RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN SALURAN IRIGASI


LOKASI : DESA TONGGORISA KECAMATAN PALIBELO
TAHUN ANGGARAN : 2021
KODE HARGA JML.HARGA
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA SATUAN (Rp.) (Rp)
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 1.00 Unit Ls 268,620.00 268,620.00
2 Pengukuran dan Pemasangan Bouwplank 1.00 Unit A. 2.2.1.4. 615,120.00 615,120.00
3 Pembersihan Lokasi/Finishing 1.00 Unit A. 2.2.1.9. 401,500.00 401,500.00
1,285,240.00
II. PEKERJAAN TANAH
1 Menggali Tanah Lumpur Sedalam 1 m' 22.50 M³ A. 3.2.1.6 140,167.50 3,153,768.75
2 Urugan Pasir 7.50 M³ A. 3.2.1.11 259,215.00 1,944,112.50
5,097,881.25
III. PEKERJAAN PASANGAN
1 Pek. Pasangan Batu 1 Pc : 5 Ps 81.00 M³ A. 3.2.1.3 885,489.00 71,724,609.00
2 Pek. Plesteran 1 Pc : 3 Psr 90.00 M² A. 4.4.2.3 82,720.97 7,444,887.12
3 Pek. Siar 1 Pc : 2 Psr 360.00 M² A. 4.4.2.26 77,637.12 27,949,363.20
4 Pek. Acian 90.00 M² A. 4.4.2.27 48,163.50 4,334,715.00
111,453,574.32
REKAPITULASI
PEKERJAAN : PEMBANGUNAN SALURAN IRIGASI
LOKASI : DESA TONGGORISA KECAMATAN PALIBELO
TAHUN ANGGARAN : 2021

NO URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN 1,285,240.00


II. PEKERJAAN TANAH 5,097,881.25
III. PEKERJAAN PASANGAN 111,453,574.32
a. Real Cost 117,836,695.57
b. PPN (10% x a) 11,783,669.56
c. Honor Tim Pelaksana Kegiatan dan Tim Penerima Hasil Pekerjaan 1,900,000.00
d. ATK dan Penggandaan 500,000.00
e. Perencanaan Tekhnis (C x 2%) 2,588,515.00
f. Pengawasan Tekhnis / Sertifikasi Teknis (C x 2%) 2,588,515.00
c. Jumlah Total 137,197,395.13
d. Pembulatan 137,197,000.00

TERBILANG SERATUS TIGA PULUH TUJU JUTA SERATUS SEMBILAN PULUH TUJU RIBU RUPIAH

. Bima 18 Mei 2021

Diperiksa Oleh: Tim Perencana Teknis


…………………………………………………

1. ……………………. ............................

2. ……………………………….. ............................

…………………………………………. 3. ……………………………….. ............................


NIP. …………………………………….

Mengetahui : Disetujui Oleh:


.

………………………………. ………………………………………
NIP…………………………. NIP. ……………………………….
BREAK DOWNS PERHITUNGAN VOLUME/BILL QUNTITY
PROVINSI : NUSA TENGGARA BARAT PEKERJAAN : PEMBANGUNAN SALURAN IRIGASI
KABUPATEN : BIMA LOKASI : SO LADERU
KECAMATAN : PALIBELO VOLUME : PANJANG RENCANA = 150 METER
DESA : TONGGORISA SUMBER DANA : DDS
TAHUN ANGGARAN : 2021

PEMBANGUNAN SALURAN IRIGASI

No. SKETSA PERHITUNGAN VOLUME Vol. Sat.

I. PEKERJAAN TANAH
1. Pekerjaan Galian Tanah Galian Tanah Biasa
V1 = P x L x T x Ʃ
= 150.00 x 0.3 x 0.25 x 2
= 22.50 m³ 22.50 m³

Volume Total Galian Tanah Biasa 22.50 m³


2. Urugan Pasir 2. Urugan Pasir
V1 = P x L x T x Ʃ
= 150.00 x 1 x 0.05 x 1
= 7.50 m³ 7.50 m³
Volume Total Galian Tanah Biasa 7.50 m³

II. PEKERJAAN PASANGAN


1. Memasang Batu Kali Camp. 1 pc : 5 ps Pasangan Batu untuk Pondasi Saluran
V1 = P x L x T x Ʃ
= 150.00 x 0.25 x 1.1 x 1
= 41.25 m³ 41.25 m³

