jpg
KEGIATAN
PEMBANGUNAN GEDUNG KANTOR
10.00
10.00
PEKERJAAN
PEMBANGUNAN STADION KONI
TANAH KAMPUNG
LOKASI
KEC. TANAH KAMPUNG
4%
4%
-110 CM
-110 CM
-110 CM
-110 CM
-110 CM
4%
KOTA SUNGAI PENUH
-110 CM
-110 CM
DIKETAHUI OLEH:
PPK BIDANG CIPTA KARYA
2%
DINAS PU KOTASUNGAI PENUH
2.00
4%
2.00
4%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
DISETUJUI OLEH:
2.00
2.00
2%
2%
2%
2%
2%
2%
-40 CM
-20 CM
-40 CM
-40 CM
-40 CM
-40 CM
2%
2.00
-20 CM
-40 CM
65.00
4%
2.00
2%
2%
2%
2.00
2.00
2%
2%
2.00
2.00
DIPERIKSA OLEH:
2%
2%
-40 CM
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
-110 CM
-110 CM
2.00
-110 CM
2.00
REZA PUTRAMUDIA, ST HERRI AGUSTIAWAN, ST
-110 CM
-110 CM
-110 CM
-110 CM
NIP. 19811029 201101 1 005 NIP. 19890822 201503 1 003
4%
KONSULTAN PENGAWASAN
4%
4%
4%
CV. DINAMIKA TEKNIK
5.00
5.00
5.00
105.00
ACHMAD YANI, ST
SUPERVISI ENGINEER
DIBUAT OLEH :
PT. AIR PANAS SEMURUP
TABURMAN
KUASA DIREKTUR
ra
Uta
CATATAN
DENAH DRAINMATE DAN POROUS PIPE
SKALA 1 : 500