+2,076
+2,145
+2,218
+2,287
+2,218
+2,145
+2,076
+1,925
Elevasi EVALUASI STRUKTUR
Eksisting (m)
PERKERASAN CRITICAL AREA
Slope (%) 2,0% 1,5% 1,5% 1,5% 1,5% 1,5% 1,5% 2,0%
RUNWAY & TAXIWAY BANDAR
UDARA JUANDA SURABAYA
NAMA MAHASISWA
Potongan 1-1 (Taxiway N1)
Skala 1:100
Dirgantoro Prakoso
NRP.10111710013059
DOSEN PEMBIMBING
KETERANGAN
SKALA
SUBBASE COURSE 56cm
560
SUBGRADE CBR 8%
13 27