Anda di halaman 1dari 2

20/08/2021

TABEL RITASI ARMADA PRODUKSI BRAVO 10


No Nama S0pir No DT Jam Pencapaian target (%) KETERANGAN
7-8 8-9 9-10 10-11 13-14 14-15 15-16 16-17 Total/DT Rit/Jam
Kerja (26RIT/HARI)
1 MADROI 044 3 2 2 2 2 3 2 1 17 8,5 2,0 65,38 Loading Tengah
2 SARIF 051 4 3 3 2 3 3 3 2 23 9,0 2,6 88,46 Loading Tengah
4 HERI 268 3 2 3 1 1 3 2 2 17 8,5 2,0 65,38 Loading Barat
5 IMAM 272 5 3 4 2 3 4 2 2 25 9,0 2,8 96,15 Loading Tengah
7 SAMAUN 275 3 2 2 2 2 2 2 2 17 8,5 2,0 65,38 Loading Tengah
7 JAMAL 285 3 3 4 2 3 3 3 3 24 10,0 2,4 92,31 Loading Tengah
8 RONI 289 5 3 3 2 3 5 3 1 25 9,0 2,8 96,15 Loading Tengah
9 FAHRI 290 3 3 3 9 7,5 1,2 34,62 Loading Tengah + Pok Boulder
11 YANDI 300 3 3 2 1 2 2 4 1 18 9,0 2,0 69,23 Loading Tengah
11 ENDANG 334 0 9 0,0 0,00 Pok Natu
12 SOLEH 339 0 8,5 0,0 0,00 Pok Natu
12 SUGIMAN 340 3 3 2 2 2 2 2 2 18 9,0 2,0 69,23 Loading Barat
13 ROHMAT 345 1 1 9,0 0,1 3,85 Loading Tengah + Pok Boulder
15 HENDRA 349 4 1 1 6 10,0 0,6 23,08 Pok Boulder + Storing Mekanik
18 JAUL 353 7 4 6 3 2 5 3 2 32 9,0 3,6 123,08 Loading Tengah
18 FASNI 355 3 3 3 2 2 3 2 2 20 9,0 2,2 76,92 Loading Barat
17 AGUS 357 3 1 2 2 1 3 2 2 16 8,5 1,9 61,54 Loading Tengah
18 JUMAN 358 5 4 5 3 3 4 3 2 29 9,0 3,2 111,54 Loading Tengah
21 IWAN 359 4 3 4 2 2 4 3 2 24 9,0 2,7 92,31 Loading Tengah
19 FATULLOH 360 6 3 4 2 2 4 3 2 26 9,0 2,9 100,00 Loading Tengah
20 WANDI 368 0 9 0,0 0,00 Pok Natu
21 SAMLAWI 373 5 3 4 2 3 4 3 3 27 9,0 3,0 90,00 Loading Tengah
Total/Jam 66 45 53 32 36 61 46 35 374

Keterangan warna : Hasil Ritasi diatas 75%


Hasil Ritasi diatas 60%-75%
Hasil Ritasi dibawah 60%

Anda mungkin juga menyukai