Anda di halaman 1dari 22

Data Chatmen area Statsiun

LUAS KEBON AGUNG (131) = 10.936


LUAS STATION GUNUNG SARI (136) = 18.755
LUAS STASIUN WONOREJO (136B) = 36.281
Σ luas = 65.972

Koefiseian Thiesen
LUAS KEBON AGUNG (131) = 0.17
LUAS STATION GUNUNG SARI (136) = 0.28
LUAS STASIUN WONOREJO (136B) = 0.55
Σ Koef = 1.00
Σ Koef = 100.00
Data hujan Pengamatan 10 tahun

Tabel 3. Data hujan pengamatan 10 tahun

NO TAHUN STASION NO
PENGAMATAN 131 136 136B
1 2000 0 110 115
2 2001 90 117 200
3 2002 113 105 115
4 2003 98 75 76
5 2004 103 92 85
6 2005 114 105 90
7 2006 110 98 153
8 2007 96 100 71
9 2008 81 85 68
10 2009 78 76 98

Tabel 4. hujan rata-rata metode aritmatik

TAHUN nΣ Urutan
NO PENGAMATAN Σ Ri/N Registrasi
i=1
1 2000 75.00 135
2 2001 135.67 120.33
3 2002 111.00 111
4 2003 83.00 103
5 2004 93.33 93.33
6 2005 103.00 89
7 2006 120.33 84
8 2007 89.00 83
9 2008 78.00 78
10 2009 84.00 75
972.33

R= 97.2333333333 mm/24jam
Tabel 5. Hasil perhitungan tinggi hujan rata-rata metode thiessen poligon

NO TAHUN STASION NO JUMLAH


PENGAMATAN 131 136 136B
1 2000 0.00 31.27 63.24 94.52
2 2001 14.92 33.26 109.99 158.17
3 2002 18.73 29.85 63.24 111.83
4 2003 16.25 21.32 41.80 79.36
5 2004 17.07 26.15 46.75 89.97
6 2005 18.90 29.85 49.50 98.24
7 2006 18.23 27.86 84.14 130.24
8 2007 15.91 28.43 39.05 83.39
9 2008 13.43 24.16 37.40 74.99
10 2009 12.93 21.61 53.89 88.43

Σ = 1009.13

R Metode Thiessen Poligon

Ř= 1009.13 = 100.91 mm/24 jam


10

Tabel 12. Perhitungan masa ulang T = 100 tahun metode gumbel


jika Ri menggunakan Thiesen poligon

xi
Urutan
Ri (R i)2
Registrasi
1 158.17 25017.7489
2 130.24 16962.4576
3 111.83 12505.9489
4 98.24 9651.0976
5 94.52 8934.0304
6 89.97 8094.6009
7 88.43 7819.8649
8 83.39 6953.8921
9 79.36 6298.0096
10 74.99 5623.5001

Σ 1009.14 107861.15
Gumbel 1

X=Ř = 1009.14 = 100.91 mm/24 jam


10

( Ř )2 = = 10183.635396
( Ři )2= = 10786.1151
σ =Ѵ = 25.8731886966669 669.42189
n= = 10
hal 37 (Reduce men) Yn = = 0.4952
(Tabel SD )Sn = = 0.9496
T 100 :
(T/T-1)= 1.1111
ln (T/T-1) = 0.1054
ln * ln * (T/T-1)= -2.2504
YT = - ln * ln * (T/T-1) = 2.2504

K= YT - Yn = 1.7289
Sn
RT = R 100 = Ř + σ *K = 145.645757432142 mm / etmal

Gumbel 2

Ř= 1009.14 = 100.91 mm / 24 jam


10
( Ř )2 = = 10183.635396
( Ři )2= = 10786.1151
σx = Ѵ = 25.8731886966669
n= = 10
hal 37(Reduce men) Yt = = 0.4271
(Tabel SD ) σy = = 0.9757

T 100 :
(T/T-1)= 1.1111
ln (T/T-1) = 0.1054
ln * ln * (T/T-1)= -2.2504
YT = - ln * ln * (T/T-1) = 2.2504
K= YT - Yn = 1.8126
Sn
1/a = σx / σy = 26.5175655392712
b = Ř - (1/a) * Yt = 89.588348
RT = R 100 = ((1/a) * Yt) + b = 149.26261

Q 100 CARA Hss NAKAYASU

Dari perhitungan terdahulu, metode gumbel di dapat :


