RINCIAN BAHAN

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN BAHAN SATUAN HARGA DASAR MERK SPESIFIKASI SUMBER


1 Air liter Rp 5.03 Standar Standar Estimator.id
2 Besi beton (polos/ulir) kg Rp 17,382.81 Standar 6 mm IKK BPS 2022
3 Dolken kayu Ø 8-10/400 cm batang Rp 52,269.38 Standar Standar IKK BPS 2022
4 Jaring kawat baja (wiremesh) kg Rp 12,151.96 Standar M8 IKK BPS 2022
5 Kawat beton kg Rp 22,013.45 Standar Standar IKK BPS 2022
6 Kayu balok kelas II m3 Rp 10,407,804.51 Kamper ukuran 8/12 IKK BPS 2022
7 Kayu balok kelas III m3 Rp 5,697,068.84 Glugu ukuran 8/12 IKK BPS 2022
8 Kayu papan kelas III m3 Rp 2,319,956.17 Kamper Standar IKK BPS 2022
9 Kerikil m3 Rp 430,217.17 Standar 0.5 - 1 cm (mesin) IKK BPS 2022
10 Kerikil (Maks 30 mm) kg Rp 235.67 Standar Standar Estimator.id
11 Minyak bekisting liter Rp 10,051.80 Standar Standar IKK BPS 2022
12 Multiplek lembar Rp 115,595.74 Standar tebal 9 mm IKK BPS 2022
13 Paku biasa kg Rp 29,150.23 Standar 1 3/4 "- (reng kayu) IKK BPS 2022
14 Paku biasa 2” - 5” kg Rp 23,119.15 Standar seven (reng kayu) IKK BPS 2022
15 Pasir Beton kg Rp 262.06 Standar Standar IKK BPS 2022
16 Pasir Beton m3 Rp 300,548.91 Standar Standar IKK BPS 2022
17 Penjaga jarak bekisting / spacer buah Rp 25,129.51 Standar Standar Estimator.id
18 Semen portland kg Rp 1,759.07 Holcim 40 kg IKK BPS 2022
19 Strorox - 100 kg Rp 75,388.52 Standar Standar Estimator.id
20 Waterstop lebar 150 mm m1 Rp 124,642.36 SCG PVC SCG 70 type WSF 150 mm Estimator.id
21 Waterstop lebar 200 mm m1 Rp 100,518.03 Maspion PVC WSA 200 lebar 20cm 200mm Estimator.id
22 Waterstop lebar 230 mm - 320 mm m1 Rp 206,061.96 SCG PVC SCG 70 type WSF 300 mm Estimator.id
RINCIAN UPAH

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN UPAH SATUAN HARGA DASAR MERK SPESIFIKASI SUMBER


1 Kepala Tukang OH Rp 120,621.64 Standar Standar Estimator.id
2 Kepala Tukang Batu OH Rp 125,647.54 Standar Standar IKK BPS 2022
3 Kepala Tukang Besi OH Rp 117,606.10 Standar Standar IKK BPS 2022
4 Kepala Tukang Kayu OH Rp 130,673.44 Standar Standar IKK BPS 2022
5 Kepala Tukang Pipa OH Rp 130,673.44 Standar Standar Estimator.id
6 Mandor OH Rp 130,673.44 Standar Standar IKK BPS 2022
7 Pekerja OH Rp 100,518.03 Standar Standar IKK BPS 2022
8 Tukang Batu OH Rp 115,595.74 Standar Standar IKK BPS 2022
9 Tukang Besi OH Rp 115,595.74 Standar Standar IKK BPS 2022
10 Tukang Kayu OH Rp 115,595.74 Standar Kasar IKK BPS 2022
11 Tukang Pipa OH Rp 125,647.54 Standar Standar IKK BPS 2022
RINCIAN ALAT

