Anda di halaman 1dari 13

KEGIATAN

PERENCANAAN GEDUNG IGD, POLIKLINIK, DAN


ADMINISTRASI RSUD ABDUL AZIZ SINGKAWANG

PEKERJAAN

LOKASI

PELAKSANA

WC WC
RUANG RAPAT RUANG STAFF

POLI ORTOPEDI POLI KEBIDANAN POLI PENYAKIT POLI BEDAH POLI SARAF
DALAM SARAF WC

INSTALASI FARMASI (LOKET) GUDANG OBAT


WC
NO. REVISI TGL
RUANG KOAS WC WC
RUANG REKAM RUANG REKAM
MEDIS IN AKTIF MEDIS IN AKTIF
RUANG BEDAH

WC
RUANG SUPERVISI

WC WC

POLI BEDAH
UNIT PELAYANAN POLI BEDAH ONKOLOGI POLI GIGI POLI GIGI POLI GIGI
RUANG RAPAT INSTALASI GAWAT DARURAT WC
PENGADUAN DIGERTIF TIRUAN/IMPLAN
PUSAT
PELAYANAN
SURAT KET MEDIS RUANG RUANG RUANG
INFEKSI TINDAKAN TB
WC

LOKER
PANTRY KAMAR PERAWAT RUANG DOKTER

ARSIP SURAT LOKET


KETERANGAN MEDIS
RUANG RUANG USG TINDAK
RUANG PERAWAT RUANG KEPALA RUANG ISOLASI INFORMASI MENYUSUI
IGD
R. ISTIRAHAT R. ISTIRAHAT
WC WC

DROPOFF DROPOFF
IGD UTAMA
PARAF

DIREKTUR

TEAM LEADER

GEDUNG IGD, POLIKLINIK, DAN ADMINISTRASI


- ARSITEK
DENAH EKSISTING LANTAI 1
DRAFTER

KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN
PERENCANAAN GEDUNG IGD, POLIKLINIK, DAN
ADMINISTRASI RSUD ABDUL AZIZ SINGKAWANG

LOKASI

PELAKSANA

PANTRY
PANTRY NO. REVISI TGL
WADIR PELAYANAN WADIR UMUM KABAG TU
DAN KEUANGAN
WC
POLI KULIT POLI KESEHATAN
POLI THT
DAN KELAMIN JIWA
WC

CASE MANAGER

WC

MUSHOLLA
RUANG DIREKTUR

RUANG SEKRETARIS
TU DIREKTUR

WC

R. INFORMASI POLI MATA POLI ANAK POLI ODC


WC DAN TEKNOLOGI THALASEMIA

MUSHOLLA
WC WC

KABAG KEUANGAN KABID PELAYANAN


DAN PENUNJANG MEDIS
PARAF

DIREKTUR

TEAM LEADER

ARSITEK

GEDUNG IGD, POLIKLINIK, DAN ADMINISTRASI


- DRAFTER
DENAH LANTAI 2

KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN
PERENCANAAN GEDUNG IGD, POLIKLINIK, DAN
ADMINISTRASI RSUD ABDUL AZIZ SINGKAWANG

LOKASI

PELAKSANA

NO. REVISI TGL

PARAF

DIREKTUR

TEAM LEADER

GEDUNG IGD, POLIKLINIK, DAN ADMINISTRASI ARSITEK


- DENAH USULAN BARU LANTAI 3
DRAFTER

KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN
PERENCANAAN GEDUNG IGD, POLIKLINIK, DAN
ADMINISTRASI RSUD ABDUL AZIZ SINGKAWANG

