RINCIAN BAHAN

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN BAHAN SATUAN HARGA DASAR MERK SPESIFIKASI SUMBER


Acacia Supasleek Close Coupled Toilet CL23075- PT American Standard Indonesia
1 6DACTCBT unit Rp 10,500,000.00 American Standard Dual Flush 2.6/4L CrystalSleek Slo
2 Active W/H Lavatory WT CL0955I-6DACTLW unit Rp 1,605,500.00 American Standard Active W/H Lavatory WT PT American Standard Indonesia
3 Air liter Rp 5.03 Standar Standar Estimator.id
Assesoris (perkuatan, las dll) rangka hollow
4 ls Rp 35,181.31 Standar Standar Estimator.id
partisi dinding dan plafon per m2
5 Baja ringan canai dingin C75 kg Rp 19,275.81 Standar 0.75 TCT, Panjang 6m (Berat 5.1kg)IKK BPS 2022
6 Bak cuci piring unit Rp 226,165.57 Standar Stainless Stell IKK BPS 2022
7 Bata merah buah Rp 1,005.18 AT Standar IKK BPS 2022
8 Batu belah m3 Rp 309,595.54 Standar Standar IKK BPS 2022
9 Baut atap baja ringan buah Rp 1,005.18 Standar 1,6 cm IKK BPS 2022
10 Besi beton (polos/ulir) kg Rp 13,527.66 Standar Dia 12mm (12m) polos (SNI) IKK BPS 2022
11 Besi Hollow galvalum 20/40 m1 Rp 29,150.23 Standar Standar Estimator.id
12 Besi Hollow galvalum 40/40 m1 Rp 9,046.62 Standar Standar Estimator.id
13 Closet duduk unit Rp 1,088,610.28 INA Keramik IKK BPS 2022
14 Dolken kayu Ø 8-10/400 cm batang Rp 52,269.38 Standar Standar IKK BPS 2022
15 Dynabol dia 12 x 120 mm buah Rp 6,533.67 Standar Standar Estimator.id
16 Elbow 5/8 buah Rp 867.47 Standar Standar Estimator.id
17 Engsel angin buah Rp 12,062.16 Standar Standar Estimator.id
18 Engsel kupu-kupu buah Rp 37,694.26 Standar 6 cm IKK BPS 2022
19 Engsel pintu/jendela set Rp 26,637.28 Standar Pintu IKK BPS 2022
20 Fitting Standard JIS Elbow (AW) 1" buah Rp 3,900.00 Rucika Ukuran 1" isi 80pcs /box PT Wahana Duta Jaya Rucika
21 Fitting Standard JIS Socket (AW) 1" buah Rp 3,100.00 Rucika Ukuran 1" isi 100pcs /box PT Wahana Duta Jaya Rucika
22 Kabel NYM 3x2,5 mm2 m1 Rp 23,786.59 Supreme Standar IKK BPS 2022
23 Kaca tebal 5 mm m2 Rp 105,141.86 Standar Bening IKK BPS 2022
24 Kawat beton kg Rp 22,013.45 Standar Standar IKK BPS 2022
25 Kayu balok 5/7 kelas II m3 Rp 7,553,212.08 Kamper Standar IKK BPS 2022
26 Kayu balok kelas II m3 Rp 10,407,804.51 Kamper ukuran 8/12 IKK BPS 2022
27 Kayu balok kelas III m3 Rp 5,697,068.84 Glugu ukuran 8/12 IKK BPS 2022
28 Kayu Papan kelas I m3 Rp 26,587,019.33 Jati Standar IKK BPS 2022
29 Kayu Papan kelas II m3 Rp 10,378,486.75 Kamper ukuran 2/20 IKK BPS 2022
30 Kayu papan kelas III m3 Rp 10,378,486.75 Kruing ukuran 2/20 IKK BPS 2022
31 Keramik 40x40 cm polished m2 Rp 58,702.53 Standar Motif IKK BPS 2022
32 keramik Dinding 20cm x 20cm buah Rp 3,015.54 Standar Standar Estimator.id
33 Kerikil m3 Rp 430,217.17 Standar 0.5 - 1 cm (mesin) IKK BPS 2022
34 Kerikil (Maks 30 mm) kg Rp 235.67 Standar Standar Estimator.id
35 Klem Pipa Listrik buah Rp 2,010.36 Standar Standar Estimator.id
36 Kran air buah Rp 32,165.77 Standar 3 / 4 " (galvanis) IKK BPS 2022
