1
B3.2 Cat Plafond m2
1 Cat jotaplast briliant white pail 1.5 Rp 650,000 Rp 958,230
2 Amplas m' 5.4 Rp 10,000 Rp 54,000
B3.3 List Plafond m'
1 List Profil Gypsum 5/5 btg 36.0 Rp 10,000 Rp 360,000
2 Compound Gypsumboard kg 0.8 Rp 65,000 Rp 53,998
B4 PEKERJAAN PENGECATAN
B4.1 Dinding Dalam m2
1 Cat dasar pail 1.0 Rp 650,000 Rp 650,000
2 Top coat pail 2.0 Rp 650,000 Rp 1,300,000
3 Amplas m2 10.0 Rp 10,000 Rp 100,000
B4.2 Dinding Luar Putih m2
1 Cat dasar Pail 0.5 Rp 830,000 Rp 415,000
2 Top coat gln 1.0 Rp 1,100,000 Rp 1,100,000
3 Amplas M2 0.0 Rp 8,000 Rp 114
B5 ATAP
B5.1
Rangka Atap m2
1 Main Trus C75-75 m1 45.0 Rp 110,000 Rp 4,950,000
2 Roof Bottom/Reng R 33-0.45 M1 45.0 Rp 50,000 Rp 2,250,000
3 Self drilling screw dia 6 x 20 mm (truss Screw) BH 280.0 Rp 300 Rp 84,000
4 Self drilling screw dia 4 x 16 mm (Roof Bottom Screw) BH 280.0 Rp 300 Rp 84,000
B5.2
Penambahan Penutup Atap m2
2 Genteng Metal m2 35.0 Rp 85,000 Rp 2,975,000
B5.3
Lapis Penutup Atap m2
1 Alumunium foil roll 1.4 Rp 375,000 Rp 525,000
TOTAL B Rp 31,449,587
C PEKERJAAN LAIN LAIN
C1 PINTU
Pintu pvc bh 2.0 Rp 650,000 Rp 1,300,000
C2 JENDELA
Kusen Pintu set 2.0 Rp 850,000 Rp 1,700,000
TOTAL C Rp 3,000,000
D PLUMBING
D1 INSTALASI AIR BERSIH
D1.2 INSTALASI AIR PANAS
1 Pipa Air panas m' 6.0 Rp 28,000 Rp 168,000
2 Keni air panas bh 2.0 Rp 35,000 Rp 70,000
3 dop drat bh 2.0 Rp 5,000 Rp 10,000
D1.3 INSTALASI KE JARINGAN RUMAH Rp -
1 Pipa Air Bersih 1/2"(AW) btg 1.5 Rp 29,000 Rp 43,500
2 Keni 1/2" bh 4.0 Rp 3,000 Rp 12,000
3 Tee 1/2" bh 3.0 Rp 2,500 Rp 7,500
4 Keni Drat Kuningan Dalam 1/2" bh 3.0 Rp 6,000 Rp 18,000
D1.4 AKSESORIS Rp -
1 Closet duduk bh 1.0 Rp 850,000 Rp 850,000
2 Tee konektor bh 1.0 Rp 59,170 Rp 59,170
3 Jet shower bh 1.0 Rp 101,010 Rp 101,010
4 Shower Kamar mandi (SHS-567 dan TL-020 Wasser) bh 1.0 Rp 575,575 Rp 575,575
5 Zink bh 1.0 Rp 450,000 Rp 450,000
6 Kran zink bh 1.0 Rp 75,000 Rp 75,000
7 Floor drain bh 1.0 Rp 60,000 Rp 60,000
8 Kran taman bh 1.0 Rp 68,000 Rp 68,000
9 Kran cuci bh 1.0 Rp 120,000 Rp 120,000
10 sealtape bh 5.0 Rp 4,500 Rp 22,500
11 lem isarplas bh 2.0 Rp 65,000 Rp 130,000
D2 INSTALASI AIR KOTOR