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN ALAT SATUAN HARGA DASAR MERK SPESIFIKASI SUMBER


RINCIAN HARGA SATUAN

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO NAMA KATEGORI SATUAN KOEFISIEN HARGA DASAR HARGA SATUAN SUMBER


1 Membuat beton mutu fc = 7,4 MPa (K 100) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 215.0000 0 0
- 0 0 999.0000 0 0
- 0 0 869.0000 0 0
- 0 0 247.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu fc = 26,4 MPa (K 300), slump (120 ±
2 m3 0 Permen PUPR Nomor 28/PRT/M/2016
20) mm, w/c = 0,52
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 681.0000 0 0
- 0 0 413.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu fc = 28,8 MPa (K 325), slump (120 ±
3 m3 0 Permen PUPR Nomor 28/PRT/M/2016
20) mm, w/c = 0,49
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 670.0000 0 0
- 0 0 439.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0350 0 0
- 0 0 0.1050 0 0
- 0 0 2.1000 0 0
- 0 0 0.3500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
4 Membuat beton mutu fc = 31,2 MPa (K 350), slump (120 ± m3 0 Permen PUPR Nomor 28/PRT/M/2016
20) mm, w/c = 0,48
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 667.0000 0 0
- 0 0 448.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0350 0 0
- 0 0 0.1050 0 0
- 0 0 2.1000 0 0
- 0 0 0.3500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
5 Membuat beton kedap air dengan strorox - 100 m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.8000 0 0
- 0 0 0.4800 0 0
- 0 0 400.0000 0 0
- 0 0 1.2000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0350 0 0
- 0 0 0.1050 0 0
- 0 0 2.1000 0 0
- 0 0 0.3500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
6 Pemasangan PVC Waterstop lebar 150 mm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0030 0 0
- 0 0 0.0030 0 0
- 0 0 0.0600 0 0
- 0 0 0.0300 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
7 Pemasangan PVC Waterstop lebar 200 mm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0040 0 0
- 0 0 0.0070 0 0
- 0 0 0.0700 0 0
- 0 0 0.0350 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
8 Membuat PVC Waterstop lebar 230 mm - 320 mm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0040 0 0
- 0 0 0.0040 0 0
- 0 0 0.0800 0 0
- 0 0 0.0400 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
9 Pembesian dengan besi polos atau besi ulir kg 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
- 0 0 0.0150 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0007 0 0
- 0 0 0.0004 0 0
- 0 0 0.0070 0 0
- 0 0 0.0070 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
10 Pemasangan kabel presstressed polos/strands kg 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
- 0 0 0.0100 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0005 0 0
- 0 0 0.0003 0 0
- 0 0 0.0050 0 0
- 0 0 0.0050 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
11 Pemasangan jaring kawat baja (wiremesh) kg 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0200 0 0
- 0 0 0.0050 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0025 0 0
- 0 0 0.0001 0 0
- 0 0 0.0025 0 0
- 0 0 0.0025 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
12 Membuat beton mutu f= 9,8 MPa (K 125) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 828.0000 0 0
- 0 0 276.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
13 Pemasangan bekisting untuk pondasi m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0400 0 0
- 0 0 0.1000 0 0
- 0 0 0.3500 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0260 0 0
- 0 0 0.0260 0 0
- 0 0 0.5200 0 0
- 0 0 0.2600 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
14 Pemasangan bekisting untuk sloof m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0450 0 0
- 0 0 0.1000 0 0
- 0 0 0.3500 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0260 0 0
- 0 0 0.0260 0 0
- 0 0 0.5200 0 0
- 0 0 0.2600 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
15 Pemasangan bekisting untuk kolom m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 2.0000 0 0
- 0 0 0.0150 0 0
- 0 0 0.0400 0 0
- 0 0 0.2000 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
16 Pemasangan bekisting untuk balok m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 2.0000 0 0
- 0 0 0.0180 0 0
- 0 0 0.0400 0 0
- 0 0 0.2000 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
17 Pemasangan bekisting untuk lantai m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 6.0000 0 0
- 0 0 0.0150 0 0
- 0 0 0.0400 0 0
- 0 0 0.2000 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
18 Pemasangan bekisting untuk dinding m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 3.0000 0 0
- 0 0 0.0200 0 0
- 0 0 0.0300 0 0
- 0 0 0.2000 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
- 0 0 4.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
19 Pemasangan bekisting untuk tangga m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 2.0000 0 0
- 0 0 0.0150 0 0
- 0 0 0.0300 0 0
- 0 0 0.1500 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
20 Pemasangan jembatan untuk pengecoran beton m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.5000 0 0
- 0 0 0.0264 0 0
- 0 0 0.6000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0050 0 0
- 0 0 0.0080 0 0
- 0 0 0.1500 0 0
