2.CASTIN = 136M3 KANSTEEN 3.TROTOAR = 264M3 TROTOAR 4.TUTUP SALURAN = 91M3 TUTUP SALURAN 5.BAK CONTROL = 82M3 BAK KONTROL 6.PONDASI PJU = 13M3 PONDASI PJU TOTAL KEBUTUHAN BETON = 1133M3 RIGID KEBUTUHAN MATERIAL BASE A 1.SEMEN = 6780 SAK BASE B 2.PASIR = 452 M3 LANTAI KERJA JLN 3.KORAL =678 M3 28,382 4.BESI = 3942 BTG (D10 ) SEMEN BISA DI SELESAIKAN SAMPE 3BULAN 7 HARI PASIR 1130M3/10M3 = 113HARI KORAL 113HARI /30 HARI = 3 BULAN 7 HARI BESI
Kebutuhan material jalan kita