HARGA SATUAN PEKERJAAN (HSP)

HARGA SATUAN PEKERJAAN


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

KEGIATAN : PENYUSUNAN NORMA, STANDAR, PEDOMAN DAN MANUAL (NSPM)


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KAB. / PROVINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2020
SUMBER DANA : ---

BIDANG CIPTA
PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST
HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

A PEKERJAAN PERSIAPAN
1 1 M2 Pagar Sementara Kayu Tinggi 2 M PU-CK.A1 RSNI T-12-2002 431.887,00
2 1 M2 Pagar Sementara (Seng Gelombang 2 M) PU-CK.A2 RSNI T-12-2002 551.754,00
3 1 M2 Pagar Kawat Duri, Tinggi 1,80 M PU-CK.A3 RSNI T-12-2002 724.215,00
4 1 M' Pengukuran dan Pasangan Bouwplank PU-CK.A4 RSNI T-12-2002 107.090,00
5 1 M2 Kantor Sementara dgn Lantai Plesteran PU-CK.A5 RSNI T-12-2002 5.006.696,00
6 1 M2 Gudang Material dan Peralatan PU-CK.A6 RSNI T-12-2002 1.660.100,00
7 1 M2 Rumah Jaga/konstruksi Kayu PU-CK.A7 RSNI T-12-2002 1.642.180,00
8 1 M2 Membersihkan Lapangan dan Perataan PU-CK.A8 RSNI T-12-2002 18.704,00
9 1 M2 Bedeng Pekerja PU-CK.A9 RSNI T-12-2002 1.705.590,00
10 1 M2 Camp Darurat Kontsruksi Kayu PU-CK.A10 HPS.PU- 2020 740.620,00
11 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm PU-CK.A11 RSNI T-12-2002 242.340,00
12 1 M3 Bongkaran Beton Bertulang PU-CK.A12 RSNI T-12-2002 2.493.919,00
13 1 M3 Bongkaran Dinding Tembok Bata Merah PU-CK.A13 RSNI T-12-2002 1.173.474,00
14 1 M3 Bongkaran beton tak bertulang PU-CK.A14 HPS.PU- 2020 810.523,00
15 1 M3 Pembongkaran lantai PU-CK.A15 HPS.PU- 2020 374.095,00
16 1 M2 Mengupas plesteran PU-CK.A16 HPS.PU- 2020 18.704,00
17 1 Ret Pengangkutan Sampah (10 KM) PU-CK.A17 HPS.PU- 2020 121.303,00

B. PEKERJAAN TANAH DAN PASIR


1 1 M3 Galian Tanah Biasa Sedalam 1 M PU-CK.B.1 SNI 2835:2008 137.220,00
2 1 M3 Urug Kembali Tanah Biasa Sedalam 1 M PU-CK.B.2 SNI 2835:2008 45.740,00
3 1 M3 Galian Tanah Biasa Sedalam 1 - 2 M PU-CK.B.3 SNI 2835:2008 168.340,00
4 1 M3 Urug Kembali Tanah Biasa Sedalam 1 - 2 M PU-CK.B.4 SNI 2835:2008 56.113,33
5 1 M3 Galian Tanah Biasa Sedalam 2 - 3 M PU-CK.B.5 SNI 2835:2008 199.950,00
6 1 M3 Urug Kembali Tanah Biasa Sedalam 2 - 3 M PU-CK.B.6 SNI 2835:2008 66.650,00
7 1 M3 Galian Tanah Keras Sedalam 1 M PU-CK.B.7 SNI 2835:2008 182.638,00
8 1 M3 Urug Kembali Tanah Keras Sedalam 1 M PU-CK.B.8 SNI 2835:2008 60.879,00
9 1 M3 Galian Tanah Cadas Sedalam 1 M PU-CK.B.9 SNI 2835:2008 276.897,00
10 1 M3 Urug Kembali Tanah Cadas Sedalam 1 M PU-CK.B.10 SNI 2835:2008 92.299,00
11 1 M3 Galian Tanah Lumpur Sedalam 1 M PU-CK.B.11 SNI 2835:2008 220.780,00
12 1 M3 Urug Kembali Tanah Lumpur Sedalam 1 M PU-CK.B.12 SNI 2835:2008 73.593,33
13 1 M3 Memadatkan Tanah Per 20 cm PU-CK.B.13 SNI 2835:2008 99.640,00
14 1 M3 Urugan Tanah Urug (material didatangkan) PU-CK.B.14 SNI 2835:2008 448.480,00
15 1 M3 Urugan Tanah Pilihan (Selmat) - Manual PU-CK.B.15 SNI 2835:2008 448.480,00
16 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi PU-CK.B.16 SNI 2835:2008 1.059.860,00
17 1 M3 Urugan Sirtu / Kerikil PU-CK.B.17 SNI 2835:2008 1.694.310,00
18 1 M3 Pengangkutan Tanah Sampai Dengan Sejauh 15 M PU-CK.B.18 SNI 2835:2008 60.133,00
19 1 M3 Lapisan Ijuk Tebal 10 cm Untuk Peresapan PU-CK.B.19 SNI 2835:2008 227.510,00

C. PEKERJAAN PONDASI PASANGAN BATU


1 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Import (Manual) PU-CK.C.1 HPS.PU- 2020 3.143.912,00
2 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Import (Manual) PU-CK.C.2 HPS.PU- 2020 3.041.906,00
3 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Import (Manual) PU-CK.C.3 HPS.PU- 2020 2.980.703,00
4 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Lokal (Manual) PU-CK.C.4 HPS.PU- 2020 2.951.183,00
5 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Lokal (Manual) PU-CK.C.5 HPS.PU- 2020 2.822.554,00
6 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Lokal (Manual) PU-CK.C.6 HPS.PU- 2020 2.745.376,00
7 1 M3 Pondasi Pasangan Batu Belah, 1PC : 3PS (Manual) PU-CK.C.7 SNI 2836:2008 3.316.161,00
8 1 M3 Pondasi Pasangan Batu Belah, 1PC : 4PS PU-CK.C.8 SNI 2836:2008 3.270.526,00
9 1 M3 Pasangan Pondasi Batu Kosong (Anstamping) PU-CK.C.9 SNI 2836:2008 2.096.217,00

D. PEKERJAAN COR BETON


1 1 M3 Campuran Beton 1PC : 2PS Pasir Import - Manual PU-CK.D.1 HPS.PU- 2020 4.597.284,00
2 1 M3 Campuran Beton 1PC : 3PS Pasir Import - Manual PU-CK.D.2 HPS.PU- 2020 4.329.622,00
3 1 M3 Campuran Beton 1PC : 4PS Pasir Import - Manual PU-CK.D.3 HPS.PU- 2020 4.169.025,00
4 1 M3 Campuran Beton 1PC : 5PS Pasir Import - Manual PU-CK.D.4 HPS.PU- 2020 4.061.960,00
5 1 M3 Campuran Beton 1PC : 6PS Pasir Import - Manual PU-CK.D.5 HPS.PU- 2020 3.985.486,00
6 1 M3 Campuran Beton 1PC : 2PS Pasir Lokal - Manual PU-CK.D.6 HPS.PU- 2020 4.030.550,00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

