JUMLAH
No Jenis Material SATUAN VOLUME HARGA
BIAYA (Rp)
I. Material Utama
1 Kap lampu 150 Watt (Komplit) Unit 250 1,650,000 412,500,000
2 Bohlam SON-T150 Watt Bh 250 150,000 37,500,000
3 Kabel NYM 2 x 2,5 mm m 500 10,000 5,000,000
4 Konektor Pasang 250 25,000 6,250,000
5 Tiang Penyangga 2 m Bh 250 140,000 35,000,000
6 Clam 8 x 1,5 " Set 250 65,000 16,250,000
7 Isolasi bh 50 10,000 500,000
513,000,000
II UPAH
1 Pemasangan PJU+Pembongkaran Unit 250 300,000 75,000,000
588,000,000
Ir.MUSLIM,M.Si
Pembina Utama Muda/Nip. 196220707 199203 1 007
3.5
500
2,352,000
2,352,000