37 Kusen aluminium 3" m1 Rp 70,362.62 Standar Aluminium 3 " X 1 3/4" Estimator.id
38 Las dop listrik buah Rp 1,005.18 Standar Standar IKK BPS 2022
39 Lem Kayu/Karet kg Rp 36,186.49 Standar Standar IKK BPS 2022
40 List Plafon PVC m1 Rp 15,800.00 Indofon Ukuran: lebar 3 cm + 4 cm + 5 cm PT Indonesia Plafon Semesta
41 List plafon PVC m1 Rp 12,062.16 Standar Standar Estimator.id
42 Minyak bekisting liter Rp 10,051.80 Standar Standar IKK BPS 2022
43 Mongkok (Listrik) buah Rp 753.89 Standar Standar Estimator.id
44 Multiplek lembar Rp 115,595.74 Standar tebal 9 mm IKK BPS 2022
45 Paku biasa kg Rp 29,150.23 Standar 1 3/4 "- (reng kayu) IKK BPS 2022
46 Paku biasa 2" - 5" kg Rp 19,701.53 Standar Standar IKK BPS 2022
47 Pasir Beton kg Rp 262.06 Standar Standar IKK BPS 2022
48 Pasir Beton m3 Rp 300,548.91 Standar Standar IKK BPS 2022
49 Pasir Pasang m3 Rp 356,839.01 Standar Standar IKK BPS 2022
50 Pasir urug m3 Rp 332,714.68 Standar Standar IKK BPS 2022
51 Perlengkapan pasang sanitair % Standar Standar Estimator.id
52 Pipa listrik 5/8" batang Rp 10,453.88 power Standar IKK BPS 2022
53 Pipa PVC 3/4” m1 Rp 9,297.92 Rucika AW-4m IKK BPS 2022
54 Pipa PVC AW 3" m1 Rp 56,038.80 Rucika Tipe AW IKK BPS 2022
55 Pipa PVC Standard Tipe AW 3" m1 Rp 48,900.00 Rucika Ukuran 89mm Tipe AW. Panjang 4 m PT Wahana Duta Jaya Rucika
56 Pipa PVC Standard Tipe AW ¾" m1 Rp 7,925.00 Rucika Ukuran 26mm Tipe AW. Panjang 4 m PT Wahana Duta Jaya Rucika
57 Plafon PVC 10mm m2 Rp 99,250.00 Indofon Ukuran: lebar 20 cm, berat 2.66 kg PT Indonesia Plafon Semesta
58 Plafond PVC m2 Rp 71,367.80 Standar Standar Estimator.id
59 Rangka metal hollow 40.40.2 mm m1 Rp 12,160.77 Standar Standar IKK BPS 2022
PT American Standard Indonesia
60 Rapi C Squat AS CWR010N1-XXAWDST00 unit Rp 732,000.00 American Standard Rapi C Squat AS
61 Reng Canai Dingin m1 Rp 6,935.74 Standar Ukuran 0.45 IKK BPS 2022
62 Saklar (standar) buah Rp 57,295.28 Broco Engkel In Bouw IKK BPS 2022
63 Sealant karet untuk kaca kg Rp 150,777.05 Standar Standar Estimator.id
64 Sealant kusen alumunium tube Rp 37,995.82 Standar Standar IKK BPS 2022
65 Sealtape Listrik buah Rp 6,031.08 Standar Standar IKK BPS 2022
66 Semen portland kg Rp 1,759.07 Holcim 40 kg IKK BPS 2022
67 Seng gelombang p=2 meter lembar Rp 71,870.39 Standar Standar Estimator.id
68 Seng plat untuk nok atap lembar Rp 45,233.11 Standar Standar Estimator.id
69 Skrup/ Rivet buah Rp 703.63 Standar Standar IKK BPS 2022
70 Socket Pipa buah Rp 753.89 Standar Standar Estimator.id
71 Tanah Sirtu m3 Rp 252,300.26 Standar Standar IKK BPS 2022
72 TBA buah Rp 4,020.72 Rucika Standar IKK BPS 2022
73 Tee Doos buah Rp 16,082.89 Standar 20 mm/Clipsal IKK BPS 2022
74 Wall Tap Mono Faucet F20002G3-0GADY0000 buah Rp 358,000.00 American Standard Garden tap with rosette, Adaptor PT American Standard Indonesia
75 Wastafel unit Rp 548,828.45 INA Standar IKK BPS 2022
76 Waterdrain bak cuci piring buah Rp 60,310.82 Standar Standar Estimator.id
RINCIAN UPAH

