BAB II
ANALISA DAN PERHITUNGAN
1
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Tinggi Kuda-kuda
tinggi
tan α = 1 3,64 m
xL
2 200
tinggi 10 m
tan 20 = 1
x 20
2
Tinggi = tan 200 x 10
= 3,64 m
Dengan Kemiringan:
10,64 m
1 2
Ls =
√( 2 )
l +H 2
= √ 102 +3,642
3,64 m
= 10,64 m 200
10 m
2
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
3
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
1
qD = 20,53 kg/m => RD = ×Qd × L (jarak kuda kuda)
2
1
= x 20,53 x 4,5 = 46,193 kg
2
RDx = RD x sin 200
= (46,193) x sin 200 = 15,799 kg
1 L
RDy = ( ( ))
2
xx
2
x cos α0
1 4,5
= (2 ( ))
x 20,53 x
2
x cos 200
= 21,703 kg
1
qD = 20,53kg/m => MD = × Qd× L(jarak kuda kuda)2
8
1
= x 20,53 x 4,52 = 51,967 kgm’
8
MDx = MD x sin α
= (51,967) x sin 200 = 17,774 kgm’
2
1 L
MDy
8 ( (
= x x ( jarak kuda kuda)
2 ) ) x cos α
2
1 4,5
= ( 8 ( ))
x 20,53 x
2
x cos 202
= 12,030 kgm’
2. Beban Hidup
Berat pekerja = 100 kg (SNI-1727-2013 Tabel 4-1)
1
.P L
PL =100 kg => RL = 2
1
.(100 )
= 2 = 50 kg
RLx = (50) sin 200 = 17,10 kg
RLy = (50) cos 200 = 46,98 kg
4
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
1
PL =100 kg => ML = × Pl × L( jarak kuda kuda)
8
1
= x 100 x 4,5 = 56,25 kgm’
8
MLx = (56,25) sin 200 = 19,239 kgm’
MLy = (56,25) cos 200 = 52,858 kgm
3. Beban Angin terbuka (bangunan gedung terbuka)
1. Menentukan indikator yang di perlukan seperti :
q (beban angin) = 40 kg/m2
G / faktor tiupan angin 0.85 (pasal 26.9 SNI 1727-2013)
CNW (koefisien tekanan netto) sisi angin dating
CNL ( koefisien tekanan netto) sisi angin pergi
2. Menentukan CNW dan CNL
5
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
x = 0,193
22,5 20
15
22,5 20
15
6
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
7
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Mwy =0
4. Kombinasi Pembebanan
A. Pembebanan dasar reaksi ( reaction basic load)
1. Kombinasi Dasar 1
RUx = (1,2).(RDx) + (0,5).(RLx)
= (1,2).( 15,799) + (0,5).( 17,10)
= 27,509 kg
2. Kombinasi Dasar 2
RUx = (1,2).(RDx) + (1,6).(RLx) + (0,5).(RWx)
= (1,2).( 15,799) + (1,6).( 17,10) + (0,5).( 14,76)
= 53,699 kg
3. Kombinasi Dasar 3
RUx = (1,2).(RDx) + (1,0).( RWx) + (0,5).(RLx)
= (1,2).( 15,799) + (1,0).( 14,76) + (0,5).( 17,10)
= 42,269 kg
4. Kombinasi Dasar 4
RUx = (0,9).(RDx) + (1,0).( RWx)
= (0,9).( 15,799) + (1,0).(14,76)
= 28,979 kg
NB : Untuk perhitungan Reaksi arah Y dan momen arah X dan Y disajikan pada
tabel 2.1- 2.1
8
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
9
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
9
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
9
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
10
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
11
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Mnx = Mp = Fy x Z x
Mny = Mp = Fy x Zy
Mux Muy
+
∅ Mnx ∅ Mny < 1,0
174,668 99,009
+
0,9 x 598,78439 0,9 x 697,690 < 1,0
0,482 < 1,0 OK
12
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
13
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
5 23,150× 2 ,2 54 1 150,350× 2 ,2 53
= × + ×
384 2.10 10 ×2 , 7 .10−7 48 2.1010 × 2 ,7 .10−7
= 0,0080 m = 0,80 cm = 8 mm
∆ = √( Δx )2+( Δ y )2
2 2
= √ ( 2,8 ) + ( 8 )
l
= 8,476 mm < ∆max = 240 = 18,75 mm OK
Jadi gording dengan profil C 150 x 50 x 20, dengan tebal 2,5mm dapat
digunakan karena telah memenuhi persyaratan terhapad pengaruh biaksial dan
lendutan izin yang ditentukan.