7 1 M3 Campuran Beton 1PC : 3PS Pasir Lokal - Manual PU-CK.D.7 HPS.PU- 2020 3.685.401,00
8 1 M3 Campuran Beton 1PC : 4PS Pasir Lokal - Manual PU-CK.D.8 HPS.PU- 2020 3.478.311,00
9 1 M3 Campuran Beton 1PC : 5PS Pasir Lokal - Manual PU-CK.D.9 HPS.PU- 2020 3.340.252,00
10 1 M3 Campuran Beton 1PC : 6PS Pasir Lokal - Manual PU-CK.D.10 HPS.PU- 2020 3.241.637,00
11 1 M3 Campuran Beton 1PC : 2PS - Pasir Import (mekanis) PU-CK.D.11 HPS.PU- 2020 4.212.288,00
12 1 M3 Campuran Beton 1PC : 3PS - Pasir Import (mekanis) PU-CK.D.12 HPS.PU- 2020 3.926.992,00
13 1 M3 Campuran Beton 1PC : 4PS - Pasir Import (mekanis) PU-CK.D.13 HPS.PU- 2020 3.755.815,00
14 1 M3 Campuran Beton 1PC : 5PS - Pasir Import (mekanis) PU-CK.D.14 HPS.PU- 2020 3.641.697,00
15 1 M3 Campuran Beton 1PC : 6PS - Pasir Import (mekanis) PU-CK.D.15 HPS.PU- 2020 3.560.184,00
16 1 M3 Campuran Beton 1PC : 2PS - Pasir Lokal (mekanis) PU-CK.D.16 HPS.PU- 2020 3.646.253,00
17 1 M3 Campuran Beton 1PC : 3PS - Pasir Lokal (mekanis) PU-CK.D.17 HPS.PU- 2020 3.283.295,00
18 1 M3 Campuran Beton 1PC : 4PS - Pasir Lokal (mekanis) PU-CK.D.18 HPS.PU- 2020 3.065.520,00
19 1 M3 Campuran Beton 1PC : 5PS - Pasir Lokal (mekanis) PU-CK.D.19 HPS.PU- 2020 2.920.337,00
20 1 M3 Campuran Beton 1PC : 6PS - Pasir Lokal (mekanis) PU-CK.D.20 HPS.PU- 2020 2.816.635,00
21 1 M3 Campuran Beton 1PC : 2PS : 3KR, Import - Manual PU-CK.D.21 HPS.PU- 2020 4.136.377,00
22 1 M3 Campuran Beton 1PC : 3PS : 5KR, Import - Manual PU-CK.D.22 HPS.PU- 2020 3.966.204,00
23 1 M3 Campuran Beton 1PC : 4PS : 6KR, Import - Manual PU-CK.D.23 HPS.PU- 2020 3.899.813,00
24 1 M3 Campuran beton 1PC : 2PS : 3KR, Import (mekanis) PU-CK.D.24 HPS.PU- 2020 3.708.688,00
25 1 M3 Campuran beton 1PC : 3PS : 5KR, Import (mekanis) PU-CK.D.25 HPS.PU- 2020 3.529.235,00
26 1 M3 Campuran beton 1PC : 4PS : 6KR, Import (mekanis) PU-CK.D.26 HPS.PU- 2020 3.459.469,00
27 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 PU-CK.D.27 SNI 7394:2008 2.811.781,00
28 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 PU-CK.D.28 SNI 7394:2008 2.854.577,00
29 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 PU-CK.D.29 SNI 7394:2008 2.886.468,00
30 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87 PU-CK.D.30 SNI 7394:2008 2.719.311,00
31 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 PU-CK.D.31 SNI 7394:2008 2.925.422,00
32 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 PU-CK.D.32 SNI 7394:2008 2.961.357,00
33 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 PU-CK.D.33 SNI 7394:2008 2.991.163,00
34 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 PU-CK.D.34 SNI 7394:2008 3.008.067,00
35 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 PU-CK.D.35 SNI 7394:2008 3.039.265,00
36 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 PU-CK.D.36 SNI 7394:2008 3.047.883,00
37 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 PU-CK.D.37 SNI 7394:2008 3.186.301,00
38 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 PU-CK.D.38 SNI 7394:2008 3.198.631,00
51 1 KG Pembesian Besi polos/ulir Ø. 6 mm SNI PU-CK.D.51 SNI 7394:2008 19.194,00
52 1 KG Pembesian Besi polos/ulir Ø. 8 mm SNI PU-CK.D.52 SNI 7394:2008 17.815,00
53 1 KG Pembesian Besi polos/ulir Ø. 10 mm SNI PU-CK.D.53 SNI 7394:2008 17.863,00
54 1 KG Pembesian Besi polos/ulir Ø. 12 mm SNI PU-CK.D.54 SNI 7394:2008 17.345,00
55 1 KG Pembesian Besi polos/ulir Ø. 14 mm SNI PU-CK.D.55 SNI 7394:2008 18.789,00
56 1 KG Pembesian Besi polos/ulir Ø. 16 mm SNI PU-CK.D.56 SNI 7394:2008 20.680,00
57 1 KG Pembesian Besi polos/ulir Ø. 19 mm SNI PU-CK.D.57 SNI 7394:2008 18.891,00
58 1 KG Pembesian Besi polos/ulir Ø. 22 mm SNI PU-CK.D.58 SNI 7394:2008 19.147,00
59 1 M2 Bekisting untuk Pondasi PU-CK.D.59 SNI 7394:2008 301.851,00
60 1 M2 Bekisting untuk Sloof PU-CK.D.60 SNI 7394:2008 318.503,00
61 1 M2 Bekisting untuk Kolom PU-CK.D.61 SNI 7394:2008 640.720,00
62 1 M2 Bekisting untuk Balok PU-CK.D.62 SNI 7394:2008 655.101,00
63 1 M2 Bekisting untuk Pelat Lantai PU-CK.D.63 SNI 7394:2008 717.678,00
64 1 M2 Bekisting untuk Pelat Dinding PU-CK.D.64 SNI 7394:2008 742.625,00
65 1 M2 Bekisting untuk Tangga PU-CK.D.65 SNI 7394:2008 607.367,00
66 1 M2 Pasang Jembatan untuk Pengecoran Beton PU-CK.D.66 SNI 7394:2008 152.494,00
67 1 M2 Cetakan Beton / Begisting Papan (Kayu Kelas 3) PU-CK.D.67 HPS.PU- 2020 306.755,00
68 1 M2 Cetakan Beton / Begisting Memakai Multiplek PU-CK.D.68 HPS.PU- 2020 350.745,00
69 1 M3 Membongkar cetakan / Bekisting Beton PU-CK.D.69 HPS.PU- 2020 6.992,00
70 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (memakai kayu dolken) PU-CK.D.70 HPS.PU- 2020 3.779.837,00
71 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (memakai Scafolding) PU-CK.D.71 2.012.109,00
72 1 M' Kolom penguat/praktis beton bertulang (11 x 11) cm PU-CK.D.72 SNI 7394:2008 127.512,00
73 1 M' Sloof/Ring balok beton bertulang (10 x 15) cm PU-CK.D.73 SNI 7394:2008 186.753,00
74 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Import PU-CK.D.74 HPS.PU- 2020 212.830,00
75 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Lokal PU-CK.D.75 HPS.PU- 2020 196.898,00
76 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Import PU-CK.D.76 HPS.PU- 2020 212.830,00
77 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Lokal PU-CK.D.77 HPS.PU- 2020 196.898,00
78 1 Btg Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) PU-CK.D.78 HPS.PU- 2020 4.515.042,00
79 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Import PU-CK.D.79 HPS.PU- 2020 838.179,00
80 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Lokal PU-CK.D.80 HPS.PU- 2020 753.211,00