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN UPAH SATUAN HARGA DASAR MERK SPESIFIKASI SUMBER


1 Kepala Tukang OH Rp 120,621.64 Standar Standar Estimator.id
2 Kepala Tukang Alumunium OH Rp 120,621.64 Standar Standar Estimator.id
3 Kepala Tukang Batu OH Rp 125,647.54 Standar Standar IKK BPS 2022
4 Kepala Tukang Besi OH Rp 117,606.10 Standar Standar IKK BPS 2022
5 Kepala Tukang Kayu OH Rp 130,673.44 Standar Standar IKK BPS 2022
6 Mandor OH Rp 130,673.44 Standar Standar IKK BPS 2022
7 Pekerja OH Rp 100,518.03 Standar Standar IKK BPS 2022
8 Tukang Alumunium OH Rp 110,569.83 Standar Standar Estimator.id
9 Tukang Batu OH Rp 115,595.74 Standar Standar IKK BPS 2022
10 Tukang Besi OH Rp 115,595.74 Standar Standar IKK BPS 2022
11 Tukang Kayu OH Rp 115,595.74 Standar Kasar IKK BPS 2022
RINCIAN ALAT

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN ALAT SATUAN HARGA DASAR MERK SPESIFIKASI SUMBER


1 Alat Rangka Atap Baja Canai Dingin set Rp 30,155.41 Standar Standar Estimator.id
RINCIAN HARGA SATUAN

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO NAMA KATEGORI SATUAN KOEFISIEN HARGA DASAR HARGA SATUAN SUMBER


1 Pemasangan bekisting untuk balok m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 2.0000 0 0
- 0 0 0.0180 0 0
- 0 0 0.0400 0 0
- 0 0 0.2000 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
2 Pengukuran dan pemasangan Bouwplank m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0120 0 0
- 0 0 0.0070 0 0
- 0 0 0.0200 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.0050 0 0
- 0 0 0.1000 0 0
- 0 0 0.1000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
3 Pembuatan gudang semen dan peralatan m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.7000 0 0
- 0 0 0.2100 0 0
- 0 0 0.0500 0 0
- 0 0 0.3000 0 0
- 0 0 0.0300 0 0
- 0 0 10.5000 0 0
- 0 0 1.5000 0 0
- 0 0 0.2500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.2000 0 0
- 0 0 0.0500 0 0
- 0 0 1.0000 0 0
- 0 0 2.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
4 Penggalian tanah biasa sedalam 1 m m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
B UPAH
- 0 0 0.0250 0 0
- 0 0 0.7500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
5 Pengurugan dengan pasir urug m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
6 Pengurugan sirtu padat m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0250 0 0
- 0 0 0.2500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
7 Pengurugan kembali galian tanah m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
B UPAH
- 0 0 0.0500 0 0
- 0 0 0.5000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
8 Pemasangan pondasi batu belah campuran 1SP : 5PP m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.2000 0 0
- 0 0 0.5440 0 0
- 0 0 136.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0750 0 0
- 0 0 0.0750 0 0
- 0 0 1.5000 0 0
- 0 0 0.7500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
9 Pemasangan batu kosong (anstamping) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.2000 0 0
- 0 0 0.4320 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0390 0 0
- 0 0 0.0390 0 0
- 0 0 0.7800 0 0
- 0 0 0.3900 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
10 Pembesian dengan besi polos atau besi ulir kg 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
- 0 0 0.0150 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0007 0 0
- 0 0 0.0004 0 0
- 0 0 0.0070 0 0
- 0 0 0.0070 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
11 Pemasangan bekisting untuk pondasi m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0400 0 0
- 0 0 0.1000 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0260 0 0
- 0 0 0.0260 0 0
- 0 0 0.5200 0 0
- 0 0 0.2600 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
12 Pemasangan bekisting untuk sloof m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0450 0 0
- 0 0 0.1000 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0260 0 0