14
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Perencanaan Sag-rod
Karena dipasang sagrod pada tengah bentang, maka besarnya RUy untuk perhitungan
sagrod harus dihitung ulang
Akibat beban mati
15
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
1 1
.q D . L.cos35 0 .(58 ,99 ).(1 , 271). cos350
RDy = 2 = 2 = 30,71kg
Perhitungan diameter baja pejal bulat untuk sagrod jika dihitung dengan gaya
yang ditahan oleh sagrod :
Pu = 2.Ruy = 2 (102,388) = 204,776 kg
Menghitung dimensi kebutuhan minimal Sagrod
Pu = 204,776 kg
Ø Pn = 0.9 Fy Ag
Ø Pn = 0.9 Fy Ag > Pu
Pu 204,776
Ag = = =0,0496 cm2
0,9 fy 0,9 x 4588,72
1
A = π× d2
4
16
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
4 x Ag 4 x 0,0496
d2 = = = 0,0631 cm
π π
d = √ 0,0631 = 0, 25 cm = 2,5 mm
Sesuai dengan tabel produk sagrod maka
lk
λ = i min
I
Ag
1
= 4 × π× d2
1
I = 64 × π× d4 i min= √ Ag
1 1
= 4 ×π ×1,82 = 64 × π ×1,84 i min/r=
0, 515
√ 2, 55
= 2,55 cm2 = 0,515 cm4 i min= 0,5 cm
lk 127,1(1)
λ = i min = 0,45 = 282,22 < 300 OK
Cek Kapasitas Penampang
Ø Pn = 0.9 Ag Fy > Pu
= 0.9 x 2,55 x 4588,72 > Pu
17
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Ø 18 mm
102,388 kg
18
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
perhitungan beban angin pada atap direncanakan menggunakan 30 % dari total luas
keseluruhan.
19
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 50 x 0,85 x 0,967
= 41,1 kg/m2
Tabel Rekapitulasi Beban angin Pada Atap
Satua
Kondisi Indikator n Jumlah
Luas Bidang m2 8,2125
Beban angin (dari soal) kg/m2 50,000
Angin Datang Tekanan angin rencana kg/m2 11,350
Tekanan angin permukaan kg/m2 93,22
Beban angin/titik (6 nodal) kg 15,54
Luas Bidang m2 8,2125
Beban angin (dari soal) kg/m2 50,000
Angin Pergi Tekanan angin rencana kg/m2 41,100
Tekanan angin permukaan kg/m2 337,54
Beban angin/titik (6 nodal) kg 56,25
20
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
21
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
22
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
23
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Cek Kelangsingan
lk
λ= < 300
imin
589
< 300
1,98
297,47 < 300 (OK)
24
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pn = ∅ ( Fy . Ag )
Dimana :
Fy = 4588,72 kg/cm2
Ag = 13,620 cm2
∅t = 0,9
Pn = 0,9 (4588,72 x 13,620 )
= 56248,53 kg
= 56248,53 kg ¿ Pu. (OK)
25
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
d ≤ (√ 2,043
0,78 )
= 1,62 cm
26
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
2. PADA DINDING
27
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
28
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
29
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
34
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
35
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
36
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Cek Kelangsingan
lk
λ= < 300
imin
673
< 300
3,6
186,94 < 300 (OK)
37
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pn = ∅ ( Fy . Ag )
Dimana :
Fy = 4588,72 kg/cm2
Ag = 38,80 cm2
∅t = 0,9
Pn = 0,9 (4588,72 x 38,80 )
= 160238,1 kg
= 160238,1 kg ¿ Pu. (OK)
38
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
39
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
40
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
673
< 200
3,6
186,85 < 200 (OK)
1
x 150
- b 2
= =8,33
t 9
b E
-
t √
<0,56 ( ) = 8,3 < 13,49 (OK)
Fy
Jadi dapat disimpulkan bahwa penampang tidak langsing
41
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
42
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
43
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pn = ∅c x Fcr x Ag
Dimana Fcr adalah :
KL
Bila
r
<4,71 (√ FyE )= 1 x366730 < 4,71√( 200000
450 )
= 186,964 > 99,29
Maka Fcr = 0,877 Fe
π2 E π 2 200000
Fe= =
KL 2 1 x 6730 2 = 56,48 MPa
( ) (
r 36 )
Fcr =0,877 Fe
= 0,877 x 56,48
= 49,53 MPa
Pn = ∅c x Fcr x Ag
= 0,9 x 49,53 x 3880
= 172973 N
= 17297,3 kg > 209,575 kg (OK)
44
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
45
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
PERENCANAAN CRANE
Merencanakan crane bangunan industri harus di identifikasi menggunakan
double girder atau single girder yang pemilihannya berdasarkan pada kapasitas atau
peruntukannya. Dalam hal ini perencanaan Tugas struktur baja dengan study kasus
bangunan industri menggunakan single girder karena kapasitas crane hanya sebesar 5
ton.