LOKASI

PELAKSANA

V1 V1 V1 V1 V1 J2 J3 J3 J3 J3

P2
P4 NO. REVISI TGL

P2 P2
P2

P6 P4
J3 J3

P5 P5 P5 P5
P6

P6 P1 P1 P1 P1
P5 P5 P5
P1 P1

P2

P1
P2 P3

P1 P2
P1

P1 P3 P2
P1 P1 P1 P1

P2
J1 J1 J1

P2

P2 P3 P3

PARAF
J1 J1 J1

DIREKTUR

TEAM LEADER

GEDUNG IGD, POLIKLINIK, DAN ADMINISTRASI


- ARSITEK
DENAH PJV LANTAI 3
DRAFTER

KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN
ATAP +19.32

ATAP +18.24
PERENCANAAN GEDUNG IGD, POLIKLINIK, DAN
ADMINISTRASI RSUD ABDUL AZIZ SINGKAWANG

LOKASI

RING BALOK +12.00

PELAKSANA
LT DUA +8.00

LT SATU +4.00

LT DASAR ±0.00

NO. REVISI TGL

PARAF

ATAP +19.32
DIREKTUR
ATAP +18.24

TEAM LEADER
RING BALOK +12.00

ARSITEK
LT DUA +8.00

DRAFTER

LT SATU +4.00

KONSTRUKTUR
LT DASAR ±0.00

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
B
B B
BALOK LATEI BALOK LATEI
BALOK LATEI
10X15CM 10X15CM
10X15CM

NUT

KEGIATAN
DAUN PINTU
A A DAUN PINTU
A A A A

DAUN DAUN
HANDLE PINTU HANDLE PINTU

KUNCI KUNCI PEKERJAAN


KUSEN ALUMINIUM 3" KUSEN ALUMINIUM 3"
POWDER COATING POWDER COATING

NUT

LOKASI
B
B B

POT. B TAMPAK DEPAN POT. B TAMPAK DEPAN POT. B PELAKSANA

KUSEN ALUMINIUM 3" KUSEN ALUMINIUM 3"


POWDER COATING POWDER COATING

DAUN PINTU DAUN PINTU

NUT

HANDLE HANDLE

NO. REVISI TGL

ARS-06 DETAIL PINTU P1


CATATAN ARS-06 DETAIL PINTU P2 ARS-06 DETAIL PINTU P3
A 10 1 : 50 A 10 1 : 50 A 10 1 : 50

B
B BALOK LATEI B
BALOK LATEI BALOK LATEI
10X15CM
10X15CM 10X15CM

NUT

DAUN PINTU
A A DAUN PINTU ENGINEERING DOOR A A DAUN PINTU
A A
PARAF
DAUN DAUN
HANDLE PINTU HANDLE HANDLE PINTU

KUNCI KUNCI
DIREKTUR
KUNCI
KUSEN ALUMINIUM 3" KUSEN ALUMINIUM 3"
POWDER COATING KUSEN ALUMINIUM 3" POWDER COATING
POWDER COATING

NUT NUT
TEAM LEADER

B B B
ARSITEK
POT. B TAMPAK DEPAN POT. B TAMPAK DEPAN POT. B TAMPAK DEPAN
DRAFTER

KUSEN ALUMINIUM 3" KUSEN ALUMINIUM 3"


POWDER COATING POWDER COATING

KONSTRUKTUR

DAUN PINTU DAUN PINTU

DAUN PINTU
HANDLE NUT
HANDLE
HANDLE NOMOR LEMBAR JUMLAH LEMBAR

ARS-06 DETAIL PINTU P5


A 10
ARS-06 DETAIL PINTU P4 1 : 50
ARS-06 DETAIL PINTU P6
A 10 1 :50 A 10 1 : 50

SKALA
B

KEGIATAN
A A
A A A A
B

KUSEN ALUMINIUM 3"


POWDER COATING
PEKERJAAN
KACA 5 MM

LOKASI

ARS-06 DETAIL VENTILASI 1 B POT. B


A 10 1 : 50
PELAKSANA

B
POT. B
TAMPAK DEPAN
ARS-06 DETAIL JENDELA 2
A 10 1 : 50
KUSEN ALUMINIUM 3"
POWDER COATING
KACA 8 MM

NO. REVISI TGL

ARS-06 DETAIL JENDELA 1


A 10 1 : 50

B
PARAF

DIREKTUR

A A

TEAM LEADER

ARSITEK
B
POT. B
DRAFTER

KONSTRUKTUR

ARS-06 DETAIL JENDELA 3


A 10 1 : 50
NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

A
PEKERJAAN

DROP OFF
NAIK TURUN
MAIN LOKASI
ENTRANCE

PELAKSANA

DENAH RAMP DROP OFF

NO. REVISI TGL

POTONGAN A

PARAF

A DIREKTUR

DROP OFF TEAM LEADER


NAIK TURUN
IGD
ARSITEK

DRAFTER

DENAH RAMP DROP OFF


KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

POTONGAN A
SKALA
KEGIATAN

PEKERJAAN

LOKASI

PELAKSANA

NO. REVISI TGL

KOLOM 40 X 40 KOLOM 30 X 30

PARAF

DIREKTUR

TEAM LEADER

ARSITEK
DETAIL PELAT LANTAI
DRAFTER

BALOK 15 X 30
BALOK 25 X 40
KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
POTONGAN A
SKALA 1 : 20

