ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mobilisasi/Demobilisasi


Satuan/Unit : ls
Nomor Pembayaran

Harga
Kuantitas / Satuan Harga
No. Uraian Satuan
Koefisien Dasar (Rp)
(Rp)
1 2 3 4 5 6

I Upah/Tenaga Kerja

Sub Jumlah I -

II Bahan/Material

Sub Jumlah II -

III Peralatan
1 Exavator Backhoe unit 1.000 4,000,000.00 4,000,000.00
2 Beton Molen unit 1.000 500,000.00 500,000.00
3 Theodolith unit 1.000 500,000.00 500,000.00
4 Waterppas unit 1.000 500,000.00 500,000.00

Sub Jumlah III 5,500,000.00


Sub Jumlah (I+II+III) 5,500,000.00

IV Lain-lain
- Biaya umum 0.00% x Sub Jumlah (I+II+III) -
- Keuntungan 0.00% x Sub Jumlah (I+II+III) -
Sub Jumlah IV -
Jumlah Harga = I+II+III+IV 5,500,000.00
Harga Satuan pekerjaan (dibulatkan) 5,500,000.00
Jenis Pekerjaan : Uitzet/Pengukuran
Satuan/Unit : ls
Nomor Pembayaran

Harga
Kuantitas / Satuan Harga
No. Uraian Satuan
Koefisien Dasar (Rp)
(Rp)
1 2 3 4 5 6

I Upah/Tenaga Kerja
1 Juru Ukur OH 1.000 #REF! #REF!
2 Pembatu OH 2.000 #REF! #REF!
3 Pekerja OH 4.000 #REF! #REF!
4 Juru Gambar OH 1.000 #REF! #REF!

Sub Jumlah I #REF!

II Bahan/Material
1 Bambu - bambu btg 30.000 #REF! #REF!
2 Patok kayu btg 60.000 10,000.00 600,000.00
3 Kertas / alat tulis kalkir ls 3.000 300,000.00 900,000.00

Sub Jumlah II #REF!

III Peralatan
1 Theodolithe / Water Pass unit 2.000 #REF! #REF!
2 Mistar Ukur unit 2.000 100,000.00 200,000.00
3 Roll Meter unit 2.000 100,000.00 200,000.00

Sub Jumlah III #REF!


Sub Jumlah (I+II+III) #REF!

IV Lain-lain
- Biaya umum 0.00% x Sub Jumlah (I+II+III) #REF!
- Keuntungan 0.00% x Sub Jumlah (I+II+III) #REF!
Sub Jumlah IV #REF!
Jumlah Harga = I+II+III+IV #REF!
Harga Satuan pekerjaan (dibulatkan) #REF!
Jenis Pekerjaan : Administrasi dan Dokumentasi
Satuan/Unit : ls
Nomor Pembayaran

Harga
Kuantitas / Satuan Harga
No. Uraian Satuan
Koefisien Dasar (Rp)
(Rp)
1 2 3 4 5 6

I Upah/Tenaga Kerja
Foto Dokumentasi ls 1.000 1,000,000.00 1,000,000.00
Pembuatan Laporan ls 1.000 2,000,000.00 2,000,000.00
Pembuatan Gambar ls 1.000 2,000,000.00 2,000,000.00
Administrasi MC ls 1.000 1,000,000.00 1,000,000.00

Sub Jumlah I 6,000,000.00

II Bahan/Material

Sub Jumlah II -

III Peralatan

Sub Jumlah III -


Sub Jumlah (I+II+III) 6,000,000.00

IV Lain-lain
- Biaya umum 0.00% x Sub Jumlah (I+II+III) -
- Keuntungan 0.00% x Sub Jumlah (I+II+III) -
Sub Jumlah IV -
Jumlah Harga = I+II+III+IV 6,000,000.00
Harga Satuan pekerjaan (dibulatkan) 6,000,000.00
ANALISA HARGA SATUAN PEKERJAAN
Angkutan Material