46
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Dalam tugas besar ini, perencaan crane terbagi atas beberapa bagian :
1. Pemilihan jenis hoist
2. Design bridge crane/ balok crane
3. Design run-way crane
47
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
48
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
49
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
T: 96
A: 552 J: -
B: 697 K: 350 U: -
C: 425 N: 1145
D: 566 (591) O: 125
E1: 110 P: 12000
Q: -
E2: 110
F1: 135 R: 770
50
F2: 135
S: 110
H: 222 (272)
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Diketahui :
L = 12,5 m = 12500 mm = 492,13 in
L 492,13
≤25 ≤ 25 , h=19,68∈¿ 499,57 mm
h h
L 492,13
≤65 ≤ 65 , b=7,57∈¿192,278 mm
b b
51
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Di ambil ;
492,13
h = 650 mm = 25,59 in ≤ 25=19,23≤ 25OK
25,59
492,13
b = 450 mm = 17,72 in ≤ 65=27,77 ≤65 OK
17,72
25,59 1000
t = 25 mm = 0,98 in ≤ = 26,11 ≤ 124OK
0,98 √ 65
NB :
nilai b disesuaikan dengan produk hoist yang applcable box rail sebesar
450 mm.
52
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Penempatan wheel hoist pada bridge crane diambil ¼ λ dan ¾ λ dari titik tengah
bridge crane. Yang berdasar dari “AISC 7th Stee
l Design Guide industrial Buildings Second Edition”
P λ
Mmax = (L− )2 V = P ׿)
2 xL 2 0,217
= 2852,512×(2− )
2 12,5
2852,512 0,217
M max =
2(12,5) (
× 12,5−
2 ) =5655,5 kg
= 5,65 t
= 17520,05 kg.m
= 17,52 t.m
53
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
P
ft = 2 ≤ f tarik = fy
7 x tw
P
= tw ≥ 2
7 x fy
2852,512
= tw ≥ 2
7 x 4588,72
54
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Cek Stabilitas
NB : Penampang kotak yang memiliki sayap belum diatur pada SNI 1729-2015
namun ANSI- AISC -360-2016 sudah mengatur ketentuan tersebut sehingga
perencanaan bridge crane yang menggunakan box girder mengacu pada AISC
2016
55
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
56
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
LuasProfil
Luas Penampang
A = F1 + F2 + W1 + W2
= 10000 + 11250 + 12000 + 12000
= 45250 mm2
( F 1∙ y 1 )+ ( F 2∙ y 2 )+ ( W 1 ∙ y 3 ) + ( W 2 ∙ y 4 )
Y bawah =
∑A
( 10000 x 637,5 ) + ( 11250 x 12,5 ) + ( 12000 x 325 ) x 2
=
45250
= 316,37 mm
1
Ix2 = ∙b ∙ h3 + A 2 ∙ a2
12
1
= x 450 x 253 +¿11250 x ( 316,37 -12,5)2
12
= 1039376928 mm4
1
Ix3 = Ix4 = ∙b ∙ h3 + A 3 ∙ a2
12
1
= x 20 x 600 3+12000 x (333,63−325)2
12
57
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 360893722,8 mm4
1
Iy = x b 3 xh + A1 a2
12
1
Iy1 = x 4003 x 25 +10000 ( 0 )2
12
= 133333333,3 mm4
1
Iy2 = x 4503 x 25+11250( 0)2
12
= 189843750 mm4
1
Iy3 = Iy4 = x 203 x 600 +12000 (10+290/2)2
12
= 288700000 mm4
Iy total = Iy1 + Iy2 + Iy3 + Iy4
= 133333333,3 + 189843750 + 288700000+ 288700000
= 900577083,3 mm4
P
ft = ¿σ y
7 tw
7131,25
= < 4588,72
7×2
58
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
0,75 P
fb = ¿σ y
tf2
0,75∙ (7131,25)
= ¿ σ y = 0,6 x 4588,72
2,5 2
= 855,75 kg /cm2 ¿ σ y =2753,232 kg/cm2
1
M max = q x l 2 +¿
8
1
` = 0,457 x 12,52+(17,52)
8
= 26,45 tm
1
V = ( ×q × l¿+ V
2
1
=( ×0,457 × 12,5)+5,65
2
59
