6 Q-Outflow 0
3
#1 Pintu 1 Elv. 186.82 100.00% 0.000 m /det
#2 Emergency 400mm 100.00% 0.390 m3/det
7 Penguapan 0.00 mm/hari 0.000 m3/det
8 Q-Inflow 6.125 m3/det 5
Dam Instruments
9 Rembesan di waduk (mm)
V-notch 2 (kanan) 94 3.828 liter/det
V-notch 3 (kiri) 17 0.053 liter/det
TOTAL 3.881 liter/det
10 Drainase tebing
V-notch 1 37 0.372 liter/det
V-notch 4 67 1.642 liter/det
TOTAL 2.014 liter/det
14 Curah Hujan Sta. Bendungan Bendo mm
STa. Sooko mm
STa. Poedak mm
15 Temperature max °C
16 Temperature min °C
17 Wind Run Km/hari
18 Barrometer mb