Pasangan Batu untuk Pondasi Saluran


V2 = P x L x T x Ʃ
= 150.00 x 0.25 x 0.9 x 1
= 33.75 m³ 33.75 m³

Pasangan Batu untuk Lantai Saluran


V2 = 150.00 x 0.4 x 0.1 x 1
= 6.00 m³ 6.00 m³

Volume Total Pasangan Batu Camp. 1 pc : 5 ps 81.00 m³


III. PEKERJAAN PLESTERAN
1. Memasang Plesteran Camp. 1 pc : 5 ps Luas = ( a + b ) x P x Ʃ
L1 = 0.20 + 0.1 x 150.00 x 2
= 0.3 x 150.00 x 2
= 90.00 m² 90.00 m²

Luas Total Plesteran Camp. 1 pc : 5 ps 90.00 m²

2. Memasang Acian Total Luas Acian = Luas Plesteran 90.00 m²

3. Finishing Siar Adukan Camp. 1 pc : 2 ps Luas Finishing Siar Adukan Dinding


L = P x L x Ʃ
= 150.00 x 1.20 x 2
= 360.00 m² 360.00 m²

Luas Total Finishing Siar Adukan Camp. 1 pc : 2 ps 360.00 m²

Tonggorisa, 18 Mei 2021


Difasilitasi Oleh : Dibuat Oleh :
Pendamping Desa Teknik Infrasturktur Kader Teknis Desa/Perencana,
Kecamatan Palibelo,

( RITA RAMIATUN, ST ) ( ROSMANSYIR, ST )


REKAPITULASI HARGA SATUAN PEKERJAAN
Tahun Anggaran 2020

HARGA TOTAL
NO URAIAN PEKERJAAN SAT KODE ANALISA KET
(RP)
1 2 3 4 7 8

DIVISI 1. PEKERJAAN PERSIAPAN


1 Pengukuran dan Pemasangan Bouwplank Unit A. 2.2.1.4. 615,120.00

2 Pembersihan Lokasi/Finishing Unit A. 2.2.1.9. 401,500.00

3 Papan Nama Kegiatan Unit Ls 268,620.00

DIVISI 2. PEKERJAAN TANAH


1 Menggali Tanah Lumpur Sedalam 1 m' M³ A. 3.2.1.6 140,167.50

2 Mengurug dengan Pasir Urug M³ A. 3.2.1.11 259,215.00

DIVISI 3. PEKERJAAN PASANGAN


1 Memasang Pondasi Batu Kali 1Pc : 5Ps M³ A. 3.2.1.3 885,489.00

DIVISI 4.4 PEKERJAAN PLESTERAN


1 Plesteran Dinding Tebal 15 mm 1Pc : 3Ps M² A. 4.4.2.3 82,720.97

2 Finishing Siar Adukan 1Pc : 2Ps M² A. 4.4.2.26 77,637.12

3 Memasang Acian M² A. 4.4.2.27 48,163.50


DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
Memasang Papan Nama Kegiatan
Ls

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL


NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 0.5000 OH 100,000.00 50,000.00

SUB JUMLAH ( Rp ) 50,000.00


JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
MATERIAL
VOLUME SATUAN ( Rp ) ( Rp )

Usuk 5/7 2.000 Batang 40,600.00 81,200.00


Reng 3/5 2.000 Batang 27,000.00 54,000.00
Paku 0.5000 Kg 18,000.00 9,000.00
Baliho 1.0000 Buah 50,000.00 50,000.00

SUB JUMLAH ( Rp ) 194,200.00


JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 244,200.00
VOLUME Overhead 24,420.00
QUANTITY 1.00 Ls Harga Satuan Pekerjan 244,200.00 Per 268,620.00
DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
1 Pengukuran dan Pemasangan Bouwplank
A. 2.2.1.4.
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL
NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 0.100 100,000.00 10,000.00


Tukang Kayu 0.100 165,000.00 16,500.00
Kepala Tukang Kayu 0.010 170,000.00 1,700.00
Mandor 0.005 165,000.00 825.00

SUB JUMLAH ( Rp ) 29,025.00


MATERIAL JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
VOLUME SATUAN ( Rp ) ( Rp )

Kaso - Kaso ( 5 x 7 ) cm 0.012 M3 8,500,000.00 102,000.00


Paku Panjang 1 - 3 cm 0.020 Kg 7,500.00 150.00
Balok Kayu Kls III 0.007 M3 2,900,000.00 20,300.00

SUB JUMLAH ( Rp ) 122,450.00


PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah 151,475.00
VOLUME Overhead 15,147.50
QUANTITY : 1.00 M' Harga Satuan Pekerjan 166,622.50

DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE


2 Pembersihan Lapangan
A. 2.2.1.9.
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL
NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 0.100 100,000.00 10,000.00


Mandor 0.050 165,000.00 8,250.00

SUB JUMLAH ( Rp ) 18,250.00


MATERIAL JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
VOLUME SATUAN ( Rp ) ( Rp )

-
SUB JUMLAH ( Rp ) -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 18,250.00
VOLUME Overhead 1,825.00
QUANTITY : 1.00 M² Harga Satuan Pekerjan 20,075.00
DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
1 Menggali Tanah Lumpur Sedalam 1 m'
A. 3.2.1.6
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL
NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020
63700

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 1.200 100,000.00 120,000.00


Mandor 0.045 165,000.00 7,425.00

89,300.00 127,425.00
JUMLAH SAT KODE 89,300.00 BIAYA SUB TOTAL
MATERIAL
VOLUME 83,600.00 ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
JUMLAH HARI KODE JAM 243,500.00 BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA HARGA ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 127,425.00
VOLUME Overhead 12,742.50
QUANTITY 1.00 M³ Harga Satuan Pekerjan 140,167.50
DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
1 Mengurug dengan Pasir Urug
A. 3.2.1.11
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL
NTB 52 BIMA 06 DISIAPKAN OLEH : A. 3.2.1.6

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 0.300 100,000.00 30,000.00


Mandor 0.010 165,000.00 1,650.00

SUB JUMLAH ( Rp ) 31,650.00


JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
MATERIAL
VOLUME SATUAN ( Rp ) ( Rp )

Pasir Urug 1.200 M3 170,000.00 204,000.00

SUB JUMLAH ( Rp ) 204,000.00


JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 235,650.00
VOLUME Overhead 23,565.00
QUANTITY 1.00 M³ Harga Satuan Pekerjan 259,215.00
DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
1 Plesteran Dinding Tebal 15 mm 1Pc : 3Ps
A. 4.4.2.3

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL


NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )
Pekerja 0.3000 100,000.00 30,000.00
Tukang Batu 0.1500 160,000.00 24,000.00
Kepala Tukang Batu 0.0150 165,000.00 2,475.00
Mandor 0.0150 165,000.00 2,475.00

SUB JUMLAH ( Rp ) 58,950.00


JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
MATERIAL
VOLUME SATUAN ( Rp ) ( Rp )

Semen Portland/PC SNI (@50 Kg 0.1555 Zak 69,000.00 10,730.88


Pasir Pasang 0.0230 M3 240,000.00 5,520.00

SUB JUMLAH ( Rp ) 16,250.88


JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 75,200.88
VOLUME Overhead 7,520.09
QUANTITY : 1.00 M² Harga Satuan Pekerjan 75,200.88 Per 82,720.97

DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE


1 Finishing Siar Adukan 1Pc : 2Ps
A. 4.4.2.26
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL
NTB 52 BIMA 06 #REF! 02 Januari 2020

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )
Pekerja 0.3000 100,000.00 30,000.00
Tukang Batu 0.1500 160,000.00 24,000.00
Kepala Tukang Batu 0.0150 165,000.00 2,475.00
Mandor 0.0150 165,000.00 2,475.00

SUB JUMLAH ( Rp ) 58,950.00


JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
MATERIAL
VOLUME SATUAN ( Rp ) ( Rp )
Semen Portland/PC SNI (@50 Kg 0.1268 Zak 69,000.00 8,749.20
Pasir Pasang 0.0120 M3 240,000.00 2,880.00

SUB JUMLAH ( Rp ) 11,629.20


JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 70,579.20
VOLUME Overhead 7,057.92
QUANTITY : 1.00 M² Harga Satuan Pekerjan 70,579.20 Per 77,637.12
DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
2 Memasang Acian
A. 4.4.2.27
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL
NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 0.2000 100,000.00 20,000.00


Tukang Batu 0.1000 160,000.00 16,000.00
Kepala Tukang Batu 0.0100 165,000.00 1,650.00
Mandor 0.0100 165,000.00 1,650.00

SUB JUMLAH ( Rp ) 39,300.00


JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
MATERIAL
VOLUME SATUAN ( Rp ) ( Rp )

Semen Portland/PC SNI (@50 Kg 0.0650 Zak 69,000.00 4,485.00

SUB JUMLAH ( Rp ) 4,485.00


JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 43,785.00
VOLUME Overhead 4,378.50
QUANTITY : 1.00 M² Harga Satuan Pekerjan 43,785.00 Per 48,163.50
DINAS PKP KAB. BIMA ANALISA BIAYA PEKERJAAN KODE
1 Memasang Pondasi Batu Kali 1Pc : 5Ps
A. 3.2.1.3

