NO BANGUNAN
STRUKTUR ARSITEK
1. GALIAN 233,737 M³
2. TIMBUNAN 21,641 M²
3. SALURAN 1,439 M'
4. BASE A 1,264 M³
5. BASE B 2,221 M³
PEKERJAAN
MEP
PENERANGAN
PENERANGAN &
& INSTALASI
INSTALASI STOP
STOP KONTAK
KONTAK ,PIPING
,
PIPING
PENERANGAN & INSTALASI STOP KONTAK ,
PIPING, PEMADAM KEBAKARAN
-
-
-
1263 1140
4212.82666666668
3704.323
4104
4546.8