Anda di halaman 1dari 1

OWNER PROYEK MAIN CONTRACTOR KONSULTAN DIRENCANAKAN DIPERIKSA / DISETUJUI DIKETAHUI JUDUL GAMBAR : NO.

GAMBAR
PT. WASKITA BUMI WIRA PT. WASKITA KARYA
PT. ERKA KONSULTAN ENJ. PT. ERKA KONSULTAN ENJ. PT. WASKITA KARYA PT. WASKITA BUMI WIRA
PT. ERKA KONSULTAN ENJINIRING
GAMBAR TYPICAL PENANGANAN -
PEMBANGUNAN JALAN TOL
KRIAN - LEGUNDI - BUNDER - MANYAR STA 0+550 - STA 0+650 SKALA
SUMO JUNCTION RAMP 2 DAN RAMP 8 KONSULTAN ENJINIRING
RAMP 2 JUNCTION SUMO
SUPARDI TRI SUSANTO RINDA KARLINASARI I KADEK OKA SWARTANA YULI HARI RESPATI
Head Office : Ruko Commpark Blok G38-39, Kota Wisata, Limus Nunggal,
Kec. Cileungsi, Kab. Bogor 16820, Indonesia. Phone: (0813-8137-8912 / NTS
0812-8824-2046) email : erka.enj@@gmail.com GEOTECHNICAL ENGINEER TEAM LEADER GENERAL SUPERINTENDENT GENERAL MANAGER

GEOTEXTILE NON WOVEN 250GRAM/m2 (FILLTRASI)


PIPA PVC 16(PERFORASI)
SINGLE SIZE 2/3 SINGLE SIZE 2/3
PIPA PVC 16(PERFORASI)
GEOTEXTILE NON WOVEN 250GRAM/m2 (FILLTRASI)

60
60
GEOTEXTILE NON WOVEN 250GRAM/m2 (FILLTRASI) 50 Rigid Pavement = 30 cm
GEOTEXTILE NON WOVEN 250GRAM/m2 (FILLTRASI)
Lean Concrete = 10 cm
X=668824.675
Y=9183520.175
Drainage Layer = 25 cm Timbunan Preloading, t = 1 m
24.780 Timbunan Borrow 1.500 2.000 3.600 3.600 1.000 1.500
ROUNDING BAHU LUAR JALUR LALU LINTAS JALUR LALU LINTAS ROUNDING
Geotextile Type Woven (52 Kn) GUARDRAIL GUARDRAIL
Panjang Lipatan 10% dari Lebar Kaki Timbunan
SOLID SODDING SOLID SODDING
DS-13
Geotextile Non Woven ≈ UV-300
Timbunan Counter Weight
Timbunan Sirtu 1.00 meter
tebal Platform 50 cm Sebelum Instal PVD dan PHD
4.602 11.164 1.000 1.000 1.000 1.000
ELV. M.A.B. = 21.45
1.000 1.000 1.000 1.000

2.301 1.000 1.000 1.000 1.000

50 50
60

50 Tipikal Sub Drain


SUBDRAIN Batu Pecah 2/3 Pipa PVC (half perforated) dia
8"
PVD Int c/c 1.2 m L 7 m

BIDANG PERSAMAAN = 14

24.262

24.334

24.354
24.150

24.190
ELEVASI
FINISHING
GRADE LEVEL
JARAK

3.600

0.000

1.000
9.200

7.200
19.198

19.132

19.115

19.191

19.318

20.060

23.380

24.375
24.381
24.387
24.389
24.385

24.459

24.479
24.424

22.737

21.671

19.035
ELEVASI

EKSISTING
21.428

19.433

16.990

10.406

21.923

26.398
26.817

29.491

31.897

36.497
JARAK 9.383

6.517

0.000

1.952
2.324
2.705
3.121
3.676
19.188

20.188

21.188

22.188

23.544
ELEVASI
DASAR GALIAN
JARAK

4.012

2.074

0.121

0.715

3.000
21.415

23.458

23.744
18.915

ELEVASI
TOP
TIMBUNAN
15.364

11.279
34.480

JARAK

2.989
18.415
18.415

ELEVASI
GALIAN
REPLACEMENT
35.480

JARAK
5.999

ELEVASI
DASAR
SALURAN
JARAK

Anda mungkin juga menyukai