- 0 0 0.0260 0 0
- 0 0 0.5200 0 0
- 0 0 0.2600 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
13 Pemasangan bekisting untuk kolom m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 2.0000 0 0
- 0 0 0.0150 0 0
- 0 0 0.0400 0 0
- 0 0 0.2000 0 0
- 0 0 0.3500 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0330 0 0
- 0 0 0.0330 0 0
- 0 0 0.6600 0 0
- 0 0 0.3300 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
14 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 210.0000 0 0
- 0 0 3.0000 0 0
- 0 0 0.2700 0 0
- 0 0 0.8100 0 0
- 0 0 0.6000 0 0
- 0 0 2.0000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.3230 0 0
- 0 0 0.2830 0 0
- 0 0 5.6500 0 0
- 0 0 0.2750 0 0
- 0 0 1.4000 0 0
- 0 0 1.5600 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
15 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 315.0000 0 0
- 0 0 20.0000 0 0
- 0 0 4.5000 0 0
- 0 0 0.1500 0 0
- 0 0 0.4000 0 0
- 0 0 0.8100 0 0
- 0 0 2.0000 0 0
- 0 0 3.5000 0 0
- 0 0 4.0000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.4030 0 0
- 0 0 0.3530 0 0
- 0 0 7.0500 0 0
- 0 0 0.2750 0 0
- 0 0 2.1000 0 0
- 0 0 1.6500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
16 Membuat balok beton bertulang (200 kg besi + bekisting) m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 210.0000 0 0
- 0 0 16.0000 0 0
- 0 0 3.0000 0 0
- 0 0 0.1400 0 0
- 0 0 0.3200 0 0
- 0 0 0.8100 0 0
- 0 0 1.6000 0 0
- 0 0 2.8000 0 0
- 0 0 3.2000 0 0
- 0 0 0.5400 0 0
- 0 0 336.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.3330 0 0
- 0 0 0.3180 0 0
- 0 0 6.3500 0 0
- 0 0 0.2750 0 0
- 0 0 1.4000 0 0
- 0 0 1.6500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
17 Membuat kolom praktis beton bertulang (11 x 11) cm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 3.0000 0 0
- 0 0 0.4500 0 0
- 0 0 0.0020 0 0
- 0 0 0.0090 0 0
- 0 0 1.2000 0 0
- 0 0 0.0100 0 0
- 0 0 0.0060 0 0
- 0 0 4.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0060 0 0
- 0 0 0.0090 0 0
- 0 0 0.1800 0 0
- 0 0 0.0200 0 0
- 0 0 0.0200 0 0
- 0 0 0.0200 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100),
18 slump (3-6) cm, w/c = 0,87 m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 200.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 893.0000 0 0
- 0 0 230.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0200 0 0
- 0 0 0.0600 0 0
- 0 0 1.2000 0 0
- 0 0 0.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
Membuat beton mutu f= 16,9 MPa (K 200), slump (120 ± 20)
19 m3 0 Permen PUPR Nomor 28/PRT/M/2016
mm, w/c = 0,61
A BAHAN
- 0 0 215.0000 0 0
- 0 0 1,000.0000 0 0
- 0 0 731.0000 0 0
- 0 0 352.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0280 0 0
- 0 0 0.0830 0 0
- 0 0 1.6500 0 0
- 0 0 0.2750 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
20 Pemasangan kusen pintu alluminium m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.1000 0 0
- 0 0 0.0600 0 0
- 0 0 2.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0043 0 0
- 0 0 0.0021 0 0
- 0 0 0.0430 0 0
- 0 0 0.0430 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
21 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0190 0 0
- 0 0 0.0150 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0200 0 0
- 0 0 0.0010 0 0
- 0 0 0.2000 0 0
- 0 0 0.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x
22 60 cm, plafon m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
- 0 0 4.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0350 0 0
- 0 0 0.0180 0 0
- 0 0 0.3500 0 0
- 0 0 0.3500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
Pemasangan pasang kuda-kuda baja ringan dan reng atap
23 genteng metal/biasa m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 3.7200 0 0
- 0 0 28.0000 0 0
- 0 0 2.0000 0 0
- 0 0 5.4000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.0500 0 0
- 0 0 0.2000 0 0
- 0 0 0.4500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
