6 Q-Outflow
#1 Pintu 1 Elv. 186.82 100.00% 0.000 m3/det
#2 Emergency 400mm 100.00% 0.406 m3/det
7 Penguapan 0.00 mm/hari 0.000 m3/det
8 Q-Inflow 12.633 m3/det 24
Dam Instruments
9 Rembesan di waduk (mm)
V-notch 2 (kanan) 96 4.035 liter/det
V-notch 3 (kiri) 16 0.046 liter/det
TOTAL 4.080 liter/det
10 Drainase tebing
V-notch 1 20 0.080 liter/det
V-notch 4 42 0.511 liter/det
TOTAL 0.591 liter/det
14 Curah Hujan Sta. Bendungan Bendo 3.00 mm
STa. Sooko 12.00 mm
STa. Poedak 37.00 mm
15 Temperature max °C
16 Temperature min °C
17 Wind Run Km/hari
18 Barrometer mb