1 2 3
A. PEKERJAAN PERSIAPAN Rp. 1,500,000.00
B. PEKERJAAN GALIAN TANAH DAN PONDASI Rp. 878,086.45
C. PEKERJAAN BETON BERTULANG Rp. 32,816,223.91
D. PEKERJAAN PASANGAN DAN PLESTERAN Rp. 33,687,789.89
E. PEKERJAAN PENGECATAN Rp. 4,740,347.15
f. PEKERJAAN LAIN-LAIN Rp. 16,000,000.00
TOTAL : Rp. 89,622,447.41
TOTAL 2 UNIT : Rp. 179,244,894.82
DIBULATKAN : Rp. 179,200,000.00
TERBILANG : SERATUS TUJUH PULUH SEMBILAN JUTA DUA RATUS RIBU RUPIAH
DAFTAR KUANTITAS DAN HARGA
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
Jenis Pekerjaan : Membuat dan Memasang Kusen pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 30 Cm Kayu Kelas I atau Klas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
Jenis Peke : Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafont
Satuan / Un: M2
Analisa : AHSP PU A. 4.2.1.21
A. UPAH
1 Mandor Orang 100,000.00
2 Kepala Tukang Orang 110,000.00
3 Tukang Orang 100,000.00
4 Pekerja Orang 80,000.00
B. HARGA BAHAN
1 Air Liter 100.00
2 Batu Bata Buah 600.00
3 Batu Kali/Batu Belah (Sungai/Gunung) M³ 160,000.00
4 Batu Pecah 2 - 3 Cm M³ 270,000.00
5 Batu Pecah 2 - 3 Cm Kg 186.21
5 Besi Beton Polos Kg 10,000.00
6 Besi Beton Ulir Kg 10,500.00
7 Besi Plat Strip Kg 16,000.00
8 Besi Baja IWF Kg 16,000.00
9 Besi Hollow 40.40.2 cm m' 12,500.00
10 Besi Hollow 4/4 Btg 65,000.00
11 Besi Hollow 2/4 Btg 47,500.00
9 Bubungan Seng Genteng M¹ 85,000.00
10 Bubungan Seng BJLS M¹ 35,000.00
11 Cat Dasar Kg 29,000.00
12 Cat Dasar Penutup Kg 35,000.00
13 Cat Kayu Mengkilat Setara Jotun Kg 52,500.00
14 Cat Menie Kg 65,000.00
15 Cat Tembok (WeatherShield) Kg 35,000.00
16 Cotton Plester Bh 18,000.00
17 Compoun Zak 150,000.00
16 Dempul Kayu Kg 28,000.00
17 Dolken Kayu ø 8 -10/400 cm Batang 28,000.00
18 Door Holder Pasang 150,000.00
19 Engsel Jendela Pasang 14,500.00
20 Engsel Pintu Pasang 17,500.00
21 Floor Drain Steinless Buah 45,000.00
22 Gypsum Board tebal 9 mm Lembar 105,000.00
23 Jaring Kawat Baja Kg 15,500.00
24 Hak Angin Pasang 8,500.00
25 Kaca Bening Uk. 2 mm M² 71,200.00
26 Kaca Bening Uk. 3 mm M² 107,200.00
27 Kaca Bening Uk. 5 mm M² 120,000.00
28 Kaca Rayband Uk. 3 mm M² 127,100.00
29 Kaca Rayband Uk. 5 mm M² 127,100.00
30 Kaso- kaso ( 5 x 7 ) cm M³ 2,500,000.00
44 Kayu Klas I ( Seumantok / Ulim / dll ) M³ 6,000,000.00
45 Kayu Klas II ( Kamper / Kruing / dll ) M³ 5,000,000.00
46 Kayu Klas III ( Borneo / dll ) M³ 4,000,000.00
47 Kayu Klas IV ( Sengon / dll ) M³ 3,400,000.00
48 Keramik Sisi Kulit Jeruk 20 X 20 Cm Bh 2,773.58
No. Nama Jenis Barang Satuan Harga
C. ALAT
1 Stamper Hari-Sewa 125,000.00
2 Dump Truck Jam 225,000.00
DAFTAR ANALISA HARGA SATUAN
PEKERJAAN PERSIAPAN
RSNI.T-12-2002(B.8)
1m2 Membersihkan Lapangan dan Perataan
Upah : 0.100 OH Pekerja @ Rp. 80,000.00 Rp. 8,000.00
0.050 OH Mandor @ Rp. 100,000.00 Rp. 5,000.00
Jumlah Rp. 13,000.00
Dibulatkan Rp. 13,000.00
RSNI.T-12-2002(B.4)
1m1 Pengukuran dan Pemasangan Bouwplank
Upah : 0.100 OH Pekerja @ Rp. 80,000.00 Rp. 8,000.00
0.100 OH Tukang @ Rp. - Rp. 0.00
0.010 OH Kepala Tukang @ Rp. - Rp. 0.00
0.050 OH Mandor @ Rp. 100,000.00 Rp. 5,000.00
Bahan : 0.020 Kg Paku Kayu @ Rp. 15,400.00 Rp. 308.00
0.012 M3 Kayu Kelas III/Bekisting @ Rp. 4,000,000.00 Rp. 48,000.00
0.007 M3 Papan Kayu Kelas III @ Rp. 4,000,000.00 Rp. 28,000.00
Jumlah Upah + Bahan Rp. 89,308.00
Dibulatkan Rp. 89,308.00
PEKERJAAN TANAH
SNI.2835-2008-6.1
1m3 Galian tanah biasa sedalam 1 Meter
Upah : 0.750 OH Pekerja @ Rp. 80,000.00 Rp. 60,000.00
0.025 OH Mandor @ Rp. 100,000.00 Rp. 2,500.00
Jumlah Rp. 62,500.00
Dibulatkan Rp. 62,500.00
SNI.2835-2008-6.2
1m3 Galian tanah biasa sedalam 2 Meter
Upah : 0.900 OH Pekerja @ Rp. 80,000.00 Rp. 72,000.00
0.045 OH Mandor @ Rp. 100,000.00 Rp. 4,500.00
Jumlah Rp. 76,500.00
Dibulatkan Rp. 76,500.00
SNI.2835-2008-6.9
1m3 Urugan kembali Galian Tanah (1/3 Galian Tanah) Rp. 25,500.00
Upah : 0.250 OH Pekerja @ Rp. 80,000.00 Rp. 20,000.00
0.008 OH Mandor @ Rp. 100,000.00 Rp. 833.33
Jumlah Rp. 20,833.33
Dibulatkan Rp. 20,833.00
SNI.2835-2008-6.10
1 m3 Timbunan tanah
SNI.2835-2008-6.11
1 m3 Urugan pasir
Upah : 0.300 OH Pekerja @ Rp. 80,000.00 Rp. 24,000.00
0.010 OH Mandor @ Rp. 100,000.00 Rp. 1,000.00
Bahan : 1.200 M3 Pasir urug @ Rp. 89,900.00 Rp. 107,880.00
Jumlah Bahan Rp. 132,880.00
Dibulatkan Rp. 132,880.00
PEKERJAAN PONDASI
SNI.2835-2008-6.1
1m3 Pondasi batu belah, campuran 1 PC : 3 PP
Upah : 1.500 OH Pekerja @ Rp. 80,000.00 Rp. 120,000.00
0.600 OH Tukang @ Rp. - Rp. 0.00
0.060 OH Kepala tukang @ Rp. - Rp. 0.00
0.075 OH Mandor @ Rp. 100,000.00 Rp. 7,500.00
Bahan : 1.200 m3 Batu belah 15cm/20cm @ Rp. 160,000.000 Rp. 192,000.00
0.485 m3 Pasir pasang @ Rp. 117,900.000 Rp. 57,181.50
202.000 Kg Semen Portland @ Rp. 1,337.50 Rp. 270,175.00
Jumlah Upah + Bahan Rp. 646,856.50
Dibulatkan Rp. 646,857.00
SNI.2836-2008-6.9
1 m3 Pasangan batu Kosong (Aamstamping)
Upah : 0.780 Org Pekerja @ Rp. 80,000.00 Rp. 62,400.00
0.390 Org Tukang @ Rp. - Rp. 0.00
0.039 Org Kepala tukang @ Rp. - Rp. 0.00
0.039 Org Mandor @ Rp. 100,000.00 Rp. 3,900.00
Bahan : 1.200 m3 Batu gunung/kali @ Rp. 160,000.00 Rp. 192,000.00
0.432 m3 Pasir Urug @ Rp. 89,900.00 Rp. 38,836.80
Jumlah Upah + Bahan Rp. 297,136.80
Dibulatkan Rp. 297,137.00
PEKERJAAN BETON
SNI.7394-2008-6.4
1m3 Lantai Kerja Beton mutu ρc= 7.4 Mpa(K100),slump (3-6) cm, w/c =0,87
Upah : 1.650 OH Pekerja @ Rp. 80,000.00 Rp. 132,000.00
0.275 OH Tukang @ Rp. - Rp. 0.00
0.280 OH Kepala tukang @ Rp. - Rp. 0.00
0.830 OH Mandor @ Rp. 100,000.00 Rp. 83,000.00
Jumlah Rp. 215,000.00
SNI.7394-2008-6.22
1 m2 Cetakan Beton /Bekisting untuk Kolom
SNI.7394-2008-6.24
1 m2 Cetakan Beton /Bekisting untuk Lantai
SNI.7394-2008-6.26
1 m2 Cetakan Beton /Bekisting untuk Tangga
Upah : 0.660 OH Pekerja @ Rp. 80,000.00 Rp. 52,800.00
0.330 OH Tukang batu @ Rp. 0.00 Rp. 0.00
0.033 OH Kepala tukang @ Rp. 0.00 Rp. 0.00
0.033 OH Mandor @ Rp. 100,000.00 Rp. 3,300.00
Bahan : 0.030 m3 Kayu Kelas III @ Rp. 4,000,000.00 Rp. 120,000.00
0.400 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 6,160.00
0.150 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 1,029.15
0.015 m3 Balok Kayu Kelas II @ Rp. 5,000,000.00 Rp. 75,000.00
0.350 Lbr Plywood Tebal 9 mm @ Rp. 150,000.00 Rp. 52,500.00
2.000 Btg Dolken Kayu ø 8 -10/400 cm @ Rp. 28,000.00 Rp. 56,000.00
Jumlah Upah + Bahan Rp. 366,789.15
untuk 2 x pakai (total harga x 1/2 Rp. 183,394.58
Dibulatkan Rp. 183,395.00
PEKERJAAN DINDING
SNI.6897-2008-6.7
1m2 Pasangan Dinding Batu bata teb. 1/2 bata, 1Pc : 2 PP.