- 0 0 0.1000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu
24 campuran 1 SP : 5 PP m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 70.0000 0 0
- 0 0 0.0450 0 0
- 0 0 9.6800 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.0150 0 0
- 0 0 0.3000 0 0
- 0 0 0.1000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
25 Pemasangan plesteran 1SP : 4PP tebal 15 mm m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0240 0 0
- 0 0 6.2400 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0150 0 0
- 0 0 0.0150 0 0
- 0 0 0.3000 0 0
- 0 0 0.1500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
26 Pemasangan plint ubin granit ukuran 10cm x 40cm m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0030 0 0
- 0 0 1.1400 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0090 0 0
- 0 0 0.0050 0 0
- 0 0 0.0900 0 0
- 0 0 0.0900 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
27 Pemasangan lantai keramik ukuran 20cm x 20cm m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0450 0 0
- 0 0 10.4000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0350 0 0
- 0 0 0.0350 0 0
- 0 0 0.7000 0 0
- 0 0 0.3500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
28 Pemasangan dinding keramik 20cm x 20cm m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 26.5000 0 0
- 0 0 0.0180 0 0
- 0 0 9.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0450 0 0
- 0 0 0.0450 0 0
- 0 0 0.9000 0 0
- 0 0 0.4500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
29 Pemasangan Plafond PVC m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
- 0 0 18.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0250 0 0
- 0 0 0.0750 0 0
- 0 0 0.1500 0 0
- 0 0 0.2500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
30 Pemasangan list Plafond PVC m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0500 0 0
- 0 0 6.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0050 0 0
- 0 0 0.0050 0 0
- 0 0 0.1000 0 0
- 0 0 0.0500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
31 Pemasangan genteng beton m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0300 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.0100 0 0
- 0 0 0.2000 0 0
- 0 0 0.1000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
32 Pemasangan nok genteng beton m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0500 0 0
- 0 0 0.0320 0 0
- 0 0 10.8000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0200 0 0
- 0 0 0.0200 0 0
- 0 0 0.4000 0 0
- 0 0 0.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
Pembuatan dan pemasangan kusen pintu dan kusen
33 jendela, kayu kelas I m3 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.1000 0 0
- 0 0 1.0000 0 0
- 0 0 1.2500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 2.1000 0 0
- 0 0 0.3500 0 0
- 0 0 7.0000 0 0
- 0 0 21.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
Pembuatan dan pemasangan daun pintu panel, kayu kelas I
34 m2 0 Permen PUPR Nomor 28/PRT/M/2016
atau II
A BAHAN
- 0 0 0.0400 0 0
- 0 0 0.5000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.3000 0 0
- 0 0 0.0500 0 0
- 0 0 1.0000 0 0
- 0 0 3.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
35 Pembuatan dan pemasangan pintu dan jendela kaca, kayu m2 0 Permen PUPR Nomor 28/PRT/M/2016
kelas I atau II
A BAHAN
- 0 0 0.0240 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.2400 0 0
- 0 0 0.0400 0 0
- 0 0 0.8000 0 0
- 0 0 2.4000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
36 Pemasangan kaca tebal 5 mm m2 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.1000 0 0
- 0 0 0.0500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0150 0 0
- 0 0 0.0008 0 0
- 0 0 0.0150 0 0
- 0 0 0.1500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
37 Pemasangan engsel pintu bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0150 0 0
- 0 0 0.0008 0 0
- 0 0 0.0150 0 0
- 0 0 0.1500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