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL


NTB 52 BIMA 06 DINAS PKP KAB. BIMA 02 Januari 2020

JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp ) ( Rp )

Pekerja 1.500 100,000.00 150,000.00


Tukang Batu 0.750 160,000.00 120,000.00
Kepala Tukang Batu 0.075 165,000.00 12,375.00
Mandor 0.075 165,000.00 12,375.00

SUB JUMLAH ( Rp ) 294,750.00


JUMLAH SAT KODE HARGA BIAYA SUB TOTAL
MATERIAL
VOLUME SATUAN ( Rp ) ( Rp )

Batu Kali Belah 1.200 M3 160,000.00 192,000.00


Semen Portland/PC SNI (@50 Kg) 2.720 Zak 69,000.00 187,680.00
Pasir Pasang 0.544 M3 240,000.00 130,560.00

SUB JUMLAH ( Rp ) 510,240.00


JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
Jumlah TOTAL (Rp) 804,990.00
VOLUME Overhead 80,499.00
QUANTITY : 1.00 M³ Harga Satuan Pekerjan 804,990.00 Per 885,489.00
HARGA SATUAN BAHAN
TAHUN ANGGARAN 2020
A. BAHAN PASANGAN
1 Pasir Beton M3 240,000
2 Pasir Pasang M3 240,000
3 Pasir Urug M3 170,000
4 Tanah Urug Biasa M3 90,000
5 Tanah Urug Pilihan M3 100,000
6 Semen Portland/PC SNI (@50 Kg) Zak 69,000
7 Batu Kali m3 160,000
L. BAHAN PAKU

No. Uraian Satuan Harga Satuan (Rp) Keterangan


1 Paku Panjang 1 - 3 cm Kg 18,000
2 Paku Panjang 4 - 6 cm Kg 18,000
3 Paku Panjang 7 - 12 cm Kg 18,000
4 Paku Seng Kg 22,000
5 Paku Asbes Kg 35,000
6 Sekrup/Piles 1.5 cm Doz 20,000
7 Sekrup/Piles 2.0 cm Doz 30,000
8 Paku Sumbat Buah 2,000
9 Besi Beugel/Baut (Kuda-kuda) Buah 35,000
10 Paku Anti Karat Kg 21,000
N. BAHAN TAMBAHAN

No. Uraian Satuan Harga Satuan (Rp) Keterangan


1 Kayu Bakar m3 270,000
2 Bensin Liter 6,900
3 Minyak Tanah Liter 7,900
HARGA SATUAN UPAH
TAHUN ANGGARAN 2020

No Uraian Satuan Harga Satuan (Rp) Keterangan

1 Buruh Tak Terampil OH 100,000


2 Buruh Semi Terampil OH 120,000
3 Buruh Terampil OH 130,000
4 Pekerja OH 100,000
5 Mandor OH 165,000
6 Tukang Batu OH 160,000
7 Kepala Tukang Batu OH 165,000
8 Tukang Profil Batu / Kayu OH 165,000
9 Tukang Kayu OH 165,000
10 Kepala Tukang Kayu OH 170,000
11 Tukang Besi Beton OH 160,000
12 Kepala Tukang Besi Beton OH 165,000
13 Tukang Las OH 160,000
14 Kepala Tukang Las OH 165,000
15 Tukang Politur OH 150,000
16 Tukang Cat OH 150,000
17 Kepala Tukang Cat OH 155,000
18 Kepala Tukang Pipa OH 155,000
19 Tukang Pipa OH 150,000
20 Pemecah Batu OH 100,000
21 Jaga Malam OH 110,000
22 Penggergaji OH 100,000
23 Penggosok Tegel OH 100,000
24 Pengisi Bronjong OH 150,000
25 Penganyam Bronjong OH 120,000
26 Kepala Penganyam Bronjong OH 125,000
27 Pemasak Aspal OH 100,000
28 Sopir OH 160,000
29 Pembantu Sopir OH 110,000
30 Mekanik OH 160,000
31 Mekanik Pembantu OH 110,000
32 Operator Alat Ringan OH 160,000
33 Operator Alat Berat Terampil OH 350,000
34 Operator Alat Berat Semi Terampil OH 260,000
35 Pembantu Operator OH 160,000
36 Operator Pompa TL OH 110,000
37 Tukang Listrik OH 160,000
38 Kepala Tukang Listrik OH 165,000
39 Sopir Material OH 160,000