Anda di halaman 1dari 1

PERUNTUKAN BANGUNAN :

HOTEL

POOL PUMP ROOM LOKASI :

PAYANGAN
GIANYAR

PEMILIK :

EMMA MURMURIDIS

NO. Catatan Paraf

Nama Gambar Skala


CONCRETE 120 MM THK CONCRETE 120 MM THK
MANHOLE COVER
SUN DECK SUN DECK
WIREMESH M7 2 LAYER
SUN DECK SUN DECK
WIREMESH M7 2 LAYER POTONGAN PUMP 1:150
FFL.-3.75 FFL.-3.75
FSL.-3.85 FSL.-3.85 ROOM
RB 4 RB 4

1000

CONCRETE 150 MM THK CONCRETE 150 MM THK CONCRETE 150 MM THK CONCRETE 150 MM THK
WIREMESH M7 2 LAYER WIREMESH M7 2 LAYER WIREMESH M7 2 LAYER WIREMESH M7 2 LAYER
2120

2120
2000

2000
DIGAMBAR PARAF.
I PUTU ANGGA PRASTIKA, ST.
ARSITEK (1.1.101.2.193.09.1973673)

I MADE PUTRA DWITYAGANA, ST.


STRUKTUR (1.2.201.2.159.30.1046452)

2000 CONCRETE 150 MM THK 2000 CONCRETE 150 MM THK DEWA NYOMAN TRI BUDIANTARA, ST
WIREMESH M7 2 LAYER WIREMESH M7 2 LAYER MEP (1.4.401.3.102.22.1878774)
FSL.-5.97 FSL.-5.97

KAMI SEBAGAI PENANGGUNG JAWAB


300

300
TB3 TB3

1. BERTANGGUNG JAWAB
PENUHTERHADAP BANGUNAN YANG
TELAH BERDIRI BAIK MENYANGKUT
KEKUATAN KONSTRUKSI,
KEKOKOHAN & KUALITAS STRUKTUR
BANGUNAN SERTA KESELAMATAN
UMUM DI LINGKUNGAN SEKITARNYA
DARI KEGAGALAN KONSTRUKSI
2. BERTANGGUNG JAWAB PENUH
TERHADAP SEGALA DAMPAK YANG

SECTION A-A SECTION B-B 3.


TIMBUL AKIBAT BERDIRINYA
BANGUNAN TERSEBUT
MENYATAKAN BAHWA GAMBAR
SKALA: 1 :50 SKALA: 1 :50 SESUAI DENGAN PELAKSANAAN DI
LAPANGAN

EMMA MURMURIDIS
Pemilik

DIP DIK DIK

MENGETAHUI

MENGETAHUI

POTONGAN PUMP ROOM


SKALA: 1 :50 NO. GAMBAR JUMLAH LEMBAR

35

Anda mungkin juga menyukai