Anda di halaman 1dari 2

UEN SA H

RINCIAN ANGGARAN BIAYA (RAB)


LAMPU SON-T150 Watt

JUMLAH
No Jenis Material SATUAN VOLUME HARGA
BIAYA (Rp)
I. Material Utama
1 Kap lampu 150 Watt (Komplit) Unit 250 1,650,000 412,500,000
2 Bohlam SON-T150 Watt Bh 250 150,000 37,500,000
3 Kabel NYM 2 x 2,5 mm m 500 10,000 5,000,000
4 Konektor Pasang 250 25,000 6,250,000
5 Tiang Penyangga 2 m Bh 250 140,000 35,000,000
6 Clam 8 x 1,5 " Set 250 65,000 16,250,000
7 Isolasi bh 50 10,000 500,000
513,000,000
II UPAH
1 Pemasangan PJU+Pembongkaran Unit 250 300,000 75,000,000

588,000,000

Blangpidie, 27 November 2019

Kepala Dinas Penanaman Modal dan Pelayanan Terpadu


Satu Pintu, Tenaga Kerja dan Transmigrasi
Kabupaten Aceh Barat Daya

Ir.MUSLIM,M.Si
Pembina Utama Muda/Nip. 196220707 199203 1 007