E. PEKERJAAN DINDING BATU


1 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 2PS - Pasir Lokal PU-CK.E.1 SNI 6897:2008 545.423,00
2 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 3PS - Pasir Lokal PU-CK.E.2 SNI 6897:2008 529.703,00
3 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 4PS - Pasir Lokal PU-CK.E.3 SNI 6897:2008 516.254,00
4 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 5PS - Pasir Lokal PU-CK.E.4 SNI 6897:2008 513.511,00
5 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 6PS - Pasir Lokal PU-CK.E.5 SNI 6897:2008 521.516,00
6 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lokal PU-CK.E.6 SNI 6897:2008 264.419,00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

7 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU-CK.E.7 SNI 6897:2008 255.271,00
8 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lokal PU-CK.E.8 SNI 6897:2008 251.001,00
9 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 5PS - Pasir Lokal PU-CK.E.9 SNI 6897:2008 248.374,00
10 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 6PS - Pasir Lokal PU-CK.E.10 SNI 6897:2008 248.510,00
11 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 8PS - Pasir Lokal PU-CK.E.11 SNI 6897:2008 245.047,00
ANALISA MENGGUNAKAN PASANGAN BATU BATA LOKAL
12 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Import PU-CK.E.12 HPS.PU- 2020 350.383,00
13 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Import PU-CK.E.13 HPS.PU- 2020 339.489,00
14 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Import PU-CK.E.14 HPS.PU- 2020 332.953,00
15 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lokal PU-CK.E.15 HPS.PU- 2020 329.800,00
16 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU-CK.E.16 HPS.PU- 2020 316.063,00
17 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lokal PU-CK.E.17 HPS.PU- 2020 307.821,00
18 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Import PU-CK.E.18 HPS.PU- 2020 171.296,00
19 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Import PU-CK.E.19 HPS.PU- 2020 166.806,00
20 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Import PU-CK.E.20 HPS.PU- 2020 220.068,00
21 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Lokal PU-CK.E.21 HPS.PU- 2020 162.813,00
22 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Lokal PU-CK.E.22 HPS.PU- 2020 157.151,00
23 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Lokal PU-CK.E.23 HPS.PU- 2020 209.709,00

F. PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Import PU-CK.F.1 SNI 2837:2008 150.975,00
2 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Import PU-CK.F.2 SNI 2837:2008 143.815,00
3 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Import PU-CK.F.3 SNI 2837:2008 142.018,00
4 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Import PU-CK.F.4 SNI 2837:2008 139.717,00
5 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Import PU-CK.F.5 SNI 2837:2008 139.881,00
6 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Lokal PU-CK.F.6 SNI 2837:2008 143.103,00
7 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Lokal PU-CK.F.7 SNI 2837:2008 133.975,00
8 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Lokal PU-CK.F.8 SNI 2837:2008 130.702,00
9 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Lokal PU-CK.F.9 SNI 2837:2008 127.909,00
10 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Lokal PU-CK.F.10 SNI 2837:2008 127.089,00
11 1 M2 Plesteran 1PC : 6PS, Tebal 15 mm - Pasir Lokal PU-CK.F.11 SNI 2837:2008 126.111,00
12 1 M2 Plesteran 1PC : 7PS, Tebal 15 mm - Pasir Lokal PU-CK.F.12 SNI 2837:2008 125.814,00
13 1 M2 Plesteran 1PC : 8PS, Tebal 15 mm - Pasir Lokal PU-CK.F.13 SNI 2837:2008 125.517,00
14 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Import PU-CK.F.14 SNI 2837:2008 192.686,00
15 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Import PU-CK.F.15 SNI 2837:2008 190.290,00
16 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Import PU-CK.F.16 SNI 2837:2008 186.780,00
17 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Import PU-CK.F.17 SNI 2837:2008 187.441,00
18 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Lokal PU-CK.F.18 SNI 2837:2008 179.402,00
19 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Lokal PU-CK.F.19 SNI 2837:2008 175.038,00
20 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Lokal PU-CK.F.20 SNI 2837:2008 171.036,00
21 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Lokal PU-CK.F.21 SNI 2837:2008 170.221,00
22 1 M2 Plesteran 1PC : 6PS, Tebal 20 mm - Pasir Lokal PU-CK.F.22 SNI 2837:2008 168.638,00
23 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Import PU-CK.F.23 HPS.PU- 2020 152.285,00
24 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Import PU-CK.F.24 HPS.PU- 2020 179.190,00
25 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Import PU-CK.F.25 HPS.PU- 2020 177.814,00
26 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Import PU-CK.F.26 HPS.PU- 2020 175.504,00
27 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Lokal PU-CK.F.27 HPS.PU- 2020 152.285,00
28 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Lokal PU-CK.F.28 HPS.PU- 2020 161.970,00
29 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Lokal PU-CK.F.29 HPS.PU- 2020 159.118,00
30 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Lokal PU-CK.F.30 HPS.PU- 2020 156.316,00
31 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Import PU-CK.F.31 HPS.PU- 2020 211.798,00
32 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Import PU-CK.F.32 HPS.PU- 2020 206.482,00
33 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Lokal PU-CK.F.33 HPS.PU- 2020 194.579,00
34 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU-CK.F.34 HPS.PU- 2020 187.294,00
35 1 M2 Plesteran 1PC : 4PS, Tebal 30 mm - Pasir Lokal PU-CK.F.35 HPS.PU- 2020 183.260,00
36 1 M2 Plesteran 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU-CK.F.36 HPS.PU- 2020 178.234,00
37 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Import PU-CK.F.37 HPS.PU- 2020 90.049,00
38 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU-CK.F.38 HPS.PU- 2020 79.717,00
39 1 M2 Barapen 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU-CK.F.39 HPS.PU- 2020 78.084,00
40 1 M2 Plesteran Batu Kali 1PC : 3PS - Pasir Lokal PU-CK.F.40 HPS.PU- 2020 159.616,00
41 1 M2 Plesteran Batu Kali 1PC : 4PS - Pasir Lokal PU-CK.F.41 HPS.PU- 2020 156.975,00
42 1 M2 Plesteran Skoning 1PC : 2PS, Tebal 10 mm - Pasir Lokal PU-CK.F.42 SNI 2837:2008 125.564,00
43 1 M2 Plesteran Ciprat 1PC : 2PS, Tebal 10 mm - Pasir Lokal PU-CK.F.43 SNI 2837:2008 95.981,00
44 1 M2 Finishing Siar Pasangan Dinding Bata Merah 20 M' PU-CK.F.44 SNI 2837:2008 54.115,00
45 1 M2 Finishing Siar Pasangan Dinding Coneblock Ekspose 8 M' PU-CK.F.45 HPS.PU- 2020 25.734,00
46 1 M2 Finishing Siar Pasangan Batu Kali/Belah Adukan 1PC : 2PS PU-CK.F.46 SNI 2837:2008 118.096,00
47 1 M2 Acian PU-CK.F.47 SNI 2837:2008 69.723,00
48 1 M' Benangan PU-CK.F.48 HPS.PU- 2020 21.720,00

