Anda di halaman 1dari 1

CATATAN

KETERANGAN
AREA PENGISIAN LPG (1400 X 1800 CM)
U
1
2 RUMAH POMPA/KOMPRESSOR LPG (1200 X 300 CM)
3 TANGKI LPG KAP. 1X50 TON

M
4 BONGKAR LPG (250 X 250 CM)

= 12
M
5 KANTOR (1000 X 600 CM)X2

GSP
= 22
6 KOLAM PMK 480 M3 (2000 X 800 X 300 CM)

GSP
7 RUMAH POMPA PMK (400 X 600 CM)
8 RUANG GENSET & PANEL (400 X 600 CM)
9 GUDANG & MAINTENANCE(400 X 600 CM)
13297
10 MUSHOLLA (300 X 200 CM)
11 SHELTER SOPIR DAN KANTIN (500 X 300 CM)
AREA 12 GATE KEEPER 2 LT (300 X 300 CM)
1100

PENGEMBANGAN 13 POS JAGA (400 X 300 CM)


2709
6617
2000 1200 400 237 270 900
3485
2115 200 14 LAMPU TAMAN
15 RAMBU KELUAR / MASUK
16 RAMBU DILARANG MASUK

715
29 17 RAMBU DILARANG MEROKOK
14
7 8 9
18 RAMBU DILARANG MEMBAWA
1500

6
SENJATA TAJAM/KOREK API
10

300
11
26 19 RAMBU DILARANG MENGAKTIFKAN HANDPHONE
14 14 14 16 20 RAMBU TAMU WAJIB LAPOR

JL. P
21 RAMBU AREAL TERBATAS DILARANG MASUK
24 24 24
22 RAMBU RAMBU LALU LINTAS

ORO
EL. + 1.00
800

Beton cor 23 RAMBU WAJIB MEMAKAI APD

S MA
DANGEROUS Pintu Darurat

EL. +
DANGEROUS K-300
ZONE
88 24 CCTV (8 UNIT)

0.00

MUJU
34 ZONE
Area Parkir
1 Mobil Agen
25 GATE ENTRY (AUTOMATIC)
491

3620
Area Parkir 14 26 TOILET DAN TEMPAT WUDHU (200 X 300 CM)
EL. + 1.00
Beton cor 27 RAMBU PARKIR KENDARAAN
27

5850
27
8100

1500 300 800 1400 K-300


28 PENANGKAL PETIR
8
400 19 1141 AREA 29 RUANG SCRAP
1787 600
PENGEMBANGAN 30 SIGNAGE
24 18
1100 14
14
1800
3550

4 1

1200
3 17 5
2

24 14
EL. + 1.00
Beton cor

1515
300

K-300 300
12

400
300 300
20 MENGETAHUI
25 DISETUJUI DISETUJUI DISETUJUI
DANGEROUS
2085

DANGEROUS Pintu Masuk &


APPROVED APPROVED APPROVED

Pintu Geser
ZONE Keluar Skid Tank
ZONE EL. + 1.00
EL. + 1.00 TANGGAL TANGGAL TANGGAL
800

800
Beton cor Beton cor
K-300 DATE DATE DATE
K-300
24 24 24
15 30
350

350
14 14 14 23 22 21 14 14 14
300 800 2580 2937 3485 5500
15602

RIZALDI DODDY WIJAYA FANDA CHRISMIANTO


Region Man. Rel. & Project Dev. Sulawesi Region Manager HSSE Sulawesi Region Manager Retail Sales Sulawesi

NO JARAK AMAN (SAFETY DISTANCES) HASIL (m) STD (m)


KETERANGAN
1 Pagar Tembok ke Tangki 20.85 15.00

APAR CO2 10 Lbs KOTAK SELANG PMK 2 Bangsal Pengisian Ke Tangki 8.0 7.6 PERTAMINA
3 Bangsal Pengisian ke Kantor 17.87 15.0 PATRA NIAGA
APAR DCP 20 Lbs GAS DETECTOR 4 Ketinggian Pagar tembok SPPBE 3.0 2.0
5 Tangki ke Kabel Transmisi Listrik 114.18 22.0 PEMBANGUNAN SPBE 3 KG
APAR DCP 150 Lbs KOTAK P3K 6 Jarak Antar Tangki - 1.5
7 Tangki ke Kontrol Room (Panel Listrik) 34.88 15.0
PT. ANUGRAH DJAM SEJATI
HIDRANT PETUNJUK ARAH ANGIN 8 Tangki ke sumber api yang lain 49.11 30.0 Jl. Poros Mamuju-Pasangkayu, Desa Kasano, Kec. Baras,
9 Tangki ke Fasilitas Umum 49.11 30.0 Kab. Mamuju Utara, Provinsi Sulawesi Barat
10 Tangki ke Rumah Pompa 4.0 3.0
11 Loading/Unloading ke Pagar 11.00 7.6 KONSULTAN PERENCANA DIGAMBAR DISETUJUI

CV. CULDESAC
MULTI DESAIN

JUDUL
GENERAL LAY OUT

DIGAMBAR : Min
GENERAL LAY OUT SKALA : 1 :600
SKALA 1 : 600 TANGGAL : 27-12-2022

NO. GAMBAR :

Anda mungkin juga menyukai