ABSTRAK: Penelitian di beberapa negara maju menunjukkan bahwa proyek design-build mellJpunyai kinerj£l
terbaik dan penggunaannya berkembang pesat. Sistem delivery method ini belum banyak dipergllnakan di
Indonesia untuk proyek non-residensial dan juga tercermin dari peraturan pemerintahj yang hany£l
menyinggung sekilas sistem ini, tidak sebanding dengan pembahasan mengenai sistem tradisional.
Proyek design-build mempunyai lima metoda pengadaan kontraktor yaitu Sale Source, Qualification-Based, Best
Value, Fixed-Budget/Best-Design, dan Low Bid. Pemilihan metoda pengadaan ini akan berpengaruh terhad£lp
kinerja proyek (unit cost, cost growth, intensity, construction speed, delivery speed, schedule growth). Peneliti£ln
ini akan melihat hubungan yang signifikan diantara metoda pengadaan terhadap kinerja waktu.
Penelitian ini dilakukan di Jakarta dan sekitarnya pada proyek design-build gedung dan warehouse Wll1,~
diselesaikan pada tahun 2003-2007. Dari 63 kuesioner yang disebarkan, sebanyak 37 kuesioner diterima nal11un
yang dapat dianalisis hanya 30 kuesioner. Analisis utamanya dilakukan secara univariate, dan melalui Mood's
Median Test diperoleh kesimpulan bahwa terdapat hubungan yang signifikan secara statistik amam
penggunaan metoda pengadaan dengan kinerja kecepatan proyek (construction speed dan delivery speed)..
Analisis tambahan secara multivariate dengan ANOVA mendapatkan hal yang sama untuk kinerja construction
speed. Dari hasil penelitian ini, direkomendasikan kepada pemilik proyek untuk menggunakan metoda
pengadaan secara best value jika kecepatan penyelesaian proyek menjadi kriteria utama.
KATA KUNCI: design-build, metoda pengadaan, kinerja waktu, sistem project delivery, construction speed,
delivery speed
ABSTRACT: Publications had shown design-build project reached the best performance comparing with other
project delivery systems and its using increased recently. This system has not common in Indonesia as reflected
in government regulation that only mentioned a little bit about design-build comparing with traditional system.
Design-Build has five contractor procurement methods: Sale Source, Qualification-Based, Best Value, Fixed
Budget/Best-Design, and Low Bid. Choosing of procurement method will influence project performance of cost
and time: unit cost, cost growth, intensity, construction speed, delivery speed, schedule growth. This research
will see the significance relationship between chosen procurement methods with time performance.
This research had been carried out on design-build projects, building and warehouse, in Jakarta and its
surrounding that completed in 2003-2007. There were 63 questionnaires submitted, 37 questionnaires have been
received and finally used 30 questionnaires for analysis. Mainly, analysis had been carried out with univariate
statistics, and by Mood's-Median-Test concluded that there was a significance relationship between the chosen
procurement methods with time performance (construction speed and delivery speed). Additional analysis with
multivariate statistic, ANOVA, confirmed the univariate result for construction speed. Base on the findings. it
was recommended for owner to use best value procurement method if duration becomes the main constraint.
KEYWORDS: design-build, procurement method, time performance, project delivery system, construction
speed, delivery speed