SNI.2837-2008-6.4
1m2 Plesteran, 1Pc :4 PP tebal 13 mm
Upah : 0.200 OH Pekerja @ Rp. 80,000.00 Rp. 16,000.00
0.150 OH Tukang @ Rp. - Rp. 0.00
0.015 OH Kepala tukang @ Rp. - Rp. 0.00
0.010 OH Mandor @ Rp. 100,000.00 Rp. 1,000.00
Bahan : 0.024 m3 Pasir pasang @ Rp. 117,900.00 Rp. 2,829.60
6.240 kg Semen Portland @ Rp. 1,337.50 Rp. 8,346.00
Jumlah Upah + Bahan Rp. 28,175.60
Dibulatkan Rp. 28,176.00
SNI.2837-2008-6.27
1m2 Acian Semen Portland
Upah : 0.200 OH Pekerja @ Rp. 80,000.00 Rp. 16,000.00
0.100 OH Tukang @ Rp. - Rp. 0.00
0.010 OH Kepala tukang @ Rp. - Rp. 0.00
0.010 OH Mandor @ Rp. 100,000.00 Rp. 1,000.00
Bahan : 3.250 Kg Semen Portland @ Rp. 1,337.50 Rp. 4,346.88
Jumlah Upah + Bahan Rp. 21,346.88
Dibulatkan Rp. 21,347.00
PEKERJAAN LANTAI
SNI.7395-2008-6.13
Memasang 1 m2 Lantai Granite 60 x 60 cm
Upah : 0.700 OH Pekerja @ Rp. 80,000.00 Rp. 56,000.00
0.350 OH Tukang @ Rp. - Rp. 0.00
0.035 OH Kepala Tukang @ Rp. - Rp. 0.00
0.035 OH Mandor @ Rp. 100,000.00 Rp. 3,500.00
Jumlah Rp. 59,500.00
SNI.7395-2008-6.54 (a)
Memasang 1 m2 Dinding Keramik kmr. Mandi 20 x 25 cm
Upah : 0.900 OH Pekerja @ Rp. 80,000.00 Rp. 72,000.00
0.450 OH Tukang @ Rp. - Rp. 0.00
0.045 OH Kepala Tukang @ Rp. - Rp. 0.00
0.045 OH Mandor @ Rp. 100,000.00 Rp. 4,500.00
Jumlah Rp. 76,500.00
SNI.7395-2008-6.40
Memasang 1m' plin kramik 10 x 10
Upah : 0.090 OH Pekerja @ Rp. 80,000.00 Rp. 7,200.00
0.090 OH Tukang @ Rp. - Rp. 0.00
0.009 OH Kepala Tukang @ Rp. - Rp. 0.00
0.005 OH Mandor @ Rp. 100,000.00 Rp. 500.00
Jumlah Rp. 7,700.00
Bahan : 10.600 Bh Plin Keramik (10 x 10) @ Rp. 1,400.00 Rp. 14,840.00
0.003 M3 Pasir Pasang @ Rp. 117,900.00 Rp. 353.70
1.140 Kg Semen Portland @ Rp. 1,337.50 Rp. 1,524.75
0.050 Kg Semen Warna @ Rp. 165,000.00 Rp. 8,250.00
Jumlah Bahan Rp. 24,968.45
Jumlah Upah + Bahan Rp. 32,668.45
Dibulatkan Rp. 32,668.00
PEKERJAAN KAYU
SNI.3434-2008-6.1
Membuat Kusen pintu dan kusen jendela ,Kayu Klass I
7.000 OH Pekerja @ Rp. 80,000.00 Rp. 560,000.00
21.000 OH Tukang @ Rp. - Rp. 0.00
2.100 OH Kepala Tukang @ Rp. - Rp. 0.00
0.350 OH Mandor @ Rp. 100,000.00 Rp. 35,000.00
1.100 m3 Kayu Balok @ Rp. 6,000,000.00 Rp. 6,600,000.00
1.250 Kg Paku Kayu 10 Cm @ Rp. 15,400.00 Rp. 19,250.00
1.000 Kg Lem Kayu @ Rp. 15,000.00 Rp. 15,000.00
Jumlah Upah + Bahan Rp. 7,229,250.00
Dibulatkan Rp. 7,229,250.00
SNI.3434-2008-6.2
Membuat Kusen pintu dan kusen jendela ,Kayu Klass II dan Klass III
6.000 OH Pekerja @ Rp. 80,000.00 Rp. 480,000.00
18.000 OH Tukang @ Rp. - Rp. 0.00
1.800 OH Kepala Tukang @ Rp. - Rp. 0.00
0.300 OH Mandor @ Rp. 100,000.00 Rp. 30,000.00
1.200 m3 Kayu Balok @ Rp. 5,000,000.00 Rp. 6,000,000.00
1.250 Kg Paku Kayu 10 Cm @ Rp. 15,400.00 Rp. 19,250.00
1.000 Kg Lem Kayu @ Rp. 15,000.00 Rp. 15,000.00
Jumlah Upah + Bahan Rp. 6,544,250.00
Dibulatkan Rp. 6,544,250.00
SNI.3434-2008-6.5
Membuat Dan Memasang 1 m2 Daun Pintu Panel Klass I Atau Klass II
1.000 OH Pekerja @ Rp. 80,000.00 Rp. 80,000.00
3.000 OH Tukang Kayu @ Rp. - Rp. 0.00
0.300 OH Kepala Tukang @ Rp. - Rp. 0.00
0.050 OH Mandor @ Rp. 100,000.00 Rp. 5,000.00
1.200 m3 Papan Kayu @ Rp. 185,000.00 Rp. 222,000.00
1.000 Kg Lem Kayu @ Rp. 15,400.00 Rp. 15,400.00
Jumlah Upah + Bahan Rp. 322,400.00
Dibulatkan Rp. 322,400.00
SNI.3434-2008-6.13
1 m3 Pasang Konstruksi kuda-kuda Kayu
1.1000 m3 Kayu Klas I @ Rp. 6,000,000.00 Rp. 6,600,000.00
15.0000 kg Besi plat Strip @ Rp. 16,000.00 Rp. 240,000.00
0.200 OH Pekerja @ Rp. 80,000.00 Rp. 16,000.00
0.100 OH Tukang @ Rp. - Rp. -
0.010 OH Kepala Tukang @ Rp. - Rp. -
0.001 OH Mandor @ Rp. 100,000.00 Rp. 100.00
Jumlah Upah + Bahan Rp. 6,856,100.00
Dibulatkan Rp. 6,856,100.00
SNI.3434-2008-6.6
Membuat dan memasang 1 m2 Pintu dan Jendela Kaca, Kayu Klass I Atau II
0.800 OH Pekerja @ Rp. 80,000.00 Rp. 64,000.00
2.400 OH Tukang @ Rp. - Rp. 0.00
0.240 OH Kepala Tukang @ Rp. - Rp. 0.00
0.040 OH Mandor @ Rp. 100,000.00 Rp. 4,000.00
Jumlah Rp. 68,000.00
SNI.3436-2008-6.33
1 m2 Memasang Atap Multiroof
0.120 OH Pekerja @ Rp. 80,000.00 Rp. 9,600.00
0.060 OH Tukang @ Rp. - Rp. 0.00
0.006 OH Kepala Tukang @ Rp. - Rp. 0.00
0.006 OH Mandor @ Rp. 100,000.00 Rp. 600.00
1.150 m2 Atap Seng Genteng @ Rp. 74,000.00 Rp. 85,100.00
0.200 Kg Paku Seng @ Rp. 20,000.00 Rp. 4,000.00
Jumlah Upah + Bahan Rp. 99,300.00
Dibulatkan Rp. 99,300.00
SNI.3436-2008-6.37
1 m' Memasang Rabung Atap Multiroof
0.200 OH Pekerja @ Rp. 80,000.00 Rp. 16,000.00
0.100 OH Tukang @ Rp. 0.00 Rp. 0.00
0.010 OH Kepala Tukang @ Rp. 0.00 Rp. 0.00
0.001 OH Mandor @ Rp. 100,000.00 Rp. 100.00
0.300 m Rabung Atap Multiroof @ Rp. 85,000.00 Rp. 25,500.00
0.216 Kg Paku Seng @ Rp. 20,000.00 Rp. 4,320.00
Jumlah Upah + Bahan Rp. 45,920.00
Dibulatkan Rp. 45,920.00
SNI.2839-2008-6.5
Memasang 1 m2 Langit-langit Tripleks tebal 4 mm
0.100 OH Pekerja @ Rp. 80,000.00 Rp. 8,000.00
0.100 OH Tukang @ Rp. - Rp. 0.00
0.010 OH Kepala Tukang @ Rp. - Rp. 0.00
0.075 OH Mandor @ Rp. 100,000.00 Rp. 7,500.00
Jumlah Rp. 15,500.00
RSNI. T-03-6.4.2008
1 Set Pekerjaan Pemasangan Kunci Pintu Tanam 2 slaag
0.0600 Oh Pekerja @ Rp. 80,000.00 Rp. 4,800.00
0.0150 Oh Tukang Kayu @ Rp. - Rp. -
0.1500 Oh Kepala Tukang @ Rp. - Rp. -
0.0007 Oh Mandor @ Rp. 100,000.00 Rp. 70.00
Jumlah Rp. 4,870.00
1.0000 Set Kunci Pintu Tanam 2 slaag Merk Benotti @ Rp. 185,000.00 Rp. 185,000.00
Jumlah Bahan Rp. 185,000.00
Jumlah Upah + Bahan Rp. 189,870.00
Dibulatkan Rp. 189,870.00
RSNI.T- 03-6.5.2008
1 Buah Pasang Kunci Tanam Biasa
RSNI.T-30.2000-C- 4
1 Pasang Engel Pintu
0.0150 Oh Pekerja @ Rp. 80,000.00 Rp. 1,200.00
0.1500 Oh Tukang Kayu @ Rp. 0.00 Rp. -
0.0150 Oh Kepala Tukang @ Rp. 0.00 Rp. -
0.0001 Oh Mandor @ Rp. 100,000.00 Rp. 10.00
Jumlah Rp. 1,210.00
1.0000 Psg Hak Angin Jendela & ventilasi @ Rp. 8,500.00 Rp. 8,500.00
Jumlah Bahan Rp. 8,500.00
Jumlah Upah + Bahan Rp. 24,700.00