D2.1 INSTALASI AIR KOTOR CAIR + HUJAN
1 PIPA 2" btg 1.0 Rp 117,000 Rp 117,000
2 Keni 2" bh 4.0 Rp 14,000 Rp 56,000
D2.2 INSTALASI AIR KOTOR PADAT Rp -
1 PIPA 4" btg 0.5 Rp 380,000 Rp 190,000
2 knee 4" bh 3.0 Rp 25,000 Rp 75,000
TOTAL D Rp 3,278,255
2
E ELEKTRIKAL
E2 INSTALASI LISTRIK DARI SUMBER KE STOP KONTAK
1 Kabel 3 x 2,5 mm² roll 0.6 Rp 532,000 Rp 297,920
2 Conduit pipa PVC dia ⅝" C btg 4.0 Rp 13,000 Rp 52,000
3 Isolasi Listrik bh 0.6 Rp 10,000 Rp 5,600
4 Tee dos bh 4.0 Rp 1,600 Rp 6,400
5 Inbow doos bh 4.0 Rp 2,600 Rp 10,400
E3 INSTALASI LISTRIK DARI SUMBER KE AC
1 Kabel 3 x 2,5 mm² roll 0.1 Rp 532,000 Rp 74,480
2 Conduit pipa PVC dia ⅝" C btg 1.0 Rp 13,000 Rp 13,000
3 Isolasi Listrik bh 0.1 Rp 10,000 Rp 1,400
4 Tee dos bh 1.0 Rp 1,600 Rp 1,600
5 Inbow doos bh 1.0 Rp 2,600 Rp 2,600
E3 INSTALASI LISTRIK DARI SUMBER KE LAMPU
1 Kabel 2 x 1,5 mm² roll 0.4 Rp 420,000 Rp 168,000
2 Conduit pipa PVC dia ⅝" C btg 4.0 Rp 13,000 Rp 52,000
3 Isolasi Listrik bh 0.4 Rp 10,000 Rp 4,000
4 Tee dos bh 4.0 Rp 1,600 Rp 6,400
5 Inbow doos bh 4.0 Rp 2,600 Rp 10,400
E4 INSTALASI LISTRIK DARI SUMBER KE SAKLAR
1 Kabel 2 x 1,5 mm² roll 0.4 Rp 291,000 Rp 116,400
2 Kabel 3 x 1,5 mm² roll 1.6 Rp 540,000 Rp 864,000
3 Conduit pipa PVC dia ⅝" C btg 2.0 Rp 13,000 Rp 26,000
4 Isolasi Listrik bh 0.4 Rp 10,000 Rp 4,000
5 Tee dos bh 2.0 Rp 1,600 Rp 3,200
6 Inbow doos bh 2.0 Rp 2,600 Rp 5,200
E5 INSTALASI LISTRIK TELEPON DAN TV
1 Kabel TV roll 0.5 Rp 120,000 Rp 60,000
2 Conduit pipa PVC dia ⅝" C btg 2.0 Rp 13,000 Rp 26,000
3 Isolasi Listrik bh 0.5 Rp 8,000 Rp 4,000
4 Tee dos bh 2.0 Rp 1,600 Rp 3,200
5 Inbow doos bh 2.0 Rp 2,600 Rp 5,200
E6 AKSESORIS
1 Box MCB bh 1.0 Rp 43,000 Rp 43,000
2 Exhaust fan bh 1.0 Rp 240,000 Rp 240,000
3 Fuse MCB (kapasitas 10A) bh 3.0 Rp 22,000 Rp 66,000
4 fitting lampu bh 4.0 Rp 30,000 Rp 120,000
5 Lampu Taman Outdor bh 2.0 Rp 75,000 Rp 150,000
6 Stop kontak bh 5.0 Rp 14,000 Rp 70,000
7 Stop kontak AC bh 1.0 Rp 60,000 Rp 60,000
8 Saklar Ganda bh 2.0 Rp 23,000 Rp 46,000
TOTAL E Rp 2,618,400
TOTAL A + B + C + D + E Rp 50,005,919
TOTAL JASA Rp 15,000,000
TOTAL MATERIAL DAN JASA Rp 65,005,919
HARGA PER M2 Rp 2,166,864