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 8,51 ton
Zx = 6914860 + 6914977,5
= 13829837,5 mm3
60
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
A B
61
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Potongan A-A
Vn1 = 0,6 x fy x Aw x Cv
Aw = 2 ht
= 2 x ( 65-50) x 2
= 240 cm2
h Kv E
Cv2 Jika
tw
60
≤ 1,1
√
Fy
Kv = 5
5 x 20000000
2
≤ 1,1
30 ≤ 51,35
√4588,72
Cv2 =1
Vn1 = 0,6 x fy x Aw x Cv
= 0,6 x 4588,72x 240 x 1
= 660775,68 kg
= 660,8 t
Vu ≤ ø Vn1
5,65 ton ≤ 0,9 x 660,8 ton
5,65 ton ≤ 594,72 ton OK
Vn2 = 0,6 x fy x Aw x Cv
Potongan B-B
Aw = 2 ht
= 2 x ( 45-5) x 2
= 180 cm2
h Kv E
Cv2 Jika
tw
40
≤ 1,1
√
Fy
Kv = 5
5 x 20000000
2
≤ 1,1
20 ≤ 51,35
√4588,72
Cv2 =1
Vn2 = 0,6 x fy x Aw x Cv
= 0,6 x 4588,72x 180 x 1
= 495581,76 kg
= 495,581 t
62
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Vu ≤ ø Vn2
5,65 ton ≤ 0,9 x 495,581 ton
5,65 ton ≤ 446,02 ton OK
Preliminary design
Perhitungan beban
o Beban mati
Bridge Weight = 4110 kg
Runway Bridge = 66 kg/m ( IWF 400x200x8x13)
o Beban hidup
Crane capacity = 5000 kg
63
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Beban vertical
o P vertical = 1,2 x 1027,5 + 1,6 x 3628,125
= 7038 kg
64
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
B : 200 mm q : 66 kg/m
t1 : 8 mm Ix : 23700 cm4
t2 : 13 mm Iy : 1740 cm4
r : 16 mm ix : 16,8 cm
= 12712,5 kg.m
Vultimate = P ׿)
1000
= 7038 ×(2− )
4500
= 12512 kg
o Cek rasio terhadap lebar ( flange)
b E E
t
≤ 0,38
100
√ Fy
≤ 1,00
200000
√
Fy
200000
13
≤ 0,38
√ 450
≤ 1,00
√450
65
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
h E E
t
≤ 3,76
342
Fy ò 5,70
200000
Fy √ 200000
8
≤3,76
√
450
≤ 5,70
450 √
42,75 ≤79,27 ≤ 120,17 ( web compact)
Property penampang
1 3 3
J = ( 2t b+tw h)
3
1
= ¿
3
= 1076944 mm4
Ix 23700 x 104
Sx = = = 1185000 mm3
y0 200
Zx = bt (d-t) + 0,25wh2
= 200 x 13 ( 400- 13) + 0,25 x 8 x 3422
= 1240128 mm3
2 3
h2 b3 t (400−13) x 200 x 13
Cw = =
24 24
= 6,489 x 1011
400−13
ho = = 193,5 mm
2
1
Iy 1
1740 x 104
ry = ( ) (
A
2
=
84,1 x 102 ) 2
= 45,49 mm
66
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
67
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
h
tw
= ≤ 2,3
Lb
bf
68
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
342
8
= ≤2,3
4500
200
= 1,9 ≤ 2,3
3
h
Rn =
h 2
3
Cr tw tf
[ ( )]
1+0,4
tw
Lb
bf
, Cr = 6,62 x 106 MPa
3
342
=
6
342
[ ( )]
2
3
6,62 x 10 x 8 x 13
1+ 0,4
8
4500
200
= 388916,68 N = 38891,7 Kg
Vn = 0,6 x fy x Aw x Cv
Aw = 2 ht
= 2 x (342) x 8
= 5472 mm2
69
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
h Kv E
Cv2 Jika
tw
342
≤ 1,1
√ Fy
5 x 200000
Kv = 5
8
≤ 1,1
√
42,75 ≤ 51,85
450
Cv2 =1
Vn1 = 0,6 x fy x Aw x Cv
= 0,6 x 450x 5472 x 1
= 1477440 N
= 14774 kg
Vu ≤ Ø Vn1
12512 kg ≤ 0,9 x 14774 kg
12512 kg ≤ 13296,6 kg OK
Menghitung Reaksi
R = ½ x q x L2 + V
= ½ x 66 x 4,52 + 12512
= 13848,5 kg
= 13,85 ton
70
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Analisa struktur
Lampiran (1,2,3,4)
NB : pembebanan menggunakan 2 Jenis kombinasi pembebanan yaitu :
1. Beban mati+ layan
2. Beban mati + beban layan + angin
dari hasil perhitungan didapat kombinasi yang dipakai adalah
kombinasi ke 2.