Dibulatkan Rp. 24,700.00
RSNI. T-03-6.11.2002
1 Pasang Pegangan pintu/door holder
0.0500 Oh Pekerja @ Rp. 80,000.00 Rp. 4,000.00
0.5000 Oh Tukang Kayu @ Rp. 0.00 Rp. -
0.0500 Oh Kepala Tukang @ Rp. 0.00 Rp. -
0.0025 Oh Mandor @ Rp. 100,000.00 Rp. 250.00
Jumlah Rp. 4,250.00
PEKERJAAN SANITASI
RSNI.T-15-2-2002
Memasang Kloset Jongkok Setara KIA
PT. T-38-2008-C-B14
1 m2 Pengecatan Tembok Baru
Urungan Kembali Galian Tanah Pondasi Tapak 1/3 x Vol. Galian 27.67 m3
-
6 Urungan Kembali Galian Tanah Pondasi Menerus 1/3 x Vol. Galian 31.30 m3
Urungan Pasir Alas Pondasi Tapak
Pondasi Tapak TP-1
Pondasi Tapak TP-2 1.00 1.00 0.05 83 PXLXTXN 4.15 m3
4.15 m3
28.70 m3
VOLUME
LEBAR LEBAR LEBAR TINGGI JUMLAH/ JUMLA
ITEM PEKERJAAN PANJANG (L) ATAS BAWAH(L (T) UNIT (N1) H (N) RUMUS VOLUME SAT. KET
(P) (LA) B)
PEKERJAAN PASANGAN DAN PLESTERAN
#NAME?
pagar type 1 1.34 1.70 7.00 P xT x N1 15.95 m2
pagar type 2 1.34 1.70 8.00 P xT x N1 18.22 m2
pagar type 3 1.34 1.70 4.00 P xT x N1 9.11 m2
0.67 1.70 6.00 P xT x N1 6.83 m2
pagar type 11 1.34 1.70 6.00 P xT x N2 13.67 m2
63.78 m2
#NAME?
#NAME?
1.Galian Tanah Pondasi Tapak
Pondasi Tapak TP-1 0.80 0.80 1.00 2 PXLXTXN 1.28
Pondasi Tapak TP-2 1.00 1.00 1.00 3 PXLXTXN 3.00 m3
4.28 m3
#NAME?
Pondasi Menerus pagar m3
m3
#NAME?
0.80 0.80 0.10 2 PXLXTXN 0.13
Pondasi Tapak TP-2 1.00 1.00 0.10 3 PXLXTXN 0.30 m3
0.43 m3
#NAME?
12.00 0.70 0.50 1 PXLXTXN 4.20
Catatan :
BACK-UP DATA
VOLUME
LEBAR LEBAR LEBAR TINGGI JUMLAH/ JUMLA
ITEM PEKERJAAN PANJANG ATAS BAWAH(L (T) RUMUS VOLUME SAT. KET
(P) (L) (LA) B) UNIT (N1) H (N)
-Tarikan Jendela dan Jalusi
0.00
pagar type 1 1.34 1.70 7.00 P xT x N1 15.95 m2
pagar type 2 1.34 1.70 8.00 P xT x N1 18.22 m2
pagar type 3 1.34 1.70 4.00 P xT x N1 9.11 m2
0.67 1.70 6.00 P xT x N1 6.83 m2
pagar type 11 1.34 1.70 6.00 P xT x N2 13.67 m2
63.78 m2
PEKERJAAN ATAP
- Kuda - Kuda Baja Ringan c 100 panajng lebar Jumalh ( N )
2.73 3.55 2.00 PxLx N 19.38 m2
Atap Seng Genteng Multiroof 0,35 mm New Emerald 2.83 3.55 2.00 PxLx N 20.09 m3
asang Rabung Atap Seng Genteng Multiroof 0,35 mm 3.55 1.00 PxLx N 3.55 m1
Catatan :
Diajukan Oleh
Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
PT. POLADA MUTIARA ACE
Muhajir Rahmad
Direktur
PROYEK : TANGGAL PEKERJAAN :
PELAKSANA :
KONSULTAN SUPERV :
VOLUME
LEBAR LEBAR LEBAR TINGGI JUMLAH/ JUMLA
ITEM PEKERJAAN PANJANG (L) ATAS BAWAH(L (T) UNIT (N1) H (N) RUMUS VOLUME SAT. KET
(P) (LA) B)
III. PEKERJAAN LANTAI II
A PEKERJAAN BETON BERTULANG
1 Kolom 30/40 - K1
- Beton Cor 0.30 0.4 3.40 55 PXLXTXN 22.44 m3
- Besi Beton Ulir 4.20 12.00 55 Berat Besi = P x N1 x N x Koef 4,379.76 Kg
- Besi Beton Polos 1.18 27.2 55 Berat Besi = P x N1 x N x Koef 1,094.47 Kg
- Bekisting 1.40 3.40 55 PXTXN 261.80 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 22.44 m3
2 Kolom 13/40 - K5
- Beton Cor 1.86 m3 1.44
0.13 0.4 3.57 10 PXLTXN 1.86 m3
0.13 0.4 4.35 0 PXLTXN - m3
- Besi Beton Ulir
- Besi Beton Polos 225.65 Kg
besi 10 3.57 8 10 Berat Besi = P x N1 x N x Koef 177.07 Kg 251.21
besi 6 0.92 24 10 Berat Besi = P x N1 x N x Koef 48.58 Kg
3 Kolom 10/40 - KF
- Beton Cor 0.10 0.4 2.44 4 PXLTXN 0.39 m3 0.41
- Besi Beton Ulir
- Besi Beton Polos 29.44 Kg 62.45
2.44 8 4 Berat Besi = P x N1 x N x Koef 17.18 Kg
0.82 17.00 4 Berat Besi = P x N1 x N x Koef 12.27 Kg
- Bekisting 1.00 2.44 4 PXTXN 9.76 m2 10.2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 0.39 m3
5 Kolom 20/20 - KA
- Beton Cor 0.20 0.2 0.50 46 PXLTXN 0.92 m3 1.48
- Besi Beton Ulir 1.05 4 46 Berat Besi = P x N1 x N x Koef 233.77 Kg 179.08
- Besi Beton Polos 0.68 4.00 46 Berat Besi = P x N1 x N x Koef 48.80 Kg 46.41
- Bekisting 0.80 0.50 46 PXTXN 18.40 m2 29.6
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 0.92 m3
Catatan :
Diajukan Oleh
Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
PT. POLADA MUTIARA ACE
Muhajir Rahmad
Direktur
BACK-UP DATA
VOLUME
LEBAR LEBAR LEBAR TINGGI JUMLAH/ JUMLA
ITEM PEKERJAAN PANJANG (L) ATAS BAWAH(L (T) UNIT (N1) H (N) RUMUS VOLUME SAT. KET
(P) (LA) B)
III. PEKERJAAN LANTAI II
A PEKERJAAN BETON BERTULANG
7 Ring Balk 20/35
- Beton Cor 23.75 m3
Beton 20/35 312.00 0.2 0.35 1 PXLTXN 21.84 m3
Beton Dack 106.30 0.15 0.12 1 PXLTXN 1.91 m3
10 Plat Daag t = 10 cm
- Beton Cor 4.84 m3
5.80 5.8 0.12 1 PXLTXN 4.04 m3
3.87 1.73 0.12 1 PXLTXN 0.80 m3
- Besi Beton Polos 515.08 Kg
5.94 58 1 Berat Besi = P x N1 x N x Koef 213.60 Kg
5.94 58 1 Berat Besi = P x N1 x N x Koef 213.60 Kg
4.01 17.3 1 Berat Besi = P x N1 x N x Koef 43.01 Kg
1.87 38.7 1 Berat Besi = P x N1 x N x Koef 44.87 Kg
- Bekisting 40.34 m2
5.80 5.8 1 PXLXN 33.64 m2
3.87 1.73 1 PXLXN 6.70 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 4.84 m3
11 Plat Kanopy t = 7 cm
- Beton Cor 0.89 m3
0.58 0.4 0.07 7 PXLTXN 0.11 m3
1.82 0.4 0.07 12 PXLTXN 0.61 m3
1.30 0.4 0.07 1 PXLTXN 0.04 m3
4.70 0.4 0.07 1 PXLTXN 0.13 m3
Catatan :
Diajukan Oleh
Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
PT. POLADA MUTIARA ACE
Muhajir Rahmad
Direktur
Pondasi Tapak
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.96 6.00 11.76 83.00 976.08 868.7112
Besi Melintang 12.00 0.89 1.96 6.00 11.76 83.00 976.08 868.7112
JUMLAH : 1,737.42
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 53.12
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 10.62
Kolom Pedestal
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.45 8.00 11.60 25.00 290.00 258.10
Besi Begel 6.00 0.22 0.86 8.00 6.88 25.00 172.00 37.84
JUMLAH : 295.94
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 21.25
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 1.28
Kolom Pedestal 20/20 - K2
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.45 6.00 8.70 59.00 513.30 456.84
Besi Begel 6.00 0.22 0.66 8.00 5.28 59.00 311.52 68.53
JUMLAH : 525.37