G. PEKERJAAN KAYU
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

1 1 M3 Kusen Pintu dan Jendela Kayu Kelas I PU-CK.G.1 SNI 3434:2008 14.400.692,00
2 1 M3 Kusen Pintu dan Jendela Kayu Kelas II PU-CK.G.2 SNI 3434:2008 11.395.624,00
3 1 M3 Kusen Pintu dan Jendela Kayu Kelas III PU-CK.G.3 SNI 3434:2008 9.639.657,00
4 1 M2 Pintu Klamp Standar Kayu Kelas II PU-CK.G.4 SNI 3434:2008 517.183,00
5 1 M2 Pintu Klamp Sederhana Kayu Kelas III PU-CK.G.5 SNI 3434:2008 458.651,00
6 1 M2 Daun Pintu Panel Kayu Kelas I PU-CK.G.6 SNI 3434:2008 1.239.309,00
7 1 M2 Daun Pintu Panel Kayu Kelas II PU-CK.G.7 SNI 3434:2008 1.146.277,00
8 1 M2 Pintu, Jendela dan Ventilasi Kaca Bingkai Kayu Kelas I PU-CK.G.8 SNI 3434:2008 1.179.194,00
9 1 M2 Pintu, Jendela dan Ventilasi Kaca Bingkai Kayu Kelas II PU-CK.G.9 SNI 3434:2008 1.123.374,00
10 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas I PU-CK.G.10 SNI 3434:2008 1.410.174,00
11 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas II PU-CK.G.11 SNI 3434:2008 1.261.322,00
12 1 M2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup PU-CK.G.12 SNI 3434:2008 1.173.126,00
Kayu Kelas II (Lebar Sampai 90 cm)
13 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas I PU-CK.G.13 SNI 3434:2008 1.050.335,00
14 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas II PU-CK.G.14 SNI 3434:2008 990.794,00
15 1 M2 Jalusi Kusen, Kayu Kelas I PU-CK.G.15 SNI 3434:2008 1.122.611,00
16 1 M2 Jalusi Kusen, Kayu Kelas II PU-CK.G.16 SNI 3434:2008 983.063,00
17 1 M2 Teakwood Rangkap Rangka Expose, Kayu Kelas I PU-CK.G.17 SNI 3434:2008 1.069.358,00
18 1 M2 Teakwood Rangkap Lapis Formika Rangka Expose, Kayu Kelas II PU-CK.G.18 SNI 3434:2008 1.198.190,00
19 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I PU-CK.G.19 SNI 3434:2008 11.936.861,00
20 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II PU-CK.G.20 SNI 3434:2008 9.378.474,00
21 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas III PU-CK.G.21 SNI 3434:2008 7.768.838,00
22 1 M3 Konstruksi Kuda-Kuda Expose, Kayu Kelas I PU-CK.G.22 SNI 3434:2008 15.149.100,00
23 1 M3 Konstruksi Gordeng - Kayu Kelas II PU-CK.G.23 SNI 3434:2008 7.834.156,00
24 1 M3 Konstruksi Gordeng - Kayu Kelas III PU-CK.G.24 SNI 3434:2008 6.224.519,00
25 1 M2 Rangka Atap Genteng Keramik, Kayu Kelas II PU-CK.G.25 SNI 3434:2008 160.201,00
26 1 M2 Rangka Atap Genteng Beton, Kayu Kelas II PU-CK.G.26 SNI 3434:2008 203.930,00
27 1 M2 Rangka Atap Genteng Sirap, Kayu Kelas II PU-CK.G.27 SNI 3434:2008 847.763,00
28 1 M2 Rangka Plafond (50 x 100), Kayu Kelas II PU-CK.G.28 SNI 3434:2008 197.131,00
29 1 M2 Rangka Plafond (50 x 100), Kayu Kelas III PU-CK.G.29 SNI 3434:2008 174.596,00
30 1 M2 Rangka Plafond (60 x 60), Kayu Kelas II PU-CK.G.30 SNI 3434:2008 195.468,00
31 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III PU-CK.G.31 SNI 3434:2008 171.616,00
32 1 M2 Rangka Plafond (100 x 100), Kayu Kelas II PU-CK.G.32 HPS.PU- 2020 166.106,00
33 1 M2 Rangka Plafond (100 x 100), Kayu Kelas III PU-CK.G.33 HPS.PU- 2020 132.012,00
34 1 M2 Rangka Plafond (60 x 120), Kayu Kelas II PU-CK.G.34 HPS.PU- 2020 163.515,00
35 1 M2 Rangka Plafond (60 x 120), Kayu Kelas III PU-CK.G.35 HPS.PU- 2020 144.492,00
36 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas I PU-CK.G.36 SNI 3434:2008 147.269,00
37 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas II PU-CK.G.37 SNI 3434:2008 122.151,00
38 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas I PU-CK.G.38 SNI 3434:2008 147.488,00
39 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas II PU-CK.G.39 SNI 3434:2008 121.904,00
40 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas I PU-CK.G.40 HPS.PU- 2020 77.532,00
41 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas II PU-CK.G.41 HPS.PU- 2020 66.834,00
42 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas III PU-CK.G.42 HPS.PU- 2020 60.102,00
43 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas I PU-CK.G.43 HPS.PU- 2020 86.076,00
44 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas II PU-CK.G.44 HPS.PU- 2020 72.586,00
45 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas I PU-CK.G.45 HPS.PU- 2020 189.332,00
46 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas II PU-CK.G.46 HPS.PU- 2020 157.236,00
47 1 M' Lisplank Ukuran 2 x (2x20) cm, Kayu Kelas I PU-CK.G.47 HPS.PU- 2020 110.281,00
48 1 M' Lisplank Ukuran 2 x (2x20) cm, Kayu Kelas II PU-CK.G.48 HPS.PU- 2020 88.884,00
49 1 M' Lisplank Ukuran 2 x (2x20) cm, Kayu Kelas III PU-CK.G.49 HPS.PU- 2020 75.422,00
50 1 M' Papan Ruiter, Kayu Kelas II PU-CK.G.50 HPS.PU- 2020 44.599,00
51 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas III PU-CK.G.51 SNI 3434:2008 654.729,00
52 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas IV PU-CK.G.52 SNI 3434:2008 650.162,00
53 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II PU-CK.G.53 SNI 3434:2008 276.862,00
54 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas III PU-CK.G.54 SNI 3434:2008 235.890,00
55 1 M2 Rangka Dinding Pemisah Teakwood Rangkap, PU-CK.G.55 SNI 3434:2008 409.444,00
56 1 M2 Rangka Dinding Pemisah Tripleks 4 mm Rangkap, PU-CK.G.56 SNI 3434:2008 441.786,00
57 1 M2 Lambriziring Dari Papan Kayu Kelas I PU-CK.G.57 SNI 3434:2008 612.650,00
58 1 M2 Lambriziring dari Plywood Ukuran (120 x 240) cm PU-CK.G.58 SNI 3434:2008 63.622,00
59 1 M3 Rangka/kolom dinding kayu - Kelas I PU-CK.G.59 HPS.PU- 2020 13.988.089,00
60 1 M3 Rangka/kolom dinding kayu - Kelas II PU-CK.G.60 HPS.PU- 2020 11.429.702,00
61 1 M3 Rangka/kolom dinding kayu - Kelas III PU-CK.G.61 HPS.PU- 2020 9.820.066,00
62 1 M3 Gelagar bawah lantai - Kayu Kelas I PU-CK.G.62 HPS.PU- 2020 12.695.213,00
63 1 M3 Gelagar bawah lantai - Kayu Kelas II PU-CK.G.63 HPS.PU- 2020 10.136.826,00
64 1 M3 Gelagar bawah lantai - Kayu Kelas III PU-CK.G.64 HPS.PU- 2020 8.527.190,00
65 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas I PU-CK.G.65 HPS.PU- 2020 440.362,00
66 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas II PU-CK.G.66 HPS.PU- 2020 358.958,00
67 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas III PU-CK.G.67 HPS.PU- 2020 307.743,00
68 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas I PU-CK.G.68 HPS.PU- 2020 498.702,00
69 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas II PU-CK.G.69 HPS.PU- 2020 428.927,00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