Tabel Hasil Analisa :
o Analisa gaya dalam
Nama Momen Maximal Gaya Geser Gaya
elemen Batang
Mmax (Kg.m) Vmax (Kg) Nmax (Kg)
Corbel 9171 13913 0
Kolom 7475,5 1536,2 15837
Kuda-kuda 1566,9 794,36 1700,4
o Analisa lendutan
71
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
LAMPIRAN I
ANALISA PEMBEBANAN
KOMBINASI BEBAN MATI + LAYAN + ANGIN
LAMPIRAN II
72
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
73
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
LAMPIRAN III
74
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
75
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
76
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
LAMPIRAN IV
ANALISA GAYA DALAM
GAYA BATANG (AXIAL)
77
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
78
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
79
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Kelangsingan badan
H 450−( 14 x 2 )−(18 x 2)
λ= = =¿42,89
tw 9
5
E
= 3,76 2 x 10 = 79,27
λ p=3,76
√ fy √ 450
5
E
= 5,70 2 x 10 = 120,17
λ r=5,70
√ fy √ 450
λ ≤ λ p ≤ λr = 42,89 ≤ 79,27 ≤ 120,17 Penampang Compact
o Kelangsingan Sayap
o Kelangsingan Badan
o Keadaan batas (Yielding)
80
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
o Lendutan ijin
1. Pelelehan (yielding)
Mn = Zx . Fy
Fy = 450 MPa
1
Zx = bf . tf (d-tf) + tw ( d−2. tf )2
4
1
= 200×14 × ( 450−14 )+ × 9 ×(450− (2 ×14 ) )2
4
= 1621489 mm3
Mn = Zx . Fy
Mn = 450 x 1621489
Mn = 729670050 N
Mn = 72967005 Kg = 72967,005 ton
∅ Mn = 0,9 x 72967,005 = 65670,31 ton
81
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
82
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
85
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
86
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Ga =
∑ I /H
GA =1,53 ∑ I /L
5M 13600/500
Ga =
13600/763
Ga = 1,53
GB=0 (jepit)
86
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
87
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
88
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pn = Fcr Ag
KL E
Fcr jika
r
≤ 4,71
Fy √
1,21 x 500 200000
8,84
≤ 4,71
450 √
68,43 ≤ 99,29
Fy
Fcr [
= 0,658 Fe Fy ]
π2E
Fe = KL 2
r( )
π 2 x 200000
= 0,55000 2
(
88,4 )
= 2468,051 MPa
450
Fcr [
= 0,658 2468,051 x 450 ]
= 416,9 MPa
∅Pn = 0,9 Fcr Ag
= 0,9 x 416,9 x (173,9 x 102 )
= 652490 Kg
∅Pn ≥ Pr = 652490 Kg ≥ 15837 Kg (OK)
89
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
h E E
t
≤ 3,76
√
Fy
≤ 5,7
Fy √
350−( 2 x 19 ) −(2 x 20) 200000 200000
12
≤ 3,76
√
450
≤ 5,7
√450
22,67 ≤ 79,27 ≤ 120,17 ( penampang badan compact)
Zx = bf tf ( d – tf ) + 0,25 tw ( d – 2tf)2
= 350 x 19 ( 350-19) + 0,25 x 12 ( 350 – 2 x 19)2
= 2493182 mm3
Mn = Mp = Fy Zx
= 450 x 2493182
= 1121931900 Nmm
90
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 112193,19 Kg.m
- menghitung momen kapasitas lentur
91
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Mn = Mp – ( Mp – 0,7 Fy Sx ) ( λrfλ−λpf
−λpf )
bf 350
λ = = =9,21
2t f 2 x 19
λpf = λp = 8,01
λrf = λr = 21
Mn = Mp – ( Mp – 0,7 Fy Sx ) ( λrfλ−λpf
−λpf )
92
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pu = Pr = 15837 Kg
Pe = ØPn = 652490 Kg
Mr = 7475,5 Kg
Mc = 97677 Kg
Pr 15837
Jika ≥0,2= ≥0,2=0,024 ≤ 0,2 ,maka
Pe 652490
Pr M rx M ry
+ ( +
2 Pe M cx M cy
≤1,0 )
15837 7475,5
+
2 x 652490 97677 ( +0 ≤1,0 )
0,1 ≤1,0 Aman
h E
=
t
≤ 2,46
Fy√
350−( 2 x 19 ) −(2 x 20) 200000
=
12 √
≤ 2,46
450
= 22,67 ≤ 51,86
93
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Vu = 2423,5 Kg
Vn = 0,6 Fy Aw Cv
Cv =1
ØVn = 1 ! 4200 x 1
= 1134000 N = 113400 Kg
ØVn ≥ Vu = 113400 Kg ≥ 1536,2 Kg (OK)
Cek Lendutan
H 5000
Δijin = = = 10 mm
500 500
Lendutan dari analisa STAAD-PRO = 6,771 mm
94
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
95