Jarak angkut : 200 m


Kode Analisa : T.15.a.7

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.9500 1,000.00 950.00
2 Mandor OH 0.0475 1,000.00 47.50
Jumlah Tenaga Kerja 997.50
B BAHAN
1 Pasir Pasang 1,0 x 1,28 / 1,10 x HSP m3 1,160.73
2 Papan Kayu 1,0 x 0,80 / 1,10 x HSP m3 725.45
2 Pasir Beton 1,0 x 1,26 / 1,10 x HSP m3 1,142.59
3 Semen ( PC ) 50 Kg 1,0 x 0,05 / 1,10 x HSP zak 45.34
4 Batu Belah 1,0 x 0,94 / 1,10 x HSP m3 852.41
5 Batu Kerikil / Split 1,0 x 1,25 / 1,10 x HSP m3 1,133.52
6 Besi Beton 0,7 x 0,10 / 1,10 x HSP kg 63.48

Keterangan :
Untuk harga satuan angkutan bahan adalah jumlah harga Tenaga kerja dikalikan dengan koefisien bahan
ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH DI SITU

SATUAN PEMBAYARAN : Rupiah/jam URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE SATUAN Perhitungan Biaya Operasi Peralatan KETERANGAN

A. URAIAN PERALATAN Jenis Excavator 2 Excavator 1


Ponton 2 Bulldozer
1. Peralatan + Ponton-1
2. Merk / Tipe - 80-140 HP 80-140 HP 100-150 HP
3. Tenaga Pw HP 133.0 233.0 100.0 150.0
4. Kapasitas Cp - 0.6 0.8 0.0 -
5. Umur Ekonomis A Tahun 5.0 5.0 5.0 5.0
6. Jam Operasi Dalam 1 Tahun W Jam 2,000 2,000 2,000 2,000
7. Harga Alat B Rp 600,000,000 700,000,000 100,000,000 700,000,000

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat C Rp 60,000,000 70,000,000 10,000,000 70,000,000
Suku bunga
Faktor Angsuran Modal =(i x 〖 (1+i) 〗 ^A D - 0.26380 0.26380 0.26380 0.26380 i = 10%
)/
3. Biaya Pasti per Jam : ( 〖 (1+i) 〗 ^A−1)
= ((B−C) x D)/W
a. Biaya Pengembalian Modal E Rp/jam 71,225.32 83,096.21 11,870.89 83,096.21
Asuransi
b. Asuransi, dll.
= p x B/W F Rp/jam 900.00 1,050.00 250.00 1,875.00 p = 0.2%

Biaya Pasti per Jam G = (E + F) G Rp/jam 72,125.32 84,146.21 12,120.89 84,971.21

C. BIAYA OPERASI PER JAM KERJA Koef. Biaya OP alat


1. Bahan Bakar = (12%-15%) x Pw x Ms H Rp/jam #REF! #REF! #REF! #REF! 12.00%

2. Pelumas = (2.5%-3%) x Pw x Mp I Rp/jam 66,500.00 116,500.00 50,000.00 75,000.00 2.50%

3. Biaya bengkel = (6,25% - 8,75%) x 𝐵/𝑊 J Rp/jam 18,750.00 21,875.00 3,125.00 21,875.00 6.25%

4. Perawatan dan = (12,5%-17,5%) x 𝐵/𝑊 K Rp/jam 37,500.00 43,750.00 6,250.00 43,750.00 12.50%
perbaikan

5. Operator = (m orang/jam) x U1 M Rp/jam #REF! #REF! #REF! #REF!


6. Pembantu operator = (n orang/jam) x U2 L Rp/jam #REF! #REF! #REF! #REF!

Biaya Operasi (per Jam) = P Rp/jam #REF! #REF! #REF! #REF!

