Grand Total
1 PEKERJAAN PERSIAPAN
1.1 MOB AND DEMOB
ALAT BANTU KERJA & PERALATA SAFETY
1.2 K3
1.3 PERAPIHANN DAN KEBERSIHAN
1.4 KEAMANAN DAN KOORDINASI
2 NORMALISASI KOLAM
PENGANGKATAN LUMPUR SEDIMENTASI
2.1 KOLAM
LEVELING DASAR KOLAM 50 CM DENGAN
LUAS 75 M2 SEDALAM 50 CM
2.2
2.3 COR LANTAI 15M X 5 M
2.3.1 COR LANTAI DENGAN SETEBAL 10 CM BETON K 175
3,000,000.00
3,000,000.00
SIK 1.00 0.00 7,500,000.00
0.00
M3 7.50 0.00 1,950,000.00
0.00
0.00
0.00
KG 450.00 0.00 19,000.00
0.00
0.00
EA 14.00 0.00 225,000.00
0.00
0.00
0.00
Grand Total
1 PEKERJAAN PERSIAPAN
1.1 MOB AND DEMOB
3,000,000.00
0.00 3,000,000.00 0.00
SIK 1.00 0.00 0.00 7,500,000.00