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 40.12
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 2.01
Sloof
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang ( ULIR ) 12.00 0.89 294.30 5.00 1,471.50 1.00 1,471.50 1,309.64
Besi Begel ( Polos ) 8.00 0.39 0.74 2,354.40 1,742.26 1.00 1,742.26 679.48
JUMLAH : 1,989.11
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 147.15
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 14.72
Kolom
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.60 8.00 12.80 25.00 320.00 284.80
Besi Begel 6.00 0.22 0.86 14.00 12.04 25.00 301.00 66.22
JUMLAH : 351.02
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 35.00
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 2.10
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.95 6.00 11.70 59.00 690.30 614.37
Besi Begel 6.00 0.22 0.66 16.00 10.56 59.00 623.04 137.07
JUMLAH : 751.44
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 73.16
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 3.66
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 10.00 0.62 81.00 4.00 324.00 1.00 324.00 200.88
Besi Begel 6.00 0.22 0.46 540.00 248.40 1.00 248.40 54.65
JUMLAH : 255.53
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN TINGGI LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 21.89
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 1.42
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang ( Polos ) 12.00 0.89 195.90 5.00 979.50 1.00 979.50 871.76
Besi Begel ( Polos ) 6.00 0.22 0.66 1,306.00 861.96 1.00 861.96 189.63
JUMLAH : 1,061.39
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 92.07
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 7.84
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.96 6.00 11.76 3.00 35.28 31.3992
Besi Melintang 12.00 0.89 1.96 6.00 11.76 3.00 35.28 31.3992
JUMLAH : 62.80
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 1.92
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.38
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.56 5.00 7.80 3.00 23.40 20.826
Besi Melintang 12.00 0.89 1.56 5.00 7.80 3.00 23.40 20.826
JUMLAH : 41.65
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 1.44
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.22
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.45 6.00 8.70 3.00 26.10 23.23
Besi Begel 6.00 0.22 0.86 8.00 6.88 3.00 20.64 4.54
JUMLAH : 27.77
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 2.55
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.15
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.45 4.00 5.80 4.00 23.20 20.65
Besi Begel 6.00 0.22 0.66 8.00 5.28 4.00 21.12 4.65
JUMLAH : 25.29
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 2.24
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.09
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang ( ULIR ) 12.00 0.89 12.15 5.00 60.75 1.00 60.75 54.07
Besi Begel ( Polos ) 8.00 0.39 0.74 97.20 71.93 1.00 71.93 28.05
JUMLAH : 82.12
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 6.08
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.61
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 12.00 0.89 1.65 6.00 9.90 3.00 29.70 26.43
Besi Begel 6.00 0.22 0.86 15.00 12.90 3.00 38.70 8.51
JUMLAH : 34.95
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 4.50
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.27
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang 10.00 0.62 1.40 4.00 5.60 14.00 78.40 48.61
Besi Begel 6.00 0.22 0.58 14.00 8.11 14.00 113.48 24.97
JUMLAH : 73.57
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI
JUMLAH : 11.09
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Besi Memanjang 10.00 0.62 5.00 5.00 25.00 1.00 25.00 15.50
Besi Begel 6.00 0.22 0.54 34.00 18.36 1.00 18.36 4.04
JUMLAH : 19.54
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN TINGGI LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 2.75
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.13
#NAME?
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang ( Polos ) 12.00 0.89 11.50 4.00 46.00 1.00 46.00 40.94
Besi Begel ( Polos ) 6.00 0.22 0.42 77.00 32.34 1.00 32.34 7.11
JUMLAH : 48.05
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI
JUMLAH : 2.99
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
JUMLAH : 0.19
BACK UP DATA
Pekerjaan : PEMBANGUNAN PAGAR PUSKESMAS NYONG
Lokasi : KEC. BANDAR BARU KAB. PIDIE JAYA
Err:509 : Err:509
Tahun Anggaran : DINAS KESEHATAN
1 2
Pondasi 2
Panjang = 1.800 m'
Lebar = 1.700 m'
Tinggi = 1.200 m'
Jumlah = 1.00 bh
Volume = 1.800 x 1.700 x 1.200 x 1.00
= 3.672 m3
Pot. 3
Panjang = 11.000 m'
Lebar = 1.180 m'
Tinggi = 0.600 m'
Volume = 11.000 x 1.180 x 0.600
= 7.788 m3
Pot. 4
Panjang = 6.000 m'
Lebar = 1.380 m'
Tinggi = 0.600 m'
Volume = 6.000 x 1.380 x 0.600
= 4.968 m3
#NAME? #NAME?
Panjang = 38.100 m'
Lebar = 0.300 m'
Tinggi = 0.100 m'
Volume = 38.100 x 0.300 x 0.100
= 1.143 m3
Urungan Kembali Galian Tanah Pondasi TapaUrungan Kembali Galian Tanah Pondasi Tapak
Kubikasi Total Galian= 23.328 m3
#NAME? #NAME?
Kubikasi Total Galian= 38.484 m3
Urungan Pasir Alas Pondasi Bata Urungan Pasir Alas Pondasi Bata
Panjang = 70.600 m'
Lebar = 0.800 m'
Tinggi = 0.050 m'
#NAME? Ruangan
Luas = 88.000 m2
Tinggi = 0.100 m'
Volume = 88.000 x 0.100
= 8.800 m3
Teras
Luas = 12.9 m2
Tinggi = 0.100 m'
Volume = 12.9 x 0.100
= 1.29 m3
Selasar/ Halaman
Luas = 134.760 m2
Tinggi = 0.100 m'
Volume = 134.76 x 0.100
= 13.48 m3
#NAME? Ruangan
Luas = 88.000 m2
Tinggi = 1.000 m'
Volume = 88.000 x 1.000
= 88.000 m3
Teras
Luas = 12.9 m2
Tinggi = 0.950 m'
Volume = 12.9 x 0.950
= 12.26 m3
Selasar/ Halaman
Luas = 134.760 m2
Tinggi = 0.600 m'
Volume = 134.76 x 0.600
= 80.86 m3
#NAME? #NAME?
