1.00 17,000.00 17,000.00
JUMLAH HARGA BAHAN 77,410.00
C. PERALATAN
AN-UM 1 A.4.5.1.7. Pemasangan 1 m2 plafond gypsum board ukuran (120x240x9) mm, tebal 9 mm
A TENAGA
Pekerja 0.1000 OH 92,000.00 9,200.00