R 100 = 149.263 mm / etmal

maka curah hujan efektif selama 5 jam :


R 24 = α * Rt = 0.6 * R 100 = 89.558 mm

Tinggi hujan jam-jamnya

Jam ke 1= R = 0.58 * R 24 = 51.943 mm 1.000


ke 2 = R = 0.16 * R 24 = 14.329 mm
ke 3 = R = 0.10 * R 24 = 8.956 mm
ke 4 = R = 0.08 * R 24 = 7.165 mm
ke 5 = R = 0.08 * R 24 = 7.165 mm

Panjang sungai (L) = 15.858 Km


Luas DAS (A) = 65.972 Km2
α= 2.5
Re = 1 mm

Tg = 0,4 + 0,058 * L
= 1.319764 jam

Tr = diambil : 1 jam
Tp = Tg + (0,8*Tr)
= 2.119764 jam

T 0.3= α * Tg = 3.29941 jam

Q max = A * Re
3,6 (0,3*Tp+T0.3)
= 4.657 m3/ detik

Menghitung debit (Q) tiap-tiap jam (t)


a. Kurva naik
0 < t < Tp ------> 0 < t < 2.119764 Jam
Q = (t / Tp)2,4 *Q max

Untuk t = 0.5 Jam


Q= 0.145 m3/ detik
Untuk t = 1 Jam
Q= 0.767 m3/ detik
Untuk t = 1.5 Jam
Q= 2.031 m3/ detik
Untuk t = 2 Jam
Q= 4.050 m3/ detik
Untuk t = 2.5 Jam
Q= 6.919 m3/ detik
Untuk t = 2.119764 Jam
Q= 4.657 m3/ detik

b. Kurva turun
1). Saat Tp < t < Tp +T0,3 --> 2.119764 < t < 5.419174

u = (t-Tp) / T0.3
Q = 0,3u * Q max

Untuk t = 3 Jam
Q= 3.377 m3/ detik
Untuk t = 3.5 Jam
Q= 2.814 m3/ detik
Untuk t = 4 Jam
Q= 2.345 m3/ detik
Untuk t = 4.5 Jam
Q= 1.954 m3/ detik
Untuk t = 5 Jam
Q= 1.628 m3/ detik
2). Saat Tp+T0,3 < t < Tp+T0,3 +1.5*T0,3 ---> 5.419174 < t < 10.368289

u = ((t-Tp) + (0,5 * T0,3 ))/ (1,5 * T0,3)


Q = 0,3u * Q max

Untuk t = 6 Jam
Q= 1.213 m3/ detik
Untuk t = 7 Jam
Q= 0.951 m3/ detik
Untuk t = 8 Jam
Q= 0.746 m3/ detik
Untuk t = 9 Jam
Q= 0.585 m3/ detik
Untuk t = 10 Jam
Q= 0.458 m3/ detik

3). Saat t > Tp+T0.3 + 1.5. T0.3 ----------> t > 10.368289

u = ((t-Tp) + (0,5 * T0,3 ))/ (2 * T0,3)


Q = 0,3u * Q max

Untuk t = 11 Jam
Q= 0.682 m3/ detik
Untuk t = 12 Jam
Q= 0.568 m3/ detik
Untuk t = 13 Jam
Q= 0.473 m3/ detik
Untuk t = 14 Jam
Q= 0.394 m3/ detik
Untuk t = 15 Jam
Q= 0.329 m3/ detik
Untuk t = 16 Jam
Q= 0.274 m3/ detik
Untuk t = 17 Jam
Q= 0.228 m3/ detik
Untuk t = 18 Jam
Q= 0.190 m3/ detik
Untuk t = 19 Jam
Q= 0.158 m3/ detik
Untuk t = 20 Jam
Q= 0.132 m3/ detik
Untuk t = 21 Jam
Q= 0.110 m3/ detik
Untuk t = 22 Jam
Q= 0.092 m3/ detik
Untuk t = 23 Jam
Q= 0.076 m3/ detik
Untuk t = 24 Jam
Q= 0.064 m3/ detik
Maka unit hidrograf satuan sintetik metode NAKAYASU ditabelkan sbb :

HASIL PERHITUNGAN HIDROGRAF SATUAN SINTETIK


BERDASARKAN METODE DR NAKAYASU

JAM KE t UNIT HIDROGRAF SATUAN SINTETIK


Q (M3/dt)
0 0.000
1 0.767
2 2.031
3 3.377
4 2.345
5 1.628
6 0.000
7 0.000
8 1.213
9 0.951
10 0.746
11 0.585
12 0.458
13 0.000
14 0.000
15 0.000
16 0.000
17 0.682
18 0.568
19 0.473
20 0.394
21 0.329
22 0.274
23 0.228
24 0.190
Km2
Km2
Km2
Km2