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Ga =
∑ I /l
∑ I /l
13600/763
Ga =
13600/763
Ga = 1
96
5m
Harrys Purnama ( 201510340311020 )
GB = 1,53
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
7,6
m
3
GA
K =1,39
- Kelangsingan sayap
b E
t
≤ 0,56
√Fy
62,5 200000
9
≤ 0,56
√ 450
6,94 ≤ 11,81 ( tidak langsing)
97
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
- Kelangsingan badan
h E
t
≤ 1,49
√Fy
250−( 2 x 9 )−( 2 x 12) 200000
6
≤ 1,49
√450
34,67 ≥ 31,41 ( langsing)
Pn = Fcr Ag
KL E
Fcr jika
r
≤ 4,71
Ekc
√
Q Fy
Q jika b ≤
4
t √
Fy
4
=0,83
kc = h = 250− ( 2 x 9 )−(2 x 12) , maka
√ √
tw 9
98
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
4
0,35 ≤ 250− ( 2 x 19 )−(2 x 12) ≤ 0,76
√ 9
Jadi diambil nilai kc = 0,76 OK
Ekc
Q jika b ≤
t √
Fy
0,5 x 125 200000 x 0,76
=
9
≤
= 6,94 ≤ 18,37
√ 450
Maka Q = 1,00
KL E
Fcr jika
r
≤ 4,71
√
Q Fy
99
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
b E E
t
≤ 0,38
√
Fy
≤1
Fy √
0,5 x 125 200000 200000
9
≤ 0,38
√
450
≤1
450 √
6,94 ≤ 8,01 ≤ 21 ( penampang sayap compact)
100
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pu = Pr = 1700,4 Kg
Pe = ØPn = 40767,7 Kg
Mr = 1566,9 Kg.m
Mc = 20789 Kg.m
Pr 1700,4
Jika ≥0,2= ≥ 0,2=0,042≤ 0,2 ,maka
Pe 40767,7
Pr M rx M ry
+ ( +
2 Pe M cx M cy )
≤1,0
1700,4 1566,9
+ (
2 x 40767,7 20789 )
+0 ≤ 1,0
0,1 ≤1,0 Aman
101
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Vu = 794,36 Kg
Vn = 0,6 Fy Aw Cv
Cv =1
ØVn = 1 x 0,6 Fy Aw Cv
= 1x 0,6 x 450 x 1500 x 1
= 405000 N = 40500 Kg
ØVn ≥ Vu = 40500 Kg ≥ 794,36 Kg (OK)
102
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
- Data perencanaan
Pu maks 15840 kg
Mu maks 3180 kg.m
Vu maks 1540 kg
103
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
104
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
105
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
A2
- fp (maks) = Pp = ∅ c 0,85 Fc
√ A1
A2 = 55 x 55 cm ( luasan dari tumpuan beton )
A1 = 55 x 55 cm ( luasan dari base plate )
55 x 55
- fp (maks) = Pp = 0,65 x 0,85 x 285,52 x
√ 55 x 55
= 157,75 kg/cm2
= 15,7 Mpa
Pu 15840
- f1 = = = 0,51 kg/cm2 < fp (maks) (OK)
BN 55 X 55
- qmaks = fp (maks) x B
= 157,75 x 55
= 8676 kg.cm
N Pu
- ecrit = −
2 2 q maks
N Pu
ecrit = −
2 2 q maks
55 15840
= − = 25,67 cm
2 2 x 8676
Mu 3180
- e = = = 0,2 m = 200 mm
Pu 15840
106
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pr
- Y = ( DG01 3.3.9) Base Plate & Anchor Rod Design
q maks
15840
=
8676
= 1,83 cm = 183 mm
N −0,95 d 55−0,95 x 35
m = = = 10,875
2 2
cm
B−0,8 bf 550−(0,8 x 35)
n = = =13,5 cm
2 2
107
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
λn ' =λ
√ dbf
4
4 dbf Pu
X = ((d +bf )
2
∅)Pp
4 x 35 x 35 15840
= (( )
35+ 35 )2 157,75
= 100,41
2√X
λ = <1
1+ √1−X
2 √100,41
= <1
1+ √1−100,41
= 0,68 < 1 (OK)
λn ' = 0,68
√ 35 x 35
4
= 6,02 cm
Kesimpulan :
Dari nilai m,n,λn ' diambil nilai terbesar yaitu nilai n sebesar 13,5 cm
=135 mm
108
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
1
x π x 222
= 0,02 x 4 x 250 ≥ 0,06 x 22 x 250
√ 28
= 359,19 mm ≥ 330 mm
109
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
110
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Keterangan :
Ca1 = 50 mm
S1 = 450 mm
hef = 755 mm
111
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
C a min 50
Ψ ed , N = 0,7+ 0,3 =0,7+0,3 x =0,71
1,5 hef 1,5 x 755
ΨcN = 1,25 (angkur cor di tempat)
Ψ cp N = 1,0 (angkur cor di tempat)
kc = 10 (baut angkur tipe cor di tempat)
112
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Nb = kc λa √ F c ' h ef 1,5
=10 x 1,00 √ 28 x 7551,5
= 1097740 N
= 109774 kg
A NC
Ncbg = Ψ Ψ Ψ N
A NC 0 ed N CN Cp N b
= 1,92 x 0,71 x 1,25 x 1,0 x 109774
= 187054 kg
∅Ncbg = ∅Ncbg
= 0,7 x 187054
= 130938 kg
113
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Npn = ∅ Ψ CP N p