70 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas III PU-CK.G.70 HPS.PU- 2020 385.028,00
71 1 M2 Jalusi kayu kelas I + lapis has nyamuk PU-CK.G.71 HPS.PU- 2020 420.851,00
72 1 M2 Jalusi kayu kelas II + lapis has nyamuk PU-CK.G.72 HPS.PU- 2020 342.703,00
73 1 M2 Jalusi kayu kelas III + lapis has nyamuk PU-CK.G.73 HPS.PU- 2020 293.536,00
74 1 M2 Jalusi kayu kelas IV + lapis has nyamuk PU-CK.G.74 HPS.PU- 2020 282.575,00
75 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual PU-CK.G.75 HPS.PU- 2020 172.154,00
76 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual PU-CK.G.76 HPS.PU- 2020 149.230,00
77 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis PU-CK.G.77 HPS.PU- 2020 164.180,00
78 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis PU-CK.G.78 HPS.PU- 2020 155.856,00
79 1 Btg Pancang Tiang Cerucuk Kayu (Excavator) PU-CK.G.79 HPS.PU- 2020 316.861,00
80 1 Btg Pancang Tiang Cerucuk Beton (Excavator) PU-CK.G.80 HPS.PU- 2020 341.833,00
81 1 Btg Pancang Tiang Umpak untuk Pondasi Rumah PU-CK.G.81 HPS.PU- 2020 128.787,00
82 1 M3 Gelagar Melintang Jembatan PU-CK.G.82 HPS.PU- 2020 11.364.646,00
83 1 M3 Gelagar Memanjang Jembatan PU-CK.G.83 HPS.PU- 2020 11.252.333,00
84 1 M2 Lantai dan Dinding Turap Jembatan PU-CK.G.84 HPS.PU- 2020 518.048,00
85 1 M3 Sandaran dan Balok Pengikat Tiang Pancang Jembatan PU-CK.G.85 HPS.PU- 2020 11.252.333,00

H. PEKERJAAN ATAP
1 1 M2 Penutup Atap Seng Gelombang BJLS 0,30 PU-CK.H.1 SNI 03-3436-2002 105.070,00
2 1 M2 Penutup Atap Seng Gelombang BJLS 0,22 PU-CK.H.2 SNI 03-3436-2002 86.640,00
3 1 M2 Penutup Atap Seng Gelombang BJLS 0,20 PU-CK.H.3 SNI 03-3436-2002 80.932,00
4 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,30 PU-CK.H.4 SNI 03-3436-2002 137.968,00
5 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,20 PU-CK.H.5 SNI 03-3436-2002 125.249,00
6 1 M2 Penutup Atap Fiberglass Gelombang PU-CK.H.6 SNI 03-3436-2002 131.977,00
7 1 M' Bubungan/Nok Atap Fiberglass Gelombang PU-CK.H.7 SNI 03-3436-2002 125.249,00
8 1 M2 Penutup Atap Genteng Metal - Multiroof PU-CK.H.8 SNI 03-3436-2002 138.472,00
9 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof PU-CK.H.9 SNI 03-3436-2002 135.487,00
10 1 M2 Penutup Atap Alumunium Gelombang PU-CK.H.10 SNI 03-3436-2002 156.363,00
11 1 M' Bubungan/Nok Atap Alumunium Gelombang PU-CK.H.11 SNI 03-3436-2002 134.392,00
12 1 M' Talang Datar / Jurai Seng BJLS Lebar 90 cm PU-CK.H.12 SNI 7393-2008 201.690,00
13 1 M' Talang ½ Lingkaran D-15 cm, Seng Plat BJLS 30 45 cm PU-CK.H.13 SNI 7393-2008 130.979,00

I. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 1 M2 Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm PU-CK.I.1 SNI 7395-2008 221.361,00
2 1 M2 Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm PU-CK.I.2 SNI 7395-2008 244.107,00
3 1 M2 Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm PU-CK.I.3 SNI 7395-2008 231.572,00
4 1 M2 Lantai Ubin PC Warna Ukuran 20 x 20 cm PU-CK.I.4 SNI 7395-2008 251.570,00
5 1 M2 Lantai Ubin PC Warna Ukuran 30 x 30 cm PU-CK.I.5 SNI 7395-2008 247.652,00
6 1 M2 Lantai Ubin PC Warna Ukuran 40 x 40 cm PU-CK.I.6 SNI 7395-2008 255.795,00
7 1 M2 Lantai Ubin PC Teraso Ukuran 30 x 30 cm PU-CK.I.7 SNI 7395-2008 238.342,00
8 1 M2 Lantai Ubin PC Teraso Ukuran 40 x 40 cm PU-CK.I.8 SNI 7395-2008 251.983,00
9 1 M2 Lantai Ubin PC Granito Ukuran 30 x 30 cm PU-CK.I.9 SNI 7395-2008 234.629,00
10 1 M2 Lantai Ubin PC Granito Ukuran 40 x 40 cm PU-CK.I.10 SNI 7395-2008 237.367,00
11 1 M2 Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm PU-CK.I.11 SNI 7395-2008 247.652,00
12 1 M2 Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm PU-CK.I.12 SNI 7395-2008 253.256,00
13 1 M2 Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm PU-CK.I.13 SNI 7395-2008 399.099,00
14 1 M2 Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm PU-CK.I.14 SNI 7395-2008 312.979,00
15 1 M2 Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm PU-CK.I.15 SNI 7395-2008 303.496,00
16 1 M2 Lantai Keramik Artistik Ukuran 10 x 20 cm PU-CK.I.16 SNI 7395-2008 372.723,00
17 1 M2 Lantai Keramik Ukuran 15 x 15 cm PU-CK.I.17 HPS.PU- 2020 358.158,00
18 1 M2 Lantai Keramik Artistik Uk. 10 x 10 cm atau 5 x 20 cm PU-CK.I.18 SNI 7395-2008 465.821,00
19 1 M2 Lantai Keramik Ukuran 33 x 33 cm PU-CK.I.19 SNI 7395-2008 356.851,00
20 1 M2 Lantai Keramik Ukuran 30 x 30 cm berglasir PU-CK.I.20 SNI 7395-2008 384.145,00
21 1 M2 Lantai Keramik Ukuran 40 x 40 cm PU-CK.I.21 HPS.PU- 2020 377.501,00
22 1 M2 Lantai Keramik Ukuran 25 x 25 cm PU-CK.I.22 HPS.PU- 2020 383.826,00
23 1 M2 Lantai Keramik Ukuran 20 x 25 cm PU-CK.I.23 HPS.PU- 2020 407.838,00
24 1 M2 Lantai Keramik Ukuran 20 x 20 PU-CK.I.24 SNI 7395-2008 380.456,00
25 1 M2 Lantai Mozaik Uk. 30 x 30 cm, Camp. 1PC : 3PS PU-CK.I.25 SNI 7395-2008 390.109,00
26 1 M2 Lantai Marmer Ukuran 100 x 100 cm PU-CK.I.26 SNI 7395-2008 712.323,00
27 1 M' Plint Ubin PC Abu-abu Ukuran 10 x 30 cm PU-CK.I.27 SNI 7395-2008 85.854,00
28 1 M' Plint Ubin PC Abu-abu Ukuran 10 x 40 cm PU-CK.I.28 SNI 7395-2008 86.228,00
29 1 M' Plint Ubin PC Warna Ukuran 10 x 20 cm PU-CK.I.29 SNI 7395-2008 72.667,00
30 1 M' Plint Ubin PC Warna Ukuran 10 x 30 cm PU-CK.I.30 SNI 7395-2008 85.854,00
31 1 M' Plint Ubin PC Warna Ukuran 10 x 40 cm PU-CK.I.31 SNI 7395-2008 81.657,00
32 1 M' Plint Ubin Teraso Ukuran 10 x 30 cm PU-CK.I.32 SNI 7395-2008 85.854,00
33 1 M' Plint Ubin Teraso Ukuran 10 x 40 cm PU-CK.I.33 SNI 7395-2008 83.181,00
34 1 M' Plint Ubin Granito Ukuran 10 x 40 cm PU-CK.I.34 HPS.PU- 2020 83.181,00
35 1 M' Plint Ubin Granito Ukuran 10 x 30 cm PU-CK.I.35 SNI 7395-2008 77.735,00
36 1 M' Plint Ubin Teralux Kerang Ukuran 10 x 40 cm PU-CK.I.36 SNI 7395-2008 69.467,00
37 1 M' Plint Ubin Teralux Kerang Ukuran 10 x 30 cm PU-CK.I.37 SNI 7395-2008 77.735,00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