KEGIATAN

DETAIL PLAFOND GYPSUM PEKERJAAN


SKALA 1 : 20

LOKASI

PELAKSANA
DETAIL POTONGAN RANGKA PLAFOND

NO. REVISI TGL

RANGKA PLAFOND

PARAF

DIREKTUR

TEAM LEADER

DETAIL LIST PLAFOND


ARSITEK

DRAFTER

KONSTRUKTUR
PERSPEKTIF RANGKA PLAFOND

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN

LOKASI

PELAKSANA

TAMPAK DEPAN ACP TAMPAK DEPAN ACP

0.05
0.05 0.05
0.10 0.09 0.09 0.05 0.05
0.10 0.10 0.10 0.05 0.05
0.95 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.05 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00

NO. REVISI TGL


14.40

1.45 1.45
0.95 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.05 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00
0.10
0.10 0.10
0.09 0.10
0.09 0.05
0.05 0.05
0.05
0.05 0.05
0.05

POTONGAN A
0.38 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

POTONGAN A
B

B
23.82

14.40 0.10 0.10 0.10 0.10 0.10


2.20
0.10 0.10 0.10 0.10 0.10
0.95 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 1.00 1.00

0.53 0.53

1.00 1.00 1.00 1.00

1.00 1.00

1.00 1.00 1.00 1.00

1.00 1.00
A
0.72 0.72 0.72 0.72
A
0.53 0.53
0.18 0.18 0.18 0.18

0.20 0.20

1.00 1.00 1.00 1.00


0.50 0.50

PARAF
1.00 1.00
1.00 1.00 1.00 1.00

1.00 1.00

1.08 1.08 1.08 1.08

13.00
0.50

0.20 13.00
0.50

0.20
0.18 0.18 0.18 0.18
DIREKTUR
1.00 1.00 1.00 1.00
0.50 0.50

1.00 1.00
1.00 1.00 1.00 1.00

1.00 1.00
0.78 0.78 0.95 0.45 0.45 0.95 0.45 0.45 0.95 0.45 0.45 0.95 0.45 0.45 0.95 0.45 0.45 0.95 0.45 0.45 0.90 0.78 0.78
1.08 1.08 1.08 1.08

0.50 0.50
0.18 0.18 0.18 0.18 0.18 0.18
TEAM LEADER
0.20 0.20

0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00

ARSITEK
1.00 1.00

1.08 1.08 1.08 1.08 1.08 1.08

0.50 0.50

2.20 0.60 0.60 1.00 1.00 1.00 1.00 0.60 0.60 0.25 1.15 1.15 0.56 0.56 0.56 0.56 0.25 0.66 0.66 0.66 0.66
2.20 0.95 1.00 1.00 1.00 0.95 1.00 1.00 1.00

DRAFTER
POTONGAN B RANGKA ACP POTONGAN B RANGKA ACP

KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN

LOKASI

PELAKSANA

TAMPAK DEPAN ACP


NO. REVISI TGL

0.74 0.51 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.87 1.87

0.74 0.51 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

POTONGAN A
B

C
1.87
0.74 0.51 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

0.77 0.77 0.77 0.77


A 0.70

0.13 0.11
0.15 0.15

1.00 1.00 1.00


0.78 0.78

1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00


1.00 1.00
PARAF
0.78 0.78
1.00 1.00 1.00

0.23
DIREKTUR
1.00 1.00 1.00 0.78 0.78

1.00 1.00
1.00 1.00 1.00

1.00 1.00
1.00 1.00 1.00

1.00 1.00 1.00


1.19 1.19
TEAM LEADER
0.22

0.20
1.00 1.00 1.00

0.43 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.70

POTONGAN C ARSITEK
1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00

DRAFTER
1.03 1.03 1.03 1.03

1.87 0.74

POTONGAN B RANGKA ACP


KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA
KEGIATAN

PEKERJAAN

LOKASI

PELAKSANA

NO. REVISI TGL

A
A

DENAH TANGGA LT 2
DENAH TANGGA DARURAT (TANGGA SAMPING)

DETAIL - KB

PARAF

2 DETAIL - 1 DETAIL - 2
DETAIL - KB
DIREKTUR
1 2 2

1
DETAIL - 1 DETAIL - 2
1 1 2

TEAM LEADER

ARSITEK
POTONGAN A-A
POTONGAN A-A
DRAFTER

KONSTRUKTUR

NOMOR LEMBAR JUMLAH LEMBAR

SKALA

Anda mungkin juga menyukai