PAVED PAVED SARJANA TERAPAN

+3.000 SHOULDER TAXIWAY TAXIWAY SHOULDER TEKNOLOGI REKAYASA


CL
PENGELOLAAN
PEMELIHARAAN BANGUNAN
SIPIL
+2.000 FAKULTAS VOKASI
INSTITUT TEKNOLOGI
SEPULUH NOPEMBER
Bid. Pers +1.000
JUDUL TUGAS AKHIR
Jarak (mm) 7000 5000 5000 5000 5000 5000 5000 7000
+1,925

+2,076

+2,145

+2,218

+2,287

+2,218

+2,145

+2,076

+1,925
Elevasi EVALUASI STRUKTUR
Eksisting (m)
PERKERASAN CRITICAL AREA
Slope (%) 2,0% 1,5% 1,5% 1,5% 1,5% 1,5% 1,5% 2,0%
RUNWAY & TAXIWAY BANDAR
UDARA JUANDA SURABAYA

NAMA MAHASISWA
Potongan 1-1 (Taxiway N1)
Skala 1:100
Dirgantoro Prakoso
NRP.10111710013059

DOSEN PEMBIMBING

Amalia Firdaus Mawardi, ST., MT.


NIP.19600105 198603 1 003

KETERANGAN

ASPHALT SURFACE COURSE 4cm


250

ASPHALT BINDER COURSE 11cm


ASPHALT TREATED COURSE 10cm
150

GRANURAL BASE COURSE 15cm

SKALA
SUBBASE COURSE 56cm
560

TERLAMPIR PADA GAMBAR

SUBGRADE CBR 8%

Detail Perkerasan Taxiway N1 JUMLAH


NO HALAMAN HALAMAN
Skala 1:20

13 27