Panjang = 34.000 m'
Lebar = 0.600 m'
Tinggi = 0.100 m'
Jumlah = 1.000 bh
Volume = 34.000 x 0.600 x 0.100 x 1.000
= 2.040 m3
#NAME? Ruangan
Luas = 88.000 m2
Tinggi = 0.05 m'
Volume = 88.000 x 0.050
= 4.4 m3
Teras
Luas = 12.900 m2
Tinggi = 0.05 m'
Volume = 12.900 x 0.050
= 0.645 m3
Selasar/ Halaman
Luas = 134.760 m2
Tinggi = 0.05 m'
Volume = 134.760 x 0.050
= 6.738 m3
Pot. 3
Panjang = 11.000 m'
Lebar = 1.180 m'
Tinggi = 0.100 m'
Volume = 11.000 x 1.180 x 0.100
= 1.298 m3
Pot. 4
Panjang = 6.000 m'
Lebar = 1.380 m'
Tinggi = 0.100 m'
Volume = 6.000 x 1.380 x 0.100
= 0.828 m3
Volume Total
Panjang = Pot. 2 + Pot. 3 + Pot. 4
= 4.288 + 1.298 + 0.828
= 6.414 m3
#NAME? Pot. 1
Panjang = 34.000 m'
Lebar Atas = 0.250 m'
Lebar Bawah = 0.400 m'
Tinggi = 0.450 m'
Volume = 0.250 + 0.400 x 0.450 x 34.00
2.000
= 0.325 x 0.450 x 34.000
= 4.973 m3
Pot. 2
Panjang = 53.600 m'
Lebar Atas = 0.250 m'
Lebar Bawah = 0.600 m'
Tinggi = 1.000 m'
Volume = 0.250 + 0.600 x 1.000 x 53.60
2.000
= 0.425 x 1.000 x 53.600
= 22.780 m3
Pot. 3
Panjang = 11.000 m'
Lebar Atas = 0.810 m'
Lebar Bawah = 0.990 m'
Tinggi = 1.000 m'
Volume = 0.810 + 0.990 x 1.000 x 11.00
2.000
= 0.900 x 1.000 x 11.000
= 9.900 m3
Pot. 4
Panjang = 6.000 m'
Lebar Atas = 1.110 m'
Lebar Bawah = 1.280 m'
Tinggi = 1.000 m'
Volume = 1.110 + 1.280 x 1.000 x 6.00
2.000
= 1.195 x 1.000 x 6.000
= 7.170 m3
Pagar T. Wudhu
Panjang = 30.300 m'
Lebar Atas = 0.250 m'
Lebar Bawah = 0.450 m'
Tinggi = 1.000 m'
Volume = 0.250 + 0.450 x 1.000 x 30.30
2.000
= 0.350 x 1.000 x 30.300
= 10.605 m3
Teras Samping
Lebar = 3.000 m'
Panjang/ Tinggi = 1.030 m' jumlah
Volume = 3.000 x 1.030 x 2.000
= 6.180 m2
#NAME? #NAME?
Panjang = 38.100 m'
Panjang/ Tinggi = 0.550 m'
Volume = 38.100 x 0.550
= 20.955 m2
#NAME? #NAME?
Panjang = 104.600 m'
Lebar = 0.200 m'
Tinggi = 0.250 m'
Volume = 104.600 x 0.200 x 0.250
= 5.230 m3
#NAME? #NAME?
Panjang = 0.200 m'
Lebar = 0.200 m'
Tinggi = 4.450 m'
Jumlah = 20.000 bh
Volume = 0.200 x 0.200 x 4.450 x 20.000
= 3.560 m3
#NAME? #NAME?
Panjang = 0.200 m'
Lebar = 0.200 m'
Tinggi = 4.800 m'
Jumlah = 4.000 bh
Volume = 0.200 x 0.200 x 4.800 x 4.000
= 0.768 m3
#NAME? #NAME?
Panjang = 0.200 m'
Lebar = 0.200 m'
Tinggi = 1.600 m'
Jumlah = 5.000 bh
Volume = 0.200 x 0.200 x 1.600 x 5.000
= 0.320 m3
#NAME? #NAME?
Panjang = 0.130 m'
Lebar = 0.130 m'
Tinggi = 4.450 m'
Jumlah = 14.000 bh
Volume = 0.130 x 0.130 x 4.450 x 14.000
= 1.053 m3
#NAME? #NAME?
Panjang = 0.130 m'
Lebar = 0.130 m'
Tinggi = 0.300 m'
Jumlah = 12.000 bh
Volume = 0.130 x 0.130 x 0.300 x 12.000
= 0.061 m3
#NAME? #NAME?
Panjang = 0.130 m'
Lebar = 0.130 m'
Tinggi = 1.110 m'
Jumlah = 2.000 bh
Volume = 0.130 x 0.130 x 1.110 x 2.000
= 0.038 m3
#NAME? #NAME?
Panjang = 0.130 m'
Lebar = 0.130 m'
Tinggi = 1.600 m'
Jumlah = 4.000 bh
Volume = 0.130 x 0.130 x 1.600 x 4.000
= 0.108 m3
#NAME? #NAME?
Panjang = 0.200 m'
Lebar = 0.200 m'
Tinggi = 2.700 m'
Jumlah = 4.000 bh
Volume = 0.200 x 0.200 x 2.700 x 4.000
= 0.432 m3
#NAME? #NAME?
Panjang = 45.520 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
#NAME? #NAME?
Panjang = 3.600 m'
Lebar = 0.200 m'
Tinggi = 0.200 m'
#NAME? #NAME?
Panjang = 52.600 m'
Lebar = 0.200 m'
Tinggi = 0.250 m'
#NAME? #NAME?
Panjang = 82.600 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
#NAME? #NAME?
Panjang = 3.600 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
#NAME? #NAME?
Panjang = 8.160 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
#NAME? #NAME?
Panjang = 30.300 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
#NAME? Teras
Luas = 22.200 m2
Tebal = 0.100 m2
Volume = 22.200 x 0.100
= 2.220 m3
- Dinding Luar
Luas = 30.400 m2
Tebal = 0.100 m2
Volume = 30.400 x 0.100
= 3.040 m3
#NAME? #NAME?
Luas Bidang Pas.Bat= 67.880 m2
Sisi = 1.000 sisi
Volume = 67.880 x 1.000
= 67.880 m2
Elv. + 5.00
Panjang = 40.000 m'
Tinggi = 0.300 m'
Volume = 40.000 x 0.300
= 12.000 m2
Elv. + 5.60
Panjang = 3.600 m'
Tinggi = 0.600 m'
Volume = 3.600 x 0.600
= 2.160 m2
Teras
Panjang = 17.600 m'
Tinggi = 0.900 m'
Volume = 17.600 x 0.900
= 15.840 m2
#NAME? #NAME?
Luas Bidang = P. Bidang x Jmlh x Tinggi/Panjang = Hasil
#NAME? = 0.400 x 20.000 x 4.450 = 35.60
#NAME? = 0.400 x 4.000 x 4.800 = 7.68
#NAME? = 0.400 x 4.000 x 2.700 = 4.32
#NAME? = 0.400 x 1.000 x 3.600 = 1.44
#NAME? = 0.450 x 1.000 x 52.600 = 23.67
Volume (m2) = 72.71
#NAME?
#NAME? #NAME?
Luas Ruangan = 88.000 m2
Luas Teras = 12.900 m2
Volume = 88.000 + 12.900
= 100.900 m2
#NAME? #NAME?
Panjang = 9.000 m'
Jumlah Line = 7.000 bh
Volume = 9.000 x 7.000
= 63.000 m'
#NAME? #NAME?
Luas = 134.760 m2
Volume = 134.760 m2
#NAME? #NAME?
Panjang = 10.700 m'
Tinggi = 1.600 m'
Volume = 10.700 m2
#NAME?
#NAME? #NAME?
Luas Plafond Ruanga= 88.000 m2
Luas Plafond Teras = 12.900 m2
Volume = 88.000 + 12.900
= 100.900 m2
#NAME?
#NAME? #NAME?
Luas Bidang 1 = 15.880 m2
Luas Bidang 2 = 98.804 m2
Volume = 15.880 + 98.804
= 114.684 m2
#NAME? #NAME?
Bidang 1 = 1/2 x alas x tinggi x jml bidang
= 0.500 x 10.000 x 2.820 3
= 42.300 m2
#NAME? #NAME?
Panjang Bid. 1 = 5.820 x 4.000 = 23.280 m'
Panjang Bid. 2 = 5.470 x 1.000 = 5.470 m'
Volume = 28.750 m'
PEKERJAAN PENGECATAN
Pengecatan Pintu Gerbang Pengecatan Pintu Gerbang
Volume = #NAME? + Plesteran Dinding 1 : 4 + Acian Beton
= #NAME? + 20.13 + #NAME?
= #NAME? m2
#NAME? #NAME?
Volume = Luas Plafond Gypsum
= #NAME? m2
#NAME? #NAME?
Volume = Panjang Listplan x Luas Bid. Listpl x Sisi
= #NAME? x 0.25 x 2
= #NAME? m2
BACK UP DATA PEKERJAAN LANTAI. II
Pekerjaan : PEMBANGUNAN PAGAR PUSKESMAS NYONG
Lokasi : KEC. BANDAR BARU KAB. PIDIE JAYA
Prop / Kab / Kodya : ###
Tahun Anggaran : DINAS KESEHATAN
1 2
#NAME? #NAME?
#NAME?
#NAME?
#NAME? #NAME?