%
Urutan
Registrasi
158.17
130.24
111.83
98.24
94.52
89.97
88.43
83.39
79.36
74.99

mm/24 jam

xi-X (xi-x)^2

57.26 3278.249536
29.33 860.014276
10.92 119.159056
-2.67 7.150276
-6.39 40.883236
-10.94 119.771136
-12.48 155.850256
-17.52 307.090576
-21.55 464.574916
-25.92 672.053776

6024.797040
mm/24 jam

mm / etmal

mm / 24 jam
mm
/ etmal
K
PERHITUNGAN DEBIT RENCANA
ANALISA HIDROGRAF DENGAN METODE NAKAYASU
DENGAN PERIODE ULANG T = 100 TAHUN

HSS Tinggi Hujan (mm)


jam ke Q(m3/dt) 51.943388574972 14.329210641 8.9557566509 7.164605321 7.16460532
0 0 0
1 0.767335 39.857975 0
2 4.050018 210.371651 10.995303345 0
3 3.377367 175.431909 58.033558983 6.8720645909 0
4 2.344779 121.795755 48.395009418 36.270974364 5.497651673 0
5 1.627891 84.558197 33.59882892 30.246880886 29.01677949 5.49765167
6 1.212918 63.003066 23.326399114 20.999268075 24.19750471 29.0167795
7 0.951 49.398155 17.38015622 14.578999446 16.79941446 24.1975047
8 0.745641 38.731094 13.627077218 10.862597637 11.66319956 16.7994145
9 0.584627 30.367484 10.684439839 8.5169232615 8.69007811 11.6631996
10 0.458382 23.809915 8.3772369407 6.6777748992 6.813538609 8.69007811
11 0.681869 35.418608 6.5682525074 5.2357730879 5.342219919 6.81353861
12 0.56815 29.511635 9.770650356 4.1051578171 4.18861847 5.34221992
13 0.473396 24.589803 8.141140561 6.1066564725 3.284126254 4.18861847
14 0.394445 20.488814 6.7833938602 5.0882128506 4.885325178 3.28412625
15 0.328661 17.071772 5.6520866968 4.2396211626 4.070570281 4.88532518
16 0.273848 14.224611 4.7094543951 3.5325541855 3.39169693 4.07057028
17 0.228177 11.852287 3.9240305199 2.943408997 2.826043348 3.39169693
18 0.190123 9.875610 3.2695964818 2.452519075 2.354727198 2.82604335
19 0.158415 8.228596 2.7243063221 2.0434978011 1.96201526 2.3547272
20 0.131995 6.856264 2.2699574636 1.7026914513 1.634798241 1.96201526
21 0.109981 5.712804 1.8913830815 1.4187234148 1.362153161 1.63479824
22 0.091639 4.760045 1.5759458133 1.182114426 1.134978732 1.36215316
23 0.076356 3.966184 1.3131159048 0.9849661333 0.945691541 1.13497873
24 0.063622 3.304720 1.094119712 0.8206974405 0.787972907 0.94569154
25 0.9116468241 0.68382482 0.656557952 0.78797291
26 0.569779265 0.547059856 0.65655795
27 0.455823412 0.54705986
28 0.45582341

DEBIT BANJIR MAKSIMAL


ASU

Hidrograf
aliran m3/dt

39.857975
221.36695465841
240.33753271443
211.95939029101
182.9183377589
160.54301768581
122.35422975182
91.683383288267
69.922124677087
54.368543898099
59.378391664192
52.918281096469
46.310344500586
40.529872418481
35.919375500236
29.928886426012
24.937467041855
20.778496520442
17.313142386329
14.425726086313
12.019861471344
10.015237286903
8.3449362667044
6.9532013371687
3.0400025031102
1.7733970734438
1.0028832680465
0.4558234120367

340.739266
Tabel. Kapasitas Eksisting
Bentuk Kedalaman Lebar Lebar
Ruas Penampang m Saluran (h) Dasar (b1) Atas (b2)
m m m
3 4 5 6 7 8
43 - 44 Segi Empat 0 0.75 1.2 1.2
44 - 46a Trapesium 0.3 1 1.5 2.1
45 - 46 Segi Empat 0 0.8 1.5 1.5
46b - 47 Trapesium 0.3 1.3 2.2 2.98

