VOLUME
No. URAIAN SAT. Harga Satuan
TOTAL Swad. TOTAL Swadaya
I BAHAN
II ALAT
III UPAH
1 Pekerja 14.71 HOK 100,000 1,470,950
2 Tukang 5.42 HOK 125,000 677,844
3 Kep. Tukang/ Kep. Kelompok 7.00 HOK 150,000 1,050,113
4 Pengadaan Batu 8.61 HOK 240,000 2,306,400
5 Pengadaan Kerikil 0.92 HOK 275,000 528,000
Sub Total 3) 6,033,306 0.00
……………………………. …………………………………….