38 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 60 cm PU-CK.I.38 SNI 7395-2008 110.413,00
39 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 40 cm PU-CK.I.39 SNI 7395-2008 75.562,00
40 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 30 cm PU-CK.I.40 HPS.PU- 2020 75.705,00
41 1 M' Plint Keramik Artistik Ukuran 10 x 20 cm PU-CK.I.41 SNI 7395-2008 75.537,00
42 1 M' Plint Keramik Artistik Ukuran 10 x 10 cm PU-CK.I.42 SNI 7395-2008 100.403,00
43 1 M' Plint Keramik Ukuran 5 x 20 cm PU-CK.I.43 SNI 7395-2008 66.688,00
44 1 M' Plint Keramik Ukuran 10 x 30 CM PU-CK.I.44 HPS.PU- 2020 73.941,00
45 1 M' Plint Kayu Klas II Tebal 2 cm, Lebar 10cm PU-CK.I.45 SNI 7395-2008 67.265,00
46 1 M2 Dinding Porselin Ukuran 11 x 11 cm, (putih/warna) PU-CK.I.46 SNI 7395-2008 425.974,00
47 1 M2 Dinding Porselin Ukuran 15 x 15 cm PU-CK.I.47 HPS.PU- 2020 382.048,00
48 1 M2 Dinding Porselin Ukuran 10 x 20 cm PU-CK.I.48 SNI 7395-2008 392.591,00
49 1 M2 Dinding Porselin Ukuran 20 x 20 cm PU-CK.I.49 SNI 7395-2008 413.167,00
50 1 M2 Dinding Keramik Artistik Ukuran 10 x 20 cm PU-CK.I.50 SNI 7395-2008 405.634,00
51 1 M2 Dinding Keramik Artistik Ukuran 10x10 atau 5x20 cm PU-CK.I.51 SNI 7395-2008 413.303,00
52 1 M2 Dinding Keramik Ukuran 10 x 20 cm PU-CK.I.52 HPS.PU- 2020 414.777,00
53 1 M2 Dinding Keramik Ukuran 20 x 20 cm PU-CK.I.53 SNI 7395-2008 418.043,00
54 1 M2 Dinding Keramik Ukuran 20 x 25 cm PU-CK.I.54 HPS.PU- 2020 390.058,00
55 1 M2 Dinding Batu Paras PU-CK.I.55 SNI 7395-2008 593.396,00
56 1 M2 Dinding Batu Tempel Hitam PU-CK.I.56 SNI 7395-2008 669.289,00
57 1 M2 Dinding Marmer Ukuran 100 x 100 cm PU-CK.I.57 HPS.PU- 2020 896.441,00
58 1 M2 Pasang Wallpaper Lebar 50 cm PU-CK.I.58 SNI 7395-2008 752.305,00
59 1 M2 Pasang Paving Block PU-CK.I.59 HPS.PU- 2020 543.256,00

J. PEKERJAAN BESI - ALUMUNIUM


1 1 KG Pasang Besi Profil PU-CK.J.1 SNI 7393-2008 54.092,00
2 1 KG Pasang Kuda-Kuda Baja IWF PU-CK.J.2 SNI 7393-2008 54.092,00
3 1 KG Gording Baja PU-CK.J.3 SNI 7393-2008 56.141,00
4 100 KG Perakitan Besi Baja PU-CK.J.4 SNI 7393-2008 5.753,00
5 1 M2 Pintu Besi Plat Baja Tbl 2 mm Rangkap, Rangka Baja Siku PU-CK.J.5 SNI 7393-2008 1.255.527,00
6 10 CM Pengelasan Dengan Las Listrik PU-CK.J.6 SNI 7393-2008 9.177,00
7 1 M2 Pasang Sunscreen Alumunium PU-CK.J.7 SNI 7393-2008 787.027,00
8 1 M2 Pasang Rolling Door Alumunium PU-CK.J.8 SNI 7393-2008 1.008.377,00
9 1 M' Pasang Kusen Pintu Alumunium PU-CK.J.9 SNI 7393-2008 276.785,00
10 1 M2 Pasang Pintu Kaca Rangka Alumunium PU-CK.J.10 SNI 7393-2008 2.097.019,00
11 1 M2 Pasang Terali Besi Strip (2 x 3) mm PU-CK.J.11 SNI 7393-2008 1.257.748,00
12 1 M2 Pasang Kawat Nyamuk (Rangka Besi) PU-CK.J.12 SNI 7393-2008 256.987,00
13 1 M2 Pasang Kawat Nyamuk (Rangka Kayu) PU-CK.J.13 HPS.PU- 2020 78.755,00
14 1 M2 Pasang Kawat Harmonika PU-CK.J.14 HPS.PU- 2020 139.823,00
15 1 M2 Pasang Kawat Kassa PU-CK.J.15 HPS.PU- 2020 78.755,00
16 1 M2 Pasang Kawat Burung PU-CK.J.16 HPS.PU- 2020 87.159,00
17 1 M2 Jendela Nako dan Tralis PU-CK.J.17 SNI 7393-2008 661.613,00
18 1 KG Plat Besi Lembaran tebal : 1.0 mm - 120 x 240 Cm PU-CK.J.18 HPS.PU- 2020 49.663,00
19 1 KG Plat Besi Lembaran tebal : 1.2 mm - 120 x 240 Cm PU-CK.J.19 HPS.PU- 2020 48.342,00
20 1 KG Plat Besi Lembaran tebal : 2.0 mm - 120 x 240 Cm PU-CK.J.20 HPS.PU- 2020 47.723,00
21 1 KG Plat Besi Lembaran tebal : 3.0 mm - 120 x 240 Cm PU-CK.J.21 HPS.PU- 2020 47.690,00

