Anda di halaman 1dari 4

PEKERJAAN

NO BANGUNAN
STRUKTUR ARSITEK

1. MASJID SELESAI DINDING , PENGECATAN , SANIT


2. FOODCOURT SELESAI DINDING , PENGECATAN , SANIT
3. MESS A SELESAI
DINDING , PENGECATAN , SANIT
4. MESS B SELESAI DINDING
5. BANGUNAN INTI STRUKTUR LANTAI 1-
6. GWT & POWER HOUSE
( EST. START JAN 22 -

NO ITEM VOLUME SATUAN

1. GALIAN 233,737 M³
2. TIMBUNAN 21,641 M²
3. SALURAN 1,439 M'
4. BASE A 1,264 M³
5. BASE B 2,221 M³
PEKERJAAN
MEP

PENERANGAN
PENERANGAN &
& INSTALASI
INSTALASI STOP
STOP KONTAK
KONTAK ,PIPING
,
PIPING
PENERANGAN & INSTALASI STOP KONTAK ,
PIPING, PEMADAM KEBAKARAN
-
-
-

1263 1140
4212.82666666668
3704.323

4104

4546.8