38 Pemasangan engsel jendela kupu-kupu bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.0005 0 0
- 0 0 0.0100 0 0
- 0 0 0.1000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
39 Pemasangan engsel angin bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0200 0 0
- 0 0 0.0005 0 0
- 0 0 0.1000 0 0
- 0 0 0.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
40 Pemasangan closet duduk/monoblock bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
- 0 0 6.0000 Rp 11,588,610.28 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0100 0 0
- 0 0 0.1600 0 0
- 0 0 3.3000 0 0
- 0 0 1.1000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
41 Pemasangan bak cuci piring stainlessteel bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
- 0 0 1.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0300 0 0
- 0 0 0.0150 0 0
- 0 0 0.0300 0 0
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
42 Pemasangan kran diameter ½” atau 3/4” bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
- 0 0 0.0250 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0400 0 0
- 0 0 0.0050 0 0
- 0 0 0.0100 0 0
- 0 0 0.4000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
43 Pemasangan closet jongkok porslen bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 0.0100 0 0
- 0 0 1.0000 0 0
- 0 0 6.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.1500 0 0
- 0 0 0.1600 0 0
- 0 0 1.0000 0 0
- 0 0 1.5000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
44 Pemasangan pipa PVC tipe AW diameter 3/4” m1 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 35.0000 Rp 20,667.50 0
- 0 0 1.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0060 0 0
- 0 0 0.0020 0 0
- 0 0 0.0360 0 0
- 0 0 0.0600 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
45 Pemasangan wastafel bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.2000 0 0
- 0 0 0.0100 0 0
- 0 0 12.0000 Rp 2,599,316.95 0
- 0 0 6.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.1500 0 0
- 0 0 0.0600 0 0
- 0 0 1.2000 0 0
- 0 0 1.4500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
46 Pemasangan titik lampu bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 4.0000 0 0
- 0 0 24.0000 0 0
- 0 0 24.0000 0 0
- 0 0 3.0000 0 0
- 0 0 1.0000 0 0
- 0 0 0.2830 0 0
- 0 0 1.0000 0 0
- 0 0 3.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0300 0 0
- 0 0 0.0300 0 0
- 0 0 0.1500 0 0
- 0 0 0.1500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
47 Memasang Instalasi Penerangan bh 0 Permen PUPR Nomor 28/PRT/M/2016
A BAHAN
- 0 0 1.0000 0 0
- 0 0 11.0000 0 0
- 0 0 3.0000 0 0
- 0 0 2.0000 0 0
- 0 0 2.7500 0 0
- 0 0 0.2500 0 0
- 0 0 2.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0300 0 0
- 0 0 0.0300 0 0
- 0 0 0.1500 0 0
- 0 0 0.1500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
AHSP SNI Data Pembaharuan dan
48 Buangan Tanah Galian m3 0 Penyesuaian 2017-2018
A BAHAN
B UPAH
- 0 0 0.0400 0 0
- 0 0 0.2000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
AHSP SNI Data Pembaharuan dan
49 Pemasangan Lantai Keramik 40x40cm Polished m2 0 Penyesuaian 2017-2018
A BAHAN
- 0 0 1.0500 0 0
- 0 0 1.6200 0 0
- 0 0 0.0450 0 0
- 0 0 11.3800 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0350 0 0
- 0 0 0.0350 0 0
- 0 0 0.7000 0 0
- 0 0 0.3500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
AHSP SNI Data Pembaharuan dan
50 Pemasangan Talang Pembuluh Pipa PVC 3 m 0 Penyesuaian 2017-2018
A BAHAN
- 0 0 0.3000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0810 0 0
- 0 0 0.1350 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
AHSP SNI Data Pembaharuan dan
51 Pas. Plafond Kalsiboard 6 mm Rangka Hollow m2 0
Penyesuaian 2017-2018
A BAHAN
- 0 0 2.0000 0 0
- 0 0 0.7500 0 0
- 0 0 4.0000 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
B UPAH
- 0 0 0.0250 0 0
- 0 0 0.0750 0 0
- 0 0 0.1500 0 0
- 0 0 0.2500 0 0
JUMLAH HARGA 0
JASA 30.00 % 0
TOTAL HARGA 0
C ALAT
RINCIAN VOLUME