K. PEKERJAAN LANGIT - LANGIT


1 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 3 mm PU-CK.K.1 SNI 2839:2008 72.385,00
2 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 4 mm PU-CK.K.2 SNI 2839:2008 80.821,00
3 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 6 mm PU-CK.K.3 SNI 2839:2008 89.889,00
4 1 M2 Langit-langit Lambriziring Kayu, Tebal 9 mm PU-CK.K.4 SNI 2839:2008 418.846,00
5 1 M2 Langit-langit Gypsum Board Ukuran (1200 x 2400 x 9) mm PU-CK.K.5 SNI 2839:2008 72.587,00
6 1 M' Pasang list plafond gypsum profil PU-CK.K.6 SNI 2839:2008 69.525,00
7 1 M' List Langit - langit Kayu lat/profil PU-CK.K.7 SNI 2839:2008 32.235,00

L. PEKERJAAN KUNCI, PENGGANTUNG DAN KACA


1 1 Buah Kunci Pintu Tanam Antik PU-CK.L.1 Pt T-30-2000-C 354.487,00
2 1 Buah Kunci Pintu Tanam Biasa PU-CK.L.2 Pt T-30-2000-C 235.957,00
3 1 Buah Kunci Slot Untuk Kamar Mandi atau WC PU-CK.L.3 Pt T-30-2000-C 110.354,00
4 1 Buah Engsel Pintu PU-CK.L.4 Pt T-30-2000-C 82.553,00
5 1 Buah Engsel Pintu Klamp PU-CK.L.5 Pt T-30-2000-C 160.113,00
6 1 Buah Engsel Jendela PU-CK.L.6 Pt T-30-2000-C 61.232,00
7 1 Buah Kait Angin PU-CK.L.7 Pt T-30-2000-C 49.887,00
8 1 Buah Grendel PU-CK.L.8 Pt T-30-2000-C 158.982,00
9 1 M2 Kaca polos tebal 3 mm PU-CK.L.9 Pt T-30-2000-C 217.512,00
10 : Kaca mati polos tebal 5 mm PU-CK.L.10 : 296.157,00
11 1 M2 Kaca raiben tebal 5 mm PU-CK.L.11 Pt T-30-2000-C 344.781,00
12 1 M2 Kaca buram tebal 3 mm PU-CK.L.12 Pt T-30-2000-C 208.045,00
13 1 M2 Kaca buram tebal 5 mm PU-CK.L.13 Pt T-30-2000-C 292.725,00
14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU-CK.L.14 HPS.PU- 2020 1.029.697,00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU-CK.L.15 HPS.PU- 2020 1.029.697,00
16 1 Unit Jendela Jalusi 75 x 120 cm PU-CK.L.16 HPS.PU- 2020 1.452.279,00
17 1 Unit Pintu Panel 80 x 210 cm PU-CK.L.17 HPS.PU- 2020 2.826.414,00
18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU-CK.L.18 HPS.PU- 2020 1.661.261,00
19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU-CK.L.19 HPS.PU- 2020 1.782.710,00
20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU-CK.L.20 HPS.PU- 2020 1.627.706,00
21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU-CK.L.21 HPS.PU- 2020 1.749.155,00
22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU-CK.L.22 HPS.PU- 2020 1.735.998,00
23 1 Unit Pintu kisi kaca kayu rahay 80 x 210 cm PU-CK.L.23 HPS.PU- 2020 4.336.149,00
24 1 Unit Pintu klam 80 x 210 cm ( tempel ) PU-CK.L.24 HPS.PU- 2020 2.164.601,00