Tabel. Debit Rencana Ruas Saluran pada Sub Catchment Jemur Andayani

Luas Kemiringan
L
Saluran Ruas Catchment (A) C Lahan (S)
km2 m
1 2 3 4 5 6
Saluran T 43 - 44 0.076 0.6 0.0003 320
Saluran S 44 - 46a 0.076 0.6 0.0003 100
Saluran T 45 - 46 0.069 0.6 0.0003 214
Saluran S 46b - 47 0.145 0.6 0.0003 21

Tabel. Jumlah Penduduk Kecamatan Wonocolo

Luas Wilayah Jumlah Penduduk Jumlah Penduduk Laju Pertumbuhan


Kelurahan
km2 Tahun 2000 Tahun 2010 Penduduk
Siwalanke 1.98 19164 18349 -0.4409751
Jemur Won 1.64 22905 21673 -0.560673
Margorejo 0.65 11181 9751 -1.3820161
Bendul Me 0.77 15449 16104 0.4231648
Sidosermo 1.07 12961 13371 0.3172139
Jumlah 6.11 81660 79248 -1.6432855
Sumber: Wonocolo dalam angka 2010

Jemur andayani termasuk kedalam kelurahan Jemur Wonosari


Kepadatan penduduk kelurahan Jemur Wonosari tahun 2010:
= 21673 Jiwa : 1,64 km2
= 13215 Jiwa/ km2
Tabel. Analisa Kapasitas Saluran dengan Debit Rancangan

Q air hujan (Qah) Q air kotor (Qak) Qtotal Q yang


Saluran Ruas T = 10 tahun T = 10 tahun Qah + Qak membebani saluran
m3/det m3/detik m3/detik m3/detik
1 2 3 7 8 9
Saluran T 43 - 44 0.906 0.0002738 0.906107 0.906107
Saluran S 44 - 46a 1.651 0.0002738 1.650925 2.557032
Saluran T 45 - 46 1.012 0.0002486 1.012365 1.012365
Saluran S 46b - 47 7.045 0.0005224 7.045453 3.569397
Luas Keliling Jari-jari Kemiringan Kecepatan
Penampang (A)Basah (P) n Hidrolis (R) Dasar Saluran (S) (Vs)
m2 m m m/det
9 10 11 12 13 14
0.9 2.7 0.023 0.33 0.0004 0.42
1.8 3.59 0.023 0.50 0.0005 0.61
1.2 3.1 0.023 0.39 0.0004 0.46
3.37 4.91 0.023 0.69 0.0005 0.75

Intensitas Q rencana (Qah)


tc
Hujan (I) T = 10 tahun
Akar (S) jam mm/jam m3/det
7 8 9 10
0.0173205081 0.63 71.51 0.906
0.0173205081 0.26 130.31 1.651
0.0173205081 0.46 88.01 1.012
0.0173205081 0.08 291.51 7.045

Tabel. Perhitungan Debit air Buangan Domestik (Air Kotor) Qak

Luas Jumlah Jumlah Qak total


Saluran Ruas Catchment (A) Penduduk (Po) Penduduk (Pn) T = 10 tahun
km2 Jiwa T = 10 tahun m3/detik/km2
1 2 3 4 5 6
Saluran Tersie 43 - 44 0.076 1004 949 0.003602872899
Saluran Sekund44 - 46a 0.076 1004 949 0.003602872899
Saluran Tersie 45 - 46 0.069 912 862 0.003602872899
Saluran Sekund46b - 47 0.145 1916 1811 0.003602872899
Jumlah 0.366
Kapasitas Saluran
Eksisting (Q) Analisa
m3/det
10 11
0.375 Meluap
1.102 Meluap
0.552 Meluap
2.541 Meluap
Kapasitas
Saluran (Q)
m3/det
15
0.37
1.10
0.55
2.54

Qak
T = 10 tahun
m3/detik
7
0.00027382
0.00027382
0.00024860
0.00052242
ALFA 0.655938089172634 A 24
TC 3.09249494710992 L 10
1+3.7x10 7.79788073509631E+074 S 0.005
t^2+15 34443.6899924413
2.26395044689101E+070
A/12 0.903602003609845 185.5497
1/BETA 2.04571015988412E+070
BETA 2.04081632653061 0.49

153.75

Anda mungkin juga menyukai