Anda di halaman 1dari 1

PAKET KEGIATAN :

NOMOR KONTRAK :
TANGGAL KONTRAK :
SUMBER DANA :
KONTRAKTOR :
KONSULTAN SUPERVISI :
LOKASI :
JOB MIX FORMULA :

RANCANGAN CAMPURAN ASPAL


LATASTON - HRS (BASE)

A. PENENTUAN KADAR ASPAL PERKIRAAN


NO. URAIAN NILAI SATUAN
1 Proporsi Fraksi Agragat Kasar (CA) 54,03 %
2 Proporsi Fraksi Halus (FA) 41,76 %
3 Proporsi Fraksi Bahan Pengisi (FF) 4,20 %
4 Nilai Konstanta (K) ditetapkan 2,00 %
Perkiraan Kadar Aspal (Pb) 6,53 %

RUMUS, Pb = (0,035 x CA) + (0,045 x FA) + (0,1800 x FF) + K

B. KOMPOSISI DALAM PERSEN


KADAR ASPAL RENCANA
NO. KOMPOSISI CAMPURAN PERSEN
5,50 6,00 6,50 7,00 7,50
1 HOT BIN 1 - HALUS 56,14 % 53,05 52,77 52,49 52,21 51,93
2 HOT BIN 2 - SEDANG 30,33 % 28,66 28,51 28,36 28,21 28,06
3 HOT BIN 3 - KASAR 13,53 % 12,79 12,72 12,65 12,58 12,52

TOTAL CAMPURAN 100,00 % 100,00 100,00 100,00 100,00 100,00

C. KOMPOSISI DALAM BERAT


KOMPOSISI CAMPURAN Satuan Berat Timbangan
NO.
RENCANA KADAR ASPAL % 5,50 6,00 6,50 7,00 7,50 0,00
1 HOT BIN 1 - HALUS gr. 636,6 633,3 629,9 626,5 623,2 0,0
2 HOT BIN 2 - SEDANG gr. 343,9 342,1 340,3 338,5 336,7 0,0
3 HOT BIN 3 - KASAR gr. 153,4 152,6 151,8 151,0 150,2 0,0

Berat Agregat Campuran gr. 1134,0 1128,0 1122,0 1116,0 1110,0 0,0
Berat Aspal gr. 66,0 72,0 78,0 84,0 90,0 0,0
Berat Campuran gr. 1200 1200 1200 1200 1200 0
B. Aditif (Anti Pengelupasan) -- 0,1% gr. 0,1320 0,1440 0,1560 0,1680 0,1800 0,0000
Berat Total Campuran gr. 1200,1320 1200,1440 1200,1560 1200,1680 1200,1800 0,0000