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO URAIAN PEKERJAAN JUMLAH PANJANG LEBAR TINGGI LUAS VOLUME TOTAL VOLUME SATUAN
A PEKERJAAN PERSIAPAN
A.1 Pengukuran dan pemasangan Bouwplank m1
A.2 Pembuatan gudang semen dan peralatan m2
A.3 Penggalian tanah biasa sedalam 1 m m3
A.4 Buangan Tanah Galian m3
A.5 Pengurugan kembali galian tanah m3
A.6 Pengurugan dengan pasir urug m3
A.7 Pengurugan sirtu padat m3
B PEKERJAAN STRUKTURAL
Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100),
B.1 m3
slump (3-6) cm, w/c = 0,87
B.2 Pemasangan batu kosong (anstamping) m3
B.3 Pemasangan pondasi batu belah campuran 1SP : 5PP m3
B.4 Membuat kolom praktis beton bertulang (11 x 11) cm m1
B.5 Membuat kolom beton bertulang (300 kg besi + bekisting) m3
B.6 Pemasangan bekisting untuk sloof m2
B.7 Pemasangan bekisting untuk kolom m2
B.8 Membuat balok beton bertulang (200 kg besi + bekisting) m3
B.9 Pemasangan bekisting untuk pondasi m2
B.10 Membuat sloof beton bertulang (200 kg besi + bekisting) m3
B.11 Pemasangan bekisting untuk balok m2
B.12 Pekerjaan balok beton
B.12.1 Pembesian dengan besi polos atau besi ulir kg
B.12.2 Pemasangan bekisting untuk balok m2
Membuat beton mutu f= 16,9 MPa (K 200), slump (120 ± 20)
B.12.3 m3
mm, w/c = 0,61
C PEKERJAAN ARSITEKTURAL
C.1 Pemasangan Lantai Keramik 40x40cm Polished m2
C.2 Pemasangan lantai keramik ukuran 20cm x 20cm m2
C.3 Pemasangan dinding keramik 20cm x 20cm m2
C.4 Pemasangan plint ubin granit ukuran 10cm x 40cm m1
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu
C.5 m2
campuran 1 SP : 5 PP
C.6 Pemasangan plesteran 1SP : 4PP tebal 15 mm m2
C.7 Pemasangan list Plafond PVC m1
C.8 Pemasangan Plafond PVC m2
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x
C.9 m2
60 cm, plafon
C.10 Pas. Plafond Kalsiboard 6 mm Rangka Hollow m2
C.11 Pemasangan kusen pintu alluminium m1
Pembuatan dan pemasangan kusen pintu dan kusen jendela,
C.12 m3
kayu kelas I dan pemasangan daun pintu panel, kayu kelas I
Pembuatan
C.13 m2
atau II
Pembuatan dan pemasangan pintu dan jendela kaca, kayu
C.14 m2
kelas I atau II
C.15 Pemasangan kaca tebal 5 mm m2
C.16 Pemasangan engsel angin bh
C.17 Pemasangan engsel pintu bh
C.18 Pemasangan engsel jendela kupu-kupu bh
C.19 Pemasangan genteng beton m2
Pemasangan pasang kuda-kuda baja ringan dan reng atap
C.20 m2
genteng metal/biasa
C.21 Pemasangan nok genteng beton m1
C.22 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm m1
C.23 Pemasangan Talang Pembuluh Pipa PVC 3 m
D PEKERJAAN MEP
D.1 Memasang Instalasi Penerangan bh
D.2 Pemasangan titik lampu bh
D.3 Pemasangan pipa PVC tipe AW diameter 3/4” m1
D.4 Pemasangan kran diameter ½” atau 3/4” bh
D.5 Pemasangan bak cuci piring stainlessteel bh
D.6 Pemasangan wastafel bh
D.7 Pemasangan closet jongkok porslen bh
D.8 Pemasangan closet duduk/monoblock bh
RENCANA ANGGARAN BIAYA

