42 Arsy
42 Arsy
70 458
Tapak Kubah
46 9
+8.62
Puncak Atap Metal Deck 0.4 mm IWF 250.125
10 1
162
+7.00
Rgel Baja IWF 125.250
187
+5.12
Roof Deck IWF 250.125
IWF 250.125
412
+1.00
Pedestal Beton K-250
100
-0.05
Struktur Finish Level
50
-0.75
25
-2.25
DASAR GALIAN
SHOP DRAWING
PEKERJAAN
PEMBANGUNAN MASJID AL RASYID
215 260 LOKASI
105 200 475 480 475 200 105
TANJUNG PINANG
1 2 3 4 5 6 PERENCANA:
BUDHI SERAYA
ARSITEKTURINDO
2040
NAMA GAMBAR SKALA
PORTAL AS 3=4=C=D
1 SKALA 1:100
NOMOR LEMBAR JUMLAH LEMBAR