Anda di halaman 1dari 1

D:\KONI 2017\PT OK BGT DEH.

jpg
KEGIATAN
PEMBANGUNAN GEDUNG KANTOR
10.00

10.00

PEKERJAAN
PEMBANGUNAN STADION KONI
TANAH KAMPUNG
LOKASI
KEC. TANAH KAMPUNG
4%

4%
-110 CM

-110 CM

-110 CM

-110 CM

-110 CM
4%
KOTA SUNGAI PENUH
-110 CM

-110 CM
DIKETAHUI OLEH:
PPK BIDANG CIPTA KARYA

2%
DINAS PU KOTASUNGAI PENUH
2.00
4%

2.00

4%
2%
2%
2%
2%
2%
2%

2%

2%

2%
2%

2%

ADE RHAMA PUTRA, ST


2%

NIP. 19810721 200903 1 001

2%
2%
2%
2%
DISETUJUI OLEH:
2.00
2.00
2%
2%

2%
2%

PPTK PEMBANGUNAN GEDUNG KANTOR

2%

2%
-40 CM

-20 CM

-40 CM
-40 CM

-40 CM
-40 CM

2%
2.00
-20 CM

-40 CM
65.00

4%
2.00
2%
2%

DEDE KOSRI MAFAZAN, ST


2.00

NIP. 19761028 201001 1 013


2.00

2%
2.00

2.00

2%
2%
2.00

2.00

DIPERIKSA OLEH:
2%
2%

-40 CM

-20 CM DIREKSI BIDANG CIPTA KARYA DAN


2%
2%

JASA KONSTRUKSI DINAS PUPR


KOTA SUNGAI PENUH

2%
2%
2%

2%
2%

2%
2%
2%

2%
2%
2%

-110 CM
-110 CM

2.00

-110 CM
2.00
REZA PUTRAMUDIA, ST HERRI AGUSTIAWAN, ST

-110 CM
-110 CM
-110 CM

-110 CM
NIP. 19811029 201101 1 005 NIP. 19890822 201503 1 003

4%
KONSULTAN PENGAWASAN
4%

4%

4%
CV. DINAMIKA TEKNIK

5.00

5.00

5.00

105.00
ACHMAD YANI, ST
SUPERVISI ENGINEER
DIBUAT OLEH :
PT. AIR PANAS SEMURUP
TABURMAN
KUASA DIREKTUR
ra
Uta

CATATAN
DENAH DRAINMATE DAN POROUS PIPE
SKALA 1 : 500

Anda mungkin juga menyukai