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO URAIAN PEKERJAAN TOTAL VOLUME SATUAN HARGA SATUAN HARGA %


A 0 0 0
A.1 0 0 0 0 0 0
A.2 0 0 0 0 0 0
A.3 0 0 0 0 0 0
A.4 0 0 0 0 0 0
A.5 0 0 0 0 0 0
A.6 0 0 0 0 0 0
A.7 0 0 0 0 0 0
B 0 0 0
B.1 0 0 0 0 0 0
B.2 0 0 0 0 0 0
B.3 0 0 0 0 0 0
B.4 0 0 0 0 0 0
B.5 0 0 0 0 0 0
B.6 0 0 0 0 0 0
B.7 0 0 0 0 0 0
B.8 0 0 0 0 0 0
B.9 0 0 0 0 0 0
B.10 0 0 0 0 0 0
B.11 0 0 0 0 0 0
B.12 0
B.12.1 0 0 0 0 0 0
B.12.2 0 0 0 0 0 0
B.12.3 0 0 0 0 0 0
C 0 0 0
C.1 0 0 0 0 0 0
C.2 0 0 0 0 0 0
C.3 0 0 0 0 0 0
C.4 0 0 0 0 0 0
C.5 0 0 0 0 0 0
C.6 0 0 0 0 0 0
C.7 0 0 0 0 0 0
C.8 0 0 0 0 0 0
C.9 0 0 0 0 0 0
C.10 0 0 0 0 0 0
C.11 0 0 0 0 0 0
C.12 0 0 0 0 0 0
C.13 0 0 0 0 0 0
C.14 0 0 0 0 0 0
C.15 0 0 0 0 0 0
C.16 0 0 0 0 0 0
C.17 0 0 0 0 0 0
C.18 0 0 0 0 0 0
C.19 0 0 0 0 0 0
C.20 0 0 0 0 0 0
C.21 0 0 0 0 0 0
C.22 0 0 0 0 0 0
C.23 0 0 0 0 0 0
D 0 0 0
D.1 0 0 0 0 0 0
D.2 0 0 0 0 0 0
D.3 0 0 0 0 0 0
D.4 0 0 0 0 0 0
D.5 0 0 0 0 0 0
D.6 0 0 0 0 0 0
D.7 0 0 0 0 0 0
D.8 0 0 0 0 0 0
JUMLAH HARGA 0 100.00
PPN 10.00 % 0
TOTAL HARGA 0
REKAPITULASI ANGGARAN BIAYA

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO URAIAN PEKERJAAN HARGA %


A 0 0 0
B 0 0 0
C 0 0 0
D 0 0 0
JUMLAH HARGA 0 100.00
PPN 10.00 % 0
TOTAL HARGA 0
DIBULATKAN 0

0
REKAPITULASI BAHAN

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN BAHAN VOLUME SATUAN MERK SPESIFIKASI SUMBER JUMLAH HARGA %
JUMLAH HARGA 0 100.00
REKAPITULASI UPAH

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN UPAH VOLUME SATUAN MERK SPESIFIKASI SUMBER JUMLAH HARGA %
JUMLAH HARGA 0 100.00
REKAPITULASI ALAT

NAMA PROYEK RUMAH TINGGAL SEDERHANA


LOKASI KALIMANTAN SELATAN
TAHUN 2022

NO. URAIAN ALAT VOLUME SATUAN MERK SPESIFIKASI SUMBER JUMLAH HARGA %
JUMLAH HARGA Rp 0.00 0.00