M. PEKERJAAN SANITASI DAN AIR


1 1 BH Closet duduk / monoblok PU-CK.M.1 RSNI T-15-2002 2.929.610,00
2 1 BH Closet jongkok porselin PU-CK.M.2 RSNI T-15-2002 1.230.399,00
3 1 BH Closet jongkok plastik PU-CK.M.3 RSNI T-15-2002 844.810,00
4 1 BH Memasang Urinoir PU-CK.M.4 RSNI T-15-2002 3.018.252,00
5 1 BH Memasang Wastafel PU-CK.M.5 RSNI T-15-2002 1.335.270,00
6 1 Buah Bak Mandi Fiberglass 0,3 M3 PU-CK.M.6 RSNI T-15-2002 1.472.941,00
7 1 Buah Bak Air Fiberglass 1 M3 PU-CK.M.7 RSNI T-15-2002 2.540.463,00
8 1 BH Bak Mandi Batu Bata Volume 0,3 M3 PU-CK.M.8 RSNI T-15-2002 3.336.727,00
9 1 M Pipa penyalur air limbah jenis pipa tanah Dia. 15 cm PU-CK.M.9 RSNI T-15-2002 1.339.572,00
10 1 BH Bak Kontrol Pasangan Bata Ukuran (30 x 30) x 50 cm PU-CK.M.10 RSNI T-15-2002 1.372.069,00
11 1 BH Bak Kontrol Pasangan Bata Ukuran (45 x 45) x 50 cm PU-CK.M.11 RSNI T-15-2002 1.237.940,00
12 1 BH Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 cm PU-CK.M.12 RSNI T-15-2002 1.865.829,00
13 1 M Memasang Pipa Galvanis Dia. 1/2" PU-CK.M.13 RSNI T-15-2002 74.378,00
14 1 M Memasang Pipa Galvanis Dia. 3/4" PU-CK.M.14 RSNI T-15-2002 87.061,00
15 1 M Memasang Pipa Galvanis Dia. 1" PU-CK.M.15 RSNI T-15-2002 101.400,00
16 1 M Memasang Pipa Galvanis Dia. 1,5" PU-CK.M.16 RSNI T-15-2002 161.342,00
17 1 M Memasang Pipa Galvanis Dia. 3" PU-CK.M.17 RSNI T-15-2002 274.116,00
18 1 M Memasang Pipa Galvanis Dia. 4" PU-CK.M.18 RSNI T-15-2002 403.545,00
19 1 M Memasang Pipa PVC Tipe AW Dia. 1/2" PU-CK.M.19 RSNI T-15-2002 34.370,00
20 1 M Memasang Pipa PVC Tipe AW Dia. 3/4" PU-CK.M.20 RSNI T-15-2002 37.074,00
21 1 M Memasang Pipa PVC Tipe AW Dia. 1" PU-CK.M.21 RSNI T-15-2002 43.081,00
22 1 M Memasang Pipa PVC Tipe AW Dia. 1,5" PU-CK.M.22 RSNI T-15-2002 51.147,00
23 1 M Memasang Pipa PVC Tipe AW Dia. 2" PU-CK.M.23 RSNI T-15-2002 61.904,00
24 1 M Memasang Pipa PVC Tipe AW Dia. 3" PU-CK.M.24 RSNI T-15-2002 135.571,00
25 1 M Memasang Pipa PVC Tipe AW Dia. 4" PU-CK.M.25 RSNI T-15-2002 161.779,00
26 1 BH Kran air Dia. 3/4" atau 1/2" PU-CK.M.26 RSNI T-15-2002 70.537,00
27 1 Unit Bak air volume 1 m3 - (Pasir Import) PU-CK.M.27 HPS.PU- 2020 4.010.090,00
28 1 Unit Bak air volume 1 m3 - (Pasir Lokal) PU-CK.M.28 HPS.PU- 2020 3.518.091,00
29 1 M Talang air pvc 8" PU-CK.M.29 HPS.PU- 2020 192.517,00
30 1 M Talang jurai/talang got PU-CK.M.30 HPS.PU- 2020 169.379,00
31 1 Unit Septictank 2 x (1 x 1) dalam 1,5 M + Resapan PU-CK.M.31 HPS.PU- 2020 16.513.258,00
32 1 Unit Septictank 1 x (1 x 1) dalam 1,5 M + Resapan PU-CK.M.32 HPS.PU- 2020 11.081.033,00
33 1 Unit Septictank (1,5x1,5x1,5 m) dinding papan PU-CK.M.33 HPS.PU- 2020 6.250.706,00
34 1 Unit Bak Peresapan Uk.1 x 1 m, jarak 2 m dari septictank PU-CK.M.34 HPS.PU- 2020 1.303.252,00
35 1 Unit Bak air Uk. 60 x 60 x 80 PU-CK.M.35 HPS.PU- 2020 1.002.332,00
36 1 Unit Pompa dragon/pompa tangan PU-CK.M.36 HPS.PU- 2020 1.125.795,00
37 1 M Memasang Pipa HDPE Ø 50 mm - 63 mm PU-CK.M.37 PAHSP PU 2013 27.033,00
38 1 M Memasang Pipa HDPE Ø 75 mm PU-CK.M.38 PAHSP PU 2013 27.927,00
39 1 M Memasang Pipa HDPE Ø 100 mm PU-CK.M.39 PAHSP PU 2013 28.821,00
40 1 M Galian Tanah Pipa HDPE Ø 100 mm (b=30 ; h=80 cm) PU-CK.M.40 HPS.PU- 2020 32.932,80
41 1 M Urug Kembali Galian Tanah Pipa HDPE Ø 100 mm PU-CK.M.41 HPS.PU- 2020 10.520,20
42 1 M Galian Tanah Pipa HDPE Ø 75 mm (b=30 ; h=65 cm) PU-CK.M.42 HPS.PU- 2020 26.757,90
43 1 M Urug Kembali Galian Tanah Pipa HDPE Ø 75 mm PU-CK.M.43 HPS.PU- 2020 8.662,01
44 1 M Galian Tanah Pipa HDPE Ø 50-63 mm (b=25 ; h=65 cm) PU-CK.M.44 HPS.PU- 2020 22.298,25
45 1 M Urug Kembali Galian Tanah Pipa HDPE Ø 50 mm PU-CK.M.45 HPS.PU- 2020 7.318,40
46 1M Pengetesan Pipa PU-CK.M.46 HPS.PU- 2020 14.277,00
47 1 Unit Box Valve Ukuran (60 x 60) x 65 cm PU-CK.M.47 HPS.PU- 2020 2.657.743,00
48 1 Buah Trush Block Beton Ukuran 40 x 30 x 20 cm PU-CK.M.48 HPS.PU- 2020 104.910,00
49 1 M2 Bongkaran dan Galian Jalan untuk Pipa PU-CK.M.49 HPS.PU- 2020 1.325.569,00
50 1M Memasang PVC Water Stop Lebar 230 - 320 mm PU-CK.M.50 HPS.PU- 2020 182.286,00

N. PEKERJAAN CAT DAN RESIDU


1 1 M2 Mengikis atau mengerok cat tembok lama (manual) PU-CK.N.1 Pt.T-38-2000-C 28.467,00
2 1 M2 Lapis Plamir PU-CK.N.2 Pt.T-38-2000-C 15.376,00
3 1 M2 Cat bidang tembok lama (2 lapis dengan kuas) PU-CK.N.3 Pt.T-38-2000-C 21.281,00
4 1 M2 Cat bidang tembok lama (2 lapis dengan roll) PU-CK.N.4 Pt.T-38-2000-C 24.878,00
5 1 M2 Cat Plafond 2 Lapis dgn cat tembok menggunakan kuas PU-CK.N.5 Pt.T-38-2000-C 39.114,00
6 1 M2 Cat Plafond 2 Lapis dgn cat tembok biasa, kuas roll PU-CK.N.6 Pt.T-38-2000-C 35.096,00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JULI - DESEMBER 2020 LOKASI : KOTA MERAUKE - DIST


HARGA SATUAN
NO. JENIS PEKERJAAN ANALISA REFERENSI PEKERJAAN
(Rp.)
1 2 3 4 5

7 1 M2 Cat Plafond 2 Lapis dgn cat tembok (setara Dulux Weathershield), kuas roll PU-CK.N.7 HPS.PU- 2020 60.109,00
8 1 M2 Pasang Wall Paper dengan perekat PU-CK.N.8 Pt.T-38-2000-C 355.702,00
9 1 M2 Pelapisan Bidang Kayu Dengan Meny PU-CK.N.9 Pt.T-38-2000-C 43.525,00
10 1 M2 Mengecat Dasar 1 Lapis Pada Kayu PU-CK.N.10 Pt.T-38-2000-C 45.574,00
11 1 M2 Mengecat Penutup 2 Lapis Pada Kayu PU-CK.N.11 Pt.T-38-2000-C 103.333,00
12 1 M2 Pelapisan Bidang Besi-Baja Dengan Meny PU-CK.N.12 Pt.T-38-2000-C 34.429,00
13 1 M2 Mengecat Penutup 2 Lapis Pada Permukaan Besi (manual) PU-CK.N.13 Pt.T-38-2000-C 88.025,00
14 1 M2 Pelapisan Bidang Kayu Dengan Residu / ter PU-CK.N.14 Pt.T-38-2000-C 35.747,00
15 1 M2 Cat tembok biasa (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU-CK.N.15 HPS.PU- 2020 27.609,00
16 1 M2 Cat tembok khusus (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU-CK.N.16 HPS.PU- 2020 82.168,00
17 1 M2 Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) PU-CK.N.17 HPS.PU- 2020 21.809,00
18 1 M2 Cat ulang dinding/tembok PU-CK.N.18 HPS.PU- 2020 18.406,00

O. PEKERJAAN INSTALASI LISTRIK


1 1 Titik Instalasi Lampu SL 18 - 23 VA+ Pitting + Saklar PU-CK.O.1 HPS.PU- 2020 253.170,00
2 1 Titik Instalasi Lampu SL 8 - 14 VA+ Pitting + Saklar PU-CK.O.2 HPS.PU- 2020 240.952,00
3 1 Titik Instalasi Stop Kontak PU-CK.O.3 HPS.PU- 2020 159.440,00
4 1 Unit MCB PU-CK.O.4 HPS.PU- 2020 405.941,00
5 1 Titik Saklar Ganda PU-CK.O.5 HPS.PU- 2020 379.454,00
6 1 Titik Saklar Tunggal PU-CK.O.6 HPS.PU- 2020 372.370,00
7 1 Unit Panel Box PU-CK.O.7 HPS.PU- 2020 17.688.117,00
8 1 M' Kabel NYA 2.5 mm PU-CK.O.8 HPS.PU- 2020 60.212,00