Luas Dinding
Dinding Bangunan
Panjang = 45.000 m'
Tinggi = 3.000 m'
Luas = 45.000 x 3.000
= 135.000 m2
Kusen J1
Panjang = 0.400 m'
Tinggi = 1.800 m'
Luas = 0.400 x 1.800 x 9
= 6.480 m2
###
Rp -
Rp -
###
Rp -
JADWAL PENGGUNAAN BAHAN
PEKERJAAN PEMBANGUNAN PAGAR PUSKESMAS NYONG
LOKASI KEC. BANDAR BARU KAB. PIDIE JAYA
### Err:509
SKPA DINAS KESEHATAN
B PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak
2 Galian Tanah Pondasi Menerus
3 Urugan Tanah Kembali
4 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Bahan :
Pasir Urug
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
C PEKERJAAN PONDASI DAN BETON
1 Aanstamping pada Pondasi Tapak
Jenis Bahan :
Batu gunung/kali
Pasir Urug
2 Pasangan Batu Pondasi Menerus 1:2
Jenis Bahan :
Batu belah 15cm/20cm
Pasir pasang
Semen Portland
3 Lantai Kerja T = 5 Cm K-100
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
5 Pondasi Tapak (80/80)
6 Sloof Beton Bertulang (25/40)
7 Sloof Beton Bertulang (20/30)
8 Balok Beton Bertulang (25/30)
12 Kolom (40 x 40)
13 Kolom Praktis (13/13)
16 Plat Lantai t=12 cm
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
Besi betn
Kayu Kelas III
Paku 5 cm - 10 cm
Minyak bekisting
Balok Kayu Kelas II
Plywood tebal 9 mm
Dolken Kayu ø 8 -10/400 cm
F PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
Jenis Bahan :
Tanah timbun
2 Urugan Pasir Bawah Lantai
Jenis Bahan :
Pasir Urug
3 Beton Cor 1:3:5
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
5 Lantai Keramik 40 x 40 Cm
6 Lantai Keramik 20 x 20 Cm KM/WC
7 Pasangan dinding keramik 20 x 25 cm
Jenis Bahan :
Keramik
Pasir pasang
Semen Portland
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
H PEKERJAAN PLAFOND
1 Rangka Plafond ( Furing )
2 Plafond Gypsum Board 8 mm
3 List Plafond
Jenis Bahan :
Gipsum Board
Furing
List Gipsum
I PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
2 Cat Kusen, Pintu, dan Ventilasi
Jenis Bahan :
CatT embok
Cat Minyak
Minyak Cat
J PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
K PEKERJAAN SANITASI
1 Memasang Floor Drain Stainless Kelas 1
2 Memasang Kloset Duduk Kelas 1
3 Memasang Kran Air Stainless Kelas 1
4 Memasang Wastafel + Assesoris Kelas 1
5 Cermin Wastafel (150x80 cm) + frame Alumunium
6 Memasang Pipa Air Bersih dan kotor + Aksesoris
Jenis Bahan :
Floor Drain
Kloset Duduk
Kran
Wastafel
Pipa
Seal Tape
Lem Pipa
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Bahan :
pasir Urug
E PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
2 Urugan Pasir Bawah Lantai
Jenis Bahan :
Tanah Timbun
Pasir Urug
3 Beton Cor 1:3:5
Jenis Bahan :
Pasir Beton
Semen Portland
Kerikil beton
Air
4 Lantai Keramik 40 x 40 Cm
Jenis Bahan :
Keramik
Pasir Pasang
Semen Portland
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
F PEKERJAAN ATAP
1 Rangka kuda-kuda Metal Zincalume 0.75 mm
2 Atap Genteng metal 3mm
3 Rabung metal Zincalume 3mm
4 Listplank Kayu Kelas 1
Jenis Bahan :
Rangka Profil C Truss
Seng Metal
Rabung metal
Kayu Klas I
H PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
Jenis Bahan :
Cat Tembok
I PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
J PEKERJAAN LAIN-LAIN
1 Pembongkaran Beton
2 Perbaiki Instalasi Air
Jenis Bahan :
Pipa
Seal Tape
Lem Pipa
3 Perbaiki Plafond Bocor
###
###
###
###
JADWAL PENGGUNAAN PERALATAN
PEKERJAAN PEMBANGUNAN PAGAR PUSKESMAS NYONG
LOKASI KEC. BANDAR BARU KAB. PIDIE JAYA
### Err:509
SKPA DINAS KESEHATAN
F PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
Jenis Alat :
Alat Pertukangan
2 Urugan Pasir Bawah Lantai
Jenis Alat :
Alat Pertukangan
3 Beton Cor 1:3:5
Jenis Alat :
Molen
Kereta Sorong
5 Lantai Keramik 40 x 40 Cm
6 Lantai Keramik 20 x 20 Cm KM/WC
7 Pasangan dinding keramik 20 x 25 cm
Jenis Alat :
Water Pass
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
H PEKERJAAN PLAFOND
1 Rangka Plafond ( Furing )
2 Plafond Gypsum Board 8 mm
3 List Plafond
Jenis Alat :
Bor Listrik
Alat Pertukangan
Water Pass
I PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
2 Cat Kusen, Pintu, dan Ventilasi
Jenis Alat :
Kuas/Roll
J PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
Jenis Alat :
Alat Tool Listrik
Alat Pertukangan
K PEKERJAAN SANITASI
1 Memasang Floor Drain Stainless Kelas 1
2 Memasang Kloset Duduk Kelas 1
3 Memasang Kran Air Stainless Kelas 1
4 Memasang Wastafel + Assesoris Kelas 1
5 Cermin Wastafel (150x80 cm) + frame Alumunium
6 Memasang Pipa Air Bersih dan kotor + Aksesoris
Jenis Alat :
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Alat :
Kereta Sorong
Cangkul
Sekop
E PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
2 Urugan Pasir Bawah Lantai
Jenis Alat :
Kereta Sorong
Alat Pertukangan
3 Beton Cor 1:3:5
Jenis Alat :
Kereta Sorong
Alat Pertukangan
4 Lantai Keramik 40 x 40 Cm
Jenis Alat :
WaterPass
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
F PEKERJAAN ATAP
1 Rangka kuda-kuda Metal Zincalume 0.75 mm
2 Atap Genteng metal 3mm
3 Rabung metal Zincalume 3mm
4 Listplank Kayu Kelas 1
Jenis Alat :
Bor Listrik
Alat Pertukangan
H PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
Jenis Alat :
Kuas/Roll
I PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
Jenis Alat :
Alat Tool Listrik
Alat Pertukangan
J PEKERJAAN LAIN-LAIN
1 Pembongkaran Beton
2 Perbaiki Instalasi Air
3 Perbaiki Plafond Bocor
Jenis Alat :
Mobil Pick Up
Alat Pertukangan
Kereta Sorong
###
###
###
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
###
JADWAL PERSONIL INTI
Err:509
Rp -
Err:509
-
BACK UP DATA
Pekerjaan : PEMBANGUNAN PAGAR PUSKESMAS NYONG
Lokasi : KEC. BANDAR BARU KAB. PIDIE JAYA
Err:509 : Err:509
Tahun Anggaran : DINAS KESEHATAN
1 2
Pondasi P2
Panjang = 0.700 m'
Lebar = 0.900 m'
Tinggi = 1.200 m'
Jumlah = 1.00 bh
Volume = 0.700 x 0.900 x 1.200 x 1.00
= 0.756 m3
Pondasi PS1
Panjang = 1.500 m'
Lebar = 1.500 m'
Tinggi = 1.200 m'
Jumlah = 4.00 bh
Volume = 1.500 x 1.500 x 1.200 x 4.00
= 10.800 m3
Pot. 4,5
Panjang = 11.780 m'
Lebar = 0.630 m'
Tinggi = 0.550 m'
Volume = 11.780 x 0.630 x 0.550
= 4.082 m3
Urungan Kembali Galian Tanah Pondasi TapaUrungan Kembali Galian Tanah Pondasi Tapak
Kubikasi Total Galian= 17.388 m3
#NAME? #NAME?