- 0 0 0.0500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
21 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 157.5000 0 0
- 0 0 2.2500 0 0
- 0 0 0.2000 0 0
- 0 0 0.8100 0 0
- 0 0 0.4000 0 0
- 0 0 1.5000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.2620 0 0
- 0 0 0.2650 0 0
- 0 0 5.3000 0 0
- 0 0 0.2750 0 0
- 0 0 1.0500 0 0
- 0 0 1.3000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
22 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 210.0000 0 0
- 0 0 3.0000 0 0
- 0 0 0.2700 0 0
- 0 0 0.8100 0 0
- 0 0 0.6000 0 0
- 0 0 2.0000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.3230 0 0
- 0 0 0.2830 0 0
- 0 0 5.6500 0 0
- 0 0 0.2750 0 0
- 0 0 1.4000 0 0
- 0 0 1.5600 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
23 Membuat beton mutu f= 12,2 MPa (K 150) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 799.0000 0 0
- 0 0 299.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
24 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 315.0000 0 0
- 0 0 20.0000 0 0
- 0 0 4.5000 0 0
- 0 0 0.1500 0 0
- 0 0 0.4000 0 0
- 0 0 0.8100 0 0
- 0 0 2.0000 0 0
- 0 0 3.5000 0 0
- 0 0 4.0000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.4030 0 0
- 0 0 0.3530 0 0
- 0 0 7.0500 0 0
- 0 0 0.2750 0 0
- 0 0 2.1000 0 0
- 0 0 1.6500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
25 Membuat balok beton bertulang (200 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 210.0000 0 0
- 0 0 16.0000 0 0
- 0 0 3.0000 0 0
- 0 0 0.1400 0 0
- 0 0 0.3200 0 0
- 0 0 0.8100 0 0
- 0 0 1.6000 0 0
- 0 0 2.8000 0 0
- 0 0 3.2000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.3330 0 0
- 0 0 0.3180 0 0
- 0 0 6.3500 0 0
- 0 0 0.2750 0 0
- 0 0 1.4000 0 0
- 0 0 1.6500 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
26 Membuat kolom beton bertulang (150 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 157.5000 0 0
- 0 0 32.0000 0 0
- 0 0 2.2500 0 0
- 0 0 0.1200 0 0
- 0 0 0.3200 0 0
- 0 0 0.8100 0 0
- 0 0 1.6000 0 0
- 0 0 2.8000 0 0
- 0 0 3.2000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.2650 0 0
- 0 0 0.2650 0 0
- 0 0 5.3000 0 0
- 0 0 0.2750 0 0
- 0 0 1.0500 0 0
- 0 0 1.3000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
27 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 157.5000 0 0
- 0 0 24.0000 0 0
- 0 0 2.2500 0 0
- 0 0 0.1600 0 0
- 0 0 0.2400 0 0
- 0 0 0.8100 0 0
- 0 0 1.6000 0 0
- 0 0 2.8000 0 0
- 0 0 3.2000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.2620 0 0
- 0 0 0.2650 0 0
- 0 0 0.5300 0 0
- 0 0 0.2750 0 0
- 0 0 1.0500 0 0
- 0 0 1.3000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
28 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 210.0000 0 0
- 0 0 14.0000 0 0
- 0 0 3.0000 0 0
- 0 0 0.1050 0 0
- 0 0 0.2500 0 0
- 0 0 0.8100 0 0
- 0 0 1.2000 0 0
- 0 0 2.5000 0 0
- 0 0 3.0000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.3230 0 0
- 0 0 0.2830 0 0
- 0 0 5.6500 0 0
- 0 0 0.2750 0 0
- 0 0 1.4000 0 0
- 0 0 1.5600 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
29 Membuat kolom praktis beton bertulang (11 x 11) cm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 3.0000 0 0
- 0 0 0.4500 0 0
- 0 0 0.0020 0 0
- 0 0 0.0090 0 0
- 0 0 1.2000 0 0
- 0 0 0.0100 0 0
- 0 0 0.0060 0 0
- 0 0 4.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0060 0 0
- 0 0 0.0090 0 0
- 0 0 0.1800 0 0
- 0 0 0.0200 0 0
- 0 0 0.0200 0 0
- 0 0 0.0200 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
30 Membuat ring balok beton bertulang (10 x 15) cm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 3.6000 0 0
- 0 0 0.0500 0 0
- 0 0 0.0030 0 0
- 0 0 0.0150 0 0
- 0 0 1.2000 0 0
- 0 0 0.0200 0 0
- 0 0 0.0090 0 0
- 0 0 5.5000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.0150 0 0
- 0 0 0.2970 0 0
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100),
31 m3 0 Permen PUPR Nomor 28/PRT/M/2016
slump (3-6) cm, w/c = 0,87
A BAHAN
- 0 0 200.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 893.0000 0 0
- 0 0 230.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0200 0 0
- 0 0 0.0600 0 0
- 0 0 1.2000 0 0
- 0 0 0.2000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu f = 14,5 MPa (K 175), slump (120 ±20)
32 m3 0 Permen PUPR Nomor 28/PRT/M/2016
mm, w/c = 0,66
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 760.0000 0 0
- 0 0 326.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu f= 16,9 MPa (K 200), slump (120 ± 20)
33 m3 0 Permen PUPR Nomor 28/PRT/M/2016
mm, w/c = 0,61
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 731.0000 0 0
- 0 0 352.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu f = 19,3 MPa (K 225), slump (120 ±
34 m3 0 Permen PUPR Nomor 28/PRT/M/2016
20) mm, w/c = 0,58
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 698.0000 0 0
- 0 0 371.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu f= 21,7 MPa (K 250), slump (120 ± 20)
35 m3 0 Permen PUPR Nomor 28/PRT/M/2016
mm, w/c = 0,56
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 692.0000 0 0
- 0 0 384.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu f = 24,0 MPa (K 275), slump (120 ±
36 20) mm, w/c = 0,53 m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 684.0000 0 0
- 0 0 406.0000 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 20.00 % 0
TOTAL HARGA 0
C ALAT
RINCIAN VOLUME

