NOMOR KONTRAK :
TANGGAL KONTRAK :
SUMBER DANA :
KONTRAKTOR :
KONSULTAN SUPERVISI :
LOKASI :
JOB MIX FORMULA :
Berat Agregat Campuran gr. 1134,0 1128,0 1122,0 1116,0 1110,0 0,0
Berat Aspal gr. 66,0 72,0 78,0 84,0 90,0 0,0
Berat Campuran gr. 1200 1200 1200 1200 1200 0
B. Aditif (Anti Pengelupasan) -- 0,1% gr. 0,1320 0,1440 0,1560 0,1680 0,1800 0,0000
Berat Total Campuran gr. 1200,1320 1200,1440 1200,1560 1200,1680 1200,1800 0,0000