Kubikasi Total Galian= 13.762 m3
Pondasi P2
Panjang = 0.700 m'
Lebar = 0.900 m'
Tinggi = 0.050 m'
Jumlah = 1.000 bh
Volume = 0.700 x 0.900 x 0.050 x 1.000
= 0.032 m3
Pondasi PS1
Panjang = 1.500 m'
Lebar = 1.500 m'
Tinggi = 0.050 m'
Jumlah = 4.000 bh
Volume = 1.500 x 1.500 x 0.050 x 4.000
= 0.450 m3
Total Volume
Panjang = Pondasi P1 + Pondasi P2 + Pondasi PS1
= 0.243 + 0.032 + 0.450
= 0.725 m3
Urungan Pasir Alas Pondasi Bata Urungan Pasir Alas Pondasi Bata
Pot. 1,2,3 Panjang = 22.000 m'
Lebar = 0.800 m'
Tinggi = 0.050 m'
KM/WC
Luas = 33.66 m2
Tinggi = 0.550 m'
Volume = 33.66 x 0.550
= 18.51 m3
#NAME? Pondasi P1
Panjang = 0.900 m'
Lebar = 0.900 m'
Tinggi = 0.100 m'
Jumlah = 6.000 bh
Volume = 0.900 x 0.900 x 0.100 x 6.000
= 0.486 m3
Pondasi P2
Panjang = 0.700 m'
Lebar = 0.900 m'
Tinggi = 0.100 m'
Jumlah = 1.000 bh
Volume = 0.700 x 0.900 x 0.100 x 1.000
= 0.063 m3
Pondasi PS1
Panjang = 1.500 m'
Lebar = 1.500 m'
Tinggi = 0.100 m'
Jumlah = 4.000 bh
Volume = 1.500 x 1.500 x 0.100 x 4.000
= 0.900 m3
Volume Total
Panjang = Pondasi P1 + Pondasi P2 + Pondasi PS1
= 0.486 + 0.063 + 0.900
= 1.449 m3
KM/WC
Luas = 33.660 m2
Tinggi = 0.05 m'
Volume = 33.660 x 0.050
= 1.683 m3
Volume Total = Tempat Wudhu + KM/WC
= 2.5145 + 1.683
= 4.20 m3
Pondasi P2
Panjang = 0.500 m'
Lebar = 0.700 m'
Tinggi = 0.200 m'
Jumlah = 1.000 bh
Volume = 0.500 x 0.700 x 0.200 x 1.000
= 0.070 m3
Pondasi PS1
Panjang = 1.300 m'
Lebar = 1.300 m'
Tinggi = 0.200 m'
Jumlah = 4.000 bh
Volume = 1.300 x 1.300 x 0.200 x 4.000
= 1.352 m3
Pas. Pondasi Rolaag Selasar 1PC : 2 PS Pas. Pondasi Rolaag Selasar 1PC : 2 PS
Panjang = 1.950 m'
Tinggi = 0.750 m'
Volume = 1.950 x 0.750
= 1.463 m2
Plesteran Pondasi Rolaag Selasar 1PC : 2 PS Plesteran Pondasi Rolaag Selasar 1PC : 2 PS
Panjang = 1.950 m'
Tinggi = 0.750 m'
Volume = 1.950 x 0.750
= 1.463 m2
Pot. 4,5
Panjang = 11.780 m'
Lebar = 0.630 m'
Tinggi = 0.100 m'
Volume = 11.780 x 0.630 x 0.100
= 0.742 m3
Volume Total
Panjang = Pot. 1,2,3 + Pot. 4,5
= 1.540 + 0.742
= 2.282 m3
Pot. 4,5
Panjang = 11.780 m'
Lebar Atas = 0.250 m'
Lebar Bawah = 0.430 m'
Tinggi = 0.600 m'
Volume = 0.250 + 0.430 x 0.600 x 11.78
2.000
= 0.340 x 0.600 x 11.780
= 2.403 m3
Teras Samping
Lebar = 3.000 m'
Panjang/ Tinggi = 1.030 m' jumlah
Volume = 3.000 x 1.030 x 2.000
= 6.180 m2
Kolom Praktis 13/13 - KP (elv. + 3.00) Kolom Praktis 13/13 - KP (elv. + 3.00)
Panjang = 0.130 m'
Lebar = 0.130 m'
Tinggi = 3.200 m'
Jumlah = 11.000 bh
Volume = 0.130 x 0.130 x 3.200 x 11.000
= 0.595 m3
Balok Latai 13/20 Elv + 2,25 Balok Latai 13/20 Elv + 2,25
Panjang = 7.200 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
#NAME? #NAME?
Panjang = 26.890 m'
Lebar = 0.200 m'
Tinggi = 0.250 m'
#NAME? #NAME?
Luas Bidang Pas.Bat= 29.003 m2
Sisi = 1.000 sisi
Volume = 29.003 x 1.000
= 29.003 m2
Elv. + 3.00
Panjang = 34.890 m'
Tinggi = 0.750 m'
Volume = 34.890 x 0.750
= 26.168 m2
Elv. + 6.75
Panjang = 8.000 m'
Tinggi = 3.450 m' Luas Kusen
Volume = 8.000 x 3.450 - 6.400
= 21.200 m2
Elv. + 7.30
Panjang = 4.000 m'
Tinggi = 0.500 m'
Volume = 4.000 x 0.500
= 2.000 m2
#NAME? #NAME?
Luas Bidang = P. Bidang x Jmlh x Tinggi/Panjang = Hasil
Kolom 30/30 - K1 = 0.600 x 4.000 x 6.850 = 16.44
Kolom 20/20 - K2 = 0.400 x 8.000 x 3.200 = 10.24
Kolom 10/25 = 0.350 x 8.000 x 4.100 = 11.48
Balok Lantai 25/35 - = 0.950 x 1.000 x 8.000 = 7.60
#NAME? = 0.700 x 1.000 x 26.890 = 18.82
Ring Balk 20/30 Men= 0.800 x 1.000 x 8.000 = 6.40
Ring Balk 15/25 = 0.650 x 1.000 x 4.000 = 2.60
Ring Balk 15/35 = 0.850 x 1.000 x 4.000 = 3.40
Volume (m2) = 76.98
PEKERJAAN LANTAI
Lantai Keramik 30 x 30 Cm UnPolished Lantai Keramik 30 x 30 Cm UnPolished
Luas Ruangan = 66.639 m2
Luas KM/WC = 4.680 m2
Volume = 66.639 + 4.680
= 71.319 m2
PEKERJAAN PLAFOND
Plafond PVC (tebal 6 mm + rangka + AccecorPlafond PVC (tebal 6 mm + rangka + Accecories, terpasang)
Luas Plafond Ruanga= 66.639 m2
Luas Plafond KM/WC= 4.680 m2
Volume = 66.639 + 4.680
= 71.319 m2
PEKERJAAN PENGECATAN
Pengecatan Pintu Gerbang Pengecatan Pintu Gerbang
Volume = #NAME? + Plesteran Dinding 1 : 4 + Acian Beton
= 29.003 + 124.65 + 76.98
= 230.637 m2
#NAME? #NAME?
Volume = Luas Plafond Gypsum
= #NAME? m2
#NAME? #NAME?
Volume = Panjang Listplan x Luas Bid. Listpl x Sisi
= #NAME? x 0.25 x 2
= #NAME? m2
#NAME?
#NAME? #NAME?
Tinggi = 3.75 m'
Lebar = 1.20 m'
Bidang = 4.00 sisi
Volume = Tinggi x Lebar x Bidang - Batu Alam
= 3.75 x 1.20 x 4.00 - 2.7
= 15.300 m2
#NAME? #NAME?
Volume = Luas Bidang x Panjang Bidang
= 5.84 x 8.00
= 46.72 m2
#NAME? #NAME?