∅ = 0,7 (Faktor Reduksi)
Ψ c p = 1,00 (asumsi beton retak)
Abrg = 0,462 in2 (1 in = 645,16 mm2)
= 298,06 mm
Np = 8 Abrg fc’
(Kuat Cabut/pullout pada angkur yang memiliki kait)
= 8 x 298,06 x 28
= 66766,3 N
= 6676,63 kg
∅Npn = ∅ Ψ CP N p
= 0,7 x 1,0 x 6676,63
= 4673,64 kg (satu buah angkur)
Cek Kuat Lekat (Bond-Stress) beton dengan angkur
114
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 2,3 Mpa
115
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
116
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
117
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Penentuan nilai Avc berdasar pada kondisi penempatan baut angkur (pinggir,
pojok, pinggir angkur ganda). Pada perencanaan angkur tugas besar struktur baja
kali ini menggunakan studi kasus desain dengan Avc pada kondisi penempatan baut
pojok)
118
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
le = 8 da = 8 x 22 = 176 mm
λa = λ = 1,00 (Beton Normal)
0,2
Vb ( ( ) √ da) λa √ Fc ' (C )
= 0,6
¿
da a1
1,5
0,2
176
= ( 0,6 ( )
22 )
1,5
Vb x √ 22 x 1,00 √ 28 ( 50 )
= 79802 N
= 7980,2 kg
A vc
∅Vbg = 0,75 Ψ Ψ Ψ Ψ V
A vc 0 ec v ed v c v h v b
119
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
9375
= 0,75 x x 1,00 x 0,90 x 1,00 x 1,22 x 7980,2
11250
= 5476,42 kg
120
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
∅Nn = 18694,57 Kg
Vu = 1540 Kg
∅Vn = 5476,42 Kg
Vu
Jika > 0,2
∅Vu
1540
> 0,2
8806
0,17 > 0,2
N ua V u
Interaksi Gaya tarik dan geser = + <1,2
∅ Nn ∅ V u
7227,27 1540
= + <1,2
18694,57 5476,42
= 0,66 < 1,2 (OK)
Menghitung kebutuhan las
121
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
122
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
123
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
124
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
min = 8/3 d
= 8/3 x 22
= 58,67 mm
Smaks = 24 tp
= 24 x 19
= 456 mm
Maka digunakan jarak 161 mm pada corbel
Jarak 121 mm pada haunch corbel
- Tebal (thickness)
200
ts min = 0,5
16
200
= 0,5
16
= 6,25 mm
125
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
- Cek Alobang
Alob =ndt
= 10 x 18 x 20
= 3600 mm2
Alob < 15% ( Abruto)
3600 < 15% x ( 230 x 792)
3600 mm2 < 27324 mm2 OK
- Cek Kebutuhan tebal pelat ujung (end plate)
Untuk kebutuhan praktis, maka kebutuhan tebal pelat ujung dengan konfigurasi 5
baut yang dikekang menggunakan Tabel 3.6 Range of Tested Parameters (cyclic
Tested) dari DG 04 AISC didapatkan tebal minimum 0,75 in = 19,05 mm mm
Maksimum 2,5 in = 63,5 mm
Maka digunakan tebal pelat ujung (end plate) 20 mm
126
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
- Cek Kapasitas
Cek Geser baut terhadap geser baut pada end plate
∅Rn = ∅ Fnv Ab
∅ = 0,75
Fnv = 372 Mpa ( A325) = 3796,58 kg/cm2
1
Ab = π d 2 , d = 16 mm
4
1
= x π x 162
4
= 200,96 mm2 = 2,01 cm2
∅Rn = ∅ Fnv Ab
∅Rn = 0,75 x 3796,58 x 2,01
= 5723,34 kg (Per 1 baut)
∅Rn = N x ∅Rn
= 10 x 5723,34
= 57233,4 kg
= 57,2 ton
= ∅Rn > ∅Ru
= 57,2 ton > 13,91 ton OK
Sambungan Aman Terhadap Geser
127
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 113,9 ton
∅Rn > Ru = Vu = 113,9 ton > 13,913 ton
Pt = Ab Fnt
= 3,08 x 6327,63
= 19489,1 kg = 19,49 ton
Mnp = 2 Pt (h0 + h1 + h2 + h3 +h4 )
= 2 x 19489,1 x (66,6 +55,5 + 34,4 + 20,1 + 8)
= 7195375 kg.cm
= 71953,75 kg.m
= 71,95 ton.m
∅Mn = ∅ Mnp
= 0,75 x 71,95
= 53,96 ton.m
∅Mn > Mu = 53,96 ton.m > 9,178 ton.m OK
128
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
129
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
130
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
131
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
132
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
133
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Smin = 8/3 d