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO URAIAN PEKERJAAN JUMLAH PANJANG LEBAR TINGGI LUAS VOLUME TOTAL VOLUME SATUAN
A PEKERJAAN PERSIAPAN
A.1 Pemasangan bekisting untuk balok m2
A.2 Pemasangan bekisting untuk dinding m2
A.3 Pemasangan bekisting untuk kolom m2
A.4 Membuat ring balok beton bertulang (10 x 15) cm m1
A.5 Membuat PVC Waterstop lebar 230 mm - 320 mm m1
A.6 Pemasangan bekisting untuk pondasi m2
A.7 Membuat sloof beton bertulang (200 kg besi + bekisting) m3
A.8 Pemasangan bekisting untuk tangga m2
A.9 Pemasangan bekisting untuk sloof m2
A.10 Pemasangan bekisting untuk lantai m2
B PEKERJAAN STRUKTURAL
Membuat beton mutu f = 19,3 MPa (K 225), slump (120 ± 20)
B.1 m3
mm, w/c = 0,58
B.2 Membuat balok beton bertulang (200 kg besi + bekisting) m3
Membuat beton mutu f = 24,0 MPa (K 275), slump (120 ± 20)
B.3 m3
mm, w/c = 0,53
B.4 Membuat beton mutu f= 12,2 MPa (K 150) m3
Membuat beton mutu f= 21,7 MPa (K 250), slump (120 ± 20)
B.5 m3
mm, w/c =beton
Membuat 0,56 mutu f = 14,5 MPa (K 175), slump (120 ±20)
B.6 m3
mm, w/c = 0,66
B.7 Membuat beton mutu f= 9,8 MPa (K 125) m3
B.8 Membuat beton kedap air dengan strorox - 100 m3
Membuat beton mutu f= 16,9 MPa (K 200), slump (120 ± 20)
B.9 m3
mm, w/c =beton
Membuat 0,61 mutu fc = 26,4 MPa (K 300), slump (120 ±
B.10 m3
20) mm, w/c = 0,52
C PEKERJAAN ARSITEKTURAL
Membuat beton mutu fc = 28,8 MPa (K 325), slump (120 ±
C.1 m3
20) mm, w/c
Membuat = 0,49
beton mutu fc = 31,2 MPa (K 350), slump (120 ±
C.2 m3
20) mm, w/c = 0,48
C.3 Membuat dinding beton bertulang (200 kg besi + bekisting) m3
C.4 Membuat kolom beton bertulang (150 kg besi + bekisting) m3
C.5 Membuat beton mutu fc = 7,4 MPa (K 100) m3
Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100),
C.6 m3
slump (3-6) cm, w/c = 0,87
C.7 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3
C.8 Membuat dinding beton bertulang (150 kg besi + bekisting) m3
C.9 Membuat kolom beton bertulang (300 kg besi + bekisting) m3
C.10 Membuat kolom praktis beton bertulang (11 x 11) cm m1
D PEKERJAAN MEP
D.1 Pemasangan jembatan untuk pengecoran beton m2
D.2 Pemasangan kabel presstressed polos/strands kg
D.3 Pemasangan PVC Waterstop lebar 150 mm m1
D.4 Pemasangan PVC Waterstop lebar 200 mm m1
D.5 Pemasangan jaring kawat baja (wiremesh) kg
D.6 Pembesian dengan besi polos atau besi ulir kg
RENCANA ANGGARAN BIAYA