Volume = Panjang Bidang Atap
= 8.000 m'
PEKERJAAN PENGECATAN
Pengecatan Pintu Gerbang Bidang Dinding
Volume = Luas Plesteran
= 29.00 m2
Bidang Beton Bertulang
Volume = Luas Acian
= 76.98 m2
1 2 3
A. PENGADAAN MOBILER GEDUNG BPP
I. MOBILER PERALATAN KERJA Rp. 75,450,000.00
II. MOBILER PERALATAN ELEKTRIKAL Rp. 121,626,000.00
SUB TOTAL I + II : Rp. 197,076,000.00
PPN 10% : Rp. 19,707,600.00
GRAND TOTAL : Rp. 216,783,600.00
DIBULATKAN : Rp. 216,780,000.00
Terbilang : SERATUS TUJUH PULUH SEMBILAN JUTA DUA RATUS RIBU RUPIAH
Harga Satuan
No. Uraian Pekerjaan Volume Sat Analisa Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A. PENGADAAN MOBILER GEDUNG BPP
1 MOBILER PERALATAN KERJA
1 Kursi kerja tampa Lengan ( rangka Besi,Alas/sandaan spon dibalut Plastik) 6.00 unit Taksir 700,000.00 4,200,000.00
1 Kursi kerja Kepala balai( hydrulic,tilting control) 1.00 unit Taksir 3,600,000.00 3,600,000.00
3 Meja Kerja Kepala Balai(meja 1 Biro ) 1.00 unit Taksir 1,600,000.00 1,600,000.00
4 Meja Kerja Staf Balai (Meja 1/2 Biro ) 4.00 unit Taksir 1,000,000.00 4,000,000.00
6 Kursi Tunggu 3 person 2.00 unit Taksir 2,500,000.00 5,000,000.00
7 Kursi aula ( rangka Besi,Alas/sandaan spon dibalut Plastik ) 42.00 unit Taksir 700,000.00 29,400,000.00
8 White Board 1.00 unit Taksir 850,000.00 850,000.00
9 Filling Cabinet 4 Laci Standart 3.00 unit Taksir 3,500,000.00 10,500,000.00
10 Lemari Arsip 2 Pintu 2.00 unit Taksir 2,500,000.00 5,000,000.00
11 Lemari Perpustakaan 2.00 unit Taksir 5,650,000.00 11,300,000.00
1 Pondasi Tapak
80.00 3.00 26.67 1.00 26.67 m3
Jumlah 26.67 m3
4 ###
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
2 Pondasi Menerus
117.36 3.00 39.12 1.00 39.12 m3
Jumlah 39.12 m3
1 Pondasi Tapak
1.00 1.00 0.05 0.05 80.00 4.00 m3
Jumlah 4.00 m3
1 Pondasi Menerus
293.40 0.80 0.05 11.74 1.00 11.74 m3
Jumlah 11.74 m3
9 ###
URAIAN PERHITUNGAN
No Panjang Lebar Atas Lebar Bawah Tinggi Volume Volume Bersih Jumlah Jumlah Volume
Pengurang Satuan
(meter) (meter) (meter) (meter) an (m3) Pias
1 Pondasi Menerus
293.40 0.25 0.60 0.55 68.58 1.00 68.58 m3
Jumlah 68.58 m3
C PEKERJAAN BETON BERTULANG
1 Pondasi Tapak
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.94 6.00 11.64 80.00 931.20 828.77
sengkang Ø 12.00 0.89 1.94 6.00 11.64 80.00 931.20 828.77
JUMLAH : 1,657.54
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 0.80 0.20 4.00 0.64 80.00 51.20 51.20
JUMLAH : 51.20
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.80 0.80 0.20 0.13 80.00 10.24 10.24
JUMLAH : 10.24
2 Kolom Pedestal
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.45 8.00 11.60 25.00 290.00 258.10
sengkang Ø 6.00 0.22 0.86 9.00 7.74 25.00 193.50 42.57
JUMLAH : 300.67
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 0.85 1.00 1.00 0.85 25.00 21.25 21.25
JUMLAH : 21.25
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.30 0.20 0.85 0.05 25.00 1.28 1.28
JUMLAH : 1.28
4 Sloof
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 293.40 5.00 1,467.00 1.00 1,467.00 1,305.63
sengkang Ø 8.00 0.39 0.76 1,956 1,486.56 1.00 1,486.56 579.76
JUMLAH : 1,885.39
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 293.40 0.25 2.00 146.70 1.00 146.70 146.70
JUMLAH : 146.70
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 293.40 0.20 0.25 14.67 1.00 14.67 14.67
JUMLAH : 14.67
5 Kolom
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.60 8.00 12.80 25.00 320.00 284.80
sengkang Ø 6.00 0.22 0.86 10.00 8.60 25.00 215.00 47.30
JUMLAH : 332.10
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 1.40 1.00 1.00 1.40 25.00 35.00 35.00
JUMLAH : 35.00
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.30 0.20 1.40 0.08 25.00 2.10 2.10
JUMLAH : 2.10
6 ###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.95 6.00 11.70 55.00 643.50 572.72
sengkang Ø 6.00 0.22 0.66 11.00 7.26 55.00 399.30 87.85
JUMLAH : 660.56
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 1.55 0.80 1.00 1.24 55.00 68.20 68.20
JUMLAH : 68.20
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.20 0.20 1.55 0.06 55.00 3.41 3.41
JUMLAH : 3.41
7 ###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 10.00 0.62 81.00 4.00 324.00 1.00 324.00 200.88
sengkang Ø 6.00 0.22 0.46 540.00 248.40 1.00 248.40 54.65
JUMLAH : 255.53
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 72.97 0.15 2.00 21.89 1.00 21.89 21.89
JUMLAH : 21.89
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 72.97 0.13 0.15 1.42 1.00 1.42 1.42
JUMLAH : 1.42
8 ###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 195.90 5.00 979.50 1.00 979.50 871.76
sengkang Ø 6.00 0.22 0.66 1,306 861.96 1.00 861.96 189.63
JUMLAH : 1,061.39
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 195.90 0.47 1.00 92.07 1.00 92.07 92.07
JUMLAH : 92.07
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 195.90 0.20 0.20 7.84 1.00 7.84 7.84
JUMLAH : 7.84
2 Plesteran Dinding 1 : 4
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
Jumlah 127.57 M2
5 Acian Beton Bertulang
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
###
0.20 0.20 1.55 0.62 55.00 34.10 M2
###
195.90 0.47 92.07 1.00 92.07 M2
Jumlah 126.17 M2
D. PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Beton Bertulang 3 x
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah
Volume Pengurangan Satuan
(meter) (meter) (meter) UNIT Volume
Plesteran Dinding 1 : 4
618.99 1.00 618.99 M2
#NAME?
127.57 1.00 127.57 M2
Acian Beton Bertulang
126.17 1.00 126.17 M2
Jumlah 872.73 M2
F. PEKERJAAN FINISING
1 Pasang Rbesi Hollow
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
1 -
Pagar type 1 2.83 0.75 2.12 6.00 12.74 M2
Pagar type 2 2.90 0.75 2.18 6.00 13.05 M2
Pagar type 3 3.00 0.75 2.25 4.00 9.00 M2
3.39 0.75 2.54 6.00 15.26 M2
Jumlah 50.04 M2
2 Pasang Logo Dan Huruf Tulisan Pada Pintu Gerbang
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah
Volume Pengurangan Jumlah Volume Satuan
(meter) (meter) (meter) (m32) Pias
1 1.00 1.00 1.00 1.00 UNIT
Jumlah 1.00 UNIT
4 Pas. Batu Alam Candi + cat hitam
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
Kolom 20/20 - K1
31.00 0.30 1.40 13.02 2.00 26.04 m1
Jumlah 26.04 m1
5 Rellief Pinggang Dinding Sesuai gambar
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
Ring Balk 13/13 - RB1
82.00 82.00 1.00 82.00 M1
Jumlah 82.00 M1
6 Pembuatan topi Tiang type 1
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
Kolom 20/20 - K1
25.00 25.00 1.00 25.00 BH
Jumlah 25.00 BH
4 ###
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
-
1 12.00 0.70 0.50 4.20 1.00 4.20 m3
Jumlah 4.20 m3
###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.96 6.00 11.76 3.00 35.28 31.40
sengkang Ø 12.00 0.89 1.96 6.00 11.76 3.00 35.28 31.40
JUMLAH : 62.80
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 0.80 0.20 4.00 0.64 3.00 1.92 1.92
JUMLAH : 1.92
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.80 0.80 0.20 0.13 3.00 0.38 0.38
JUMLAH : 0.38
- ###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.56 5.00 7.80 4.00 31.20 27.77
sengkang Ø 12.00 0.89 1.56 5.00 7.80 4.00 31.20 27.77
JUMLAH : 55.54
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 0.60 0.20 4.00 0.48 4.00 1.92 1.92
JUMLAH : 1.92
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.60 0.60 0.20 0.07 4.00 0.29 0.29
JUMLAH : 0.29
8 ###
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias
1 #NAME?
1.00 1.00 0.10 0.10 3.00 0.30 m3
2 #NAME?
0.80 0.80 0.10 0.06 4.00 0.26 m3
Jumlah 0.56 m3
3 ###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 12.15 5.00 60.75 1.00 60.75 54.07
sengkang Ø 6.00 0.22 0.76 98.00 74.48 1.00 74.48 16.39
JUMLAH : 70.45
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 12.15 0.25 2.00 6.08 1.00 6.08 6.08
JUMLAH : 6.08
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 12.15 0.20 0.25 0.61 1.00 0.61 0.61
JUMLAH : 0.61
4 ###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 12.00 0.89 1.65 6.00 9.90 3.00 29.70 26.43
sengkang Ø 6.00 0.22 0.86 15.00 12.90 3.00 38.70 8.51
JUMLAH : 34.95
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 1.50 1.00 1.00 1.50 3.00 4.50 4.50
JUMLAH : 4.50
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.30 0.20 1.50 0.09 3.00 0.27 0.27
JUMLAH : 0.27
###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 10.00 0.62 1.40 4.00 5.60 14.00 78.40 48.61
sengkang Ø 6.00 0.22 0.52 8.00 4.16 14.00 58.24 12.81
JUMLAH : 61.42
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 1.20 0.66 1.00 0.79 14.00 11.09 11.09
JUMLAH : 11.09
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 0.20 0.13 1.20 0.03 14.00 0.44 0.44
JUMLAH : 0.44
###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 10.00 0.62 5.00 5.00 25.00 1.00 25.00 15.50
sengkang Ø 6.00 0.22 0.52 34.00 17.68 1.00 17.68 3.89
JUMLAH : 19.39
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 5.00 0.55 1.00 2.75 1.00 2.75 2.75
JUMLAH : 2.75
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 5.00 0.13 0.20 0.13 1.00 0.13 0.13
JUMLAH : 0.13
###
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang Ø 10.00 0.62 11.50 4.00 46.00 1.00 46.00 28.52
sengkang Ø 6.00 0.22 0.46 77.00 35.42 1.00 35.42 7.79
JUMLAH : 36.31
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG tinggi SISI
(M2) (UNIT) (M2)
Bekisting 11.50 0.26 1.00 2.99 1.00 2.99 2.99
JUMLAH : 2.99
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 11.50 0.13 0.13 0.19 1.00 0.19 0.19
JUMLAH : 0.19
2 Plesteran 1 : 4
URAIAN PERHITUNGAN
No Panjang Lebar Tinggi Volume Bersih Jumlah Jumlah Volume
Volume Pengurangan Satuan
(meter) (meter) (meter) (m3) Pias