= 8/3 x 1,9
= 5,08 cm
Smaks = 24 tp
= 24 x 2
= 48 cm
Maka digunakan jarak 116 mm pada corbel
Maka digunakan jarak 101 haunch
gmin = 8/3 d
= 8/3 1,2
= 3,2 cm
gmaks = bfb = 12,5 cm
bfb = lebar dari balok
maka digunakan jarak antar baut arah horizontal adalah 180 mm
134
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
- Tebal (thickness)
bs
ts min = tf x 0,5 <
16
17,5
= 12 x 0,5 <
16
= 6 mm
< 1,09 mm
Digunakan 12 mm
135
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Cek Kapasitas
Cek Geser baut terhadap geser baut pada end plate
∅Rn = ∅ Fnv Ab
∅ = 0,75
Fnv = 372 Mpa ( A325) = 3796,58 kg/cm2
1
Ab = π d 2 , d = 1,6 cm
4
1
= x π x 1,62
4
= 2,01 cm2
∅Rn = ∅ Fnv Ab
∅Rn = 0,75 x 3796,58 x 2,01
= 5722,21` kg (per 1 baut)
∅Rn = N x ∅Rn
= 10 x 5722,21
= 57222,1 kg
= ∅Rn > Ru = Vu
= 57221,1 kg > 645,577 kg OK
Sambungan geser aman terhadap geser
136
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pt = Ab Fnt
= 2,01 x 6327,63
= 12718,5 kg = 18,04 ton
Mnp = 2 Pt (h0 + h1 + h2 + h3 )
= 2 x 12718,5 x (41,2 + 32 + 17,1 + 7)
= 2475020,1 kg.cm
= 24750,2 kg.m
= 24,8 ton.m
∅Mn = ∅ Mnp
= 0,75 x 24,8
= 18,6 ton
∅Mn > Mu = 18,6 ton.m > 2,05 ton.m
137
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
∅Rn = Fnt Ab
∅Rn = 6322,23 kg/cm2 x 2,01
= 12707,68 kg (untuk 1 baut)
∅Rn = 8 x 12707,68 kg
= 101661,44 kg
Menghitunmg gaya tarik tersedia
ya tarik tersedia
M =FZ , Z = 70 cm (jarak antar baut terluar vertikal, H1-H3)
M 2050
F = = = 2928,57 kg
Z 0,7
Tu = 2928,57 kg = 2,9 ton
∅Rn > Ru = Tu = 101,7 ton > 2,9 ton OK
Aman terhadap tarik dan geser
138
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
139
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
= 3594,23 kg/cm2
140
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Tipe sambungan yang digunakan adalah moment end plate beam splice APEX flush
(MEP BS APEX flush)
141
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
142
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Smin = 8/3 d
= 8/3 x 1,9
= 5,08 cm
Maka digunakan jarak 80 mm
143
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
144
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Cek Kapasitas
Cek Geser baut terhadap geser baut pada end plate
∅Rn = ∅ Fnv Ab
∅ = 0,75
Fnv = 372 Mpa ( A325) = 3796,58 kg/cm2
1
Ab = π d 2 , d = 16 mm
4
1
= x π x 1,62
4
= 2,01 cm2
∅Rn = ∅ Fnv Ab
∅Rn = 0,75 x 3796,58 x 2,01
= 5723,34 kg (per 1 baut)
∅Rn = N x ∅Rn
= 10 x 5723,34
= 57233,4 kg
= 57,2 ton
= ∅Rn > ∅Ru
= 57233,4 kg > 794,36 kg OK
Sambungan geser aman terhadap geser
145
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Pt = Ab Fnt
= 2,01 x 6327,63
= 12718,5 kg = 12,7 ton
Mnp = 2 Pt (h0 + h1 + h2 + h3 + h4 )
= 2 x 12718,5 x (42 + 33,71 + 25,35 + 13,45 + 5)
= 3039975,87 kg.cm
= 30399,75 kg.m
= 30,3 ton.m
∅Mn = ∅ Mnp
= 0,75 x 30,3
= 22,7 ton.m
∅Mn > Mu = 22,7 ton > 1,57 ton.m
146
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
147
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
148
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
149
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
Dilakukan analisa dengan komputer mengunakan software RAM-CONNECTION, maka didapatkan hasil berdasar pada rasio 0-1 yang
membuktkan bahwa sambungan tersebut aman terhadap gaya gaya yang bekerja. Adapun hasil analisa akan disertakan pada hambar di bawah ini
:
139
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
140
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
141
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
142
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
SAMBUNGAN KUDA-KUDA
143
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201501340311049 )
Tugas Besar Struktur Baja 2017
86