D. BIAYA OPERASI ALAT / JAM = (G + P) S Rp/jam #REF! #REF! #REF! #REF!

E. LAIN - LAIN
1. Bahan Bakar Premium (non subsidi) Mb Liter 7,800.00 7,800.00 7,800.00 7,800.00
2. Bahan Bakar Solar (non subsidi) Ms Liter #REF! #REF! #REF! #REF!
3. Minyak Pelumas Mp Liter 20,000.00 20,000.00 20,000.00 20,000.00
METODE ANALISA TEKNIK PEKERJAAN

Bagian Pekerjaan : Pekerjaan Persiapan


Jenis Pekerjaan : Mobilisasi/Demobilisasi
Volume : 1.00 Ls

A. Uraian Tahapan Pelaksanaan Pekerjaan :


- Mobilisasi dilaksanakan di awal pelaksanaan
- Mobilisasi berupa peralatan kerja untuk pelaksanaan pekerjaan
- Alat yang didatangkan memenuhi kelayakan kerja
- Di akhir pelaksanaan peralatan di demobilisasi

B. Analisa Teknis :

1. Analisa Pemakaian Peralatan :

Jenis Alat Jumlah

- Exavator Backhoe 1 unit


- Beton Molen 1 unit
- Theodolith 1 unit
- Waterppas 1 unit

C. Analisa Waktu Pelaksanaan :

Volume Pekerjaan = 1.000 Ls

Jumlah waktu yang dibutuhkan 14 hari

Bagian Pekerjaan : Pekerjaan Persiapan


Jenis Pekerjaan : Uitzet/Pengukuran
Volume : 1.00 Ls

A. Uraian Tahapan Pelaksanaan Pekerjaan :

Pengukuran dilaksanakan untuk mengetahui sejauh mana pekerjaan yang akan dilaksanakan, Dikerjakan dengan menggunakan alat
ukur optik, Pengukuran dilaksanakan bersama sama dengan pihak rekanan dan pengawas lapangan/ direksi, Hasil pengukuran
dilanjutkan ke perhitungan MC 0 % dan penggambaran Shoop Drawing.Uitzet dikerjakan setelah titik lokasi sudah ditentukan,
Penentuan elevasi atas persetujuan pengawas dan direksi, Papan bouwplank harus benar benar kuat dan tidak mudah lepas dan
mudah dibacah. Dikerjakan lebih awal pada minggu ke 2

B. Analisa Teknis :
1. Analisa Pemakaian Tenaga :

Jumlah Tenaga yang digunakan :


- Pekerja = 4 orang
- Juru Ukur = 1 orang
- Pembatu Juru Ukur = 2 orang
- Juru Gambar = 1 orang

C. Analisa Waktu Pelaksanaan :

Volume Pekerjaan = 1.000 Ls


Jumlah waktu yang dibutuhkan 7 hari
Bagian Pekerjaan : Pekerjaan Lain-lain
Jenis Pekerjaan : Administrasi & Dokumentasi
Volume : 1.00 bh

A. Uraian Tahapan Pelaksanaan Pekerjaan :


- Pembuatan administrasi proyek sangatlah penting sebagai acuan kemajuan pekerjaan yang sedang dilaksanakandan ini sangat
menentukan proses pengambilan Termijn. Dengan demikian, pada pekerjaan ini akan dilaksanakan laporan perkembangan
pekerjaan pada ; 0 % pekerjaan, 50% dan 100 % pekerjaan.
- Apabila setelah selesai pekerjaan ternyata masih perlu dilakukan perbaikan maka pengerjaannya dilakukan pada saat itu dan
apabila pada masa pemeliharaan masih terdapat kerusakan yang perlu diperbaiki maka pengerjaannya dilaksanakan pda masa
pemeliharaan tersebut.
- Setiap tahap pelaksanaan diinventarisasi dengan photo/dokumentasi lapangan dari 0% , 50% sampai 100 % dan dibuat laporan-
laporan seperti laporan harian, laporan mingguan, dan lapora bulanan, serta asbuilt drawing.
- Setelah pekerjaan selesai, kami segera melaporkan untuk pemeriksaan lapangan serta pernyataan bahan pekerjaan dinyatakan
selesai 100%
- Apabila pekerjaan telah dinyatakan selesai 100% oleh pihak direksi maka kami akan melaksanakan penyerahan pekerjaan.

B. Analisa Teknis :
1. Analisa Pemakaian Tenaga :

Jumlah Tenaga yang digunakan :


- Juru poto = 1 orang
- Pelaksana Lapangan = 1 orang

C. Analisa Waktu Pelaksanaan :

Volume Pekerjaan = 1.000 bh


Jumlah waktu yang dibutuhkan 210 hari