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO URAIAN PEKERJAAN TOTAL VOLUME SATUAN HARGA SATUAN HARGA %


A 0 0 0
A.1 0 0 0 0 0 0
A.2 0 0 0 0 0 0
A.3 0 0 0 0 0 0
A.4 0 0 0 0 0 0
A.5 0 0 0 0 0 0
A.6 0 0 0 0 0 0
A.7 0 0 0 0 0 0
A.8 0 0 0 0 0 0
A.9 0 0 0 0 0 0
A.10 0 0 0 0 0 0
B 0 0 0
B.1 0 0 0 0 0 0
B.2 0 0 0 0 0 0
B.3 0 0 0 0 0 0
B.4 0 0 0 0 0 0
B.5 0 0 0 0 0 0
B.6 0 0 0 0 0 0
B.7 0 0 0 0 0 0
B.8 0 0 0 0 0 0
B.9 0 0 0 0 0 0
B.10 0 0 0 0 0 0
C 0 0 0
C.1 0 0 0 0 0 0
C.2 0 0 0 0 0 0
C.3 0 0 0 0 0 0
C.4 0 0 0 0 0 0
C.5 0 0 0 0 0 0
C.6 0 0 0 0 0 0
C.7 0 0 0 0 0 0
C.8 0 0 0 0 0 0
C.9 0 0 0 0 0 0
C.10 0 0 0 0 0 0
D 0 0 0
D.1 0 0 0 0 0 0
D.2 0 0 0 0 0 0
D.3 0 0 0 0 0 0
D.4 0 0 0 0 0 0
D.5 0 0 0 0 0 0
D.6 0 0 0 0 0 0
JUMLAH HARGA 0 100.00
PPN 10.00 % 0
TOTAL HARGA 0
REKAPITULASI ANGGARAN BIAYA

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO URAIAN PEKERJAAN HARGA %


A 0 0 0
B 0 0 0
C 0 0 0
D 0 0 0
JUMLAH HARGA 0 100.00
PPN 10.00 % 0
TOTAL HARGA 0
DIBULATKAN 0

0
REKAPITULASI BAHAN

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN BAHAN VOLUME SATUAN MERK SPESIFIKASI SUMBER JUMLAH HARGA %
JUMLAH HARGA 0 100.00
REKAPITULASI UPAH

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN UPAH VOLUME SATUAN MERK SPESIFIKASI SUMBER JUMLAH HARGA %
JUMLAH HARGA 0 100.00
REKAPITULASI ALAT

NAMA PROYEK RUMAH BELAJAR


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN ALAT VOLUME SATUAN MERK SPESIFIKASI SUMBER JUMLAH HARGA %
JUMLAH HARGA Rp 0.00 0.00